Status of JCM Implementation in Cambodia December 8, 2014 SUM Thy, Director of Climate Change Department, Ministry of Environment, CAMBODIA
12

Status of JCM Implementation in Cambodia€¦ · Status of JCM Implementation in Cambodia December 8, 2014 SUM Thy, Director of Climate Change Department, Ministry of Environment,

Jun 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Status of JCM Implementation in Cambodia€¦ · Status of JCM Implementation in Cambodia December 8, 2014 SUM Thy, Director of Climate Change Department, Ministry of Environment,

Status of JCM Implementation in Cambodia

December 8, 2014SUM Thy, Director of Climate Change Department, Ministry of

Environment, CAMBODIA

Page 2: Status of JCM Implementation in Cambodia€¦ · Status of JCM Implementation in Cambodia December 8, 2014 SUM Thy, Director of Climate Change Department, Ministry of Environment,

Contents

1. Brief Policy toward Low Carbon2. Status of JCM implementation in Cambodia3. Next steps

Page 3: Status of JCM Implementation in Cambodia€¦ · Status of JCM Implementation in Cambodia December 8, 2014 SUM Thy, Director of Climate Change Department, Ministry of Environment,

Brief Policies toward Low Carbon

• Cambodia started integrating climate change into RectangularStrategy Phase 2 with a particular focus on promoting renewableenergy, energy efficiency and the implementation of the NationalAdaptation Programme of Action to Climate Change.

• Climate change has become a priority in the National StrategicDevelopment Plan Update 2009-2013 and was extensively integratedinto all relevant sectors.

• The Government also recently adopted the National Policy onGreen Growth and the National Green Growth Strategic Plan, whichserve as an overarching platform to support sustainabledevelopment.

Page 4: Status of JCM Implementation in Cambodia€¦ · Status of JCM Implementation in Cambodia December 8, 2014 SUM Thy, Director of Climate Change Department, Ministry of Environment,

• The Royal Government of Cambodia officially launched the first-ever, Cambodia Climate Change Strategic Plan 2014-2023 inNovember 2013.• The CCCSP captures the main strategic objectives and directionsfor a climate-smart development of Cambodia in the next 10 years.• It builds synergies with existing government policies to ensure astrategic cohesion to address a wide range of climate change issueslinked to adaptation, GHG mitigation, and low-carbon development.

Brief Policies toward Low Carbon

Page 5: Status of JCM Implementation in Cambodia€¦ · Status of JCM Implementation in Cambodia December 8, 2014 SUM Thy, Director of Climate Change Department, Ministry of Environment,

Status of JCM implementation in Cambodia

Cambodia and Japansigned the documentConcerning the JCM

A joint committee was

established tooperate the JCM

Page 6: Status of JCM Implementation in Cambodia€¦ · Status of JCM Implementation in Cambodia December 8, 2014 SUM Thy, Director of Climate Change Department, Ministry of Environment,

Cambodia joint committeemember: Ministry ofEnvironment, Ministry ofEnergy and Mines, Ministryof Industry and Handicraft,Ministry of Public Worksand Transport, and Ministryof Agriculture, Forestry andFisheries

Status of JCM implementation in Cambodia

Page 7: Status of JCM Implementation in Cambodia€¦ · Status of JCM Implementation in Cambodia December 8, 2014 SUM Thy, Director of Climate Change Department, Ministry of Environment,

JCM Feasibility Studies:•E coMobility Project,

located in Siem Reap-Angkor to participate insocial contribution forcurrent drivers, improvetourism experience,and reduce impact on

Angkor from air pollution

Status of JCM implementation in Cambodia

Page 8: Status of JCM Implementation in Cambodia€¦ · Status of JCM Implementation in Cambodia December 8, 2014 SUM Thy, Director of Climate Change Department, Ministry of Environment,

© 2014 Japan Development Institute September 2014

Page 9: Status of JCM Implementation in Cambodia€¦ · Status of JCM Implementation in Cambodia December 8, 2014 SUM Thy, Director of Climate Change Department, Ministry of Environment,

Other JCM Feasibility Studies:(1) Quantification of GHG reduction effect of countermeasuresin water supply sector and study of MRV methodology inPhnom Penh City;(2) Phnom Penh LED lighting project: Minebea(3) REDD+: Conservation International(4) High-efficient rice milling(5) Energy management at hotels

Status of JCM implementation in Cambodia

Page 10: Status of JCM Implementation in Cambodia€¦ · Status of JCM Implementation in Cambodia December 8, 2014 SUM Thy, Director of Climate Change Department, Ministry of Environment,

JCM Capacity Building:

(1) IGES: Capacity Building forJCM in Cambodia.

(2) OECC: JCM ProjectFindings

Status of JCM implementation in Cambodia

Page 11: Status of JCM Implementation in Cambodia€¦ · Status of JCM Implementation in Cambodia December 8, 2014 SUM Thy, Director of Climate Change Department, Ministry of Environment,

10 CDM Projects were registered with EB with an estimated of 2million tCO2 equivalent annually.

Status of JCM implementation in Cambodia

Page 12: Status of JCM Implementation in Cambodia€¦ · Status of JCM Implementation in Cambodia December 8, 2014 SUM Thy, Director of Climate Change Department, Ministry of Environment,

• Collaborate with Japanese Partners to identify JCMproject and capacity building• First JCM Joint Committee Meeting tentatively in Feb2015• Discussion and approval on the JCM rule andmethodology

Next steps