Top Banner
Status of Hybrid target R&D at KEK- LINAC T.Takahashi Hiroshima University April 25 2012 KILC12 大大大大大 Collaborators: V. Strakhovenko O. Dadoun, R. Chehab, A.Variola, L. Rinolfi, O. Dadoun,T.Kamitani, T.Suwada, T.Omori, J.Urakawa,K.Furukawa, K.Umemori,M.Satoh,T.Sugimura,S.Kawada, T.Akagi, Y. Uesugi
17

Status of Hybrid target R&D at KEK-LINAC

Jan 01, 2016

Download

Documents

Hector Mason

Status of Hybrid target R&D at KEK-LINAC. T.Takahashi Hiroshima University. April 25 2012 KILC12  大邱廣域市. Collaborators: - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Status of  Hybrid target R&D at KEK-LINAC

Status of Hybrid target R&D at KEK-LINAC

T.TakahashiHiroshima University

April 25 2012KILC12  大邱廣域市

Collaborators:V. Strakhovenko O. Dadoun, R. Chehab, A.Variola, L. Rinolfi, O. Dadoun,T.Kamitani, T.Suwada, T.Omori, J.Urakawa,K.Furukawa, K.Umemori,M.Satoh,T.Sugimura,S.Kawada, T.Akagi, Y. Uesugi

Page 2: Status of  Hybrid target R&D at KEK-LINAC

Contents

• Status of previous experiments–~ same as LCWS2011

• Temperature measurement 2012 January• Prospects

Page 3: Status of  Hybrid target R&D at KEK-LINAC

experimental site KEKB LINAC

Switch yard

8 GeV  e-~ nc/bunchupto 25Hz single bunch

After the earthquake:beam recovered to 3GeV8 GeV operation expected later half of 2012

Page 4: Status of  Hybrid target R&D at KEK-LINAC

Setup

8GeV e- 1mm W crystal

Sweeping Magnet0.96T 0.75m

amorphous W8 mm18 mm

Analyzing magnet5 ~ 30MeV

Page 5: Status of  Hybrid target R&D at KEK-LINAC

pictures

e- 8GeV

W Crystal on the goniometer

Sweeping magnet

Page 6: Status of  Hybrid target R&D at KEK-LINAC

pictures

movable stage

amorphoustargets

thermocoupolesattached back end

Page 7: Status of  Hybrid target R&D at KEK-LINAC

posi

tron

yie

ld (a

rb. u

nit)

angle of crystal  axis<111> w.r.t. beam (mr)

rot. in vertical plain

esweep mag

8 mm

Rocking curve

1

2

3.4 0.1

17.7 0.4

1 2

2 22 21 2

( )f A B Const

same for horizontal rotationPreliminary

factor 3 enhancement

Page 8: Status of  Hybrid target R&D at KEK-LINAC

e+ yield

amorphous thickness [mm]

e+ d

etec

ted

[a.u

]

P=20MeV

Need simulation for analyzing the magnet collimator , detector to evaluate e+ yeilds

0 2 4 6 8 10 12 14 16 180

5

10

15

Conventional

Hybrid ON axis

Hybrid OFF axis

Page 9: Status of  Hybrid target R&D at KEK-LINAC

Detector acceptance• Simulation of the is in progress by Y.Uesugi

Page 10: Status of  Hybrid target R&D at KEK-LINAC

Detector acceptance• Simulation of the is in progress by Y.Uesugi

Page 11: Status of  Hybrid target R&D at KEK-LINAC

simulation in progress

Preliminary4 6 8 10 12 14 16 18 20 22

0

200

400

600

800datasimulation

P(MeV)

e+ y

ield

(a.u

.)

18 mm conventional

agreement of data and simulation look finelow acceptance 0.0005e+/e- takes time for simulation

Page 12: Status of  Hybrid target R&D at KEK-LINAC

Temperature measurement w/ thermocouples

back plane of amorphous target thermocouple

approximately 1mm x 1mm

to fast data loggerread temperature each 10ms

bunch by bunch temperature variationPEDD information by thermocouple

temperature at equilibriumtotal energy deposit

Page 13: Status of  Hybrid target R&D at KEK-LINAC

bunch by bunch temp.• dT provides a measure of PEDD

hybrid  on axis

conventional

hybrid off axis

Simulation

Measured

Page 14: Status of  Hybrid target R&D at KEK-LINAC

Making thermo couple array

thermocouples

temperature distribution of amorphous targetbunch by bunch bases

design in progress at Hiroshima

Page 15: Status of  Hybrid target R&D at KEK-LINAC

temperature measurementJanuary 2012

Page 16: Status of  Hybrid target R&D at KEK-LINAC

temperature measurement

Page 17: Status of  Hybrid target R&D at KEK-LINAC

summary

• Systematic data for hybrid target R&D– yield from various target thickness– momentum 5, 10, 20 MeV– G4 Simulation in progress

• energy deposit/temperature– Thermocouple array works– in progress. G4 simulation is ready.– Systematic data in next experiments

–( but we need to wait for full recovery of KEKB LINAC)