Transcript
Page 1: Status about Radioactive Components - ABT Group. Summary  General Context  Operational Criteria  Storage buildings affected by the ABT group  Status.

Status about Radioactive Components - ABT Group

Page 2: Status about Radioactive Components - ABT Group. Summary  General Context  Operational Criteria  Storage buildings affected by the ABT group  Status.

F.CASTRONUOVO 2

SummaryGeneral ContextOperational CriteriaStorage buildings affected by the ABT groupStatus about RC / BuildingNext Steps

TCM-ABT 8/9/2015

Page 3: Status about Radioactive Components - ABT Group. Summary  General Context  Operational Criteria  Storage buildings affected by the ABT group  Status.

F.CASTRONUOVO 3

General ContextDue to the many accelerators and the range of their ages:Storage of numerous radioactive components (RC)Decrease of the available space in the CERN Storages Preparation for LS2 Shutdown

An evaluation of the present situation was necessary at the sector levelAll the «technical» departments and RP group are involvedRationalise what is stored versus released from the storages Legal aspect: each RC has to be traced!

TCM-ABT 8/9/2015

Page 4: Status about Radioactive Components - ABT Group. Summary  General Context  Operational Criteria  Storage buildings affected by the ABT group  Status.

F.CASTRONUOVO 4

Operational CriteriaRC is in operation, its spare is defined with the acronym OPS The spare is not 100% operational OPS_RH

RC is not in operation then the RC is defined with the acronym RU The RC stored is not 100 % reusable RU_RH

RC unknown UNKMachine, Qty in operation, Qty Spare, Turn Over, Project, Total Cost,

Installation Time and Fabrication Time

TCM-ABT 8/9/2015

Page 5: Status about Radioactive Components - ABT Group. Summary  General Context  Operational Criteria  Storage buildings affected by the ABT group  Status.

F.CASTRONUOVO 5

Storage buildings affected by the ABT groupBuildings managed by GS* (804?, 805?), 879, 954 & 955

Buildings known and used by ABT B162, B169, B867, B868 (BA1), B869 (BA2), B873 (BA6), ..?

Deficiencies encountered up to now *: Some RC declared «non dangerous» are radioactive! Some RC mixed between RC non radioactive & radioactive Multi owners for the same location Some RC stored not recorded in the GS’s databaseActions on going by GS + Owners in B879 and B955 (B954 is the next one) Each «code Article» receives an TREC Number (CR-XXXXXX)

TCM-ABT 8/9/2015

Page 6: Status about Radioactive Components - ABT Group. Summary  General Context  Operational Criteria  Storage buildings affected by the ABT group  Status.

F.CASTRONUOVO 6

Status in B879

TE-ABT0

1

2

3

4

5

TE-ABT; 4

TE-ABT; 1 TE-ABT; 1

TE-ABT B879

RC Missing Dimensions Missing Weight Missing OP Criteria

100% FPS

TCM-ABT 8/9/2015

Page 7: Status about Radioactive Components - ABT Group. Summary  General Context  Operational Criteria  Storage buildings affected by the ABT group  Status.

F.CASTRONUOVO 7

Status in B955

0

10

20

30

40

50

60

TE-ABT; 23

TE-ABT; 19

TE-ABT; 57

TE-ABT; 4TE-ABT; 6 TE-ABT; 6

TE-ABT B955

Waste OPS OPS_RH RU RU_RH To Check0

20

40

60

80

100

120

140

TE-ABT; 115

TE-ABT; 9TE-ABT; 6

TE-ABT; 38

TE-ABT B955

RC Missing Dimensions Missing Weight Missing OP Criteria

72% SE - 28% FPS

TCM-ABT 8/9/2015

Page 8: Status about Radioactive Components - ABT Group. Summary  General Context  Operational Criteria  Storage buildings affected by the ABT group  Status.

F.CASTRONUOVO 8

Status in B954

TE-ABT0

2

4

6

8

10

12

14

16

18

20

TE-ABT; 13

TE-ABT; 18

TE-ABT; 2

TE - ABT B954

OPS OPS_RH RU RU_RHTE-ABT0

5

10

15

20

25

30

35

TE-ABT; 32

TE-ABT; 1 TE-ABT; 1

TE-ABT; 14

TE- ABT B954

RC Missing Dimensions Missing Weight Missing OP Criteria

75% SE, 25% FPS

TCM-ABT 8/9/2015

Page 9: Status about Radioactive Components - ABT Group. Summary  General Context  Operational Criteria  Storage buildings affected by the ABT group  Status.

F.CASTRONUOVO 9

Status in others BuildingsB151, B162, B169 SE has started and completed the Excel files with all the OP Criteria

B867, B868 (BA1), B869 (BA2), B873 (BA6), others(?)The lists of the data are to be created

TCM-ABT 8/9/2015

Page 10: Status about Radioactive Components - ABT Group. Summary  General Context  Operational Criteria  Storage buildings affected by the ABT group  Status.

F.CASTRONUOVO 10

Next Steps GS/IS/LS will call the owners In case of doubt to stick the TREC NumberTo record a RC which is found and not in the GS’s DBNOTE: The owner has to prepare a TREC number before to pick the RC up

Complete all the OP criteria Continue to list the RC + OP criteria for the buildings used by ABT

TCM-ABT 8/9/2015

Page 11: Status about Radioactive Components - ABT Group. Summary  General Context  Operational Criteria  Storage buildings affected by the ABT group  Status.

F.CASTRONUOVO 11

Thank you for your attention

QUESTIONS?

TCM-ABT 8/9/2015