Status about Radioactive Components - ABT Group
Jan 20, 2016
Status about Radioactive Components - ABT Group
F.CASTRONUOVO 2
SummaryGeneral ContextOperational CriteriaStorage buildings affected by the ABT groupStatus about RC / BuildingNext Steps
TCM-ABT 8/9/2015
F.CASTRONUOVO 3
General ContextDue to the many accelerators and the range of their ages:Storage of numerous radioactive components (RC)Decrease of the available space in the CERN Storages Preparation for LS2 Shutdown
An evaluation of the present situation was necessary at the sector levelAll the «technical» departments and RP group are involvedRationalise what is stored versus released from the storages Legal aspect: each RC has to be traced!
TCM-ABT 8/9/2015
F.CASTRONUOVO 4
Operational CriteriaRC is in operation, its spare is defined with the acronym OPS The spare is not 100% operational OPS_RH
RC is not in operation then the RC is defined with the acronym RU The RC stored is not 100 % reusable RU_RH
RC unknown UNKMachine, Qty in operation, Qty Spare, Turn Over, Project, Total Cost,
Installation Time and Fabrication Time
TCM-ABT 8/9/2015
F.CASTRONUOVO 5
Storage buildings affected by the ABT groupBuildings managed by GS* (804?, 805?), 879, 954 & 955
Buildings known and used by ABT B162, B169, B867, B868 (BA1), B869 (BA2), B873 (BA6), ..?
Deficiencies encountered up to now *: Some RC declared «non dangerous» are radioactive! Some RC mixed between RC non radioactive & radioactive Multi owners for the same location Some RC stored not recorded in the GS’s databaseActions on going by GS + Owners in B879 and B955 (B954 is the next one) Each «code Article» receives an TREC Number (CR-XXXXXX)
TCM-ABT 8/9/2015
F.CASTRONUOVO 6
Status in B879
TE-ABT0
1
2
3
4
5
TE-ABT; 4
TE-ABT; 1 TE-ABT; 1
TE-ABT B879
RC Missing Dimensions Missing Weight Missing OP Criteria
100% FPS
TCM-ABT 8/9/2015
F.CASTRONUOVO 7
Status in B955
0
10
20
30
40
50
60
TE-ABT; 23
TE-ABT; 19
TE-ABT; 57
TE-ABT; 4TE-ABT; 6 TE-ABT; 6
TE-ABT B955
Waste OPS OPS_RH RU RU_RH To Check0
20
40
60
80
100
120
140
TE-ABT; 115
TE-ABT; 9TE-ABT; 6
TE-ABT; 38
TE-ABT B955
RC Missing Dimensions Missing Weight Missing OP Criteria
72% SE - 28% FPS
TCM-ABT 8/9/2015
F.CASTRONUOVO 8
Status in B954
TE-ABT0
2
4
6
8
10
12
14
16
18
20
TE-ABT; 13
TE-ABT; 18
TE-ABT; 2
TE - ABT B954
OPS OPS_RH RU RU_RHTE-ABT0
5
10
15
20
25
30
35
TE-ABT; 32
TE-ABT; 1 TE-ABT; 1
TE-ABT; 14
TE- ABT B954
RC Missing Dimensions Missing Weight Missing OP Criteria
75% SE, 25% FPS
TCM-ABT 8/9/2015
F.CASTRONUOVO 9
Status in others BuildingsB151, B162, B169 SE has started and completed the Excel files with all the OP Criteria
B867, B868 (BA1), B869 (BA2), B873 (BA6), others(?)The lists of the data are to be created
TCM-ABT 8/9/2015
F.CASTRONUOVO 10
Next Steps GS/IS/LS will call the owners In case of doubt to stick the TREC NumberTo record a RC which is found and not in the GS’s DBNOTE: The owner has to prepare a TREC number before to pick the RC up
Complete all the OP criteria Continue to list the RC + OP criteria for the buildings used by ABT
TCM-ABT 8/9/2015
F.CASTRONUOVO 11
Thank you for your attention
QUESTIONS?
TCM-ABT 8/9/2015