Statoil subsea challenges – Older, longer, deeper, colder SUBSEA UK, Lunch and Learn, 22 January 2014 Bjorn A. Egerdahl Advisor Subsea Production Systems 22.01.14 Classification: Open
Statoil subsea challenges – Older, longer, deeper, colder
SUBSEA UK, Lunch and Learn, 22 January 2014 Bjorn A. Egerdahl Advisor Subsea Production Systems 22.01.14 Classification: Open
Build material positions in 3-5 new offshore business clusters* Longer, deeper, colder and older
Security Classification: Restricted - Status: Final
*Cluster = area with potential production of > 200 000 BPD Statoil equity
Older 521 wells get one day older every day
Classification: Internal 2013-02-15
5 Security Classification: Internal - Status: Draft
Preventive
Corrective
Num
ber o
f fai
lure
Life time
Older Fast-track development of subsea tie-backs
Simplify process and project set-up
1
Clustering of projects
2
Selection of standard concept
3
Strengthen commercial mindset and focus on fast delivery
4
Fast track / standard subea projects Contracts to date
Contract #1: Visund Sør, Vigdis Nordøst, Hyme, Stjerne, Visund Nord
Contract #3: Gullfaks Sør Omega, Oseberg Delta 2, Gullfaks Rimfaksdalen, 2 open options
Contract #2: Skuld, Vilje Sør, Svalin C
Classification: Internal 2013-08-20 7
8
Standardisation
9
Subsea production systems Standardized and configurable
• System is configured to field spesific requirements
• Building blocks are standard – but configured as required to meet field requirements, i.e reservoir conditions, seabed conditions and host platform characteristics
Classification: Internal 2013-08-20
System configurations Building blocks Oil production Oil production w/gas lift Gas production Gas injection Water injection Combinations of above
4 slot templates Single slot templates (satellites) Wellhead Tubing Hanger Xmas Tree Choke Module Manifold Production Control System Tie-in tool (normally rented)
Standard universal workover system
• For well completion and workover
• Can be used on subsea trees from both Aker and FMC – in future also GE and OneSubsea
• First contract won by Aker
• Equipment for 5 parallell rig operations being delivered and taken into use late 2013 / 2014
Classification: Internal 2013-08-20 1
11 - Classification: Internal 2011-09-12
Umbilical – standards for static and dynamic applications
First tender won by Nexans – call-offs up to 50 km total
12
Leading in seismic imaging and interpretation to increase discovery and recovery Contribute to add quality prospects in areas with complex geology
Become a leading exploration company
Pushing reservoir characterisation and recovery to the next level to maximise value Enable faster maturation of resources & reserves
Contribute to add 1.5 bn boe to reserves by 2020
Step change in well-construction efficiency to drill more cost-efficient wells 30% reduction in well construction time and 15% in well construction cost by 2020
Taking subsea longer, deeper and colder to accelerate and increase production Simplification and standardisation Flexible Subsea tie-backs Realise subsea compression by 2015 and complete subsea factory by 2020.
Subsea Factory in a Technology Strategy context
Existing Subsea Toolbox within Statoil
Classification: Internal 2013-02-15
13 Security Classification: Internal - Status: Draft
Gullfaks Compression
• DG3: May 2012
• Inc. recovery: 22 mill boe
Åsgard Compression
• DG3: Aug 2011
• Inc. recovery: 280 mill boe
Subsea Factory
• Realise by 2020 • Towards 60% recovery • Improved CAPEX OPEX HSE
Troll Water Separation
• Installed 1999 • 10 000 bopd
Tordis Separation and boosting
• Installed 2007 • Designed to increase oil
recovery from 49% to 55%
Tyrihans Sea water injection
• Installed 2009 • Design: 10% increase
in total recovery
Lufeng Multiphase pumping
• Installed 1997 • 12 years in operation • Enabler for FD
Subsea large share of production: • 521 subsea wells • 40% of Statoil operated NCS prod • 50% of equity prod
Significant yearly subsea spend (2012): • 13.4 BNOK CAPEX • 10.1 BNOK OPEX
Classification: Internal 2013-05-23
14 Security Classification: Internal - Status: Draft
Oil storage
Gas compression
Gas, oil, produced water separation
Power distribution and control
Manifold
Sea water injection template with pumping
Produced water injection template
Production template Produced water
injection pump Production template
ROV intervention
Oil pump
Oil export
Gas export
The Statoil Subsea Factory™
14
Commercially available
Tyrihans Qualification
ongoing Lufeng / Tordis
Gullfaks / Aasgard
Qualification – Ormen Lange
Tordis
Tordis
Commercially available
Commercially available
Commercially available
Commercially available
ARCTIC FACTORY
HEAVY OIL FACTORY
DEEP WATER FACTORY
EXTENDED REACH FACTORY
COMPACT SEPARATION
DEEPER INSTALLATION &
IMR
ARTIFICIAL LIFT ESP & DUAL
BOOST
SEA WATER INJECTION
SUBSEA FIELD CENTRE
GAS TREATMENT
HIGH VISCOSITY BOOSTING
OIL STORAGE & OFFLOADING OIL TREATMENT
INTERVENTION SIMPLIFIED COMPRESSION
POWER DISTRIBUTION
SIMPLIFIED BOOSTING
WATER SEPARATION & INJECTION
LONG DISTANCE OIL TRANSPORT
HIGH CAPACITY BOOSTING
Subsea Factory Menu – Key technology elements
SUBSEA-TO-HOST FACTORY
BROWNFIELD FACTORY
Statoil subsea challenges – Older, longer, deeper, colder
Bjorn A. Egerdahl Advisor Subsea Production Systems E-mail address [email protected] Tel: +4790079954 www.statoil.com
22.01.2014 16 Classification: Open