Statistical Analysis of New Product Development (NPD) Cycle-time Data
Alpha Technologies recently concluded a comprehensive study of historical NPD performance data (cost, cycle-time, resource requirements, program type and complexity, plans versus actuals, etc.) and has successfully applied the results of this study to make measureable improvements to their NPD process. Probability-based summary data is used to aide in planning and budgeting, set statistically valid continuous improvement targets for performance scorecards, and develop a visual resource management tool for allocation of human resources to present and future NPD programs.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Quality and Business Excellence
Celebration
ASQ Vancouver 25th Anniversary
Statistical Analysis of New Product Development (NPD) Cycle-time Data Including Applications of Results
Steve Pratt, MEng., PE, CSSBB Director of Engineering, Alpha Technologies
Alpha Technologies
Company Background
Alpha is a Full Service Power
Systems Provider to Multiple Markets
Pratt – Slide 1
Power Modules
Indoor Power Systems
Outdoor Power Systems
Alpha’s Power Solutions Products
Pratt – Slide 2
Phase-Gate New Product
Development (NPD) Process
Deliverables: • Product Concept • Business Case • Preliminary Plan
Deliverables: •High-Level Design •Requirements •Complete Project Plan
Deliverables: • Design Outputs • DFx Reviews • Preliminary Test
Reports
Deliverables: • Pilot Doc Pack • Pilot Build • Sales Forecasts
Deliverables: • Compliance
Certifications • Training • MarCom docs
Deliverables: • Sustaining Eng • Repair/Support • Cost Reduction
• Program Plans: estimated time to LA, estimated time to GA
• Calculated: total time, time per phase, actual vs. plan
Cost Data
• Timecard System: actual total effort (man-hours)
• Program Plans: estimated total effort
• Calculated: effort by function, effort by phase, remaining effort, actual vs. plan
Pratt – Slide 6
Tools Used in the Study
JMP – Statistical Discovery Software Analyze-Distribution Platform: • Calculations: Quantiles, Moments • Plots: Histogram, Quantile Box, Normal Quantile • Fit Distribution: Normal, Beta, Goodness of Fit Tests
Fit Y by X Platform: Bivariate Analysis • Fit Line, Fit Polynomial, Summary of Fit
Fit Y by X Platform: One-way Analysis • Calculations: Means and Standard Deviations • Plots: Mean Diamonds • Analysis of Variance (ANOVA)
Fit Model Platform • Calculations: Standard Least Squares, Summary of Fit, Effect Tests • Plots: Actual by Predicted, Effect Leverage, Residual by Predicted • Two-way ANOVA with interactions
Microsoft Excel and PowerPoint
Pratt – Slide 7
External Benchmarking Data – PDMA
Best Practices Research
Provides industry-average NPD Cycle-Time based on complexity of programs: