Top Banner
14 Division 14 Cherokee Clay Graham Haywood Henderson Jackson Macon Polk Swain Transylvania STATE TRANSPORTATION IMPROVEMENT PROGRAM
41

STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

Feb 23, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

14

Division 14CherokeeClayGrahamHaywoodHendersonJacksonMaconPolkSwainTransylvania

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Page 2: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

JACKSON TRANSYLVANIA

MACONCHEROKEE

CLAY

HENDERSON

POLK

GRAHAM

HAYWOOD

SWAIN

64

19

176

23

23

64

64

129

19

64

276

441

26

40 209

294106

225281

108

28

107

280143

215

Waynesville

Hendersonville

AV-5775

B-5911

B-5918

B-4823B-4822

B-5915

B-5550 B-5403

B-5923

B-5898

B-5904

B-5920

B-5909

B-5900

B-5903 B-5409

B-5917

B-5913

B-5901B-5906

B-5907

B-5899

B-5921

B-5905

B-5902

B-4159

B-5404

B-5410

B-4775

B-5919

B-5908

B-3868B-5914B-5912

B-4792 B-5916

W-5506

B-5896

K-5002

U-5105

U-5840

I-5758

EB-5758

I-5508

EB-5735

EB-5759

U-5604

I-4729

EB-5757

U-5866

R-5527B

R-5527A

R-5715

EB-5756

U-5104R-5605

R-4047

R-5734

U-5783

U-5839

R-5735

R-5206

EB-5737

U-4412

R-5600

I-5757

R-4416

I-5759

I-5810

I-4400C

A-0011C

R-4753R-5748

R-5742

R-2588BR-5744

I-5776

A-0009B

I-5834

R-2409C

I-5756

I-5835

I-5868

R-5747

R-3622B R-5115

DRAFT STIPFY 2015-2025STI ProjectsDIVISION 14

0 10 205Miles

BRIDGES FUNDED THROUGH STI

STATEWIDE AVIATION

REGIONAL AVIATION

DIVISION AVIATION

DIVISION FERRYREGIONAL RAILDIVISION RAILREGIONAL TRANSITDIVISION TRANSITSAFETYTRANSITION *TRANSITION *INTERSTATE MAINTENANCESTATEWIDE HIGHWAYREGIONAL HIGHWAYDIVISON HIGHWAYDIVISION BIKE/PEDESTRIANINTERSTATE ROUTEUS ROUTENC ROUTESECONDARY ROADPROJECTED ROUTEMUNICIPAL BOUNDARIESMILITARY BASENCDOT DIVISION BOUNDARYCOUNTY BOUNDARYWATER FEATURES

* Note: Reflects 108 of the Major Transition ProjectsNote: FY 2015 projects represent major projects not

let as of November 2014

Page 3: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

COUNTY

FUTURE YEARS

F

NHPB - National Highway Performance Program (Bridge)NHPIM - National Highway Performance Program (Interstate Maintenance)O - OthersRR - Rail-Highway SafetyS (M) - State MatchSRTS - Safe Routes to School

FLPI - Federal Lands Program (Indian Reservation Roads) STP - Surface Transportation ProgramHFB - Highway Fund Bridge Replacement Program STPDA - Surface Transportation Program - Direct AttributableHP - Federal-Aid High Priority STPEB - Surface Transportation Program, Enhancements (Bike)

STPON - Surface Transportation Program Bridge (On System Bridge)STPOFF -Surface Transportation Program (Off System Bridge) PE - Preliminary EngineeringT - State Highway Trust Funds

NHP - National Highway Performance Program TAP - Transportation Alternatives Program RG - Right of Way (GARVEE)

SW - StatewideTRN -Transition Project

S - StructureU - Utilities

I - ImplementationL - LandscapingM - MitigationO - OperationsP - Paving

WAKE

NUMBERLENGTH (MILES)

DIVISION 00

R-0000

IDROUTE/CITY

US or NC RoutesON NEW LOCATION. I - InterstateWITH A BYPASS OF HOMETOWN ROUTE/CITY

Project termini and a general

SW

M1500

A

NHP

4000

FUNDING CATEGORY (1)

used for each project phase.

FUNDING SOURCE (2)

U

B3000R

FY 2017

C

(3) WORK TYPE (ACTIVITY)

A - Acquisition

with proposed work type or activity beginning in the initial scheduled year. (Estimates are in thousand of

For other work types or activities see Work Type (Activity) box below.

dollars.)

of a project segment indicates (Cash-Flow Funding) COMMITMENTSFUTURE

SW CBSW

One or two letter

HIGHWAY PROGRAM

UNFUNDED

NC 3 TO SR 1003SR 1003 TO NC 96

ASW

UNFUNDED

20000CRC 5000C 5000 BC B

WIDEN TO A FOUR-LANE FACILITY

A

NC 00 R7.3 R25063,450I-40 TO NC 96 EAST OF HOMETOWN.

B

FY 2025 FY 2018

700

FY 2019

DEVELOPMENTAL PROGRAMSTATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2020FY 2015 FY 2016

M

TOTAL PROJECT

COST (THOU)

NHPNHP

FUN

DS

A

PRIOR YEARS COST

(THOU)

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

U 5000NHP

C10000

FY 2021

C

FY 2023 FY 2024

FY 2022

5000

9000

APD - Appalachian Development

NHPNHP

LOCATION / DESCRIPTION NHP

NHP

I-40 TO NC 3

Preliminary engineering, Right of Way, Mitigation, Utilities or Construction. break.

work description.

way, utility, mitigation and construction cost estimates

See Highway Funding Key

any project breaks.Category for the project andIdentifies the "STI" Funding

by funding category in current dollars. Cost may include one or more funding types. Multi-year funding

for an explanation of funding categories

Phases of implementation: ESTIMATED COST Preliminary engineering, right of

(1) FUNDING CATEGORY

PROJECT BREAKS

designation for project

LOCATION / DESCRIPTION

SR - Secondary Road

IDENTIFICATION NUMBER Assigned to each project at conception and remains with

BVarious - multiple routesNEW ROUTE or City

WORK TYPE (ACTIVITY) (3)

BOND (R) - Revenue Bond

HRRR - High Risk Rural Roads

L - LocalHSIP - Highway Safety Improvement Program

project until completion.

DIV - DivisionEX - Exempt

REG - RegionalHF - State Dollars (Non-STI)

F - Feasibility StudyCG - Construction (GARVEE)C - Construction

G - Grading and Structures

R - Right of Way

(2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES

ER - Emergency Relief Funds

CMAQ - Congestion MitigationDP - Discretionary or Demonstration

FED - Federal Rail Funds

Page 4: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

R-5735 11360END OF 4-LANE DIVIDED SECTION TO SR 1556 (MARTINS CREEK ROAD). IMPROVE ROADWAY.

1.2

DIV

T R 1300 T U 160 T C 9900

CHEROKEE US 19/US 74/US 64/US 129

SECTIONS A, B, AND BA - DIVISION PROJECTS; PLANNING/DESIGN IN PROGRESS

R-3622 20534 12719US 64/US 74 AT RANGER TO TENNESSEE STATE LINE. UPGRADE EXISTING ROADWAY.

13.5

TRN

T 7700C B T 115C BA

AA REPLACE BRIDGE NO. 50 - COMPLETEAB SR 1309 TO SR 1130 (SUNNY POINT ROAD) - EXCLUDING BRIDGE REPLACEMENT - COMPLETEB SR 1130 (SUNNY POINT ROAD) TO SR 1312 (BEAR PAW ROAD). - RIGHT OF WAY IN PROGRESSTRNBA SR 1130 (SUNNY POINT ROAD) TO SR 1312 (BEAR PAW ROAD). - CLEARING AND GRUBBING ONLYTRN

CHEROKEE NC 294

R-5527 11275 11275CONSTRUCT ACCESS ROAD AND BRIDGE OFF US 19/74/129 NEAR MURPHY.

0.8TRN A CONSTRUCT BRIDGE. - UNDER CONSTRUCTIONTRN

B CONSTRUCT ROADWAY. - UNDER CONSTRUCTIONTRN

CHEROKEE NEW LOCATION

IN PROGRESS - PURCHASE ORDER CONTRACT (POC)

R-4048 2519 2519GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY

A-0009* 883443 83818CORRIDOR "K", US 19/US 74/US 129 AT ANDREWS TO NC 28 EAST OF ALMOND. FOUR LANE DIVIDED FACILITY, PRIMARILY ON NEW LOCATION.

27.1 APD 14300R A APD 925U A APD 366000C A APD R 14900 B APD U 2300 B APD M 2500 B APD 39000C B C 19500 B C 19500 BAPD R 14500 C APD M 22200 C APD 41000G CA G 20500 CA G 20500 CAAPD 91500C CB C 45750 CB C 45750 CBAPD 19000P CC

A US 19 BUSINESS IN ANDREWS TO US 129B US 129 TO NC 143 AT SR 1223 (BEECH CREEK) - DESIGN-BUILD CONTRACTDIVC NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH - RIGHT OF WAY ONLYEXCA NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH. GRADING AND STRUCTURES ( EXCEPT TUNNELS). - DESIGN-BUILD CONTRACTEXCB TUNNELS AT APPALACHIAN TRAIL - DESIGN-BUILD CONTRACTEXCC NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH. PAVING.DA SR 1121 (WATTIA ROAD) AT ALMONDS TO EXISTING US 19/NC 28 - COMPLETEDB EAST OF CALFPEN GAP IN GRAHAM COUNTY TO SR 1121 (WATTIA ROAD) AT ALMONDS IN SWAIN COUNTY - COMPLETEDC WEST OF SR 1231 (TOBACCO BRANCH ROAD) TO CALFPEN GAP - COMPLETEDD NC 28 AT STECOAH TO WEST OF SR 1231 (TOBACCO BRANCH ROAD) - COMPLETE

CHEROKEEGRAHAMSWAIN

FUTURE US 74

FEDERAL BRIDGE PROJECTSB-4462 812 162REPLACE BRIDGE NO. 148 OVER

PERSIMMON CREEK.

HF

HFB R 50 HFB C 600

CHEROKEE SR 1127(BELL HILL ROAD)

B-4069 2098 3REPLACE BRIDGE NO. 159 OVER HANGING DOG CREEK.

HF

HFB R 295 HFB C 1800

CHEROKEE SR 1326(JOE BROWN HIGHWAY)

14-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 5: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-5925 2860REPLACE BRIDGE NO. 223 OVER HIWASSEE RIVER.

HF

HFB 260R HFB 2600C

CHEROKEE SR 1548(OLD HIGHWAY 64)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5114 17255 15255DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4914 18871 18871ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

HAZARD ELIMINATION PROJECTS

IN PRGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)

W-5214 3128 3128DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

14-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 6: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)

UNDER CONSTRUCTION

E-4975 576 576BLUE RIDGE NATIONAL HERITAGE SITES. INTERPRETATIVE AND GATEWAY MARKERS.

ALLEGHANYASHEAVERYBUNCOMBEBURKECALDWELLCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONMADISONMcDOWELLMITCHELLPOLKRUTHERFORDSURRYSWAINTRANSYLVANIAWATAUGAWILKESYANCEY

VARIOUS

RURAL PROJECTSA-0011 103468 30268NC 69, GEORGIA STATE LINE TO US 64.

WIDEN TO FOUR LANES DIVIDED. US 64, NC 69 TO EAST OF NC 175. WIDEN TO MULTI-LANES.

4.5 APD R 14700 C APD 29000C C APD 14800R D APD 14700C D

A GEORGIA STATE LINE TO US 64 (HAYESVILLE BYPASS). UPGRADE EXISTING TWO-LANES - COMPLETEBA NC 69 IN HAYESVILLE TO EAST OF THE HIWASSEE RIVER - COMPLETEBB EAST OF THE HIWASSEE RIVER TO EAST OF NC 175 - COMPLETEC GEORGIA STATE LINE TO US 64 (HAYESVILLE BYPASS). WIDEN TO FOUR-LANESDIVD EAST OF THE HIWASSEE RIVER TO EAST OF NC 175. WIDEN TO FOUR-LANES.

CLAY US 64/NC 69

DIVISION PROJECT

R-4416 5675 675CHUNKY GAL GAP WESTWARD FOR TWO MILES. CONSTRUCT TRUCK CLIMBING LANE.

2TRN

STP 5000C CLAY US 64

R-5742 4900GEORGIA STATE LINE TO US 64. UPGRADE ROADWAY.

4.1

DIV

T R 100 T C 4800

CLAY NC 175

IN PROGRESS - PURCHASE ORDER CONTRACT (POC)

R-4048 2519 2519GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

FEDERAL BRIDGE PROJECTS

UNDER CONSTRUCTION

B-4733 4072 4072REPLACE BRIDGE NO. 11 OVER CHATUGE LAKE.REG

CLAY NC 175

14-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 7: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-5918 320REPLACE BRIDGE NO. 60 OVER LEFT FORK EAGLE CREEK.

DIV

STPOFF 20R STPOFF 300C

CLAY SR 1169(LEFORD ROAD)

UNDER CONSTRUCTION

B-4734 1366 1366REPLACE BRIDGE NO. 9 OVER TUSQUITEE CREEK.

DIV

CLAY SR 1300(JULIA BUCKNER ROAD)

B-5911 370REPLACE BRIDGE NO. 41 OVER SWEETWATER CREEK.

DIV

STPOFF 20R STPOFF 350C

CLAY SR 1302(LOWER SWEETWATER)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5114 17255 15255DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4914 18871 18871ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

HAZARD ELIMINATION PROJECTSW-5119 1950 50GEORGIA STATE LINE TO US 64. INSTALL

PAVED SHOULDERS AND REALIGN CURVE.4

REG

HSIP 100R HSIP C 900 C 900

CLAY NC 175

IN PRGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)

W-5214 3128 3128DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

14-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 8: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)

UNDER CONSTRUCTION

E-4975 576 576BLUE RIDGE NATIONAL HERITAGE SITES. INTERPRETATIVE AND GATEWAY MARKERS.

ALLEGHANYASHEAVERYBUNCOMBEBURKECALDWELLCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONMADISONMcDOWELLMITCHELLPOLKRUTHERFORDSURRYSWAINTRANSYLVANIAWATAUGAWILKESYANCEY

VARIOUS

RURAL PROJECTS

IN PROGRESS - PURCHASE ORDER CONTRACT (POC)

R-4048 2519 2519GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY

A-0009* 883443 83818CORRIDOR "K", US 19/US 74/US 129 AT ANDREWS TO NC 28 EAST OF ALMOND. FOUR LANE DIVIDED FACILITY, PRIMARILY ON NEW LOCATION.

27.1 APD 14300R A APD 925U A APD 366000C A APD R 14900 B APD U 2300 B APD M 2500 B APD 39000C B C 19500 B C 19500 BAPD R 14500 C APD M 22200 C APD 41000G CA G 20500 CA G 20500 CAAPD 91500C CB C 45750 CB C 45750 CBAPD 19000P CC

A US 19 BUSINESS IN ANDREWS TO US 129B US 129 TO NC 143 AT SR 1223 (BEECH CREEK) - DESIGN-BUILD CONTRACTDIVC NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH - RIGHT OF WAY ONLYEXCA NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH. GRADING AND STRUCTURES ( EXCEPT TUNNELS). - DESIGN-BUILD CONTRACTEXCB TUNNELS AT APPALACHIAN TRAIL - DESIGN-BUILD CONTRACTEXCC NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH. PAVING.DA SR 1121 (WATTIA ROAD) AT ALMONDS TO EXISTING US 19/NC 28 - COMPLETEDB EAST OF CALFPEN GAP IN GRAHAM COUNTY TO SR 1121 (WATTIA ROAD) AT ALMONDS IN SWAIN COUNTY - COMPLETEDC WEST OF SR 1231 (TOBACCO BRANCH ROAD) TO CALFPEN GAP - COMPLETEDD NC 28 AT STECOAH TO WEST OF SR 1231 (TOBACCO BRANCH ROAD) - COMPLETE

CHEROKEEGRAHAMSWAIN

FUTURE US 74

14-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 9: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

U-5866 3970US 129 (RODNEY ORR BYPASS) TO ROBINSVILLE HIGH SCHOOL AND MIDDLE SCHOOL. CONSTRUCT NEW ROUTE INCLUDING BRIDGE OVER CHEOAH RIVER.

0.3

DIV

T R 150 T U 20 T 3800C

GRAHAM NEW ROUTE

FEDERAL BRIDGE PROJECTSB-5923 260REPLACE BRIDGE NO. 119 OVER MILL

CREEK.

DIV

STPOFF R 10 STPOFF C 250

GRAHAM SR 1105(MILL CREEK ROAD)

UNDER CONSTRUCTION

B-3457 782 782REPLACE BRIDGE NO. 68 OVER PANTHER CREEK.

DIV

GRAHAM SR 1232(PANTHER CREEK ROAD)

BRIDGE PURCHASE ORDER CONTRACT (DPOC)

B-3458 826 201REPLACE BRIDGE NO. 114 OVER STECOAH CREEK.

DIV

T 625C GRAHAM SR 1237(JENKINS ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5114 17255 15255DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4914 18871 18871ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

HAZARD ELIMINATION PROJECTS

IN PRGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)

W-5214 3128 3128DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

14-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 10: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)

UNDER CONSTRUCTION

E-4975 576 576BLUE RIDGE NATIONAL HERITAGE SITES. INTERPRETATIVE AND GATEWAY MARKERS.

ALLEGHANYASHEAVERYBUNCOMBEBURKECALDWELLCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONMADISONMcDOWELLMITCHELLPOLKRUTHERFORDSURRYSWAINTRANSYLVANIAWATAUGAWILKESYANCEY

VARIOUS

INTERSTATE PROJECTSI-5834 30470.4 MILE EAST OF SR 1366 (ORCHARD COVE

ROAD) TO 0.4 MILE EAST OF SR 1535 (THOMPSON COVE ROAD). PAVEMENT REHABILITATION.

5SW

NHPIM C 3047 HAYWOOD I-40

I-5776 6000.4 MILE EAST OF SR 1366 (ORCHARD COVE ROAD) TO SR 1535 (THOMPSON COVE). PAVEMENT REHABILITIATION.

5SW

NHPIM C 600 HAYWOOD I-40

I-5757 2000.2 MILE EAST OF SR 1513 (HYDER MOUNTAIN ROAD) TO SR 1535 (THOMPSON COVE ROAD). PAVEMENT REHABILITATION.

2SW

NHPIM C 200 HAYWOOD I-40

I-5756 4000.4 MILE EAST OF SR 1366 (ORCHARD COVE ROAD) TO 0.2 MILE EAST OF SR 1513 (HYDER MOUNTAIN ROAD). PAVEMENT REHABILITATION.

3SW

NHPIM C 400 HAYWOOD I-40

"O" FUNDS ARE STATE BRIDGE FUNDS.

I-5512 6000REHABILITATE TUNNELS 15, 17, AND 104.

SW

NHPIM 2500C O 3500C

HAYWOOD I-40

RIGHT OF WAY IN PROGRESS

I-5508 6551 251I-40 NEAR MILEPOST 7. SLOPE STABILIZATION, ROCK BOLTING, AND ROCKFALL BARRIER FENCE AND MESH.TRN

NHPIM 6300C HAYWOOD I-40

UNDER CONSTRUCTION

I-5402 1439 1439MILE POST 35 TO MILE POST 36. ADDRESS SLOPE INSTABILITY THROUGH REPAIRS AND STREAM RESTORATION.

HAYWOOD I-40

UNDER CONSTRUCTION

I-5323 4473 4473MILE MARKER 34 TO MILE MARKER 36. PAVEMENT REHABILITATION.

2HAYWOOD I-40

UNDER CONSTRUCTION

I-5322 9864 9864MILE MARKER 15 TO MILE MARKER 20. PAVEMENT REHABILITATION.

5HAYWOOD I-40

14-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 11: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025INTERSTATE PROJECTS

COMPLETE - GARVEE BOND FUNDING $12.87 MILLION; PAYBACK FY 2008 - FY 2019

I-4910 24728 17673TENNESSEE STATE LINE (MILE MARKER 0.0) TO EXIT 15 (MILE MARKER 14.8). PAVEMENT REHABILITATION.

14.8TRN

NHP 1411CG CG 1411 CG 1411 CG 1411 CG 1411 HAYWOOD I-40

I-5868 4200SR 1535 (THOMPSON COVE RD) TO BUNCOMBE COUNTY LINE. PAVEMENT REHABILITATION.

8.5SW

NHPIM C 4200 HAYWOOD I-40

I-5810 23000.2 MILE EAST OF SR 1338 (WHITEOAK ROAD) TO 0.7 MILE EAST OF US 276. PAVEMENT REHABILITATION.

6.3SW

NHPIM C 2300 HAYWOOD I-40

COMPLETE - GARVEE BOND FUNDING $8.37 MILLION; PAYBACK FY 2007 - FY 2018

I-5004 12404 8732US 74 (MILE MARKER 27) TO BUNCOMBE COUNTY LINE. PAVEMENT REHABILITATION.

7TRN

NHP 918CG CG 918 CG 918 CG 918 HAYWOOD I-40

RURAL PROJECTSR-5747 8800SR 1304 (FIE TOP ROAD) AT GHOST TOWN

USA TO JENKINS CREEK ROAD. UPGRADE ROADWAY.

9.4

DIV

T 100R T 5800C C 2900

HAYWOODJACKSON

US 19

UNDER CONSTRUCTION - SECTION 115 FUNDS, 2004 APPROPRIATIONS ACT USED FOR PRELIMINARY ENGINEERING

R-4904 921 9213 MILES EAST OF US 23 BUSINESS. REPAIR SLOPE FAILURES AND RESURFACE.TRN

HAYWOOD US 276

UNDER CONSTRUCTION - INCLUDES R-2210 B

R-4047 31261 19287US 23 BUSINESS TO NORTH OF SR 1523 (OLD CLYDE ROAD) AT LAKE JUNALUSKA. WIDEN TO A MULTI-LANE FACILITY AND REPLACE RAILROAD STRUCTURE R-32. (INCLUDES R-2210B).

0.3TRN

STP 5987C C 5987 HAYWOOD NC 209

IN PROGRESS - PURCHASE ORDER CONTRACT (POC)

R-4048 2519 2519GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

URBAN PROJECTSU-5839 17750US 23/74 TO US 23 BUSINESS (MAIN

STREET). UPGRADE CORRIDOR.1.1

DIV

T R 6200 T U 750 T 10800C

HAYWOOD US 276 (RUSSAVENUE)

UNDER CONSTRUCTION

U-4412 22023 22023US 276 TO US 23 BUSINESS IN WAYNESVILLE. UPGRADE TWO LANES AND CONSTRUCT RAILROAD GRADE SEPARATION.

1.5HAYWOOD SR 1184 (HOWELLMILL ROAD)

U-5100 36950STP-DA IN THE FRENCH BROAD RIVER METROPOLITAN PLANNING ORGANIZATION.

DIV

STPDA C 500 C 1060 C 3500 C 3500 C 3500 3500C3500C3500C C 3500 C 3500L C 125 C 265 C 875 C 875 C 875 875C875C875C C 875 C 875

BUNCOMBEHAYWOODHENDERSON

VARIOUS

U-5548 550REALIGNMENT OF BROWN AVENUE FROM BOYD AVENUE TO APPROXIMATELY 1200 FEET SOUTH OF THE INTERSECTION. PROJECT INCLUDES CONSTRUCTION OF NEW ROADWAY (SCHOOL STREET), RAISED CROSSWALK, PAINTED CROSSWALKS, REFUGE ISLAND, BULBOUT AND SIGNAGE.

DIV

STPDA PE 40 L PE 10 STPDA C 400 L C 100

HAYWOOD BROWN AVENUE

14-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 12: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-5541 7700REPLACE BRIDGE NO. 236 OVER SR 1513.

HF

HFB 700R HFB C 7000

HAYWOOD I-40

B-3186 5900REPLACE BRIDGE NO. 155 AND BRIDGE NO. 158 OVER RICHLAND CREEK.

SW

NHPB R 800 NHPB 5100C

HAYWOOD US 23/US 74(NORTHBOUND LANE)

B-5898 3250REPLACE BRIDGE NO. 168 OVER US 19 AND US 23.

SW

NHPB R 150 NHPB 3100C

HAYWOOD US 23US 74

B-5408 770REPLACE BRIDGE NO. 386 OVER ALLENS CREEK.

HF

HFB R 70 HFB C 700

HAYWOOD SR 1148(WIGGINS ROAD)

B-5920 640REPLACE BRIDGE NO. 246 OVER WEST FORK PIGEON CREEK.

DIV

STPOFF 30R STPOFF 610C

HAYWOOD SR 1216(REECE ROAD)

B-5924 295REPLACE BRIDGE NO. 192 OVER WESLEY CREEK.

HF

HFB 25R HFB 270C

HAYWOOD SR 1336(WESLEY CREEK ROAD)

UNDER CONSTRUCTION

B-4762 1015 1015REPLACE BRIDGE NO. 72 OVER JONATHAN CREEK.

DIV

HAYWOOD SR 1407(MEDLEY DRIVE)

UNDER CONSTRUCTION

B-4763 1630 1630REPLACE BRIDGE NO. 35 OVER BALD CREEK.

DIV

HAYWOOD SR 1503(UPPER CRABTREEROAD)

B-5904 261REPLACE BRIDGE NO. 241 OVER BEAVERDAM CREEK.

DIV

STPOFF R 10 STPOFF M 1 STPOFF 250C

HAYWOOD SR 1619(WILSON COVE ROAD)

B-5900 261REPLACE BRIDGE NO. 382 OVER DUTCH COVE CREEK.

DIV

STPOFF R 10 STPOFF M 1 STPOFF 250C

HAYWOOD SR 1835(WINDING STAIRS)

B-5909 280REPLACE BRIDGE NO. 375 OVER DUTCH COVE CREEK.

DIV

STPOFF 10R STPOFF 270C

HAYWOOD SR 1856(JENKINS ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5114 17255 15255DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

14-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 13: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025MUNICIPAL BRIDGE PROJECTS

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY BY THE TOWN OF WAYNESVILLE - MUNICIPAL BRIDGE

B-5013 REPLACE BRIDGE NO. 262 OVER RICHLAND CREEK.

HAYWOOD WAYNESVILLE(DEPOT STREET)

MITIGATION PROJECTS

IN PROGRESS

EE-4914 18871 18871ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

HAZARD ELIMINATION PROJECTS

UNDER CONSTRUCTION

W-5315 5832 5832EXIT 98 IN HAYWOOD COUNTY TO 0.1 MILE WEST OF THE JACKSON-HAYWOOD COUNTY LINE. REMOVE CONCRETE ISLAND, REPAVE WITH ASPHALT, DRAINAGE MODIFICATIONS, AND INSTALL GUARDRAIL.

4.8

TRN

HAYWOODJACKSON

US 74

UNDER CONSTRUCTION

SF-4914A 43 43SR 1004 (NEWFOUND ROAD) NEAR SR 1612 (MP 2.14-2.62) NEAR CANTON. INSTALL GUARDRAIL.

HAYWOOD SR 1004(NEWFOUND ROAD)

IN PRGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)

W-5214 3128 3128DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

CONGESTION MITIGATION PROJECTSC-5612 100PROJECTS TO IMPROVE CONGESTION AND

AIR QUALITY IN THE LAND OF SKY RPO AND SOUTHWESTERN RPO.EX

CMAQ C 50 C 50 HAYWOODSWAIN

VARIOUS

IN PROGRESS

C-5564 172 52LAND OF SKY RPO TO WORK WITH REGIONAL CLEAN AIR CAMPAIGN AND CLEAN VEHICLE COALITION TO IMPLEMENT AN EDUCATIONAL AND OUTREACH PROGRAM IN COMMUNITIES ADJACENT TO GREAT SMOKY MOUNTAINS NATIONAL PARK.

EX

CMAQ 65I I 30 L 17I I 8

BUNCOMBEHAYWOODMADISONTRANSYLVANIA

VARIOUS

C-5151 242GREAT SMOKIES NATIONAL PARK. CONSTRUCT A MIXED-USE PATHWAY.

EX

CMAQ 177C L 65C

HAYWOODSWAIN

EASTERN BANDOF CHEROKEEINDIANS (EBCI)

14-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 14: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025CONGESTION MITIGATION PROJECTS

IN PROGRESS

C-5202 308 119TRANSPORTATION CHOICES. INCREASE EDUCATION EFFORTS THAT INFORM VISITORS ABOUT THE ROLE THEIR TRANSPORTATION CHOICES HAVE IN RELATION TO AIR POLLUTION ISSUES IN GSMNP.EX

CMAQ 91I I 60 L 23I I 15

HAYWOODSWAIN

GREAT SMOKYMOUNTAINSNATIONAL PARK(GSMNP)

ENHANCEMENT (CALL PROJECTS)

UNDER CONSTRUCTION

E-4975 576 576BLUE RIDGE NATIONAL HERITAGE SITES. INTERPRETATIVE AND GATEWAY MARKERS.

ALLEGHANYASHEAVERYBUNCOMBEBURKECALDWELLCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONMADISONMcDOWELLMITCHELLPOLKRUTHERFORDSURRYSWAINTRANSYLVANIAWATAUGAWILKESYANCEY

VARIOUS

ROADSIDE ENVIRONMENTAL PROJECTS (REST AREA)

UNDER CONSTRUCTION - INCLUDES WORK PREVIOUSLY IN PROJECT K-3803B

K-5002 7892 5142US 23/US 74, ADD NEW SOUTHBOUND REST AREA ON NEW LOCATION AS A COMPANION TO EXISTING NORTHBOUND REST AREA. CONNECT NEW REST AREA TO MUNICIPAL WATER AND SEWER SYSTEM. RENOVATE EXISTING NORTHBOUND REST AREA TO INCLUDE ADA COMPLIANT FAMILY RESTROOM, UPGRADE FIXTURES AND FINISHES AND CONNECT TO MUNICIPAL SEWER SYSTEM.

TRN

NHP 2750C HAYWOOD US 23/US 74

UNDER CONSTRUCTION

S-5105 261 261GRAVEYARD FIELDS OVERLOOK AT BLUE RIDGE PARKWAY MILE POST 418. EXPAND PARKING LOT, CONSTRUCT A THREE-UNIT CONVENIENCE STATION, INSTALL NEW INTERPRETIVE EDUCATIONAL SIGNS AND MAKE TRAIL IMPROVEMENTS.

HAYWOOD BLUE RIDGEPARKWAY

INTERSTATE PROJECTSI-5759 2001 MILE EAST OF SR 1793 (TRACY GROVE

ROAD) TO 0.2 MILE EAST OF US 25. PAVEMENT REHABILITATION.

1.8SW

NHPIM C 200 HENDERSON I-26

I-5835 6000SR 1525 (DANA ROAD) TO 0.1 MILE EAST OF POLK COUNTY LINE. PAVEMENT REHABILITATION.

7.4

SW

NHPIM C 6000 HENDERSONPOLK

I-26 / US 74

14-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 15: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025INTERSTATE PROJECTS

PLANNING/DESIGN IN PROGRESS

I-4400 114941 2044US 25 (EXIT 54) TO NC 280 (EXIT 40). WIDEN TO ADD ADDITIONAL LANES.

13.6 NHP 1000R A NHP 1260M A NHP 38768C A NHP 1000R B NHP 38769C B NHP R 1000 C NHP C 31100 C

A US 25 (EXIT 54) TO US 64 (EXIT 49)B US 64 (EXIT 49) TO US 25 BUSINESS (EXIT 44)C US 25 BUSINESS (EXIT 44) TO NC 280 (EXIT 40)REG

BUNCOMBEHENDERSON

I-26

PLANNING/DESIGN IN PROGRESS

I-4700 153570 1170NC 280 (EXIT 40) TO I-40 AT ASHEVILLE. ADD ADDITIONAL LANES.

8.6 NHP R 1000 A NHP C 52600 A NHP R 1000 B NHP C 48900 B 48900C B

A NC 280 (EXIT 40) TO NC 146 - LONG SHOALS ROAD (EXIT 37)SWB NC 146 - LONG SHOALS ROAD (EXIT 37) TO I-40SW

BUNCOMBEHENDERSON

I-26

GARVEE BOND FUNDING $7.92 MILLION; CONSTRUCTION - PAYBACK FY 2008 - FY 2019; INCLUDES PROJECT I-4920

I-5005 29541 25201MILE MARKER 37.1 IN BUNCOMBE COUNTY TO SR 1783 (MILE MARKER 53.3) IN HENDERSON COUNTY. PAVEMENT REHABILITATION.

16.2 NHP 868CG A CG 868 A CG 868 A CG 868 A CG 868 A

A MILEPOST 37.1 IN BUNCOMBE COUNTY TO MILEPOST 50.3 (CONCRETE SECTION) - COMPLETETRNB MILEPOST 50.3 TO SR 1783 (MILEPOST 53.3 - ASPHALT SECTION) - COMPLETE

BUNCOMBEHENDERSON

I-26

UNDER CONSTRUCTION

I-5501 6624 6624I-26/NC 280 INTERCHANGE. RETROFIT EXISTING INTERCHANGE TO A DIVERGING DIAMOND CONFIGURATION.TRN

BUNCOMBEHENDERSON

I-26

I-5758 5000BUNCOMBE COUNTY LINE TO 1 MILE EAST OF SR 1534 (SOUTH NAPLES ROAD). PAVEMENT REHABILITATION.

4.9SW

NHPIM C 5000 HENDERSON I-26 / US 74

RURAL PROJECTSR-2588 85900US 25 IN HENDERSONVILLE TO NC 280

SOUTH OF MILLS RIVER. WIDEN TO MULTI-LANES.

7.2 STP 15200R A STP 1800U A STP 18800C A STP 4500R B STP 500U B STP 33825C B C 11275 B

A US 25 TO SR 1381 (MOUNTAIN ROAD).B SR 1381 (MOUNTAIN ROAD) TO NC 280 SOUTH OF MILLS RIVER.REG

HENDERSON NC 191

R-5207 26291 25341US 25 IN FLETCHER TO US 64. UPGRADE ROADWAY.

7.6 T 100R C T 850C C

A US 64 TO HENDERSON COUNTY BRIDGE NO. 20 - UNDER CONSTRUCTIONTRNB HENDERSON COUNTY BRIDGE NO. 20 TO SR 1539 (JACKSON ROAD) - UNDER CONSTRUCTIONTRNC SR 1539 (JACKSON ROAD) TO US 25 IN FLETCHERTRN

HENDERSON SR 1006 (HOWARDGAP ROAD)

R-5748 10300US 25 BUSINESS (CHURCH STREET) TO SR 1123 (LITTLE RIVER ROAD). UPGRADE ROADWAY.

4

DIV

T 100R T 7650C C 2550

HENDERSON SR 1127(KANUGA ROAD)

UNDER CONSTRUCTION

R-4430 49359 49359US 176 TO SR 1006 (HOWARD GAP ROAD). WIDEN AND IMPROVE ROADWAY.

2.7HENDERSON SR 1783(UPWARD ROAD)

14-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 16: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

R-5524 2221 2181CONSTRUCT IMPROVEMENTS TO OLD FANNING BRIDGE ROAD AND CONSTRUCT NEW ACCESS ROAD INTO FERNCLIFF INDUSTRIAL PARK.

T 40R C

A INSTALL TRAFFIC SIGNAL. - UNDER CONSTRUCTIONB NC 280 TO SR 1419 (OLD FANNING BRIDGE ROAD). RESURFACE AND ADD BIKE LANES. - UNDER CONSTRUCTIONC CONSTRUCT ROUNDABOUT. - UNDER CONSTRUCTIONTRND CONSTRUCT NEW ACCESS ROAD INTO FERNCLIFF INDUSTRIAL PARK. - UNDER CONSTRUCTION

BUNCOMBEHENDERSON

SR 2277/SR 3526(OLD FANNINGBRIDGE ROAD)

IN PROGRESS - PURCHASE ORDER CONTRACT (POC)

R-4048 2519 2519GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

R-5744 156200NC 191 (BREVARD ROAD) TO US 64. CONSTRUCT NEW 4-LANE EXPRESSWAY.

4.6

DIV

T 8767R R 8767 R 8766T U 900 T 129000C

HENDERSON BALFOUR PARKWAY

URBAN PROJECTSU-5783 7270SR 1180 (BLYTHE STREET) TO SR 1173

(WHITE PINE DRIVE)/SR 1186 (DANIEL DRIVE). WIDEN ROADWAY.

1

REG

T R 1850 T U 220 T 5200C

HENDERSON US 64

U-5840 2300US 25 TO MILLS GAP ROAD. WIDEN ROADWAY.

0.9

DIV

T R 100 T 2200C

HENDERSON SR 1545 (OLDAIRPORT ROAD)

U-5100 36950STP-DA IN THE FRENCH BROAD RIVER METROPOLITAN PLANNING ORGANIZATION.

DIV

STPDA C 500 C 1060 C 3500 C 3500 C 3500 3500C3500C3500C C 3500 C 3500L C 125 C 265 C 875 C 875 C 875 875C875C875C C 875 C 875

BUNCOMBEHAYWOODHENDERSON

VARIOUS

U-3403 49300NC 191 (BREVARD ROAD - OLD HAYWOOD ROAD), NC 280 TO NC 112 (SARDIS ROAD). WIDEN TO MULTI-LANES.

9.1 STP 9000R A STP 17700C A STP 5100R B STP 600U B STP C 16900 B

A NC 280 (BOYLSTON HIGHWAY) TO NC 146.B NC 146 TO NORTH OF BLUE RIDGE PARYWAY.REGC NORTH OF BLUE RIDGE PARKWAY TO NC 112 (SARDIS ROAD) - COMPLETE

BUNCOMBEHENDERSON

ASHEVILLE

U-5192 2090CONSTRUCT TRANSIT CENTER IN HENDERSONVILLE.

DIV

STPDA 1672C L 418C

HENDERSON HENDERSONVILLE

DIVISION PROJECT

U-5105 1900 200NC 225/SR 1164 (ERKWOOD DRIVE)/SR 1779(SHEPHERD STREET) IN HENDERSONVILLE. IMPROVE INTERSECTION.

TRN

STP 200R STP C 1500

HENDERSON HENDERSONVILLE

FEASIBILITY STUDIES

FEASIBILITY STUDY IN PROGRESS

FS-1214B US 64 TO NC 191 (BREVARD ROAD). CONSTRUCT NEW ROUTE.

4.6HENDERSON BALFOUR PARKWAY

14-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 17: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-5901 2206REPLACE BRIDGE NO. 121 OVER FRENCH BROAD RIVER OVERFLOW.

REG

NHPB R 100 NHPB M 6 NHPB 2100C

HENDERSON NC 191

B-5913 1050REPLACE BRIDGE NO. 100 OVER ROCK CREEK.

DIV

STPOFF 50R STPOFF 1000C

HENDERSON SR 1108(ROCK CREEK ROADEAST)

B-5907 260REPLACE BRIDGE NO. 208 OVER CABIN CREEK.

DIV

STPOFF R 10 STPOFF C 250

HENDERSON SR 1109(CABIN CREEK ROAD)

UNDER CONSTRUCTION

B-4147 2348 2348REPLACE BRIDGE NO. 75 OVER RIGHT PRONG MUD CREEK, AND BRIDGE NO. 76 OVER LEFT PRONG MUD CREEK.DIV

HENDERSON SR 1123(LITTLE RIVER ROAD)

B-5917 400REPLACE BRIDGE NO. 89 OVER BIG WILLOW CREEK.

DIV

STPOFF 20R STPOFF 380C

HENDERSON SR 1210(BIG WILLOW ROAD)

B-5903 340REPLACE BRIDGE NO. 15 OVER BOYLSTON CREEK.

DIV

STPOFF R 20 STPOFF 320C

HENDERSON SR 1323(BRICKYARD ROAD)

B-5906 270REPLACE BRIDGE NO. 182 OVER SWEET WATER BRANCH CREEK.

DIV

STPOFF 10R STPOFF 260C

HENDERSON SR 1328(GASH ROAD)

UNDER CONSTRUCTION

B-4547 1059 1059REPLACE BRIDGE NO. 45 OVER DEVILS FORK CREEK.

DIV

HENDERSON SR 1525(DANA ROAD)

UNDER CONSTRUCTION

B-4988 626 626REPLACE BRIDGE NO. 309 OVER FEATHERSTONE CREEK.

DIV

HENDERSON SR 1528(LOCUST GROVE ROAD)

B-5922 1650REPLACE BRIDGE NO. 237 OVER SOUTHERN RAILROAD.

HF

HFB 150R HFB 1500C

HENDERSON SR 1545(OLD ASHEVILLE)

UNDER CONSTRUCTION

B-4987 655 655REPLACE BRIDGE NO. 35 OVER CLEAR CREEK.

DIV

HENDERSON SR 1572(APPLE VALLEYROAD)

UNDER CONSTRUCTION (COMBINED WITH B-4765)

B-5149 559 559REPLACE BRIDGE NO. 38 OVER CLEAR CREEK.

DIV

HENDERSON SR 1574(FRUITLAND ROAD)

UNDER CONSTRUCTION (COMBINED WITH B-5149)

B-4765 2517 2517REPLACE BRIDGE NO. 113 OVER KYLES CREEK.

DIV

HENDERSON SR 1574(HAYWOOD AVENUE)

UNDER CONSTRUCTION

B-3346 1438 1438REPLACE BRIDGE NO. 42 OVER SACONON CREEK.

DIV

HENDERSON SR 1734(STEPP MILL ROAD)

14-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 18: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-5897 255REPLACE BRIDGE NO. 62 OVER KING CREEK.

HF

HFB R 25 HFB 230C

HENDERSON SR 1812(BLUE RIDGE ROAD)

B-5409 660REPLACE BRIDGE NO. 58 OVER DEVILS FORK CREEK.

DIV

STPOFF R 60 STPOFF C 600

HENDERSON SR 1893MID ALLEN ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5114 17255 15255DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

MUNICIPAL BRIDGE PROJECTSB-5929 1040REPLACE BRIDGE NO. 350 OVER DEVILS

FORK CREEK.

DIV

L 30PE STPOFF 120PE L R 10 STPOFF R 40 L C 168 STPOFF C 672

HENDERSON OLD DANA ROAD

MITIGATION PROJECTS

IN PROGRESS

EE-4914 18871 18871ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

HAZARD ELIMINATION PROJECTSW-5506 4820 190SR 1381 (MOUNTAIN ROAD) TO NORTH OF

SR 1365 (NORTH RUGBY ROAD). CONSTRUCT A CONTINUOUS THREE-LANE SECTION, EXTEND RIGHT TURN LANE INTO SCHOOL, REVISE AND INSTALL GUARDRAIL AND CONSTRUCT PAVED SHOULDERS.

REG

HSIP 155R HSIP C 1975 STP C 2500

HENDERSON NC 191

UNDER CONSTRUCTION

SF-4914C 77 77SR 1328 (TURNPIKE/GASH ROAD) TO SR 1317 (BRANNON/MAPLE SWAMP ROAD). INSTALL GUARDRAIL ALONG STEEP FILL SECTIONS.

HENDERSON SR 1316(RAY HILL ROAD)

14-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 19: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS

IN PRGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)

W-5214 3128 3128DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

ENHANCEMENT (CALL PROJECTS)

UNDER CONSTRUCTION

E-4975 576 576BLUE RIDGE NATIONAL HERITAGE SITES. INTERPRETATIVE AND GATEWAY MARKERS.

ALLEGHANYASHEAVERYBUNCOMBEBURKECALDWELLCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONMADISONMcDOWELLMITCHELLPOLKRUTHERFORDSURRYSWAINTRANSYLVANIAWATAUGAWILKESYANCEY

VARIOUS

ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)

IN PROGRESS

S-5101 46 46PACOLET RIVER BYWAY. COMPREHENSIVE BASELINE ASSESSMENT AND STRATEGIC PLAN FOR BYWAY IN NORTH PACOLET WATERSHED.

HENDERSONPOLK

VARIOUS

RURAL PROJECTSR-5747 8800SR 1304 (FIE TOP ROAD) AT GHOST TOWN

USA TO JENKINS CREEK ROAD. UPGRADE ROADWAY.

9.4

DIV

T 100R T 5800C C 2900

HAYWOODJACKSON

US 19

DIVISION PROJECT - PLANNING/DESIGN IN PROGRESS

R-2409 22931 12581NC 107 AT CASHIERS TO US 178 AT ROSMAN. SAFETY IMPROVEMENTS AND CLIMBING LANES AT SELECTED LOCATIONS.

HP 4350C C STP 1000R D STP 5000C D

A CASHIERS TO JACKSON-TRANSYLVANIA COUNTY LINE - COMPLETEB 1.1 MILES EAST OF CASHIERS TO 1.6 MILES EAST OF CASHIERS - COMPLETEC WEST OF NC 281 N NEAR LAKE TOXAWAY TO INDIAN CREEK. WIDENING AND REALIGNMENT. - RIGHT OF WAY IN PROGRESSTRND INDIAN CREEK TO FLAT CREEK VALLEY ROAD. WIDENING AND REALIGNMENT

JACKSONTRANSYLVANIA

US 64

14-22 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 20: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

FEASIBILITY STUDY IN PROGRESS

FS-1214C NC 281 TO APPROXIMATELY 1 MILE NORTH OF SR 1157 (PINE CREEK ROAD). WIDEN PAVEMENT TO 24 FEET WITH 5 FEET PAVED SHOULDERS.

7.1JACKSON NC 107

R-5715 12000SR 1449 (COPE CREEK ROAD) TO SR 1783 (COUNCIL CIRCLE). UPGRADE ROADWAY.

1

REG

T R 5800 T U 700 T 5500C

JACKSON NC 107 (E MAIN ST),US 23 BUS. (W MAIN ST)US 23 BUS(ASHEVILLE HW)

R-5600 21275NC 116 TO US 23 BUSINESS. UPGRADE TO MEDIAN DIVIDED FACILITY.

1.9

REG

STP R 7300 STP U 875 STP 13100C

JACKSON NC 107

PLANNING/DESIGN IN PROGRESS

R-4753 19680 813SR 1002 TO NC 281. UPGRADE EXISTING ROADWAY.

4.1

DIV

STP 5000R STP 267M STP C 6800 C 6800

JACKSON NC 107

RIGHT OF WAY IN PROGRESS

R-5206 3857 1576SR 1710 TO US 23/US 74. SAFETY IMPROVEMENTS AND WIDENING TO 10 FEET LANES.

1.9

TRN

T 10C T 71M T 2200C

A SR 1710 TO US 23/US 74. - CLEARING AND GRUBBING ONLYTRN

JACKSON SR 1449 (COPECREEK ROAD)

UNDER CONSTRUCTION

R-5000 26857 26857NC 116 TO NC 107 IN WEBSTER. CONSTRUCT CONNECTOR ON NEW LOCATION.

0.7JACKSON NEW ROUTE

R-5500 5672INDIAN RESERVATION ROAD (IRR) PROGRAM. ROAD AND BRIDGE IMPROVEMENTS TO BE CONSTRUCTED BY EASTERN BAND OF CHEROKEE INDIANS.EX

FLPI 5672C JACKSONSWAIN

VARIOUS

IN PROGRESS - PURCHASE ORDER CONTRACT (POC)

R-4048 2519 2519GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

FEDERAL BRIDGE PROJECTSB-5905 5820 150REPLACE BRIDGE NO. 27 OVER SCOTT

CREEK AND SOUTHERN RAILROAD.REG

STPON R 270 STPON C 5400

JACKSON US 23 BUSINESS

UNDER CONSTRUCTION

B-4554 8000 8000REPLACE BRIDGE NO. 145 OVER SR 1705, SOUTHERN RAILROAD, AND SCOTT CREEK.SW

JACKSON US 23/US 74

UNDER CONSTRUCTION

B-3480 6274 6274REPLACE BRIDGE NO. 39 OVER EAST FORK TUCKASEGEE RIVER.REG

JACKSON NC 107

B-5910 2130 150REPLACE BRIDGE NO. 32 OVER SAVANNAH CREEK.

HF

HFB 180R HFB 1800C

JACKSON NC 116

14-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 21: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

RIGHT OF WAY IN PROGRESS

B-4159 6686 886REPLACE BRIDGE NO. 108 OVER TUCKASEGEE RIVER.

DIV

STPON 5800C JACKSON SR 1002(ROGER ROAD)

B-5899 420REPLACE BRIDGE NO. 1 OVER HORSE PASTURE RIVER.

DIV

STPOFF R 20 STPOFF 400C

JACKSON SR 1119(SAPPHIRE POSTOFFICE ROAD)

B-5921 420REPLACE BRIDGE NO. 8 CEDAR CREEK.

DIV

STPOFF R 20 STPOFF C 400

JACKSON SR 1120(CEDAR CREEKROAD)

B-5404 950 200REPLACE BRIDGE NO. 136 OVER PINE CREEK.

DIV

STPOFF 50R STPOFF C 700

JACKSON SR 1163(BIG PINE CREEK)

B-5410 985 150REPLACE BRIDGE NO. 221 OVER LITTLE SAVANNAH CREEK.

DIV

STPOFF 35R STPOFF C 800

JACKSON SR 1367(LITTLE SAVANNAHROAD)

UNDER CONSTRUCTION

B-4162 2111 2111REPLACE BRIDGE NO. 320 OVER SOUTHERN RAILWAY.

DIV

JACKSON SR 1432(SKYLINE DRIVE)

B-5902 260REPLACE BRIDGE NO. 99 OVER FISHER CREEK.

DIV

STPOFF R 10 STPOFF 250C

JACKSON SR 1447(DILLS BRANCHROAD)

UNDER CONSTRUCTION

B-3861 1987 1987REPLACE BRIDGE NO. 107 OVER TUCKASEGEE RIVER.

DIV

JACKSON SR 1731(WEYEHUTTA ROAD)

UNDER CONSTRUCTION BY FEDERAL HIGHWAY ADMINISTRATION - FEDERAL LANDS ACCESS PROGRAM (FLAP) PROJECT

B-4472 2955 2955REPLACE BRIDGE NO. 80 OVER CANEY CREEK. NANTAHALA NATIONAL FOREST, FEDERAL AID NUMBER NC FLAP DOT BR80(1).

DIV

JACKSON SR 1737FH 102(CANEY FORK ROAD)

B-5159 1551 213REPLACE BRIDGE NO. 101 OVER CANEY CREEK.

HF

HFB R 135 HFB M 3 HFB C 1200

JACKSON SR 1740(MOSES CREEKROAD)

14-24 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 22: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5114 17255 15255DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4914 18871 18871ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

HAZARD ELIMINATION PROJECTS

UNDER CONSTRUCTION

W-5315 5832 5832EXIT 98 IN HAYWOOD COUNTY TO 0.1 MILE WEST OF THE JACKSON-HAYWOOD COUNTY LINE. REMOVE CONCRETE ISLAND, REPAVE WITH ASPHALT, DRAINAGE MODIFICATIONS, AND INSTALL GUARDRAIL.

4.8

TRN

HAYWOODJACKSON

US 74

IN PRGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)

W-5214 3128 3128DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

14-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 23: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)

UNDER CONSTRUCTION

E-4975 576 576BLUE RIDGE NATIONAL HERITAGE SITES. INTERPRETATIVE AND GATEWAY MARKERS.

ALLEGHANYASHEAVERYBUNCOMBEBURKECALDWELLCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONMADISONMcDOWELLMITCHELLPOLKRUTHERFORDSURRYSWAINTRANSYLVANIAWATAUGAWILKESYANCEY

VARIOUS

RURAL PROJECTSR-5734 6290US 64 TO SR 1652 (WIDE HORIZON DRIVE)/SR

1152 (BELDEN CIRCLE). IMPLEMENT ACCESS MANAGEMENT STRATEGIES.

0.8

DIV

T R 530 T U 60 T 5700C

MACON US 23/US 441

RIGHT OF WAY IN PROGRESS

R-5115 1448 623US 23/US 441 IN FRANKLIN TO NC 106 IN HIGHLANDS. CONSTRUCT TRUCK INFORMATION STATIONS AND TRUCK TURN-AROUNDS.

19TRN

T 825C MACON US 64/NC 28

R-2408 25918 25918SR 1729 (DEPOT STREET EXTENSION) TO SR 1378 (BENNETT ROAD). UPGRADE AND MAKE SAFETY IMPROVEMENTS.

3.5

A US 441 BUSINESS TO NC 28 - COMPLETEB NORTH OF SR 1323 (RIVERVIEW STREET) TO SOUTH OF SR 1378 (BENNETT ROAD) - UNDER CONSTRUCTION

MACON NC 28 ANDSR 1323

UNDER CONSTRUCTION

R-4748 19440 19440SR 1660 (SILER ROAD) TO SR 1662 (WILEY BROWN ROAD) SOUTH OF US 441 IN FRANKLIN. TWO LANE ROADWAY ON NEW LOCATION.

0.7MACON NEW ROUTE

IN PROGRESS - PURCHASE ORDER CONTRACT (POC)

R-4048 2519 2519GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

14-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 24: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

U-5604 7300US 23/US 64/US 441 TO PORTER STREET. INTERSECTION IMPROVEMENTS AT WOMAK STREET, MAPLE STREET, PORTER STREET, AND DEPOT STREET IN FRANKLIN.

1.4

REG

STP R 1600 STP 5700C

MACON US 441 BUSINESS

FEASIBILITY STUDIES

FEASIBILITY STUDY IN PROGRESS

FS-1214A SR 1649 (PRENTISS BRIDGE ROAD) TO US 64. UPGRADE ROADWAY WITH ACCESS MANAGEMENT FEATURES.

3.2MACON US 23US 441

FEDERAL BRIDGE PROJECTSB-5125 2725 275REPLACE BRIDGE NO. 22 OVER LITTLE

TENNESSEE RIVER.HF

HFB 400R HFB C 2050

MACON US 441 BUSINESS

DIVISION PURCHASE ORDER CONTRACT (DPOC)

B-4775 572 72REPLACE BRIDGE NO. 17 OVER WAYAH CREEK.

DIV

STPOFF R 50 STPOFF C 450

MACON SR 1309(CRANFORD ROAD)

B-5912 260REPLACE BRIDGE NO. 181 OVER TELLICO CREEK.

DIV

STPOFF 10R STPOFF 250C

MACON SR 1369(BYRD ROAD)

B-5914 260REPLACE BRIDGE NO. 180 OVER SUGAR COVE CREEK.

DIV

STPOFF 10R STPOFF 250C

MACON SR 1369(BYRD ROAD)

B-5908 360REPLACE BRIDGE NO. 127 OVER BURNINGTOWN CREEK.

DIV

STPOFF 20R STPOFF 340C

MACON SR 1387(OLIVE HILL ROAD)

RIGHT OF WAY IN PROGRESS

B-3868 3686 736REPLACE BRIDGE NO. 172 OVER LITTLE TENNESSEE RIVER AND CONSTRUCT IMPROVEMENTS TO NC 28.DIV

STPOFF C 2950 MACON SR 1456

B-5406 1140 150REPLACE BRIDGE NO. 67 OVER RABBIT CREEK.

HF

HFB R 90 HFB C 900

MACON SR 1513(CAT CREEK ROAD)

B-5919 420REPLACE BRIDGE NO. 43 OVER MIDDLE CREEK.

DIV

STPOFF 20R STPOFF 400C

MACON SR 1635(MIDDLE CREEKROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5114 17255 15255DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

14-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 25: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025MITIGATION PROJECTS

IN PROGRESS

EE-4914 18871 18871ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

HAZARD ELIMINATION PROJECTS

IN PRGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)

W-5214 3128 3128DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

ENHANCEMENT (CALL PROJECTS)

UNDER CONSTRUCTION

E-4975 576 576BLUE RIDGE NATIONAL HERITAGE SITES. INTERPRETATIVE AND GATEWAY MARKERS.

ALLEGHANYASHEAVERYBUNCOMBEBURKECALDWELLCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONMADISONMcDOWELLMITCHELLPOLKRUTHERFORDSURRYSWAINTRANSYLVANIAWATAUGAWILKESYANCEY

VARIOUS

ROADSIDE ENVIRONMENTAL PROJECTS (REST AREA)K-5103 285 35US 23/US 441, RENOVATION OF REST AREA-

BUILDING AND GROUNDS. INCLUDE ADA COMPLIANT FAMILY RESTROOM AND UPGRADE OF FIXTURES AND FINISHES.

TRN

NHP 250C MACON US 23/US 441

14-28 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 26: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ROADSIDE ENVIRONMENTAL PROJECTS (REST AREA)

UNDER CONSTRUCTION

S-5102 256 256US 64. MOUNTAIN WATERS SCENIC BYWAY-DRY FALLS. RESTORATION AND IMPROVEMENTS IN THE CULLASAJA GORGE.

MACON US 64

INTERSTATE PROJECTSI-4729 19000US 74/NC 108 INTERCHANGE (EXIT 36).

REVISE INTERCHANGE AND CONSTRUCT IMPROVEMENTS TO NC 108.DIV

T R 1400 T 17600C

POLK I-26

I-5835 6000SR 1525 (DANA ROAD) TO 0.1 MILE EAST OF POLK COUNTY LINE. PAVEMENT REHABILITATION.

7.4

SW

NHPIM C 6000 HENDERSONPOLK

I-26 / US 74

RURAL PROJECTS

IN PROGRESS - PURCHASE ORDER CONTRACT (POC)

R-4048 2519 2519GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

FEDERAL BRIDGE PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC)

B-4792 759 69REPLACE BRIDGE NO. 4 OVER FORK CREEK (SMALL BRANCH OF PACOLET RIVER).

DIV

STPOFF 40R STPOFF C 650

POLK SR 1102(PEARSON FALLS)

B-5896 260REPLACE BRIDGE NO. 143 OVER PANTHER CREEK.

DIV

STPOFF R 10 STPOFF 250C

POLK SR 1138(SILVER CREEKROAD)

B-5407 1800 150REPLACE BRIDGE NO. 34 OVER WALNUT CREEK.

HF

HFB R 150 HFB C 1500

POLK SR 1311(ROCK SPRINGSROAD)

B-5916 300REPLACE BRIDGE NO. 22 OVER WOLFE CREEK.

DIV

STPOFF 10R STPOFF 290C

POLK SR 1501(HUNTING COUNTRY)

UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

B-4241 623 623REPLACE BRIDGE NO. 24 OVER HOOPER CREEK.

DIV

POLK SR 1520(LANDRUM ROAD)

14-29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 27: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5114 17255 15255DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4914 18871 18871ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

HAZARD ELIMINATION PROJECTS

UNDER CONSTRUCTION

SF-4914D 106 106SR 1150 TO BRIDGE #202. INSTALL GUARDRAIL ALONG STEEP FILL SECTIONS.

POLK SR 1151(GREEN RIVERCOVE ROAD)

IN PRGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)

W-5214 3128 3128DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

14-30 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 28: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)

UNDER CONSTRUCTION

E-4975 576 576BLUE RIDGE NATIONAL HERITAGE SITES. INTERPRETATIVE AND GATEWAY MARKERS.

ALLEGHANYASHEAVERYBUNCOMBEBURKECALDWELLCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONMADISONMcDOWELLMITCHELLPOLKRUTHERFORDSURRYSWAINTRANSYLVANIAWATAUGAWILKESYANCEY

VARIOUS

ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)

IN PROGRESS

S-5101 46 46PACOLET RIVER BYWAY. COMPREHENSIVE BASELINE ASSESSMENT AND STRATEGIC PLAN FOR BYWAY IN NORTH PACOLET WATERSHED.

HENDERSONPOLK

VARIOUS

RURAL PROJECTS

UNDER CONSTRUCTION - FEDERAL LANDS ACCESS PROGRAM (FLAP) PROJECT

R-5529 71 71CONSTRUCT HELIPAD ADJACENT TO NC 28 NEAR TSALI FOREST SERVICE RECREATIONAL AREA. FEDERAL AID NUMBER NC FLAP SWN HPAD(1)

EXSWAIN NC 28

R-5500 5672INDIAN RESERVATION ROAD (IRR) PROGRAM. ROAD AND BRIDGE IMPROVEMENTS TO BE CONSTRUCTED BY EASTERN BAND OF CHEROKEE INDIANS.EX

FLPI 5672C JACKSONSWAIN

VARIOUS

IN PROGRESS - PURCHASE ORDER CONTRACT (POC)

R-4048 2519 2519GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

14-31 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 29: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY

A-0009* 883443 83818CORRIDOR "K", US 19/US 74/US 129 AT ANDREWS TO NC 28 EAST OF ALMOND. FOUR LANE DIVIDED FACILITY, PRIMARILY ON NEW LOCATION.

27.1 APD 14300R A APD 925U A APD 366000C A APD R 14900 B APD U 2300 B APD M 2500 B APD 39000C B C 19500 B C 19500 BAPD R 14500 C APD M 22200 C APD 41000G CA G 20500 CA G 20500 CAAPD 91500C CB C 45750 CB C 45750 CBAPD 19000P CC

A US 19 BUSINESS IN ANDREWS TO US 129B US 129 TO NC 143 AT SR 1223 (BEECH CREEK) - DESIGN-BUILD CONTRACTDIVC NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH - RIGHT OF WAY ONLYEXCA NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH. GRADING AND STRUCTURES ( EXCEPT TUNNELS). - DESIGN-BUILD CONTRACTEXCB TUNNELS AT APPALACHIAN TRAIL - DESIGN-BUILD CONTRACTEXCC NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH. PAVING.DA SR 1121 (WATTIA ROAD) AT ALMONDS TO EXISTING US 19/NC 28 - COMPLETEDB EAST OF CALFPEN GAP IN GRAHAM COUNTY TO SR 1121 (WATTIA ROAD) AT ALMONDS IN SWAIN COUNTY - COMPLETEDC WEST OF SR 1231 (TOBACCO BRANCH ROAD) TO CALFPEN GAP - COMPLETEDD NC 28 AT STECOAH TO WEST OF SR 1231 (TOBACCO BRANCH ROAD) - COMPLETE

CHEROKEEGRAHAMSWAIN

FUTURE US 74

FEDERAL BRIDGE PROJECTS

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5114 17255 15255DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4914 18871 18871ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

14-32 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 30: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS

IN PRGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)

W-5214 3128 3128DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

CONGESTION MITIGATION PROJECTSC-5612 100PROJECTS TO IMPROVE CONGESTION AND

AIR QUALITY IN THE LAND OF SKY RPO AND SOUTHWESTERN RPO.EX

CMAQ C 50 C 50 HAYWOODSWAIN

VARIOUS

C-5151 242GREAT SMOKIES NATIONAL PARK. CONSTRUCT A MIXED-USE PATHWAY.

EX

CMAQ 177C L 65C

HAYWOODSWAIN

EASTERN BANDOF CHEROKEEINDIANS (EBCI)

C-5203 241BIG COVE MIXED USE PATH, CHEROKEE CENTRAL SCHOOL NORTHWARD ON BOTH SIDES OF THE OCONALUFTEE RIVER TO THE EXISTING BIG COVE ROAD MIXED USE TRAIL. CONSTRUCT PEDESTRIAN AND BIKE PATH, PHASES 3 AND 4.

EX

CMAQ 39PE L 10PE CMAQ 77R L 19R CMAQ 77C L 19C

SWAIN EASTERN BANDOF CHEROKEEINDIANS (EBCI)

IN PROGRESS

C-5202 308 119TRANSPORTATION CHOICES. INCREASE EDUCATION EFFORTS THAT INFORM VISITORS ABOUT THE ROLE THEIR TRANSPORTATION CHOICES HAVE IN RELATION TO AIR POLLUTION ISSUES IN GSMNP.EX

CMAQ 91I I 60 L 23I I 15

HAYWOODSWAIN

GREAT SMOKYMOUNTAINSNATIONAL PARK(GSMNP)

14-33 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 31: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)

UNDER CONSTRUCTION

E-4975 576 576BLUE RIDGE NATIONAL HERITAGE SITES. INTERPRETATIVE AND GATEWAY MARKERS.

ALLEGHANYASHEAVERYBUNCOMBEBURKECALDWELLCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONMADISONMcDOWELLMITCHELLPOLKRUTHERFORDSURRYSWAINTRANSYLVANIAWATAUGAWILKESYANCEY

VARIOUS

RURAL PROJECTS

FEASIBILITY STUDY REEVALUATION IN PROGRESS

R-2702 27000TWO LANES ON MULTI-LANE RIGHT OF WAY. 4.8 STP 7100R STP 19900C

TRANSYLVANIA US 64BREVARD BYPASS

DIVISION PROJECT - PLANNING/DESIGN IN PROGRESS

R-2409 22931 12581NC 107 AT CASHIERS TO US 178 AT ROSMAN. SAFETY IMPROVEMENTS AND CLIMBING LANES AT SELECTED LOCATIONS.

HP 4350C C STP 1000R D STP 5000C D

A CASHIERS TO JACKSON-TRANSYLVANIA COUNTY LINE - COMPLETEB 1.1 MILES EAST OF CASHIERS TO 1.6 MILES EAST OF CASHIERS - COMPLETEC WEST OF NC 281 N NEAR LAKE TOXAWAY TO INDIAN CREEK. WIDENING AND REALIGNMENT. - RIGHT OF WAY IN PROGRESSTRND INDIAN CREEK TO FLAT CREEK VALLEY ROAD. WIDENING AND REALIGNMENT

JACKSONTRANSYLVANIA

US 64

SCHEDULED FOR FEASIBILITY STUDY

FS-1514A SR 1504 (OLD US 64) TO US 276. UPGRADE ROADWAY.

3.7TRANSYLVANIA SR 1540(WILSON ROAD)

R-5743 26050US 64/US 276 TO US 64. CONSTRUCT NEW ROUTE

2.7

DIV

T 6300R T 750U T 14250C C 4750

TRANSYLVANIA NEW ROUTE

IN PROGRESS - PURCHASE ORDER CONTRACT (POC)

R-4048 2519 2519GUARDRAIL INSTALLATION AND SAFETY IMPROVEMENTS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

14-34 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 32: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

R-5605 10700US 64 TO US 276/US 64 IN PISGAH FOREST. 0.8

DIV

T R 100 T U 100 T C 10500

TRANSYLVANIA DAVIDSON RIVERVILLAGECONNECTOR

URBAN PROJECTS

RIGHT OF WAY IN PROGRESS - DIVISION PROJECT

U-5104 4071 2071SR 1348 (PROBART STREET) TO US 64 IN BREVARD. WIDEN ROADWAY.

0.6TRN

STP 2000C TRANSYLVANIA US 64 BUSINESS

FEDERAL BRIDGE PROJECTS

UNDER CONSTRUCTION

B-5010 1506 1506REPLACE BRIDGE NO. 27 OVER ROCKY CREEK WITH CULVERT.REG

TRANSYLVANIA US 64

UNDER CONSTRUCTION AS DESIGN-BUILD PROJECT - FEDERAL LANDS ACCESS PROGRAM (FLAP) PROJECT

B-5555 895 895REPLACE BRIDGE NO. 46 OVER NORTH FORK FRENCH BROAD RIVER. FEDERAL AID NUMBER: NC FLAP DOT 215(2).EX

TRANSYLVANIA NC 215

UNDER CONSTRUCTION AS DESIGN-BUILD PROJECT - FEDERAL LANDS ACCESS PROGRAM (FLAP) PROJECT

B-5554 746 746REPLACE BRIDGE NO. 73 OVER NORTH FORK FRENCH BROAD RIVER. FEDERAL AID NUMBER: NC FLAP DOT 215(1).EX

TRANSYLVANIA NC 215

UNDER CONSTRUCTION

B-4288 1090 1090REPLACE BRIDGE NO. 85 OVER EAST FORK FRENCH BROAD RIVER.

DIV

TRANSYLVANIA SR 1107(EAST FORK ROAD)

B-4822 1030 185REPLACE BRIDGE NO. 13 OVER NICHOLSON CREEK.

DIV

STPOFF 45R STPOFF C 800

TRANSYLVANIA SR 1119(SUGAR LOAF ROAD)

B-5405 645 150REPLACE BRIDGE NO. 139 OVER EAST BRANCH TOXAWAY CREEK.

HF

HFB R 45 HFB C 450

TRANSYLVANIA SR 1139(OLD TOXAWAY ROAD)

B-5915 270REPLACE BRIDGE NO. 29 OVER FLAT CREEK.

DIV

STPOFF 10R STPOFF 260C

TRANSYLVANIA SR 1316(OAK GROVECHURCH ROAD)

UNDER CONSTRUCTION

B-4289 1558 1558REPLACE BRIDGE NO. 93 OVER NORTH FORK FRENCH BROAD RIVER.

DIV

TRANSYLVANIA SR 1324(TENNESSEE GAP ROAD)

UNDER CONSTRUCTION

B-4291 2090 2090REPLACE BRIDGE NO. 193 OVER DAVIDSON RIVER.

DIV

TRANSYLVANIA SR 1504(OLD US 64)

B-5403 1140 200REPLACE BRIDGE NO. 196 OVER CRAB CREEK.

DIV

STPOFF 40R STPOFF C 900

TRANSYLVANIA SR 1532(ISLAND COVE ROAD)

B-4823 595 150REPLACE BRIDGE NO. 12 OVER HOGSED CREEK.

DIV

STPOFF R 45 STPOFF C 400

TRANSYLVANIA SR 1538(SEA OFF MOUNTAINROAD)

14-35 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 33: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5114 17255 15255DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

MUNICIPAL BRIDGE PROJECTS

PLANNING/DESIGN BY CITY OF BREVARD

B-5550 883 83RAILROAD AVENUE OVER KINGS CREEK. REPLACE BRIDGE NO. 102.

DIV

STPON 120R L 30R STPON C 520 L C 130

TRANSYLVANIA BREVARD

MITIGATION PROJECTS

IN PROGRESS

EE-4914 18871 18871ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

HAZARD ELIMINATION PROJECTS

IN PRGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)

W-5214 3128 3128DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA

VARIOUS

CONGESTION MITIGATION PROJECTS

IN PROGRESS

C-5564 172 52LAND OF SKY RPO TO WORK WITH REGIONAL CLEAN AIR CAMPAIGN AND CLEAN VEHICLE COALITION TO IMPLEMENT AN EDUCATIONAL AND OUTREACH PROGRAM IN COMMUNITIES ADJACENT TO GREAT SMOKY MOUNTAINS NATIONAL PARK.

EX

CMAQ 65I I 30 L 17I I 8

BUNCOMBEHAYWOODMADISONTRANSYLVANIA

VARIOUS

14-36 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 34: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)

UNDER CONSTRUCTION

E-4975 576 576BLUE RIDGE NATIONAL HERITAGE SITES. INTERPRETATIVE AND GATEWAY MARKERS.

ALLEGHANYASHEAVERYBUNCOMBEBURKECALDWELLCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONMADISONMcDOWELLMITCHELLPOLKRUTHERFORDSURRYSWAINTRANSYLVANIAWATAUGAWILKESYANCEY

VARIOUS

14-37 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 35: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

COUNTY ID

FUTURE YEARS

F

RR - Rail-Highway SafetyRTAP - Rural Transit Assistance ProgramS - State I - ImpementationS (M) - State Match O - OperationsSMAP - Operating Assistance and State Maintenance Oc - OPS Funded CapitalSRTS - Safe Routes to School PE - Preliminary EngineeringSTAT - State PL - Planning / DesignSTHSR - Stimulus High Speed Rail R - Right-of-WaySTPDA - Surface Transportation Program - Direct AttributableSTPE - Surface Transportation Program, EnhancementsSTPEB - Surface Transportation Program, Enhancements (Bike)T - State Highway Trust FundsT2001 - State Rail FundsTAP - Transportation Alternatives ProgramTIGER DISC - TIGER Discretionary Grants

HP - Federal-Aid High PriorityJARC - Job Assistance and Reverse Commute (3037)

(1) FUNDING CATEGORY

DURHAM AREA

SR - Secondary Road

TRANSIT PARTNERROUTE / CITY /

NUMBER

TA-4738

LOCATION / DESCRIPTION

PASSENGER AMENITIES - BUS STOP TRANSIT AUTHORITY

DIV

SHELTERS, BENCHES, SHOP EQUIPMENTSPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.

CP

BUS STOP SHELTER AND BENCHES LOCATED AT HOLLOWAY STREET

ESTIMATED COST Preliminary engineering, right of

C10000

dollars.)

of a project segment indicates (Cash-Flow Funding)Mitigation, Utilities or Construction.

way, utility, mitigation and construction cost estimates

(2) FUNDING SOURCES KEY

O - OtherL - Local

initial scheduled year. (Estimates are in thousand of

For other work types or activities see Work Type (Activity) box below.

work description. CPProject termini and a general

conception and remains with

9000

PROJECT BREAKS

CP

Various - multiple routes

A

5000

FY 2022

C

CP 3000CP

BCP 5000 B

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FY 2023 FY 2024FY 2021

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2020

TOTAL PROJECT

COST (THOU)

FUZFUZ

FUN

DS

A

PRIOR YEARS COST

(THOU)

ACP 700

FY 2015 FY 2016

4000CP

FY 2025

5000

BB

CP CP 5000B

UNFUNDED

NON HIGHWAY PROGRAM

ADIV

FY 2017 FY 2018

BSHOP EQUIPMENT, SPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.

WORK TYPE (ACTIVITY) (3)Phases of implementation:

DIV C

20000

COMMITMENTSFUTURE

by funding category in current dollars. Cost may include one or more funding types. Multi-year funding

Preliminary engineering, Right of Way, UNFUNDED

BUS STOP SHELTER AND BENCHES LOCATED AT GREGSON AVENUE

with proposed work type or activity beginning in the

break.

One or two letter

CP

A

for an explanation of funding categories

FUNDING CATEGORY (1)

DIV

DIVISION 00

DEVELOPMENTAL PROGRAM

DURHAM

FY 2019

TRANSIT PARTNERROUTE / CITY /

NEW ROUTE or CityTRANSIT PARTNER

IDENTIFICATION NUMBER Assigned to each project at

US or NC RoutesI - Interstate

project until completion.

C - City

FEPD - Elderly and Persons with Disablity (5310)

FMOD - Fixed Guideway Modifications

designation for project

any project breaks.Category for the project and

LOCATION / DESCRIPTION

used for each project phase.

FUNDING SOURCE (2)

Identifies the "STI" Funding

See Highway Funding Key

FSPR - State Planning and Research

FNF - New Freedom ProgramFNS - New Starts - Capital (5309)

FMPL - Metropolitan Planning (5303)

FED - Federal Rail Funds

FLAP - Federal Lands Access Program

FUZ - Urbanized Area Formula Program (5307)

CMAQ - Congestion Mitigation

FF - Federal Ferry

FNU - Non Urbanized Area Formula Program (5311)

(3) WORK TYPE (ACTIVITY)

C - ConstructionAD - Administrative

CP - Capital

A - AcquisitionHF - State Dollars (Non-STI)REG - RegionalSW - Statewide

DIV - Division

DP - Discretionary or DemonstrationFBUS - Capital Program - Bus Earmark (5309)

Page 36: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

NON HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025BICYCLE AND PEDESTRIAN PROJECTS

EB-5735 225SR 1649 (BULLDOG DRIVE) TO SR 1680 (MURPHY MIDDLE SCHOOL DRIVE). CONSTRUCT SIDEWALK.

0.2

DIV

TAP 16PE L 4PE L 15R TAP C 152 L C 38

CHEROKEE CAMPUS OF MURPHYMIDDLE SCHOOL

PUBLIC TRANSPORTATION PROJECTSTA-6178 328 122CAPITALHF

FNU 206CP CHEROKEE CHEROKEE COUNTY

TK-6118 2505 725ADMINISTRATION

HF

FNU 356O O 178 O 178 O 178 O 178 O 178 178O178O178O FNU

CHEROKEE CHEROKEE COUNTY

TM-6145 28OPERATING

HF

JARC 14O L 14O

CHEROKEE CHEROKEE COUNTY

TQ-6807 138OPERATING

HF

FEPD 69O L 69O

CHEROKEE CHEROKEE COUNTY

TA-6529 71CAPITAL

HF

FEPD 71CP CHEROKEE EASTERN BAND OFCHEROKEE INDIANS

TA-6163 338 127CAPITAL

HF

FNU 211CP CHEROKEEGRAHAMJACKSONSWAIN

EASTERN BAND OFCHEROKEE INDIANS

TK-6127 1644 484ADMINISTRATION

HF

FNU 232O O 116 O 116 O 116 O 116 O 116 116O116O116O FNU

CHEROKEEGRAHAMJACKSONSWAIN

EASTERN BAND OFCHEROKEE INDIANS

TM-6135 190OPERATING ASSISTANCE

HF

JARC 95O L 95O

CHEROKEE EASTERN BAND OFCHEROKEE INDIANS

TM-6153 110OPERATING

HF

JARC 55O L 55O

CHEROKEE EASTERN BAND OFCHEROKEE INDIANS

TN-6118 131MOBILITY MANAGEMENT

HF

FNF 105CP L 13CP S 13CP

CHEROKEE EASTERN BAND OFCHEROKEE INDIANS

TQ-6805 222OPERATING

HF

FEPD 111O L 111O

CHEROKEE EASTERN BAND OFCHEROKEE INDIANS

TQ-8005 52CAPITAL - MOBILITY MANAGEMENT

HF

FNF 46CP L 6CP

CHEROKEE EASTERN BAND OFCHEROKEE INDIANS

PUBLIC TRANSPORTATION PROJECTSTA-6162 1788 1574CAPITALHF

FNU 214CP CLAY CLAY COUNTY

TK-6120 2467 699ADMINISTRATION

HF

FNU 360O O 176 O 176 O 176 O 176 O 176 176O176O176O FNU

CLAY CLAY COUNTY

14-41 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 37: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

NON HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TQ-6178 72MOBILITY MANAGEMENT

HF

FEPD 58CP L 7CP S 7CP

CLAY CLAY COUNTY

PUBLIC TRANSPORTATION PROJECTSTA-6163 338 127CAPITAL

HF

FNU 211CP CHEROKEEGRAHAMJACKSONSWAIN

EASTERN BAND OFCHEROKEE INDIANS

TK-6127 1644 484ADMINISTRATION

HF

FNU 232O O 116 O 116 O 116 O 116 O 116 116O116O116O FNU

CHEROKEEGRAHAMJACKSONSWAIN

EASTERN BAND OFCHEROKEE INDIANS

TK-6130 888 592ADMINISTRATIONHF

FNU 296AD GRAHAM GRAHAM COUNTY

TQ-8001 42CAPITAL - MOBILITY MANAGEMENT

HF

FEPD 34CP L 4CP S 4CP

GRAHAM GRAHAM COUNTY

TQ-6801 202OPERATINGHF

FEPD 202O GRAHAM GRAHAM COUNTY

BICYCLE AND PEDESTRIAN PROJECTSU-5535 4013FRENCH BROAD RIVER MPO

TRANSPORTATION ALTERNATIVES (TA) PROGRAM.

DIV

TAP C 597 C 290 C 290 C 290 C 290 290C290C290C C 290 C 290L C 149 C 73 C 73 C 73 C 73 73C73C73C C 73 C 73

BUNCOMBEHAYWOODHENDERSONMADISONTRANSYLVANIA

VARIOUS

EB-5757 150US 23 BUSINESS (SOUTH MAIN STREET) TO BELLE MEADE DRIVE. REDUCE ROADWAY LANES TO THREE AND CONSTRUCT BIKE LANES.

0.3

DIV

TAP 40PE L 10PE TAP 80C L 20C

HAYWOOD BROWN AVENUE

PUBLIC TRANSPORTATION PROJECTSTA-6531 41CAPITAL

HF

FEPD 33CP L 4CP S 4CP

HAYWOOD MOUNTAIN PROJECTS, INC.

TA-6132 728 282CAPITALHF

FNU 446CP HAYWOOD MOUNTAIN PROJECTS, INC.

TK-6149 3291 937ADMINISTRATION

HF

FNU 490O O 233 O 233 O 233 O 233 O 233 233O233O233O FNU

HAYWOOD MOUNTAIN PROJECTS, INC.

TM-5314 805316 OPERATING FOR EMPLOYMENT TRIPS TO BUNCOMBE COUNTY

HF

JARC 40O L 40O

HAYWOOD MOUNTAIN PROJECTS, INC.

TQ-6182 270OPERATING ASSISTANCE

HF

FEPD 135O L 135O

HAYWOOD MOUNTAIN PROJECTS, INC.

14-42 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 38: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

NON HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TQ-6183 127MOBILITY MANAGEMENT

HF

FEPD 101CP L 13CP S 13CP

HAYWOOD MOUNTAIN PROJECTS, INC.

TM-5320 534FY 2011 FTA SECTION 5316 JARC (STATEWIDE ALLOCATION) OPERATING ASSISTANCE FOR JARC PROJECTS IN ASHEVILLE URBANIZED AREA INCLUDING MOUNTAIN MOBILITY (BUNCOMBE), MOUNTAIN PROJECTS (HAYWOOD AND ASHEVILLE TRANSIT)

HF

JARC 267O L 267O

BUNCOMBEHAYWOOD

ASHEVILLE REDEFINESTRANSIT

BICYCLE AND PEDESTRIAN PROJECTSU-5535 4013FRENCH BROAD RIVER MPO

TRANSPORTATION ALTERNATIVES (TA) PROGRAM.

DIV

TAP C 597 C 290 C 290 C 290 C 290 290C290C290C C 290 C 290L C 149 C 73 C 73 C 73 C 73 73C73C73C C 73 C 73

BUNCOMBEHAYWOODHENDERSONMADISONTRANSYLVANIA

VARIOUS

EB-5537 1300 100OKLAWAHA GREENWAY, PATTON PARK TO BALFOUR ROAD/BERKLEY MILLS IN HENDERSONVILLE. CONSTRUCT GREENWAY.

TRN

STPEB 1200C HENDERSON HENDERSONVILLE

PUBLIC TRANSPORTATION PROJECTSTA-6558 106CAPITAL

HF

FNU 84CP L 11CP S 11CP

HENDERSON APPLE COUNTRY TRANSIT

TA-6533 93CAPITAL

HF

FEPD 75CP L 9CP S 9CP

HENDERSON APPLE COUNTRY TRANSIT

TQ-6185 282Operating ASSISTANCEHF

FEPD 282O HENDERSON APPLE COUNTRY TRANSIT

TG-4951 6428 1621ROUTINE CAPITAL - COST OF CONTRACTING

HF

FUZ 610Oc Oc 305 Oc 305 Oc 305 Oc 305 Oc 305 480Oc480Oc480Oc SMAP 352O O 176 O 176 O 176 O 176 O 176

HENDERSON APPLE COUNTRY TRANSIT,

TG-6143 514 124ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC

HF

FNU FUZ 78CP CP 39 CP 39 CP 39 CP 39 CP 39 39CP39CP39CP

HENDERSON APPLE COUNTRY TRANSIT,

TK-5176 2016 533ADMINISTRATION

HF

FNU 322O O 108 O 108 O 108 O 135 O 135 135O135O135O FNU L 61O O 20 O 20 O 20 S 20O O 7 O 7 O 7

HENDERSON APPLE COUNTRY TRANSIT,

TO-6106 672 112OPERATING ASSISTANCEHF

FNU 112O O 56 O 56 O 56 O 56 O 56 56O56O56O HENDERSON APPLE COUNTRY TRANSIT,

TS-5101 50 21SAFETY & SECURITY - MIN. 1% SET ASIDEHF

FUZ 6CP CP 3 CP 3 CP 3 CP 3 CP 2 3CP3CP3CP HENDERSON APPLE COUNTRY TRANSIT,

TD-5265 321 246CITY OF HENDERSONVILLE - - US 64 PEDESTRIAN ACCESS TO BUS STOPS IMPROVEMENTS (SIDEWALKS AND CROSSWALKS) FOR FY 2013-2016

HF

FNF 75CP HENDERSON ASHEVILLE REDEFINES TRA

TM-5138 434 204BUNCOMBE COUNTY - BLACK MOUNTAIN TRAILBLAZER SERVICE JOB ACCESS REVERSE COMMUTE OPERATING ASSISTANCEHF

JARC 115O L 115O

BUNCOMBEHENDERSON

ASHEVILLE REDEFINESTRANSIT

14-43 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 39: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

NON HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TA-6163 338 127CAPITAL

HF

FNU 211CP CHEROKEEGRAHAMJACKSONSWAIN

EASTERN BAND OFCHEROKEE INDIANS

TK-6127 1644 484ADMINISTRATION

HF

FNU 232O O 116 O 116 O 116 O 116 O 116 116O116O116O FNU

CHEROKEEGRAHAMJACKSONSWAIN

EASTERN BAND OFCHEROKEE INDIANS

TA-6266 335 58CAPITALHF

FNU 277CP JACKSON JACKSON COUNTY

TK-6137 2632 752ADMINISTRATION

HF

FNU 376O O 188 O 188 O 188 O 188 O 188 188O188O188O FNU

JACKSON JACKSON COUNTY

TQ-6179 276OPERATING ASSISTANCE

HF

FEPD 138O L 138O

JACKSON JACKSON COUNTY

TQ-7180 77MOBILITY MANAGEMENT

HF

FEPD 61CP L 8CP S 8CP

JACKSON JACKSON COUNTY

TA-6192 457 177REPLACEMENT VAN

HF

FNU 280CP JACKSON TRANSPORTATION ADMIN.OF CLEVELAND COUNTY

BICYCLE AND PEDESTRIAN PROJECTSEB-5756 294US 441 BUSINESS (EAST MAIN STREET) TO

SR 1667 (WAYAH STREET). CONSTRUCT MISSING SECTIONS OF SIDEWALK ALONG WEST SIDE AND CONSTRUCT NEW SIDEWALK ALONG EAST SIDE.

0.6

DIV

TAP 14PE L 4PE TAP 221C L 55C

MACON SR 1729(DEPOT STREET)

PUBLIC TRANSPORTATION PROJECTSTA-6198 39 28CAPITALHF

FNU 11CP MACON MACON COUNTY

TA-6530 7CAPITAL

HF

FEPD 5CP L 1CP S 1CP

MACON MACON COUNTY

TK-6142 2815 907ADMINISTRATION

HF

FNU 380O O 191 O 191 O 191 O 191 O 191 191O191O191O FNU

MACON MACON COUNTY

TN-6123 40SECTION 5317 OPERATINGHF

FNF 40O MACON MACON COUNTY

TQ-8006 9MACON COUNTY 5317 CAPITAL

HF

FNF 7CP L 2CP

MACON MACON COUNTY

TQ-6781 356OPERATING ASSISTANCE

HF

FEPD 178O L 178O

MACON MACON COUNTY

14-44 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 40: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

NON HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025BICYCLE AND PEDESTRIAN PROJECTS

EB-5759 250WALKER ROAD TO WHEELER ROAD. CONSTRUCT SIDEWALK.

0.4

DIV

TAP 20PE L 5PE L 75R TAP C 120 L C 30

POLK PENIEL ROAD

PUBLIC TRANSPORTATION PROJECTSTA-6208 595 197CAPITAL

HF

FNU 318CP L 40CP S 40CP

POLK POLK COUNTYTRANSPORTATION

TK-6155 2679 736ADMINISTRATION

HF

FNU 471O O 184 O 184 O 184 O 184 O 184 184O184O184O FNU

POLK POLK COUNTYTRANSPORTATION

BICYCLE AND PEDESTRIAN PROJECTSEB-5737 448DOWNTOWN BRYSON CITY TO SWAIN

COUNTY HIGH SCHOOL. CONSTRUCT MULTI-USE PATH.

1.3

DIV

TAP 22PE L 6PE L 7R TAP 330C L 83C

SWAIN SR 1364 (FONTANADRIVE)

EB-5758 100US 441 END OF SIDEWALK TO ACQUONI ROAD END OF SIDEWALK. CONSTRUCT SIDEWALK, CURB CUTS, AND PEDESTRIAN SIGNALS.

0.1

DIV

TAP 5PE L 1PE TAP C 75 L C 19

SWAIN SR 1378(ACQUONI ROAD)

PUBLIC TRANSPORTATION PROJECTSTA-6163 338 127CAPITAL

HF

FNU 211CP CHEROKEEGRAHAMJACKSONSWAIN

EASTERN BAND OFCHEROKEE INDIANS

TK-6127 1644 484ADMINISTRATION

HF

FNU 232O O 116 O 116 O 116 O 116 O 116 116O116O116O FNU

CHEROKEEGRAHAMJACKSONSWAIN

EASTERN BAND OFCHEROKEE INDIANS

TA-6532 5CAPITAL

HF

FEPD 3CP L 1CP S 1CP

SWAIN SWAIN COUNTY FOCALPOINT ON AGING, INC.

TA-6545 2400CAPITAL

HF

FNU 1920CP L 240CP S 240CP

SWAIN SWAIN COUNTY FOCALPOINT ON AGING, INC.

TA-6557 2400CAPITAL

HF

FNU 1920CP L 240CP S 240CP

SWAIN SWAIN COUNTY FOCALPOINT ON AGING, INC.

TK-6165 1784 514ADMINISTRATION

HF

FNU 204O O 102 O 102 O 102 O 127 O 127 127O127O127O FNU L 38O O 19 O 19 O 19 S 12O O 6 O 6 O 6

SWAIN SWAIN COUNTY FOCALPOINT ON AGING, INC.

14-45 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 41: STATE TRANSPORTATION IMPROVEMENT PROGRAM 14.pdfeb-5758 i-5508 eb-5735 eb-5759 u-5604 i-4729 eb-5757 u-5866 r-5527b r-5527a r-5715 eb-5756 u-5104 r-5605 r-4047 r-5734 u-5783 u-5839

NON HIGHWAY PROGRAMDIVISION 14

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TQ-6184 59MOBILITY MANAGEMENT

HF

FEPD 47CP L 6CP S 6CP

SWAIN SWAIN COUNTY FOCALPOINT ON AGING, INC.

TQ-6804 60OPERATING

HF

FEPD 30O L 30O

SWAIN SWAIN COUNTY FOCALPOINT ON AGING, INC.

BICYCLE AND PEDESTRIAN PROJECTSU-5535 4013FRENCH BROAD RIVER MPO

TRANSPORTATION ALTERNATIVES (TA) PROGRAM.

DIV

TAP C 597 C 290 C 290 C 290 C 290 290C290C290C C 290 C 290L C 149 C 73 C 73 C 73 C 73 73C73C73C C 73 C 73

BUNCOMBEHAYWOODHENDERSONMADISONTRANSYLVANIA

VARIOUS

PUBLIC TRANSPORTATION PROJECTSTA-6272 118 62CAPITAL

HF

FNU 44CP L 6CP S 6CP

TRANSYLVANIA TRANSYLVANIA COUNTY

TK-6167 2324 680ADMINISTRATION

HF

FNU 284O O 143 O 143 O 143 O 161 O 161 161O161O161O FNU L 54O O 9 O 9 O 9 S 18O O 9 O 9 O 9

TRANSYLVANIA TRANSYLVANIA COUNTY

14-46 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project