Top Banner
State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng
19
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

State of the PanSPM User Group

19 March 2014

Andrew Morgan & Michael Ng

Page 2: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

State of the Pan

Condition survey of

public toilet facilities

in the Auckland region

Also to gain understanding

of the quantum, condition

and location of public toilets

Page 3: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

Outcome Desired• understand the dynamics of the

asset base

• plan for the maintenance and renewals - for funding and investment decisions

• Inform our planning practices by providing reliable base information

Page 4: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

Survey Overview• 650 facilities

• 4 months to survey

• 13,000 components

• Surveyors used SPM Mobile on Samsung tablets

• GPS on the spot (using tablets)

• Sketch of each toilet (floor plan)

• Property Quality Survey (PQS) survey

• Photos

• $36M (GRC) and $104M (CRV)

Page 5: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

Survey Output• Property information

– Location (GIS), management, function

• Condition data & Condition Grade Index (CGI)• Lifecycle forecasts• Photos• Surveyor comments• PQS (Star rating based on 30 questions)• Valuation

– Gross Replacement Cost (GRC) total of all surveyed components

– Added estimated Capital Replacement Value (CRV)

Page 6: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

Spatial View [http://easysolutions.co.nz/toilets2013]

Page 7: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

The Good, Bad and Ugly!

Page 8: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

Issues for us

• Lifecycle analysis are based purely on condition.

In reality, performance and perception driver

• Political Decision Making- 21 local boards

(region wide vs local needs)

• Renewal Strategy

• Still not customer focused, but departmental

Page 9: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

Issues – Condition Results

With so little in Poor and Very poor, not much $ are showing in lifecycle analysis.

Q: Is this a true reflection of reality?

Page 10: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

Lifecycle Renewals

• For over 700 facilities- seems low

Page 11: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

Realistic Renewal Programme?

Page 12: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

Lifecycle Analysis versus Renewals

Page 13: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

Lifecycle Analysis versus Renewals

Lifecycle outputs will

only consider this

Page 14: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

Analysing Performance - PQSNETWORK

AE DT FK HB HM HW KP MO MT MU OP OR PT

ACCESIBILITY 4.2 4.7 3.8 3.7 4.5 3.8 4.1 4.3 3.3 4.2 3.3 4.6 4.7 4.6

AMENITY VALUE

4.4 4.3 4.5 4.4 4.7 4.3 4.1 4.4 3.5 4.4 4.4 4.6 4.5 4.1

FUNCTIONALITY 3.1 3.2 2.8 2.8 3.1 2.8 2.8 2.8 3.8 3.8 2.8 3.2 3.1 3.5

HYGEINE 5.0 4.8 4.3 5.0 5.0 5.0 4.2 5.0 4.5 4.8 4.7 5.0 5.0 5.0

SAFETY 4.2 4.0 3.7 2.9 4.7 4.3 4.2 4.3 3.7 3.7 4.6 5.0 4.3 3.7

PQS 4.1 4.1 4.1 3.9 4.5 4.1 4.0 4.2 3.8 4.1 4.0 4.5 4.4 4.2

Page 15: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

Comparing Performance – PQS

Page 16: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

Renewal Strategy

Page 17: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

Consolidating the Scores

Property_codeAge CGI PQS Age

ScoreCGI

ScorePQS

ScoreCONSOLIDATED OVERALL SCORE

Proposed Year

T.AE.001 8 1.23 4.3 4.7 3.77 4.3 4.26 2026T.AE.002 8 1.19 4 4.7 3.81 4 4.17 2024T.AE.004 33 2.51 3.7 3.6 2.49 3.7 3.26 2016T.AE.005 23 2.2 3.5 4 2.8 3.5 3.43 2017T.AE.007 38 1.84 4.6 3.3 3.16 4.6 3.69 2019T.AE.008 33 3.24 3.3 3.6 1.76 3.3 2.89 2015T.AE.009 43 2.21 4.1 3.1 2.79 4.1 3.33 2017T.AE.011 73 1.15 4.6 1.8 3.85 4.6 3.42 2017

Age-based score + CGI (condition) + PQS (performance)

Page 18: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

Resulting Programme

Page 19: State of the Pan SPM User Group 19 March 2014 Andrew Morgan & Michael Ng.

Lessons

• Data collection- consider how you want to report and outcome

• Data analysis- consider holistic approach. Condition is only one piece of the jigsaw.

• Asset knowledge- The more you analyse your data. The more you understand about your assets.