STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION Bid Opening Date: 09/04/2019 Apparent Low Bidder (As Checked) The posting of these bids electronically on this website constitutes the Department's publication of the bids, and replaces the Department's former practice of publicly reading the bids aloud at the Becker-Hansen Building immediately following the opening of bids. Item Nbr: Project Nbr: PCN: County: Engineer's Estimate: 1 P-PH 0046(47)356 025D Clay, Lincoln $10,826,018.91 SD46 from west of the SD19/19A Jct to 1/2 mile west of I29 Location: Grading, Shoulder Widening, Structures (197'-6" Cont Conc Bridge & 3 RCBCs), & Interim Surfacing Improvement Type Contractor Total Bid Amount RUNGE ENTERPRISES, INC. $14,012,206.89 MIDWEST CONTRACTING, LLC $16,205,019.64 Foothills Contracting, Inc. $18,259,152.91 Item Nbr: Project Nbr: PCN: County: Engineer's Estimate: 2 NH-PH 0018(198)173 04XH Bennett $4,121,816.99 US18 from east of Vetal to the Bennett/Todd County line Location: Grading, Interim Surfacing Improvement Type Contractor Total Bid Amount Schweigert Construction Inc. $3,598,043.87 LOISEAU CONSTRUCTION, INC. $4,168,359.35 MIDWEST CONTRACTING, LLC $4,508,741.66 PERRETT CONSTRUCTION LTD $4,914,204.96 WEBSTER SCALE INC $5,174,379.12 Foothills Contracting, Inc. $6,115,454.69 Item Nbr: Project Nbr: PCN: County: Engineer's Estimate: 3 NH-P 0023(37) 041Q Bon Homme, Charles Mix, Hutchinson, Yankton $768,007.55 Various Locations in the Yankton Area Location: Culvert Repair Improvement Type Contractor Total Bid Amount BX CIVIL & CONSTRUCTION, INC. $1,340,000.00 Item Nbr: Project Nbr: PCN: County: Engineer's Estimate: 4 PH 0010(154) 06U0 Beadle, Brookings, Brown, Buffalo, Day, Edmunds, Grant, Hamlin, Hand, Marshall, Miner, Roberts $126,469.60 Various locations in the Aberdeen & Mitchell Regions Location: Transverse Rumble Strips Improvement Type Contractor Total Bid Amount Surface Preparation Technologies, LLC $144,771.40 HC65-BidLetting-AsChecked.rpt 09/04/2019 10:39:30AM Page 1 of 1 # - Engineer's Estimate does not include cost for time in A+B contracts. Attachment #6