Michelle Releford Public Information Officer (214) 320-4485 [email protected] TxDOT graphic NOTE: Highlighted area is not drawn to scale. S Selva Dr. San Patricio Dr. Fuller Dr. Moran Dr. Casa Vale Dr. Alvin St. Project Limits Intersection Improvements 78 78 78 244 244 12 Lake Highlands Park White Rock Marketplace Garland Rd. Peavy Rd. Garland Rd. Samuel Garland Park N Buckn e r B l v d . Shiloh Rd. Shiloh Rd. Jupiter Rd. Ferguson Rd. Easton Rd. Lochwood Blvd. Gus T homasson Rd. Crest Ridge Dr . E Northwest Hwy. 635 Centerville Rd. E Lak e Highla nds D r . Lochwood Park Dallas Intermodal Casa View Park N 1 mile T r a n q u i l l a D r . E a ston R d. Lochwood Circle Barnes Bridge Rd. TEXAS DEPARTMENT OF TRANSPORTATION PROJECT FACT SHEET 0456_072315 SUMMER • 2015 STATE HIGHWAY 78 (INTERSECTION IMPROVEMENTS) • PROJECT FACT SHEET PROJECT CONTACTS Texas Department of Transportation 4777 East Highway 80 Mesquite, Texas 75150-6643 STATE HIGHWAY 78 (INTERSECTION IMPROVEMENTS) PROJECT DETAILS: CSJ: 0009-02-045 Highway: SH 78 (Garland Road) Limits: Tranquilla Drive/South Selva Drive to Spur 244 (NW Hwy.) Cost: $7.8 million Contractor: Lone Star Civil Constr. PROJECT DESCRIPTION: Perform grading, drainage, concrete pavement installation; install utilities, signals, signs and pavement markings. Work begins: January 2016 (Pending utility relocations) Estimated completion: January 2017 (Weather permitting) PROPOSED SCHEDULE*: Phase I: Intersections and driveways construct half width – Install traffic signals Phase II: Intersections and driveways construct remaining half – Install traffic signals Phase III: Construct concrete pavement and median Phase IV: Mill and Overlay – Pavement markings NEED AND PURPOSE: TxDOT contractors are improving and/or widening 15 intersections in northeast Dallas along State Highway (SH) 78. The project will require various lane closures to provide adequate, safe work zones for crews. The project will add and/or improve left turn bays at some locations, and curb ramps at most locations. Signal and utility work will be performed, and new pave- ment markings will be installed. Intersections receiving additional left turn bay work and signal work: Peavy Rd., Easton Rd., Centerville Rd., Lochwood Blvd., Jupiter Rd., Barnes Bridge Rd. and Spur 244 (Northwest Highway). Other intersections scheduled for various improvements, including curb ramps and utility work: South Selva Drive, San Patricio Drive, Fuller Drive, Moran Drive, Casa Vale Drive, Alvin Street, Lochmond Circle, Lockwood Blvd., and White Rock Marketplace. * Subject to change.