Top Banner
STAR Status Report Salvatore Fazio BNL Time meeting – 9 April 2013
4

STAR Status Report

Feb 23, 2016

Download

Documents

Saman

STAR Status Report. Salvatore Fazio BNL Time meeting – 9 April 2013. Efficiency of sampling luminosity. Shift crew has been very efficient! EEMC -> 1/3 of the detector down during the weekend, now back in the run FMS -> Included in the run . STAR has been running smoothly the past week. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: STAR Status Report

STAR Status Report

Salvatore FazioBNL

Time meeting – 9 April 2013

Page 2: STAR Status Report

2

Efficiency of sampling luminosity

STAR has been running smoothly the past week

• Shift crew has been very efficient!• EEMC -> 1/3 of the detector

down during the weekend, now back in the run• FMS -> Included in the run

Page 3: STAR Status Report

3

Luminosity tracker

Stable since last week High polarization needed

Red line -> 2013 goalBlue line -> latest projection

W - AL Jet - ALL

Page 4: STAR Status Report

4

Summary

• STAR is up and running smoothly and efficiently

•W AL almost on target

• Jet – ALL is still off-goal (it will improve if a higher polarization)

We got a new unexpected cutie crew member in the CR this morning! A cheese pizza lover…