DF1201 File name:..\ST03.001.dwg LWC DRH FDH NOVEMBER 14, 2012 1 of 1 of 27 FOUNDATION PLAN AND SECTIONS - STANDBY GENERATOR NEW WORK 13 ST03.001 AS NOTED RC KRS DMG STANDBY GENERATOR - FOUNDATION PLAN - NEW WORK STANDBY GENERATOR - FOUNDATION SECTION - NEW WORK STANDBY GENERATOR - FOUNDATION SECTION - NEW WORK NOTES DETAIL KEY PLAN TRUE NORTH PROJECT NORTH DRAWING NOTES
6
Embed
STANDBY GENERATOR - FOUNDATION SECTION - NEW WORK …
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
DF1201
File name:..\ST03.001.dwg
LWCDRH
FDH
NOVEMBER 14, 2012
1 of 1
of 27
FOUNDATION PLAN AND SECTIONS - STANDBY GENERATOR
NEW WORK 13
ST03.001
AS NOTED
RC
KRS DMG
STANDBY GENERATOR - FOUNDATION PLAN - NEW WORK
STANDBY GENERATOR - FOUNDATION SECTION - NEW WORK STANDBY GENERATOR - FOUNDATION SECTION - NEW WORK
NOTES
DETAIL
KEY PLAN
TRUENORTH
PROJECTNORTH
DRAWING NOTES
SECTION - CONCRETEFOOTING AT STAIR BASE
DETAIL - DUCT BANK SECTION WITHREINFORCING STEEL
7"
3"
3"
1-1/2"
1-1/2"
DETAIL
0"OPENING
SECTION - NEW WORK
DETAIL
2-1/2" PROJECTION
6"
15"
SECTION THRU WALKWAY SLAB - NEW WORK (TYP. OF 2)
DF1201
File name:..\ST03.003.dwg
LWCDRH
FDH
NOVEMBER 14, 2012
1 of 1
of 27
FOUNDATION DETAILS - STANDBY GENERATOR
NEW WORK 15
ST03.003
NOT TO SCALE
RC
KRS DMG
NOTES
DF1201
File name:..\ST03.003.dwg
LWCDRH
FDH
NOVEMBER 14, 2012
1 of 1
of 27
DRAWING NOTES
DF1201
File name:..\EL04.001.dwg
LWCDRH
FDH
NOVEMBER 14, 2012
1 of 1
of 27
AND TRANSFORMER YARDNORTH SUBSTATION
POWER PLAN - NEW WORK 18
EL04.001
1/8" = 1'-0"
MJ
KRS DMG
NORTH SUBSTATION & TRANSFORMER YARD - POWER PLAN - NEW WORK