Top Banner
“Building for a Better Future” STANDARD PREQUALIFICATION DOCUMENT TEL: +974 44112563 P.O. BOX 96918 FAX: +974 44801273 DOHA E-mail : [email protected] STATE OF QATAR Website : www.poullaides.com POULLAIDES CONSTRUCTION COMPANY L.L.C. STANDARD PREQUALIFICATION DOCUMENT CONTENTS 1. Introduction 2. Human Resources 2.1 Organization Chart 2.2 Details of Management, Staff and Workmen 2.3 Letters of Recommendation and Achievements 3. Plant Resources 3.1 Plant Available 3.2 Workshops and Offices 4. Details of Projects Undertaken 5. Bank Details and References 6. Commercial Registration /Other Registrations / Classification 7. ISO 9001:2008 Standard Quality Policy and Quality Assurance Manual 8. Safety Manual Updated: March 2014 1.0 INTRODUCTION Poullaides Construction Co. (Qatar) LLC is an ISO 9001:2008 company and is part of the Poullaides Group of Companies which operate in Cyprus, UK, Qatar and Bahrain in order to carry out Building and Civil Engineering Projects including Electro-Mechanical works. Geared for a commercially competitive market the primary objectives of the Company are to provide the highest quality of construction within the client’s budget and to meet the needs and expectations of our clientele. Our Motto is “Building for a Better Future” We, in PCC, believe that quality is not a destination but a journey. Poullaides Construction Co. L.L.C. (PCC) is registered in the State of Qatar with Registration No. 43457 in order to carry out building and civil works. The Management Team of PCC (Qatar) comprises qualified Engineers who collectively have over 400 years experience in Qatar and Bahrain and over 600 years in the Arabian Gulf and some 800 projects in their portfolio. PCC has the versatility to carry out the following types of projects: - Industrial Projects, Factories etc. High Rise Buildings and Luxurious Apartment Blocks. Special Building Projects i.e. Banks, Extensions to Prestigious Buildings etc. Interior Decoration Works Fitting-out and Joinery Works for Banks, Hotels etc. Structural Repairs and Rehabilitation Works. Mechanical and Electrical Installations. Roofing Works Porta Cabins In order to tackle all the above type of projects PCC has created the following in-house departments which are currently under development: - Electro-Mechanical Division Interior Decoration and Fitting-out Division Structural Repairs and Rehabilitation Division Waterproofing Division Porta Cabin Division PCC has the in-house capability to carryout Turnkey Projects with the help of its extensive network of associates in the field of Interior Decoration, Structural design and Electro-Mechanical Design. PCC Directors and Management will continue to remain proactive to meet the market challenges and will always strive to enhance its efficiency levels. Yours Sincerely, C.A. POULLAIDES MANAGING DIRECTOR
19

STANDARD PREQUALIFICATION DOCUMENT

Apr 20, 2023

Download

Documents

Khang Minh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: STANDARD PREQUALIFICATION DOCUMENT

“Building for a Better Future”

STANDARD

PREQUALIFICATION

DOCUMENT

TEL: +974 44112563

P.O. BOX 96918 FAX: +974 44801273

DOHA E-mail : [email protected]

STATE OF QATAR Website : www.poullaides.com

POULLAIDES CONSTRUCTION COMPANY L.L.C.

STANDARD PREQUALIFICATION DOCUMENT

CONTENTS

1. Introduction

2. Human Resources

2.1 Organization Chart

2.2 Details of Management, Staff and Workmen

2.3 Letters of Recommendation and Achievements

3. Plant Resources

3.1 Plant Available

3.2 Workshops and Offices

4. Details of Projects Undertaken 5. Bank Details and References

6. Commercial Registration /Other Registrations / Classification

7. ISO 9001:2008 Standard Quality Policy and

Quality Assurance Manual

8. Safety Manual

Updated: March 2014

1.0 INTRODUCTION

Poullaides Construction Co. (Qatar) LLC is an ISO 9001:2008 company

and is part of the Poullaides Group of Companies which operate in Cyprus,

UK, Qatar and Bahrain in order to carry out Building and Civil Engineering

Projects including Electro-Mechanical works.

Geared for a commercially competitive market the primary objectives of the

Company are to provide the highest quality of construction within the client’s

budget and to meet the needs and expectations of our clientele. Our Motto is

“Building for a Better Future”

We, in PCC, believe that quality is not a destination but a journey.

Poullaides Construction Co. L.L.C. (PCC) is registered in the State of Qatar

with Registration No. 43457 in order to carry out building and civil works.

The Management Team of PCC (Qatar) comprises qualified Engineers who

collectively have over 400 years experience in Qatar and Bahrain and over

600 years in the Arabian Gulf and some 800 projects in their portfolio.

PCC has the versatility to carry out the following types of projects: -

� Industrial Projects, Factories etc.

� High Rise Buildings and Luxurious Apartment Blocks.

� Special Building Projects i.e. Banks, Extensions to Prestigious Buildings etc.

� Interior Decoration Works

� Fitting-out and Joinery Works for Banks, Hotels etc.

� Structural Repairs and Rehabilitation Works.

� Mechanical and Electrical Installations.

� Roofing Works

� Porta Cabins

In order to tackle all the above type of projects PCC has created the following

in-house departments which are currently under development: -

� Electro-Mechanical Division

� Interior Decoration and Fitting-out Division

� Structural Repairs and Rehabilitation Division

� Waterproofing Division

� Porta Cabin Division

PCC has the in-house capability to carryout Turnkey Projects with the help of

its extensive network of associates in the field of Interior Decoration,

Structural design and Electro-Mechanical Design.

PCC Directors and Management will continue to remain proactive to meet the

market challenges and will always strive to enhance its efficiency levels.

Yours Sincerely,

C.A. POULLAIDES MANAGING DIRECTOR

Page 2: STANDARD PREQUALIFICATION DOCUMENT

SE

CT

ION

2.0

HU

MA

N R

ES

OU

RC

ES

Org

an

izatio

n C

ha

rt

De

tails

of M

an

ag

em

en

t, Sta

ff an

d W

ork

me

n

Le

tter o

f Re

co

mm

en

da

tion

an

d A

ch

ieve

me

nts

2.1 ORGANIZATION CHART

2.2 DETAILS OF MANAGEMENT & STAFF

SUMMARY OF STRENGTH

S/No. Description Nos.

1 Technical Staffs & Managers 12

2 Administrative Staff 9

3 Site Staff & Workmen 285

Total Numbers 306

A. TECHNICAL STAFF

SN Name Designation Nationality Entered Const.

Industry

Experience in Region wise [Years] Total Middle

East Europe Asia Others

1 Christos A. Poullaides Managing Director Cypriot 1979 28 5 - - 33

2 Harris Poullaides Director Cypriot 2007 3 2 - - 5

3 Saleem A. Sayyad Country Manager Indian 1995 13 - 3 - 16

4 Tony Martin Projects Director British 1966 25 20 - - 45

5 Vinod Kumar P.V. Business Dev. Manager Indian 1989 14 - 8 - 22

6 Ahmed Qureshi Estimation Manager Indian 1996 13 - 2 - 15

7 Ahmed Pasha Sr. Electrical Engineer Indian 1995 13 - 3 - 16

8 Gunasekhara Hetti Senior Project Engineer Sri Lankan 1985 16 - 10 26

9 Mohammed Suleman Senior Project Engineer Indian 2000 9 - 9 - 13

10 Mohammed Ghouse Civil Engineer Indian 2009 4 - 4 - 4

11 Nicos Economides Elect. Engineer Cypriot 2003 2 6 - - 8

12 Eric Bazan Fernandez Electrical Engineer Filipino 1996 8 - 7 - 15

Page 3: STANDARD PREQUALIFICATION DOCUMENT

A. TECHNICAL STAFF

SN Name Designation Nationality Entered Const.

Industry

Experience in Region wise [Years] Total Middle

East Europe Asia Others

13 Leo Santiago Calica Quantity Surveyor Filipino 2008 3 - 2 - 5

B. ADMINISTRATIVE STAFF

SN Name Designation Nationality Entered Const.

Industry

Experience in Region wise [Years]

Middle East

Europe Asia Others Total

1 Ravi Vasu Chief Accountant Indian 1991 19 - 2 - 21

2 Prashanth K. Storekeeper Indian 1993 15 - 3 - 18

3 Pradeep P.G. Storekeeper Indian 1996 10 - - 5 15

4 Nazeer S. Hameed Doc. Controller Indian 2006 6 - 1 - 7

5 Deepu B. Pillai Accountant Indian 2008 3 - 2 - 5

6 Sunil Kumar Senior Draughtsman Indian 1993 15 - 3 - 18

7 Madhukumar SK Purchase Officer Indian 2005 6 - 1 - 7

8 Arun V.R. Pillai Safety Supervisor Indian 2005 6 - 2 - 8

9 Olwale Bamboo Safety Officer Nigeria 2008 3 - 3 - 3

10 Guiffo T Francis Safety Officer Cameroon 2009 2 - 2 - 2

11 Ashok Boi Messenger Indian 1999 6 - 8 - 14

12 Balaram Kathri Office Boy Nepali 2000 10 - 3 - 13

C.

LIS

T O

F A

VA

ILA

BL

E S

ITE

ST

AF

F A

ND

WO

RK

ME

N

S/N

o.

Nam

e

No

1

F

ore

men

10

2

C

harg

ehan

d / G

angers

16

3

Tim

e K

eepers

10

4

S

tore

keepers

10

5

Q

uality

Contro

llers

3

6

S

afe

ty O

fficers

3

7

M

asons

42

8

S

hutte

ring C

arp

ente

rs

30

9

F

inis

hin

g C

arp

ente

rs

25

10

S

teel F

ixers

25

11

W

eld

ers

8

12

Laboure

rs

71

13

E

lectric

ians

10

14

P

lum

bers

10

15

P

ain

ters

15

16

O

thers

e.g

. Watc

hm

en, D

rivers

etc

. 18

T

ota

l 306

SE

CT

ION

2.3

CL

IEN

T R

EF

ER

EN

CE

S

Page 4: STANDARD PREQUALIFICATION DOCUMENT

LETTERS OF RECOMMENDATION &

ACHIEVEMENTS (In Qatar)

LETTERS OF RECOMMENDATION &

ACHIEVEMENTS (In Qatar)

LETTERS OF RECOMMENDATION &

ACHIEVEMENTS (In Qatar)

LETTERS OF RECOMMENDATION &

ACHIEVEMENTS (In Qatar)

Page 5: STANDARD PREQUALIFICATION DOCUMENT

LE

TT

ER

S O

F R

EC

OM

ME

ND

AT

ION

&

AC

HIE

VE

ME

NT

S (In

Qa

tar)

LE

TT

ER

S O

F R

EC

OM

ME

ND

AT

ION

&

AC

HIE

VE

ME

NT

S (In

Qa

tar)

LETTERS OF RECOMMENDATION & ACHIEVEMENTS (In Bahrain)

LETTERS OF RECOMMENDATION & ACHIEVEENTS

Page 6: STANDARD PREQUALIFICATION DOCUMENT

LETTERS OF RECOMMENDATION & ACHIEVE MENTS

LETTERS OF RECOMMENDATION & ACHI EVE MENTS

SE

CT

ION

3.0

PL

AN

T R

ES

OU

RC

ES

Ve

hic

les

Pla

nt &

Eq

uip

me

nt

Wo

rksh

op

an

d O

ffice

s

3.1

P

LA

NT

& V

EH

ICL

E A

VA

ILA

BL

E (Q

ata

r)

Page 7: STANDARD PREQUALIFICATION DOCUMENT

3.1 PLANT & VEHICLE AVAILABLE (Qatar)

SN Description Qty

1 Pick Ups 2

2 Concrete Mixers 4

3 Dumpers 2

4 Compressor 250 CFM 2

5 Welding Machine 1

6 Vibrators 6

7 Hand Tools 8

8 Mini Bus 1

9 Bus (30 Seater) 3

10 Bus (60 Seater) 7

11 Cars 6

12 Scaffolding 1

13 Whitewood Only 1

3.2 PLANT & VEHICLE AVAILABLE

A. VEHICLES

SN Description Qty

14 Mercedes Benz 2

15 BMW X5 2

16 Jeep (4 Wheel) 3

17 Car Saloon (1.8 to 2.0) 3

18 Car Saloon (1.6 to 1.8) 18

19 Car Saloon (1.3 to 1.6) 25

20 Mini Bus (28 Seater) 5

21 Mini Bus (15 Seater) 1

22 Mini Bus (11 Seater) 2

23 Bus (60 Seater) 7

24 Dump Truck – 12m³ 1

25 Dump Truck – 3m³ 1

26 Six Wheel Pick-up (Single Cabin) 8

27 Six Wheel Pick-up (Double Cabin) 1

28 Water Tanker-4250 Gallon 1

29 Diesel Tanker 2

30 Double Cabin Pick-up 9

31 Single Cabin Pick-up 2

Total Nos. 98

B. PLANT & EQUIPMENT

SN Description Qty.

1 Tower Crane 2

2 JCB 3CX 8

3 Bob Cat Telescopic Handler 2

4 Bob Cat Skid Steer Loader 2

5 Dumper Machine 1

6 Forklift 1

7 Hiab Truck 10 Ton 1

8 Hoist 1

9 Generators 8.8 KVA to 20 KVA 5

10 Generators 22 KVA to 80 KVA 14

11 Generators 110 KVA to 460 KVA 8

12 Light Tower Generator 3

13 Sheet Bending Machine 1

14 Welding Generator 6

15 Welding Machine 14

16 Rail Cutting Machine 1

17 Total Station 1

18 Thedolite 1

19 Automatic Level 10

20 Hoist (Passenger Lift) 1

21 Concrete Mixer Machine 21

22 Concrete Vibrator 32

23 Air compressor – 100 Ltrs. + above 7

Page 8: STANDARD PREQUALIFICATION DOCUMENT

SN Description Qty.

24 Air Compressor – 185 cfm + above 6

25 Jack Hammer 10

26 Dry Mix Concrete Spraying Machine 1

27 Hydrolic Road Roller 4

28 Plate Compactor 14

29 Jumping Compactor 3

30 Power Float Trowel 5

31 Water Pump (2” & 3”) 7

32 Dewatering Pump 4” 2

33 G.I. Pipe Bender 5

34 Interlock Cutting Machine 2

35 Circular Saw 12” Minimax 1

36 Hydraulic Pipe Bend 1

37 Asphalt cutter 1

38 G.I. Pipe Threading Machine 1

39 Hydraulic Trolley 3

40 Tile cutting Machine – Electric 3

41 Steel Cutting Machine 2

42 Steel Bending Machine 3

43 Steel Bending & Cutting Machine Combo 1

C. TOOLS

SN Description Qty

1 Air Blower 23

2 Buffing Machine 1

3 Circular Saw Machine 36

4 Table Saw Machine 2

5 Drilling Machine 110

6 Drill Machine Angle Type 4

7 Pedestal Drill Machine 4

8 Battery Operated Drill Machine 22

9 Dry Wall Screw Machine 19

10 Grinder 4” 75

11 Grinder 4½” 13

12 Grinder 9” 63

13 Trimmer 6

14 Bench Grinder 8” 1

15 Magnetic Drill Machine 2

16 Marble Cutter 3

17 Hilti Gun 8

18 Hilti Drill Machine 4

19 Rotary Hammer Drill Machine 79

20 Demolition Hammer 20

21 Block Cutting Machine 1

22 Tile Cutting Machine 2

23 Diamond Core Tool 1

SN Description Qty

24 Wall Cutting Machine 1

25 Jigsaw Machine 44

26 Radial Arm Saw Machine 1

27 Slide Compound Saw Machine 4

28 Plate Joiner 4

29 Cut Off Machine 23

30 Roller Sander Machine 1

31 Router Machine 6

32 Hand Planner 1

33 Power Planner 1

34 Sanding Machine 4

35 Finishing Sanding Machine 10

36 Crimping Tool Machine Hydraulic 1

37 Tree Cutting Machine 1

38 Electric Heater Blade 2

39 Vacuum Cleaner Wet & Dry 2

40 Air Stapler 1

41 Air Nailer 1

42 Hydraulic Shearing Machine 1

43 Hydraulic Press Brake 1

44 Radial Drill Machine 1

45 Lathe Machine 1

46 Thicknesser 1

47 Industrial Polishing Machine 1

48 Impact Wrench ½” 2

SN Description Qty

49 Saw Bench 1

50 Planer Machine- Surface 1

51 Hot Press Model 1

52 Mini Max 1

53 Circular Saw with Tilting Blade 1

54 Veneer Splicing Machine 1

Page 9: STANDARD PREQUALIFICATION DOCUMENT

D. SCAFFOLDING

SN Description Qty.

1 Scaffolding (1 mtr.) 2,800

2 Scaffolding (2 mtr.) 14,400

3 Cross Bracing (2 mtr.) 2,800

4 Cross Bracing (2.4 mtr.) 16,100

5 Props (3 mtr.) 300

6 Props (4 mtr.) 19,900

7 Props (5 mtr.) 5,000

8 U-Head 5,100

9 Base Jack 9,300

10 Joint Pin 4,900

11 F-Clamp 11,500

12 Tie Rod Nut 19,500

13 Tie Rod Washer 19,500

14 Coupler 10,000

Important Note:

We have also drawn up an agreement with one of the most reputable and efficient plant and equipment hiring companies who have agreed to hire plant to us on a priority basis with minimum ‘lead time’ for the efficient operation of our projects. The attached letter refers.

3.2 WORKSHOP & OFFICES

We have the following facilities located in 5 sites.

S/N Location / Description Umm Al Hassam

[m²]

Sitra [m²]

Mameer [m²]

Hafeera [m²]

Total

[m²]

1 Offices 650 150 - 800 1,600

2 Joinery Workshop Nil 600 - 1000 1,600

3 Mechanical Fabrication Nil 200 - 1,300 1,500

4 Stores 50 400 - 1,700 2,150

5 Open Storage Nil 2,000 1,400 7,000 9,000

6 Labour Camp Nil 2,000 4,600 3,300 9,900

Total m² 500 5,250 6,000 14,950 20,700

Note: Some of the above facilities are still under construction / development.

Page 10: STANDARD PREQUALIFICATION DOCUMENT

SECTION 4.0

PROJECTS UNDERTAKEN

� Details of Projects � Photographs of Projects

Details of Projects Undertaken – State of Qatar

Project 1 : MIC Labour Accommodation (Supermarket,

Maintenance Block & Guard House)

Employer : Qatar Real Estate Investment Co. (Al Aqaria)

Contact Number : 00974 44086000

Contact Person : Mr. Jahangir

Consultant : Qatar Design Consortium

Value of Project : QR 3,300,000/-

Actual Duration : 6 months

Type of Work : Construction of Supermarket 2 Nos. Maintenance

Block and Guard House

Built up Area : 1200 m²

Brief Description : The Work consists of 2 storey concrete framed

structure with all MEP & external works. The location

is inside MIC premises with all QP safety standards

and quality. We have done with high safety standards

as well as the best quality within the time.

Please refer Section 2.3 appreciation letter and

completion certificate from the Client.

Please refer Section 4 for the projects photographs

Details of Projects Undertaken – State of Qatar

Project 2 : Renovation work for UBL West Bay Branch at Al

Jazeera Tower West Bay

Employer : United Bank Limited

Contact Number : 00974 44254444

Contact Person : Mr. Faisal A Jamall

Consultant : United Bank Limited

Value of Project : QR 1,000,000/-

Actual Duration : 5 months

Type of Work : Interior Fit-out of United Bank Limited at Al Jazeera

Tower at West Bay.

Built up Area : 350 m²

Brief Description : The job consists of Interior decoration of the bank

along with all strengthening of the existing structural

frames, construction of strong rooms, joinery works,

glazing works, corian counters etc.

: Please refer Section 2.3 appreciation letter and

completion certificate from the Client.

Please refer Section 4 for the projects photographs

Page 11: STANDARD PREQUALIFICATION DOCUMENT

Details of Projects Undertaken – State of Qatar

Project 3 : Tornado Tower 22nd

Floor

Employer : Globtech Engineering

Contact Number : 00974 44366886

Contact Person : Mr. Githesh Padman

Consultant : Globtech Engineering

Value of Project : QR 150,000/-

Actual Duration : 2 months

Type of Work : Ceiling and Partition Works

Brief Description : The job consists of ceiling and partition works of 22nd

floor. Tornado Tower the work was a fast track project

and completed in received time of 30 days. The quality

has been appreciated by the Client and see the attached

letter from the Client.

: Please refer Section 2.3 appreciation letter and

completion certificate from the Client.

Please refer Section 4 for the projects photographs

Details of Projects Undertaken – State of Qatar

Project 4 : Maintenance Office Extension Project at Q Chem

Employer : Qatar Chemicals

Contact Number : 00974 44767440

Contact Person : Mr. Anil Sasi

Consultant : Not Applicable

Value : QR 600,000/-

Actual Duration : 2 months

Type of Work : Office Extension and Partition Works

Brief Description : Q Chem maintenance office Extension project is in

Mesaieed and inside Qatar Chemicals Factory. It

consists of design & Build of Office along with

structural modifications and interior fit out works.

Please refer Section 2.3 appreciation letter and

completion certificate from the Client.

Details of Projects Undertaken – State of Qatar

Project 5 : Al Khamees Glass Factory

Employer : Jersey Group

Contact Person : Mr. Sanjay Patil

Consultant : Qatar Design Consortium

Value : QR 4,200,000/-

Actual Duration : 6 months

Type of Work : Modification of Glass Factory

Brief Description : Block work, Plaster, tiles, Demountable Partitions,

Ceiling and Substation works

Details of Projects Undertaken – State of Qatar

Project 6 : Interior Modification of Al Deeble Tower

Employer : State Audit Bureau

Contact Person : Mr. Ehab Musthafa

Consultant : Projacs

Value : QR 16,000,000/-

Actual Duration : 10 months

Type of Work : Interior Fitout works for 20 Storey Building

Brief Description : Partitions, Ceiling, Flooring, Wallpaper & Joinery

works

Page 12: STANDARD PREQUALIFICATION DOCUMENT

Details of Projects Undertaken – State of Qatar

Project 7 : Roof Top Dining Facility at Le Vesuvio Restaurant

Employer : Katara Project

Contact Person : Mr. Santhosh Kumar

Consultant : Projacs

Value : QR 2,680,000/-

Actual Duration : 5 months

Type of Work : Interior finishes for Restaurant

Brief Description : Steel roof, flooring, Installation of Dumbwaiter &

Installation of Lifts

Details of Projects Undertaken – State of Qatar

Project 8 : Hazardous Waste Storage Shed at RLOC (Ras

Laffan)

Employer : Qatar Chemicals

Contact Person : Mr. Deepak

Consultant : Not Applicable

Value : QR 1,500,000/-

Actual Duration : 7 months

Type of Work : Hazardous waste storage shed

Brief Description : Structural steel works, Concrete works & MEP Works

Details of Projects Undertaken – State of Qatar

Project 9 : Blast Resistant Modules and Road works

Employer : Qatar Chemicals

Contact Person : Mr. Mazhar

Consultant : Not Applicable

Value : QR 4,000,000/-

Actual Duration : 10 months

Type of Work : BRM foundation & Road works

Brief Description : 1) BRM Foundation works

2) Demolition works

3) Road Works

4) Bicycle Parking Sheds

Details of Projects Undertaken – State of Qatar

Project 10 : Coca Cola Al Mana – Beverage Plant

Employer : Coca-Cola Al Mana

Contact Person : Mr. Vidar Redhal

Consultant : Tebodin Middle East

Value : QR 46,700,000/-

Actual Duration : 12 months

Type of Work : Beverages Plant, external works, and ancillary building

Brief Description : Construction of Coca Cola Factory Building

1) Substructure works

2) Steel structure works

3) Water Tanks

4) MEP Works

Page 13: STANDARD PREQUALIFICATION DOCUMENT

De

tails of P

roje

cts Un

de

rtak

en

– S

tate

of Qata

r

Pro

ject 1

1

: B

urg

ery

Ou

tlet at A

spire Z

on

e

Em

plo

yer

: A

spire Z

on

e

Co

ntac

t Perso

n :

Mr. S

anth

osh K

um

ar

Co

nsu

ltant

: P

rojac

s

Va

lue

:

QR

90

0,0

00

/-

Ac

tual D

uratio

n

: 5

mo

nth

s

Ty

pe o

f Wo

rk :

Interio

r Fito

ut w

orks

Brief D

escrip

tion

:

Interio

r Fito

ut w

ork

s with

co

ncrete flo

orin

g, w

oo

den

floo

ring

& u

ph

olstery

work

s

DETAILS OF PROJECTS (QATAR)

S/N Project Client Consultant Status Anticipated

Completion

Approx.

Value [QR]

1

MIC Labour Accommodation

Supermarkets & Maintenance

Block

Qatar Real Estate

Investments co.

Qatar Design

Consortium Completed Sep 2011 3,500,000

2 Renovation Work for UBL West

Bay Branch at Al Jazeera Tower United Bank Limited

United Bank

Limited Completed Jan 2012 1,000,000

3

Maintenance Office Extension

Project at Qatar Chemicals

Company Ltd.

Qatar Chemicals Co.

Ltd.

Qatar Design

consortium Completed Feb 2012 600,000

4 Al Khamees Glass Factory

Jersey Group Qatar Design Consortium

Completed Jan 2013 3,500,000

5 Interior Modification works at Al

Deeble Tower, West Bay Aspire Zone

Projacs

International Completed Mar 2013 16,000,000

6

Electrical Maintenance works for

New Parts Warehouse at Karwa

City

Mowasalat Mowasalat Completed Sep 2012 250,000

7

Modification of ATM Enclosure

for UBL Bank at Pakistan

Embassy

United Bank Limited United Bank

Limited Completed Nov 2012 150,000

8 Civil works for Aspire Zone Fields

Q-Tec Group Q-Tec Group Completed Dec 2012 730,000

DETAILS OF PROJECTS (QATAR)

S/N Project Client Consultant Status Anticipated

Completion

Approx.

Value [QR]

9 Construction of Hazardous Waste

Storage Expansion at RLOC

Qatar Chemicals

Company Ltd.

Qatar Chemicals

Company Ltd. Under Construction Mar 2014 1,545,000

10

Construction of Supporting & Pre-

installation facilities for Plant

Blast Resistant Building at Q-

Chem

Qatar Chemicals

Company Ltd.

Qatar Chemicals

Company Ltd. Under Construction June 2014 3,150,000

11 Maintenance of Al Bateel Factory

for Joinery Works Towers Real Estate Towers Real Estate Completed April 2013 500,000

12

Design, Supply, Construction, Commissioning & Maintenance of

the Rooftop Dining Facility of Le

Vesuvio Restaurant at Building

No. 20 at the Katara Project

Katara Project Katara Project Under Construction May 2014 2,680,000

13 Interior Fit Out works at Burgery

Outlet at Aspire Park

Aspire Zone

Foundation

Aspire Zone

Foundation Completed August 2013 691,680

14 Modification works at Al Bidda

Tower Katara Project Katara Project Completed Oct 2013 650,000

15 Construction of Greenfield

Beverages Plant at Doha

Coca Cola Almana

W.L.L

Tebodin Middle

East Ltd. Under Construction Dec 2014 46,700,000

DETAILS OF PROJECTS – KINGDOM OF BAHRAIN

SN Project Client Consultant Anticipated Completion

Status Approx.

Value [BD]

1 Temporary Modular 2 Storey Office Building

Contrack International

Contrack International

Mar 2014 Under Construction

280,000

2 Bahrain Kuwait Embassy Residence

Kuwait Embassy ETEC Consultants Oct 2014 Completed 3,224,000

3 Amenity/Locker & Showers Building for Alba

Alba B.S.C. Alba Engineering Dept.

Oct 2013 Completed 260,000

4 New Office Building Facility for Tatweer Petroleum

Tatweer Petroleum DTEB Mar 2014 Under Construction

3,800,000

5 Extension for Food Processing Plant at Hidd

Mondelez International

Tebodin Middle East Oct 2013 Completed 1,400,000

6 Construction of 75 Nos. Villa at Hunainiya

Ministry of Housing Ministry of Housing Mar 2014 Under Construction

2,217,000

7 Proposed Roof Enclosure for Existing Swimming Pool

St. Christopher’s School

Mimar Architecture Jan 2013 Completed 430,000

8 Eagle Eye at BIIP, Hidd Reckitt Benkiser Tebodin Middle East Aug 2013 Completed 3,455,000

9 KFH Retail Branch at Al Enma’a Mall at Riffa

Kuwait Finance House

Adel Ahmadi Associates

Oct 2012 Completed 140,000

10 Bapco Service Station at Askar Bahrain Petroleum Company

The Modern Architect

Jun 2013 Completed 1,400,000

Page 14: STANDARD PREQUALIFICATION DOCUMENT

DETAILS OF PROJECTS – KINGDOM OF BAHRAIN

SN Project Client Consultant Anticipated Completion

Status Approx.

Value [BD]

11 Demolishing & Redevelopment of Isa Town Service Station

Bahrain Petroleum Company

The Modern Architect

Jul 2013 Completed 950,000

12 RMA Pipeline Equipment Factory at Hidd

RMA Middle East Tebodin Middle East Oct 2012 Completed 1,900,000

13 Muharraq STP Project (Building Works)

Samsung Engineering

Samsung Engineering

Aug 2013 Completed 2,300,000

14 Plastic Additives Blending Plat at Hidd

BASF Plastic Additives M.E.

Tebodin Middle East Apr 2013 Completed 5,100,000

15 Proposed 22 Storey Building at Juffair

Zahid Modern Properties

EBDAA Engineering Aug 2013 Completed 1,600,000

16 Architectural & Works Works for Waste Water Treatment Plant

GS Engineering GS Engineering Aug 2013 Completed 1,800,000

17 Sulb Steel Mill Project – Civil & Architectural Works

Samsung Engineering

Samsung Engineering

May 2013 Completed 1,750,000

18 KFH Retail Branch at Isa Town Fit Out Works

Kuwait Finance House

Adel Ahmadi Associates

Sep 2011 Completed 105,000

19 Temporary Facilities to Bapco Waste Water Treatment Plant

Fast Flow Services Design & Build July 2011 Completed 300,000

20 Dumistan Municipality Renovation Ministry of Interior Design & Build June 2011 Completed 250,000

DETAILS OF PROJECTS – KINGDOM OF BAHRAIN

SN Project Client Consultant Anticipated Completion

Status Approx.

Value [BD]

21 Supply of 1500m² Temporary / Modular Office Space

Bahrain Polytechnic Bahrain Polytechnic Oct 2011 Completed 230,000

22 Recovery Condensate at No. 2 Hydrogen Plant at Bapco

Ramsis Engineering Ramsis Engineering Feb 2011 Completed 60,000

23 Civil Works for Water Tanks for EWA at Al Areen & Hamad Town

Electricity and Water

Ramsis Engineering May 2013 Completed 1,100,000

24 220KV & 66KV Substation (2007-2011)

Electricity and Water Authority

Ismail Khonji Associates

Oct 2013 Completed 4,000,000

25 Refurbishment Work at UBL Branch at Manama

United Bank Limited United Bank Limited Sep 2010 Completed 110,000

26 Construction of the Training Centre at Alba

Alba B.S.C. Alba Engineering Dept.

Jun 2011 Completed 350,000

27 Lube Base Oil Plant Project at Bapco (Civil Works)

Bapco / Samsung Engineering Co. Ltd.

Samsung Engineering Co. Ltd.

Jul 2011 Completed 700,000

28 Interior Design Works – Ministry Diwan at Manama Police Fort

Ministry of the Interior

Horizon Interiors Sep 2010 Completed 719,400

29 Construction of Rawda Filling Station

The Bahrain Petroleum Company

The Modern Architect

Oct 2011 Completed 870,000

30 Two Storey German Embassy Chancery Building

Mr. Tayeb Khonji & Sons Co. WLl

Rawan Engineering Jun 2011 Completed 1,300,000

DETAILS OF PROJECTS – KINGDOM OF BAHRAIN

SN Project Client Consultant Anticipated Completion

Status Approx.

Value [BD]

31 Factory Building for MTQ Oilfield Services at BIIP

MTQ Singapore Tebodin Middle East Mar 2011 Completed 3,600,000

32 New Honda Showroom at Sehla & Fit out Works in Sitra

National Motors Company

Ansari Engineering Dec 2011 Completed 2,600,500

33 Development of Lot 10, Reef Island

Deem for Real Estate Investments

Davis Langdon Mar 2012 Completed 10,800,000

34 Jasmis Outlet at Bahrain International Airport

Jasmis Corporation MSCEB Sep 2009 Completed 166,000

35 10 Villas at Saar H.H. Sh. Khalifa Bin Salman Al Khalifa

Arabian East Bureau

Oct 2010 Completed 3,040,000

36 Fit Out Works for Davis Langdon Office

Davis Langdon Davis Langdon Apr 2009 Completed 225,000

37 Fit Out for Bahrain Islamic Bank At Isa Town/Hamad Town/Jidhafs

Abaad Real Estate Abaad Real Estate June 09 Completed 172,127

38 Raffles City Sales Office Capitaland Bahrain Bay

Design & Build Jan 2009 Completed 995,000

39 Fit Out Works for HSBC Adliya Branch

HSBC Bank Middle East

Davis Langdon Nov 2008 Completed 108,734

40 Interior Fit Out Works for Indian Restaurant

Bahrain Tourism Company

Ansari Engineering July 2009 Completed 669,600

DETAILS OF PROJECTS – KINGDOM OF BAHRAIN

SN Project Client Consultant Anticipated Completion

Status Approx.

Value [BD]

41 British School of Bahrain Essam Yusuf Abdulla Janahi

Bahrain Engineering Bureau

Aug 2009 Completed 5,900,000

42 Fit Out Works for Bahrain Islamic Bank

Abaad Real Estate Abaad Real Estate Sep 2008 Completed 75,000

43 Proposed Salhiya Palace Development

Crown Price Court Plan Architecture+ Design

Dec 2009 Completed 2,500,000

44 Fit Out Works for Capital Club- Level 23

rd

Capital Club, Bahrain

DWP Aug 2008 Completed 75,000

45 Standard Chartered Bank Refurbishment

Standard Chartered Bank

Davenport Campbell Sep 2009 Completed 970,000

46 Proposed Business Incubator Centre Phase II

Bahrain Development Bank

Ansari Engineering Dec 2010 Completed 6,500,000

47 Fit Out Work for “Le Chocolat”

Jasmis Corporation Sevenplus Interiors Jun 2008 Completed 108,000

48 Fit Out Works for HSBC Branch HSBC City Engineering May 2008 Completed 121,000

49 KFH Retail Branch at Busaiteen Kuwait Finance House

Adel Ahmadi Associates

Jan 2008 Completed 550,000

50 Riffa Views – Sewage Treatment Plant

Riffa Views Mace International Jun 2008 Completed 650,000

Page 15: STANDARD PREQUALIFICATION DOCUMENT

DETAILS OF PROJECTS – KINGDOM OF BAHRAIN

SN Project Client Consultant Anticipated Completion

Status Approx.

Value [BD]

51 Police Fort – Ministry Diwan Hard & Soft Landscaping

Ministry of the Interior

Ministry of the Interior

Mar 2010 Completed 1,906.495

52 KFH Industrial Oasis at Hidd Kuwait Finance House

Dheya Towfiqi Engg. Bureau

Dec 2010 Completed 14,000,000

53 Riffa Views BE5900 - South Park Villas

Riffa Views B.S.C.(C)

Mace International Apr 2011 On Hold 19,000,000

54 Riffa Views Development - BE5100 Residential Villa Contract Riffa Oasis – 342 Nos. [JV with M/s. Terna]

Riffa Views B.S.C.(C)

Mace International /

MSCEB / HAJ

Apr 2010 Completed 45,000,000

55 Cement Grinding Mill BNCC Tebodin Middle Est. Jul 2008 Shelved 9,500,000

56 Mosque Extension at Police Fort Ministry Of the Interior

Works Directorate Sep 2008 Completed 360,600

57 Proposed KFH Branch at Bahrain Financial Harbour

Kuwait Finance House

The Modern Architect

Jul 2008 Completed 75,000

58 Fit-Out Works for UBL Bank United Bank Limited Turnkey Oct 2007 Completed 119,600

59 Caterpillar Facility at Nuwaidrat Mohd. Abdulrahuman Al Bahar

MSCEB May 2008 Completed 2,100,000

60 Alba Club – Internal & External Finishes

ALBA B.S.C. ALBA Engineering Department

Jun 2008 Completed 730,000

DETAILS OF PROJECTS – KINGDOM OF BAHRAIN

SN Project Client Consultant Anticipated Completion

Status Approx.

Value [BD]

61 Investor’s Bank at New Seef Star Building

Investors Bank Inter Design International

Jul 2008 Completed 460,236

62 Kraft Food Processing Plant at Hidd

Kraft Foods Middle East

Tebodin Middle East Jan 2008 Completed 6,000,000

63 Paul Café Outlet at Seef Azadea Zadina Trading Jan 2007 Completed 119,600

64 Private Residence at Janabiya Sh. Hmood Bin Khalifa Al Khalifa

Yousif Dauod Al Sayegh

Dec 2010 Completed 650,000

65 St. Christopher’s School at Saar Phase 2

St. Christopher’s School

Tebodin Middle East Jan 2008 Completed 2,225,000

66 Proposed Almoayyed Showroom Omar Almoayyed DTEB Aug 2007 Completed 500,000

67 Design and Construction of Cast House & Maint. Bldg.

ALBA B.S.C. ALBA Engineering. Department

May 2007 Completed 387,000

68 Interior Fit-Out Works for Al Salam Bank at MS Centre,

Al Salam Bank M.S.C.E.B. Sep 2006 Completed 1,250,000

69 Proposed Indian Restaurant at Crowne Plaza Hotel

Bahrain Tourism Company

M.S.C.E.B. Dec 2007 Completed 480,000

70 Restoration of PSOC Club Building

Ministry of the Interior

MOI Works Directorate

Dec 2009 Completed 450,000

71 Restoration of PSOC Sports Ministry of the MOI Works Dec 2009 Completed 370,000

DETAILS OF PROJECTS – KINGDOM OF BAHRAIN

SN Project Client Consultant Anticipated Completion

Status Approx.

Value [BD]

Building Interior Directorate

72 AMA International Computer University

AMA International University W.L.L.

Salah Al Kooheji Nov 2007 Completed 3,050,000

73 Riffa Views – Site Office, Services & Operation (Design & Built)

Riffa Views Mace International Feb 2006 Completed 54,580

74 Sheikha Hessa Mosque at West Riffa

Royal Family Council

M.S.C.E.B. Sep 2007 Completed 1,276,000

75 Petrol Station at Salmabad Mr. Tawfeeq Ismail Al Alawi

The Modern Architect

Dec. 2006 Completed 585,000

76 Construction of Two Storey Building at FMO

Ministry of the Interior

MOI – Works Directorate

Jun 2006 Completed 193,000

77 Four Storey Building at Riffa H.H. Sh. Khalifa Bin Salman Al Khalifa

Arabian East Bureau

Dec 2006 Completed 670,000

78 BCC – Pile Caps to Bridge Ramps Road 2819

Majid Al Futtaim Investments

Mace International Feb 2006 Completed 66,000

79 Locker & Shower Facilities at Alba Marine Terminal

ALBA B.S.C. ALBA Engineering Department

Jul 2006 Completed 180,000

80 Construction of Receipt and Despatch Offices

ALBA B.S.C. ALBA Engineering Department

Jan 2006 Completed 22,000

DETAILS OF PROJECTS – KINGDOM OF BAHRAIN

SN Project Client Consultant Anticipated Completion

Status Approx.

Value [BD]

81 4th Floor of the NSA Building

National Security Agency

Turnkey Feb. 2006 Completed 91,000

82 Structural Steel Works for Ladies Swimming Pool

ALBA B.S.C. ALBAEngineering Department

Nov 2005 Completed 40,000

83 Relocation of Coke Store for South Gate Area

ALBA B.S.C. ALBA B.S.C. Nov 2005 Completed 152,000

84 Proposed Bar at Chili's Outlet in Seef Area

Jawad Business Group

Mimar Architecture Aug 2005 Completed 25,000

85 Investcorp House Refurbishment Investcorp Davis Langdon Dec 2005 Completed 235,000

86 DQ. Grill & Chill & Papa John’s @ Bahrain International Airport

Jawad Business Group

Mi’mar Architecture Jul 2002 Completed 50,000

87 Upgrading of Alba Club Zone

A & B

ALBA B.S.C. (C) The Modern Architect

Jan 2006 Completed 850,000

88 Fit-Out Works at BDF Branch and ATM Outlet- KFH

Kuwait Finance House

M.S.C.E.B. Jul 2005 Completed 140,000

89 Fit-Out Works on 7th Floor at

Dilmun Tower Kuwait Finance House

Concept & Design Jul 2005 Completed 70,000

90 Bahrain City Centre Development WP 1106 – External Hoarding

Majid Al Futtaim Investments

Mace International Jan 2005 Completed 120,740

Page 16: STANDARD PREQUALIFICATION DOCUMENT

DETAILS OF PROJECTS – KINGDOM OF BAHRAIN

SN Project Client Consultant Anticipated Completion

Status Approx.

Value [BD]

91 Miscellaneous Civil Works at ALBA In Rectiformer Bays

Alkomed Engineering

Alkomed Engineering

Feb 2005 Completed 31,000

92 Car Showroom at Sitra for Kuwait Finance House

Kuwait Finance House

The Modern Architect

Apr 2006 Completed 1,600,000

93 Pool Toilet Project for Hilton Bahrain

Hilton Bahrain Hilton Bahrain Dec 2004 Completed 16,000

94 British Embassy Minor Repairs British Embassy Davis Langdon Arabian Gulf

Sept 2004 Completed 10,000

95 3-Storey Villa In A’ali Ms. Badria Almansoori

Manar Engineering Feb 2005 Completed 110,000

96 Line 5 Expansion – Potline Control, Computer & Office Bldgs.

ALBA / Bechtel Turnkey Sept 2004 Completed 840,000

97 Interior Decoration and Fit-Out Works

Gulf Clearing Co. Sevenplus Feb 2004 Completed 11,000

98 3 No. Two Storey Villas at Saar Mr. Salman Khalil Kanoo

Turnkey Jul 2005 Completed 425,000

99 Diwania and Guest Quarters Mrs.& Mr. Najeb Al-Hamer

Turnkey Dec 2004 On Hold 35,000

100 Alteration / Addition to Bahrain Atomisers Plant

Bahrain Atomisers Int’l

MSCEB Apr 2004 Completed 52,000

DETAILS OF PROJECTS – KINGDOM OF BAHRAIN

SN Project Client Consultant Anticipated Completion

Status Approx.

Value [BD]

101 Interior Decoration & Fitting Out Works at Dilmun Tower

Kuwait Finance House

MSCEB Mar 2004 Completed 150,000

102 Interior Decoration and Fit-Out for Global Investments

Global Investments Seven Plus Dec 2003 Completed 50,000

103 Bapco New Tank at Sitra Marketing Terminal

Bapco (Upstream) Ismail Khonji Associates

Feb 2004 Completed 100,000

104 Paediatric Oncology Clinic at SMC M/S. K.E. Kanoo M.S.C.E.B. Feb 2004 Completed 380,000

105 Fit-Out for New Corporate Offices For E.K. Kanoo Management

E.K. Kanoo Turnkey Jul 2003 Completed 12,000

106 Repair and Restoration of Yateem Villa in Janabiya

Mr. Hussain Yateem Turnkey Jun 2003 Completed 18,000

107 Interior Decoration and Fit-Out of AMH – New Private Clinic

American Mission Hospital

Turnkey Jun 2003 Completed 60,000

108 Runway Repairs at Sh. Isa Airbase

Department of Air Force, U.S. Govt.

U.S. Air Force Engineering

Apr. 2003 Completed 29,000

109 Concrete and Associated Works for Industrial and Military Installations and Buildings

Department Of Air Force, US Govt.

U.S. Air Force Engineering

Dec 2007 Term Contract

4,265,000

110 Extension to Villa at Mahooz Dr. Salman Al Saffar Gulf House Engineering

Oct 2003 Completed 129,000

DETAILS OF PROJECTS – KINGDOM OF BAHRAIN

SN Project Client Consultant Anticipated Completion

Status Approx.

Value [BD]

111 Express Auto Centre at Arad Ebrahim K. Kanoo ASDC Dec 2003 Completed 310,000

112 Villa At Saar – External Works Mr. Nabeel Al Zain Gulf House Engineering

May 2003 Completed 31,000

113 AMH Remodel Project – Link Corridor

American Mission Hospital

Turnkey Oct 2002 Completed 22,000

114 ID and Fit-Out Works for Raymond Shop at Al A’ali Complex

Ms. Suzy Kanoo Raymond Interiors Oct 2002 Completed 50,000

115 Contract No. F38604-02-MH 601 at Sh. Isa Air Base

U.S. Air Force U.S. Air Force Sept 2002 Completed 9,000

PR

OJ

EC

T P

HO

TO

S

Page 17: STANDARD PREQUALIFICATION DOCUMENT

SE

CT

ION

5.0

BA

NK

DE

TA

ILS

Ara

b B

an

k

HS

BC

Ba

nk M

idd

le E

ast

S

tan

da

rd C

ha

rtere

d B

an

k

Un

ited

Ba

nk L

imite

d

BA

NK

ER

S D

ET

AIL

S

1.

Un

ited

Ba

nk L

imite

d

- D

oh

a B

ran

ch

Account N

o

: 010875

37

Posta

l Addre

ss

:

P.O

. Box 2

42, D

oha

Sta

te o

f Qata

r

Conta

ct P

ers

on

:

Mr. S

am

eer

C

onta

ct T

el. N

o.

:

+974 4

42544

14

2.

Co

mm

erc

ial B

an

k -

Do

ha

Bra

nch

Account N

o

: 4580-5

8297

5-0

01

Posta

l Addre

ss

:

P.O

. Box 3

232, D

oha

Sta

te o

f Qata

r

Conta

ct P

ers

on

:

Mr. O

sam

a E

zzo

C

onta

ct T

el. N

o.

:

+974 4

42022

49

3.

HS

BC

Ba

nk M

idd

le E

ast L

imite

d - M

ain

Bra

nch

Account N

o

: 001-4

78569

-001

Posta

l Addre

ss

:

P.O

. Box 5

7, D

oha

Sta

te o

f Qata

r

Conta

ct P

ers

on

:

Mr. S

andeep K

oth

ari

C

onta

ct T

el. N

o.

:

+974 4

43821

66

BANK REFERENCES

BANK REFERENCES

Page 18: STANDARD PREQUALIFICATION DOCUMENT

SE

CT

ION

6.0

CO

MM

ER

CIA

L R

EG

IST

RA

TIO

N/O

TH

ER

RE

GIS

TR

AT

ION

S / C

LA

SS

IFIC

AT

ION

Min

istry

of In

du

stry

& C

om

me

rce

Min

istry

of E

lectric

ity &

Wa

ter A

uth

ority

M

inis

try o

f Wo

rks &

Ho

usin

g

Q

ata

r Ch

am

ber o

f Co

mm

erc

e

KA

HR

AM

AA

LIC

EN

SE

COMMERCIAL REGISTRATION

Page 19: STANDARD PREQUALIFICATION DOCUMENT

ERROR: undefined

OFFENDING COMMAND: ’N

STACK: