1. An opening hole of 35mm diameter is required on sink top or work top for installation of tap. 2. Slide the rubber O-ring ⑨, base ⑧, rubber ⑦ up to the base of tap; 3. Install the plastic cover ⑥ to the A hole under the base of the tap; the connecting pipe ⑩ to the B hole and 2 flexible hoses ⒀ to C and D; 4. Place the tap through the tap hole; 5. Place the skid proof rubber ⑤ and the fixing sheet ④ through the connecting pipe and close to the sink or worktop; 6. Tight the nut ③, make sure the tap is stable; 7. Connect the pull-out pipe to the connecting pipe ⑩; 8. Place the weighting ball 10cm up the lowest point of the pull-out hose. ●Before installation, please ensure that the following work conditions are adhered to: -Water temperature between 0˚C - 90˚C -Water pressure between 0.05MPa – 1.0MPa. Pressure reducing valve is necessary if pressure exceeds 1.2MPa -Avoid major pressure differences between hot and cold water supply ●Flush pipes thoroughly before and after installation to ensure water supply is free of any debris. ●Inspect tap fitting and debugged to its best. Do not attempt to disassemble fitting on your own. ●Use thread sealant tape (PTFE) on any screw joining connections and ensure all joints are securely tightened. ETM-E3680P 9 8 10 A B C D Φ3 5mm 2 6~10cm This . FIAMMA SDN. BHD. will not be held responsible for the use of superseded or voided specifications. Fabricatoe must check for cut-out accuracy. specification is subject to change without notice Stainless Steel Mixer Tap