MATCH LINE MATCH LINE Sta. 26+500 Sta. 26+500 SARCEE TRAIL SARCEE TRAIL RICHMOND ROAD RICHMOND ROAD GLENMORE TRAIL GLENMORE TRAIL GLENMORE TRAIL GLENMORE TRAIL SOUTHWEST CALGARY SOUTHWEST CALGARY RING ROAD RING ROAD WESTHILLS WAY WESTHILLS WAY OLD STRATHCONA ROAD OLD STRATHCONA ROAD EB-NB EB-NB WB-NB WB-NB SB-WB SB-WB WB-NB/SB WB-NB/SB NB/SB-WB NB/SB-WB EB-NB/SB EB-NB/SB NB/SB-EB NB/SB-EB NB-EB/WB NB-EB/WB EB/WB-SB EB/WB-SB SB-EB/WB SB-EB/WB NB-EB NB-EB GLEN EB GLEN EB GLEN WB GLEN WB NB COLL. NB COLL. SB-EB SB-EB WB-SB WB-SB SB COLL. SB COLL. SWCRR NB SWCRR NB SWCRR SB SWCRR SB NB & EB NB & EB ELBOW RIVER ELBOW RIVER REALIGNED REALIGNED ELBOW RIVER ELBOW RIVER 90 SARCEE 60 WH. WAY 80 WB-NB/SB 80 NB/SB-WB 80 EB-NB/SB 80 NB/SB-EB 80 SB COLL. 80 SB-EB/WB 80 EB/WB-SB 110 SWCRR 80 NB-EB/WB 60 O.S.R. 40 EB-NB 70 NB & EB 80 NB COLL. 70 NB-EB 90 GLEN TR 80 SB-EB 80 WB-NB 50 SB-WB 40 WB-SB 80 GLEN WB kph kph 110 DS V = 110 DS V = TIE TO EXISTING TIE TO EXISTING WEASELHEAD ROAD WEASELHEAD ROAD WEASELHEAD ROAD WEASELHEAD ROAD UTILITY CORRIDOR UTILITY CORRIDOR POWERLINE AND POWERLINE AND PIPELINE COMPONENT PIPELINE COMPONENT REALIGNMENT OPTIONS REALIGNMENT OPTIONS BOUNDARY BOUNDARY CITY OF CALGARY CITY OF CALGARY EXISTING EXISTING ELBOW RIVER ELBOW RIVER 3 3 1 3 2 2 1 2 2 5 3 5 2 2 4 1 3 2 2 6 5 3 2 4 3 2 2 3 2 1 1 2 2 3 2 2 3 2 2 2 3 3 1 2 2 1 1 5 4 2 4 3 1 2 3 1 2 2 1 2 4 5 4 3 3 3 1 TUC TUC PROPOSED PROPOSED BOUNDARY BOUNDARY 2 STUDY LIMIT STUDY LIMIT STUDY LIMIT STUDY LIMIT STUDY LIMIT 1 1 3 1 2 1 4 80 GLEN EB PEDESTRIAN PEDESTRIAN PATHWAY PATHWAY PEDESTRIAN PEDESTRIAN PROPOSED PROPOSED 1 1 SB-EB TUNNELS WALL WALL RETAINING RETAINING END OF TUC END OF TUC STORM WATER POND STORM WATER POND STORM WATER STORM WATER POND POND PROPOSED PROPOSED PROPOSED PROPOSED 1 RICHMOND ROAD RICHMOND ROAD SARCEE TRAIL SARCEE TRAIL SARCEE TR. TIE IN Sta. 301+125 WB - NB TIE IN Sta. 30+400 APPROXIMATE SWCRR APPROXIMATE SWCRR OPTIONAL BY THE CITY OF CALGARY CONCEPT UNDER CONSIDERATION SB-EB SB-EB WB-NB WB-NB SB-WB SB-WB WB-SB WB-SB RICHMOND ROAD INTERCHANGE Sarcee Trail SW and Glenmore Trail SW STAGE 1 Southwest Calgary Ring Road at P-716 1 2 3 4 5 6 7 8 9 6 FUNCTIONAL PLANNING STUDY SOUTHWEST CALGARY RING ROAD INFRASTRUCTURE AND TRANSPORTATION Project No. 2004-0028 Region: Southern P 3287-106 AUGUST 2008 PROPOSED NUMBER OF LANES AND TRAVEL DIRECTION 2 90 SB-WB DESIGN SPEED SWCRR SOUTHWEST CALGARY RING ROAD SMT SPRUCE MEADOWS TRAIL PROPOSED TRANSPORTATION UTILITY CORRIDOR (UTILITY) PROPOSED TRANSPORTATION UTILITY CORRIDOR (ROADWAY) EXISTING TRANSPORTATION UTILITY CORRIDOR CALGARY CITY LIMITS CITY OF CALGARY PATHWAYS PROPOSED PATHWAYS RETAINING WALL STAGE 1