Page 1: Städtebau 2 Projekt  (Final)
Page 2: Städtebau 2 Projekt  (Final)

NewRüttenscheid

“Not In Your Thinking,

But In Our Planning”

Städtebau 2 Projekt

Heng Jia Wang

Bronislava Hubová

Lukáš Lechman

Er Zhuan Zhuan

Page 3: Städtebau 2 Projekt  (Final)

LOCATION OF THE PROJECT SITE

Deutschland

Nordrhein-Westfalen

Essen

Essen-RüttenscheidEssen - Grünstenscheid

Page 4: Städtebau 2 Projekt  (Final)

PUBLIC TRANSPORTATION

AND ACCESSIBILITY

Page 5: Städtebau 2 Projekt  (Final)

Mes

se

Esse

n

Bre

dene

y

Hauptb

ahnh

of

Hauptb

ahnh

of

Düss

eld

orf

Düsseldorf

Esse

n Ost

Essen West

Straßenbahn

U-Bahn

S-Bahn

Highway

Bicycle way

Page 6: Städtebau 2 Projekt  (Final)

U-BAHNRÜTTENSCHEIDER STR.

Page 7: Städtebau 2 Projekt  (Final)

BYCYCLE WAY

Page 8: Städtebau 2 Projekt  (Final)

BICYCLE WAY

Page 9: Städtebau 2 Projekt  (Final)

EXISTING LAND USE

Page 10: Städtebau 2 Projekt  (Final)

School Church

Hospital

dm

Grupa P

ark

Messe E

ssen

Mixed

Comercial areaSport

REWE

Netto

Page 11: Städtebau 2 Projekt  (Final)

PROBLEMS

Page 12: Städtebau 2 Projekt  (Final)

ACCESSIBILITY TO RÜTTENSCHEIDER STRAẞE

No access to to

Rüttenscheider Straße due

to the different ro

ad level

Page 13: Städtebau 2 Projekt  (Final)

DIFFERENT LEVELS BETWEEN PLANNING AREA AND RÜTTENSCHEDER STR.

Road Level of

Rüttenscheider

Straße

Ground Level of the Planning location

SolutionCreate a staircase at the location which only allows pedestrian to go through, but not a vehicle

Page 14: Städtebau 2 Projekt  (Final)

LACK OF PUBLIC GREEN AREA

SolutionCreate an integrated housing properties with more private green space and public green space.

Gruga Park – The nearest

and CHARGED park

Lack of Community green area within the

planning area

Page 15: Städtebau 2 Projekt  (Final)

SolutionTherefore our objective of the development project will high green area and relatively low density

HIGH GREEN AREA, LOW DENSITY

Page 16: Städtebau 2 Projekt  (Final)

LACK OF PARKING SPACEM

esse

Ess

en

The Planning

area used to be

the parking area

for Messe Essen

when there is

giant exhibition

Page 17: Städtebau 2 Projekt  (Final)

Solution- Parking area will prepared along the road site for the truck and lorry coming for exhibition.- Additional parking area will be prepared in the green circle area.- People are encourage to arrive at Messe Essen by public transport (U Bahan- Gruga/Messe) rather than by own transport.

Page 18: Städtebau 2 Projekt  (Final)

THE FOOTBALL FIELD WITH WALL AGAINST THE NOISE

SolutionFootball field and wall will be removed:- No barrier between the new planning area and existing housing area.- Suit to the planning which more focus on Green housing development.- Overcome the problem of noise.

Page 19: Städtebau 2 Projekt  (Final)

CONCEPT

More Green, low density Normal, Medium and High Class Housing More public space More out door activity facilities Connection to Rüttenschied Straße and

area nearby Environmental friendly, with walk way

and bicycle way

Page 20: Städtebau 2 Projekt  (Final)

OVER VIEW

Page 21: Städtebau 2 Projekt  (Final)

4 MAIN SECTIONS

Normal Cost Housing

High Class Housing

Medium Cost Housing

Sport and Recreation Area

Page 22: Städtebau 2 Projekt  (Final)

NORMAL COST HOUSING

- 4 Block with a total of xx units- Bicycle way and walk way connecting

- Parking area are prepared along the road side

- Public green area

Page 23: Städtebau 2 Projekt  (Final)

MEDIUM COST HOUSING- A total of 7 blocks and xx units- Parkings prepared at road side- Green area in between each blocks- Semi-private green area- Walk way and bicycle way connecting

Page 24: Städtebau 2 Projekt  (Final)

HIGH CLASS HOUSING

- A total of 3 blocks, with xx units

- Private green area- Walk way and bicycle way

provided- Parking prepared at road side

Page 25: Städtebau 2 Projekt  (Final)

SPORT AREAExtreme

Sport Area

Foot Ball Field

Recreation Area

Basket Ball Field

Tennis Court

Badminton Court

Page 26: Städtebau 2 Projekt  (Final)

PARKING

Page 27: Städtebau 2 Projekt  (Final)

STAIRCASE

- Connecting to Rüttenschiedstraße

- Connecting to Witterkindstraße