Top Banner
St. Croix River Crossing Project Industry Update October 25, 2009 St. Croix River Crossing Project St. Croix River Crossing Project Industry Update Industry Update October 25, 2009 October 25, 2009
44

St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Jun 09, 2019

Download

Documents

phamkhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

St. Croix River Crossing ProjectIndustry Update

October 25, 2009

St. Croix River Crossing ProjectSt. Croix River Crossing ProjectIndustry UpdateIndustry Update

October 25, 2009October 25, 2009

Page 2: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Bridge Update Topics•• Project BackgroundProject Background

– Concept Development– Concept Criteria– Visual Quality– Preliminary Engineering

•• Visual Quality UpdateVisual Quality Update•• Structures UpdateStructures Update

– Bridge Description– Bridge Details– Bridge Construction

•• Foundation OptionsFoundation Options

Page 3: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Project BackgroundProject BackgroundProject Background

Page 4: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Concept Development

• Supplemental Final Environmental Impact Statement (SFEIS) - 2006– Stakeholder Process

• Visual Quality Planning Process• Visual Quality Manual (VQM) - 2007

– Visual Quality Review Committee• Lower St. Croix National Scenic Riverway

– National Park Service

Page 5: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Concept Criteria

• Minimize Environmental Impacts– Bluff Impacts– Mussel Beds– High Quality Wooded Wetlands

• Minimize Visual Impacts– Low Visual Dominance– A Local Asset and Amenity– Quietly Elegant– Interesting and Expressive

Page 6: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Visual Quality

• Visual Quality Manual (VQM)– Selected Concept is called “Organic”

• The parts look as if they were found in nature, or shaped by natural forces.

• The vertical pier forms are reed-like; the girders are rounded and tapered like bones or tree branches; and walls barriers and railings are curved and blended into the larger form.

• Transitions are gradual and smooth; edges are soft and curved; and colors are unified and natural expressions of their materials.

Page 7: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Preliminary Engineering

• Concept Refinement– Structural Analysis– Visual Quality– Bridge Lighting & Signing– Construction– Maintenance & Inspection

• Design Criteria• Foundation Options

Page 8: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Visual Quality UpdateVisual Quality UpdateVisual Quality Update

Page 9: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Bridge Site

Page 10: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Study ElementsStudy ElementsStudy Elements

Two column configuration

One box girder Two box girders

Three column configuration

Page 11: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Covered cable connections

Page 12: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Exposed cable connections

Page 13: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

View of Bridge from Wisconsin bluffs

Page 14: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

View of overlook from trail

Page 15: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

View of overlook from beneath

Page 16: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Minnesota Approach North West View

Page 17: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Minnesota Approach Southwest View

Page 18: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Bridge Lighting

View from Sunnyside Marina

Page 19: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Bridge Lighting

View from Existing Stillwater Bridge

Page 20: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Bridge Lighting

River View Looking North

Page 21: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Bridge Lighting

River View Looking South

Page 22: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Structures UpdateStructures UpdateStructures Update

Page 23: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Bridge Description

• SFEIS and Visual Quality Manual (VQM)– River Spans

• Extradosed Bridge - 4 to 6 Piers in the River• Maximum Pier Height of 60 Ft. Above Roadway• Superstructure Integral Connection with Piers• Constant Depth Box Girder

– Approach Spans and Ramps• Superstructure Integral Connection with Piers• Constant Depth Box Girder• Linear Depth Transitions

Page 24: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Bridge Details

• 3 Bridges– Br No 82045 – TH 36 Eastbound & Westbound

• River Spans• Approach Spans

– Br No 82047 – TH 36 Westbound to TH 95– Br No 82048 – TH 95 to TH 36 Eastbound

• Crossing the St. Croix River – River Width: 2,850 Feet– Water Depth: 25 to 30 Feet

Page 25: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Bridge Details

• Br No 82045 – TH 36 Eastbound & Westbound– River Spans

• Extradosed Bridge• Segmental Concrete Box Girder(s)• 3,460 Ft Long Continuous• 370,000 SF

– Approach Spans• Segmental Concrete Box Girders• 1,630 Ft Long Continuous• 149,000 SF

Page 26: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Bridge Details

• Br No 82047 – TH 36 Westbound to TH 95• Segmental Concrete Box Girder• 986 Ft Long Continuous• 48,000 SF

• Br No 82048 – TH 95 to TH 36 Eastbound• Segmental Concrete Box Girder• 1,293 Ft Long Continuous• 36,000 SF

Page 27: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Overall Bridge Layout Plan

Br No 82045

Br No 82047

Br No 82048

Page 28: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Tower Elevation and Sections

Elevation Outside View Inside View

Page 29: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Cross Section of Box Girders

Two Box Girder Cross-section

Page 30: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Cross Section of Box Girders

One Box Girder Cross-section

Page 31: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Cross Section of Box Girders

Two Box Girder Isometric

Page 32: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Cable Arrangement

Elevation

Page 33: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Approach Spans Layout

Br No 82047

Br No 82045

Br No 82048

Page 34: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Approach Span Cross-Section

Br No 82045

Br No 82048

Page 35: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Approach Span Cross-Section

Br No 82045

Br No 82048Br No 82047

Page 36: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Bridge Construction

• Permitting Agencies– Corp of Engineers– Minnesota DNR

• Potential Construction Staging Areas– Stillwater Municipal Barge Terminal– Xcel Barge Unloading Facility

Page 37: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Wetland Impacts Plan

BASIN QBASIN Q

FORESTED

BASIN P-1

BASIN P-2

UPR

RTH 9

5

Page 38: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Foundation OptionsFoundation OptionsFoundation Options

Page 39: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Geotechnical - Foundations

Subsurface Investigations

Page 40: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Subsurface Investigations & Testing

Geotechnical - Foundations

Phase/Date Borings Testing1: Nov 91 – Aug 96 86 borings

• 55 onshore MN• 21 river• 10 onshore WI

• w%, PI, grain size, organic %, UU• UC on rock

2: Oct 95 • 2 drilled shaft O-cell (1 axial, 1 lateral)• 1 driven pile (axial & uplift)

3: Nov 98 – Oct 99 17 borings in river (upstream)

• w%, PI, grain size, organic %, UU • UC on rock

4: Aug – Nov 2005 11 borings in river2 CPTs in river

• w%, organic %, UU• UC on rock

5: Jun – July 2009 6 borings• 4 onshore MN• 2 onshore WI

• organic %• UC on rock

Page 41: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Subsurface Profile: Approach Spans

Geotechnical - Foundations

Page 42: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Subsurface Profile: Extradosed Spans

Geotechnical - Foundations

Page 43: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Subsurface Conditions

Geotechnical - Foundations

Strata SPT / RQD Testing Results

Soft River Silts N/A organic % avg = 13su = 30 to 270 psf

MN Overburden N = 2 to 50+ N/A

WI Overburden N = 0 to 50+ N/A

Bedrock

• Jordan Sandstone• St. Lawrence Frm• Franconia Frm

RQD = 0 to 99(40 avg)

• 0 to 85 (40 avg)• 0 to 80 (55 avg)• 0 to 95 (35 avg)

qu = 200 to 10,000 psi(1,400psi avg)

• 0.5 to 5.5 ksi (2 ksi)• 2 to 10 ksi (6 ksi)• 0.2 to 9 ksi (1.8 ksi)

Page 44: St. Croix River Crossing Project Industry Update October ... · St. Croix River Crossing Project Industry Update October 25, 2009October 25, 2009. ... • w%, PI, grain size, organic

Potential Foundation Types

Geotechnical - Foundations