SSO Project Number: Project Name: Shively Interceptor Modeled Area: Branch or SSO ID: Project Type: Receiving Stream: Project Description: Reason for Overflow: Design Parameters / Assumptions: Project Constraints: Capital Projects: Overflow Points Addressed: SSO SSO Name Service Area Overflow Type Discharge To Average Overflow / Incident (gallons) 04498 820 Echo Bridge Road West County Manhole Stream Suspected-no data 04542 Fern Lea PS Wet Well West County Manhole Ditch 91,500 81814-W Pioneer Road PS West County Pumped Ditch 32,750 MSD0047-PS Fern Lea West County Pumped Catch basin 141,083 MSD0050-PS Garrs Lane West County Pumped Ditch 72,000 S_MC_WC_NB01_M_01_A SSO SSDP Project Fact Sheet Mill Creek NB01 Pipe Upgrades Mill Creek and Heatherfield Ditch Construct 18,830 LF of new gravity sewers (10” – 27”) to eliminate pump stations. This is the Shively Interceptor capital improvement project. B06208 ~ Shively Interceptor - Preliminary Design $16,419,000 Pump station capacity (hydraulic bottleneck & backwater effects) None at this time Estimated Capital Cost (2008 dollars): Weighted Benefit/Cost Ratio (Present Worth): This solution is based on a 2.60-inch cloudburst rain event 6.70 Report As of: 5/7/2009 Page 1 of 1
4
Embed
SSO SSDP Project Fact Sheetmsdprojectwin.org/Portals/0/Documents_Extra/IOAP/archive/IOAP_200… · SSO SSDP Project Fact Sheet Mill Creek NB01 Pipe Upgrades Mill Creek and Heatherfield
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
SSO Project Number:
Project Name: Shively Interceptor
Modeled Area:
Branch or SSO ID:
Project Type:
Receiving Stream:
Project Description:
Reason for Overflow:
Design Parameters / Assumptions:
Project Constraints:
Capital Projects:
Overflow Points Addressed:
SSO SSO Name Service Area Overflow Type Discharge To
Average Overflow /
Incident (gallons)
04498 820 Echo Bridge Road West County Manhole Stream Suspected-no data
04542 Fern Lea PS Wet Well West County Manhole Ditch 91,500
81814-W Pioneer Road PS West County Pumped Ditch 32,750
MSD0047-PS Fern Lea West County Pumped Catch basin 141,083
MSD0050-PS Garrs Lane West County Pumped Ditch 72,000
S_MC_WC_NB01_M_01_A
SSO SSDP
Project Fact Sheet
Mill Creek
NB01
Pipe Upgrades
Mill Creek and Heatherfield Ditch
Construct 18,830 LF of new gravity sewers (10” – 27”) to eliminate pump
stations. This is the Shively Interceptor capital improvement project.
B06208 ~ Shively Interceptor - Preliminary Design
$16,419,000
Pump station capacity (hydraulic bottleneck & backwater effects)
None at this time
Estimated Capital Cost (2008
dollars):
Weighted Benefit/Cost Ratio
(Present Worth):
This solution is based on a 2.60-inch cloudburst rain event
6.70
Report As of: 5/7/2009 Page 1 of 1
[Ú
[Ú
[Ú
[Ú
[Ú
[Ú [Ú
[Ú
[Ú
[Ú%2
%2
%2
%2
%2
!!2
#0
!!2!!2
!!2
LYNN
VIEW
DITCH
§̈¦264
Construct 18,830 LFof sewer pipe (ranging from
10" to 27" diameter) toeliminate 5 pump stations
JACKS LANE
PIONEER
FERN LEA
ROSATERRACE
CITYPARK
SOUTHLANDTERRACE
CRUMSLANE
GARRS LN
04498
04542
MSD0050-PS
MSD0047-PS
81814-W
This document was developed in color. Reproduction in black and white may not represent the data as intended.CMS Inc. SSDP Map Series: