Sri Lakshmi Chemicals Environmental Clearance for the “Proposed Expansion of Bulk drugs & intermediates Products Manufacturing” at plot No 73 D, KIADB Kolhar Industrial Area, Kolhar and Nizampur Village, Bidar Taluk, Bidar District, Karnataka State Prepared By HUBERT ENVIRO CARE SYSTEMS (P) LTD, CHENNAI EIA Report May- 2017
266
Embed
Sri Lakshmi Chemicals - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/EIA/27052017A92U30... · Sri Lakshmi Chemicals Environmental Clearance for the “Proposed
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Sri Lakshmi Chemicals
Environmental Clearance for the “Proposed Expansion ofBulk drugs & intermediates Products Manufacturing” at plotNo 73 D, KIADB Kolhar Industrial Area, Kolhar and Nizampur
Village, Bidar Taluk, Bidar District, Karnataka State
Prepared By
HUBERT ENVIRO CARE SYSTEMS (P) LTD,CHENNAI
EIA ReportMay- 2017
ACKNOWLEDGEMENTThe following personnel are gratefully acknowledged for their fullest support in
collection, compilation of needful data regarding the project and kind cooperation in
fulfilling the report on Environmental Impact Assessment (EIA) of M/s. Sri Lakshmi
Chemicals (SLC).
Sri Lakshmi Chemicals,
Mr. SAMINENI SURESH – Managing Partner
Mr. MADHU. – Partner
Mr. DINESH PATIL - Department Head
Hubert Enviro Care Systems Pvt. Ltd, ChennaiDr. J. R. Moses - EIA Coordinator (EC) & Functional Area Expert (FAE)
Mr. Vamsee Krishna Navooru - EIA Coordinator (EC) & Functional Area Expert (FAE)
Dr. Rajkumar Samuel - Functional Area Expert
Mr. Abishek Moses -Team Member (TM)
Mr. A. Manoharan -FAE
Mr. V. Dhivakar -FAE
Ms. Ramaa Prakash -FAE
Mr. T.P. Natesan -FAE
Mr. Brijesh Kumar -FAE
Ms. Abirami -FAE
Dr. K. Karupaiyan -TM
Mr. Chengalvarayan -TM
Mr. A.K. Natarajan -TM
Mr. Tamil Selvan. B -TM
Ms. Pavithra R -TM
Mr. Vardharajan -TM
Dr. Vivekanandan -TM
Mr. Harsha Vardhan -TM
Ms. Kavya S Kumar -TM
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 2 of 263
Declaration of Experts contributing to the EIAI hereby certify that I was involved in the EIA report for the project titled “ProposedExpansion of Bulk drugs & intermediates Products Manufacturing” by M/s. SriLakshmi chemicals, plot No 73 D, KIADB Kolhar Industrial Area, Kolhar andNizampur Village, Bidar Taluk, Bidar District, Karnataka State along with the
Functional Area Experts listed below during Oct 2016 to till date.
Hubert Enviro Care Systems Pvt. Ltd.,A-21, Phase III, Thiru-vi-ka Industrial Area, Guindy,
Chennai - 600032Functional Area Experts:
S. No. Functional Areas Name of theExpert Duration of Involvement Signature
1. AP, AQ, RH & WP Dr. J R Moses July 2016 – Till date
2. AP, WP, N & SHW Mr. VamseeKrishna Navooru
Oct 2016 – Till date
3. WP & EB Dr. RajkumarSamuel
Aug 2016 – Till date
4. EB, SE, SC & SHW Mr. A. Manoharan Nov 2016 – Till date
5. WP & SHW Mrs. RamaaPrakash Nov 2016 – Feb 2017
6. SE Mr. V. Dhivakar Nov 2016 – Till date
7. LU & HG Dr. T.P. Natesan Nov 2016 – Till date
8. NV Mr. Brijesh Kumar Nov 2016 – Till date
AP - Air pollution monitoring, prevention and controlAQ - Meteorology, air quality modeling and predictionEB - Ecology and biodiversityHG - Hydrology, ground water and water conservationLU - Land useNV - Noise & VibrationRH - Risk assessment and hazards managementSC - Soil conservationSE - Socio-economicsSHW - Solid and hazardous waste managementWP - Water pollution monitoring, prevention and control
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 2 of 263
Declaration of Experts contributing to the EIAI hereby certify that I was involved in the EIA report for the project titled “ProposedExpansion of Bulk drugs & intermediates Products Manufacturing” by M/s. SriLakshmi chemicals, plot No 73 D, KIADB Kolhar Industrial Area, Kolhar andNizampur Village, Bidar Taluk, Bidar District, Karnataka State along with the
Functional Area Experts listed below during Oct 2016 to till date.
Hubert Enviro Care Systems Pvt. Ltd.,A-21, Phase III, Thiru-vi-ka Industrial Area, Guindy,
Chennai - 600032Functional Area Experts:
S. No. Functional Areas Name of theExpert Duration of Involvement Signature
1. AP, AQ, RH & WP Dr. J R Moses July 2016 – Till date
2. AP, WP, N & SHW Mr. VamseeKrishna Navooru
Oct 2016 – Till date
3. WP & EB Dr. RajkumarSamuel
Aug 2016 – Till date
4. EB, SE, SC & SHW Mr. A. Manoharan Nov 2016 – Till date
5. WP & SHW Mrs. RamaaPrakash Nov 2016 – Feb 2017
6. SE Mr. V. Dhivakar Nov 2016 – Till date
7. LU & HG Dr. T.P. Natesan Nov 2016 – Till date
8. NV Mr. Brijesh Kumar Nov 2016 – Till date
AP - Air pollution monitoring, prevention and controlAQ - Meteorology, air quality modeling and predictionEB - Ecology and biodiversityHG - Hydrology, ground water and water conservationLU - Land useNV - Noise & VibrationRH - Risk assessment and hazards managementSC - Soil conservationSE - Socio-economicsSHW - Solid and hazardous waste managementWP - Water pollution monitoring, prevention and control
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 2 of 263
Declaration of Experts contributing to the EIAI hereby certify that I was involved in the EIA report for the project titled “ProposedExpansion of Bulk drugs & intermediates Products Manufacturing” by M/s. SriLakshmi chemicals, plot No 73 D, KIADB Kolhar Industrial Area, Kolhar andNizampur Village, Bidar Taluk, Bidar District, Karnataka State along with the
Functional Area Experts listed below during Oct 2016 to till date.
Hubert Enviro Care Systems Pvt. Ltd.,A-21, Phase III, Thiru-vi-ka Industrial Area, Guindy,
Chennai - 600032Functional Area Experts:
S. No. Functional Areas Name of theExpert Duration of Involvement Signature
1. AP, AQ, RH & WP Dr. J R Moses July 2016 – Till date
2. AP, WP, N & SHW Mr. VamseeKrishna Navooru
Oct 2016 – Till date
3. WP & EB Dr. RajkumarSamuel
Aug 2016 – Till date
4. EB, SE, SC & SHW Mr. A. Manoharan Nov 2016 – Till date
5. WP & SHW Mrs. RamaaPrakash Nov 2016 – Feb 2017
6. SE Mr. V. Dhivakar Nov 2016 – Till date
7. LU & HG Dr. T.P. Natesan Nov 2016 – Till date
8. NV Mr. Brijesh Kumar Nov 2016 – Till date
AP - Air pollution monitoring, prevention and controlAQ - Meteorology, air quality modeling and predictionEB - Ecology and biodiversityHG - Hydrology, ground water and water conservationLU - Land useNV - Noise & VibrationRH - Risk assessment and hazards managementSC - Soil conservationSE - Socio-economicsSHW - Solid and hazardous waste managementWP - Water pollution monitoring, prevention and control
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 3 of 263
Declaration by the Head of the Accredited Consultant Organization
I, Dr. J R Moses hereby, confirm that the above mentioned experts prepared the EIA
for the - “Proposed Expansion of Bulk drugs & intermediates ProductsManufacturing” by M/s. Sri Lakshmi chemicals, plot No 73 D, KIADB KolharIndustrial Area, Kolhar and Nizampur Village, Bidar Taluk, Bidar District,Karnataka State. I also confirm that I shall be fully accountable for any misleading
information mentioned in this statement.
Signature: Date:27/05/2017
Name: Dr. J.R Moses
Designation: CEO
Name of the EIA Consultant Organization: Hubert Enviro Care Systems Pvt. Ltd.,
Chennai
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 3 of 263
Declaration by the Head of the Accredited Consultant Organization
I, Dr. J R Moses hereby, confirm that the above mentioned experts prepared the EIA
for the - “Proposed Expansion of Bulk drugs & intermediates ProductsManufacturing” by M/s. Sri Lakshmi chemicals, plot No 73 D, KIADB KolharIndustrial Area, Kolhar and Nizampur Village, Bidar Taluk, Bidar District,Karnataka State. I also confirm that I shall be fully accountable for any misleading
information mentioned in this statement.
Signature: Date:27/05/2017
Name: Dr. J.R Moses
Designation: CEO
Name of the EIA Consultant Organization: Hubert Enviro Care Systems Pvt. Ltd.,
Chennai
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 3 of 263
Declaration by the Head of the Accredited Consultant Organization
I, Dr. J R Moses hereby, confirm that the above mentioned experts prepared the EIA
for the - “Proposed Expansion of Bulk drugs & intermediates ProductsManufacturing” by M/s. Sri Lakshmi chemicals, plot No 73 D, KIADB KolharIndustrial Area, Kolhar and Nizampur Village, Bidar Taluk, Bidar District,Karnataka State. I also confirm that I shall be fully accountable for any misleading
information mentioned in this statement.
Signature: Date:27/05/2017
Name: Dr. J.R Moses
Designation: CEO
Name of the EIA Consultant Organization: Hubert Enviro Care Systems Pvt. Ltd.,
Chennai
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 4 of 263
Hubert Enviro Care Systems (P)Ltd.Client: Sri Lakshmi Chemicals
KIADB Kolhar Industrial Area, Kolhar and Nizampur Village, Bidar Taluk, Bidar District,Karnataka State
Project: Proposed Expansion of Bulk drugs & intermediates
Products Manufacturing
Project No.:SLC/021/2016-17,Dt 19th July 2016
Title:EIA/EMP Report
Document No.:RP002
Rev.:B
This document is the property of Hubert Enviro Care Systems (P) Ltd. and must not bepassed on to any person or body not authorised by us to receive it nor be copied orotherwise made use of either in full or in part by such person or body without our priorpermission in writing.
Rev. Date DetailsInit. Sign. Init. Sign. Init. Sign.
Prepared Checked Approved
0 10th May 17 1st Revision
Dr.K.KarupaiyanKavya S Kumar,Harsha Vardhan.B,Vivekanandan.BVardharajanPavithra R
A 13th May 17 2nd Revision
Client input updatedbyDr KarupaiyanPavithra R
B 18th May 17 3rd Revision
Vamsee inputupdated byDr KarupaiyanPavithra R
Mr.VamseeKrishnaNavooru
Dr.J.R.Moses
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 4 of 263
Hubert Enviro Care Systems (P)Ltd.Client: Sri Lakshmi Chemicals
KIADB Kolhar Industrial Area, Kolhar and Nizampur Village, Bidar Taluk, Bidar District,Karnataka State
Project: Proposed Expansion of Bulk drugs & intermediates
Products Manufacturing
Project No.:SLC/021/2016-17,Dt 19th July 2016
Title:EIA/EMP Report
Document No.:RP002
Rev.:B
This document is the property of Hubert Enviro Care Systems (P) Ltd. and must not bepassed on to any person or body not authorised by us to receive it nor be copied orotherwise made use of either in full or in part by such person or body without our priorpermission in writing.
Rev. Date DetailsInit. Sign. Init. Sign. Init. Sign.
Prepared Checked Approved
0 10th May 17 1st Revision
Dr.K.KarupaiyanKavya S Kumar,Harsha Vardhan.B,Vivekanandan.BVardharajanPavithra R
A 13th May 17 2nd Revision
Client input updatedbyDr KarupaiyanPavithra R
B 18th May 17 3rd Revision
Vamsee inputupdated byDr KarupaiyanPavithra R
Mr.VamseeKrishnaNavooru
Dr.J.R.Moses
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 4 of 263
Hubert Enviro Care Systems (P)Ltd.Client: Sri Lakshmi Chemicals
KIADB Kolhar Industrial Area, Kolhar and Nizampur Village, Bidar Taluk, Bidar District,Karnataka State
Project: Proposed Expansion of Bulk drugs & intermediates
Products Manufacturing
Project No.:SLC/021/2016-17,Dt 19th July 2016
Title:EIA/EMP Report
Document No.:RP002
Rev.:B
This document is the property of Hubert Enviro Care Systems (P) Ltd. and must not bepassed on to any person or body not authorised by us to receive it nor be copied orotherwise made use of either in full or in part by such person or body without our priorpermission in writing.
1.1 Project Back ground...........................................................................................................37
1.2 Overview of Sri Lakshmi Chemicals................................................................................37
1.3 Purpose and Status of the Report ...................................................................................38
1.4 Brief Description of Nature, Size, Location of the Project & Its Importance to theCountry, Region..............................................................................................................................39
1.4.1 Nature, Size & Location of the Project ........................................................................39
1.4.2 Need for the Project and Its Importance to the Country and/Region .....................41
2.9 Schematic Representations of the Feasibility Drawing which Give InformationImportant for EIA Purpose ............................................................................................................71
3 Description of Environment......................................................................................74
6.7 Hierarchical system/administrative order of Sri Lakshmi Chemicals limited forEnvironmental management.......................................................................................................194
6.8 Cost Estimate for Environment Management Plan (EMP).........................................195
Figure 9-3 Safety, Health and Environment Policy ............................................................................253
LIST OF ACCRONYMS
AAQ Ambient Air QualityAAQM Ambient Air Quality MonitoringCPCB Central Pollution Control BoardCSR Corporate Social ResponsibilityEIA Environmental Impact AssessmentEMC Environmental Management CellEMP Environmental Management PlanETP Effluent Treatment PlantGLC Ground Level ConcentrationISO International Standard for OrganizationKIADB Karnataka Industrial Area Development BoardKSPCB Karnataka State Pollution Control BoardkWh Kilowatt per hourLOS Level of ServiceMEE Multiple Effect EvaporatorMSDS Material Safety Data SheetNAAQ National Ambient Air QualityPCB Pollution Control BoardPCU Passenger Car UnitSEAC State Expert Appraisal CommitteeSEIAA State Environmental Impact Assessment AuthoritySTP Sewage Treatment PlantTDS Total dissolved Solids
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 15 of 263
TOR Terms of ReferenceTSDF Treatment, Storage and Disposal FacilitiesZLD Zero Liquid Discharge
LIST OF ANNEXURE
1. Existing CFO2. Land document.3. Monitoring data submitted to KSPCB4. Process & Material balance5. Product MSDS.6. List of raw materials.7. Raw materials MSDS.8. Site layout.9. Water balance charts-Existing.10.Water balance charts-Proposed.11.KSPCB authorization for HWM.12. TSDF Agreement.13. ZLD scheme.14.On-site emergency plan.15.Risk Assessment report.16.Annual Medical report.
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 16 of 263
EXECUTIVE SUMMARY
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 17 of 263
EXECUTIVE SUMMARY
M/s Sri Lakshmi Chemicals (SLC) was acquired by its management in the
year 2010 from Sree Chemicals. SLC a privately owned and professionally
managed enterprise with its corporate office in Hyderabad, Mr. Samineni
Suresh is the owner of SLC. Since Pharmaceutical products are market
desire, SLC proposes the expansion of production capacity by introducing
new products.
The Company is assigning prime importance for environmental protection.
The company has implemented zero discharge concepts and complied the
environmental laws. The industry has maintained greenery inside the industry
& maintained well developed Green belt. The Environmentally Sensitive Areas
within 15km from Project Boundary is provided in the below Table-1.
Table-1 Environmentally Sensitive Areas within 15km from Project Boundary
S. No Areas Proposed project location boundary
1. Areas protected underinternational conventions, nationalor local legislation for theirecological, landscape, cultural orother related value
Bidar fort- 7.35 Km (local legislation) Gurudwara Nanak Jhira Sahib – 3.5
Km Narasimha Jhira Cave Temple –5.7
Km2. Areas which are important or
sensitive for ecological reasons –Wetlands, Watercourses or otherwater bodies, coastal zone,biospheres, mountains, forests
Manjara river - 12.5 Km Bomgondeshwar Lake-4.5 Km Gornalli Keri-5.3 Km Papnash Lake-2.7 Km Andur Lake-2.9 Km Karanja Reservoier-13.8 Km Deciduous Forest Near Andur- 3.5 Km Deciduous Forest Shahpur- 6.1Km Kamthana Reserve Forest- 3.1Km Kaplapur Reserve Forest- 1.2 Km Honnjkere Reserve Forest- 4.1 Km Khanapur Reserve Forest- 6.5Km Chitta Reserve Forest-2.6 Km
3. Areas used by protected, importantor sensitive species of flora orfauna for breeding, nesting,foraging, resting, over wintering,
Nil
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 18 of 263
migration
4. Inland, coastal, marine orunderground waters
Nil
5. State, National boundaries Andra Pradesh – Karnataka 12.25 Km
6. Routes or facilities used by thepublic for access to recreation orother tourist, pilgrim areas
SH105, (Bidar to Hummabad)
7. Defence installations Bidar Defence Airport 0.92 Km8. Densely populated or built-up area Bidar- 2.8 Km
Kohlar Village - 3.1 Km9. Areas occupied by sensitive man-
made land uses (hospitals,schools, places of worship,community facilities)
Hospitals DistrictGovt.Hospital-7.1Km Guru Nanak Hospital- 6.2 Km Payari Hospital -7.6 Km Vasu Hospital - 7.9 Km Shree Hospital – 7.2 Km
Educational Institutions Gyan Sudha Public School- 6.2 Km Mellenium Public School -5.4 Km Sai Gnyan Public School-5.6 Km Guru Nanak Public School-6.6 Km Guru Nanak DAV Public School-7.1
Km Sri. Dattagiri Maharaj Public School-
7.5 Km Saint Joseph Public School-7.1 Km Joy Kids Public School -6.8 Km N.K.Jabshetty Ayurvedic Medical
College - 6.2 Km Bidar Institute of Medical Sciences -
6.4 Km BVB College-6.2 Km Government Polytechnic Bidar – 6.4
Km sidharth college- 6.9 Km Vasantha college of nursing- 3.9Km Noor college-9.0 Km University of Agricultural Research -
7.2 Km AIMES College Campus 7.6 Km Allama Iqbal Education Society's
Shaheen PU College-7.9 Km Karnataka Veterinary, Animal and
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 19 of 263
Fisheries Sciences University-4.0 Km Akkamahadevi College of Nursing-3.6
Km Saptagiri ITI College-5.4 Km National College-5.0 Km Vidya PU College-6.5 Km B. V. Bhoomreddy College-5.8 Km Gurunanak Dev Engginering College-
5.7 Km Govt. ITI College 5.6 Km Sai Gnyan Mate Manikeshwari
College-4.9 KmReligious Places
Jara Naraswamy Temple -10.1 Km Papanasham Temple (Shiva Temple)
-6.2 Km Bhavani Temple-8.6 Km Guru Nanak (Gurudwara)- 7.0 Km Eidgah Amlapur – Mosque -5.2 Km Masjid E Ejaz-6.2 Km Al-Farooq Masjid -5.9 Km Jamia masjid amlapur Mosque -6.5
Km10. Areas containing important, high
quality or scarce resources,(groundwater resources, surfaceresources, forestry, agriculture,fisheries, tourism, minerals)
Manjara river - 12.5 Km Karanja Reservoier-13.8 Km Bidar fort- 7.3 Km
11. Areas susceptible to naturalhazard which could cause theproject to present environmentalproblems, (earthquakes,subsidence, landslides, erosion orextreme or adverse climaticconditions)
This area is generally plain no prone to anynatural disasters. The area under study fallsin Zone-II, according to the Indian StandardSeismic Zoning Map. Suitable seismiccoefficients in horizontal and verticaldirections respectively, have to be adoptedwhile designing the structures.
M/S. Sri Lakshmi Chemicals located at plot No 73D, KIADB Kolhar Industrial
Area, Kolhar and Nizampur Village, Bidar Taluk, Bidar District, Karnataka
State, proposes expansion of production capacity by introducing new
products.
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 20 of 263
The products categories are Active Pharmaceuticals Ingredients (APIs) and
Chemical Intermediates. Presently SLC is manufacturing 1 product namely 5
Cyanophthalide with production capacity of 36 MTPA. For the present
proposal, SLC proposes to revise the existing product capacity to 96 MTPA
and add 7 more new products with capacity of 240 MTPA to a total of 8
products with capacity of 336 MTPA. The existing and proposed products
details are provided in the below Table 2.
Table-2 Existing and Proposed Products with Capacity
2.4.5 Resource Optimization/Recycling and Re-Use Envisaged in theIndustry
Solvent Recovery & Re-Use:
Solvents do not contribute to the effectiveness of the drug, with the exception
of forming the desired solvate in the final product. However, solvents play an
essential role in chemical processing for controlling the reaction rate,
facilitating heat and mass transfer and enabling product separation and
purification, which cannot be replaced easily with other alternatives.
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 58 of 263
Various solvents are proposed to be used during the process of manufacture
of APIs. The solvents proposed to be recovered and recycled during the
process of manufacture of each product are detailed in Table 2-6.
Table 2-6 Solvent Recovery and Re-use
S. No Solvent NameQty (T/A)
Solvent StorageMode Total qty used Recovered and
re-used
1. Acetone Above groundStorage Tank 0.61 0.58
2. Chloroform Above groundStorage Tank 671.312 637.75
3. DMF Above groundStorage Tank 181.17 172.11
4. DMSO Above groundStorage Tank 469.918 446.42
5. EDC Above groundStorage Tank 147.53 140.15
6. Ethanol Barrel 358.91 340.96
7. Ethyl Acetate Above groundStorage Tank 168.00 159.60
8. IPA Above groundStorage Tank 556.80 528.96
9. MDC Above groundStorage Tank 1767.267 1678.90
10. Methanol Above groundStorage Tank 373.429 354.76
11. Morpholine Above groundStorage Tank 17.58 16.70
12. n-Hexane Above groundStorage Tank 211.028 200.48
13. Pyridine Barrel 310.482 294.96
14. Tetrahydrofuran Above groundStorage Tank 237.82 225.93
15. Toluene Above groundStorage Tank 1592 1512.40
Solvent Recovery System:1. After the reaction is complete the solvents are recovered in a distillation
unit.
2. The distillation unit has two condensers in series (shell and tube type).
3. The first condenser is passed with cooling tower water, while the second
condenser will have chilled brine solution at -20 to -0 oC as coolants.
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 59 of 263
4. After the vapors are condensed, the condensate along with un-condensed
vapors is passed through a trap which is cooled externally with chilled
water.
5. The vents of condenser and receiver are connected to scrubber system.
6. All the reaction vessels and centrifuges are connected to a common line.
These fumes and exhausts are sucked by ID fan and scrubbed by alkali
solution.
7. The air after scrubbing is let out into the atmosphere and the scrubbed
water is sent to MEE for further treatment.
8. This wet scrubber absorbs acidic vapors, traces of solvents etc. and
purified gas stream is let out into the atmosphere.
9. SLC is achieving around ~95% efficiency in solvent recovery system and it
will be re-used for the process.
The typical solvent recovery system is depicted in Figure 2-6
Figure 2-6 Typical solvent recovery systemSpent Carbon:Spent carbon is used during the process of manufacture of different products.
The spent carbon will be disposed to spent carbon disposed for Incineration.
The detailed list of the quantities is appended in the below Table 2-7.
Table 2-7 Spent Carbon Recovery and Disposal
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 60 of 263
S. No Proposed Products NameQuantity of spent Carbon
generated, T/ADisposalMethod
1. 5-Cyanophthalide96.00
2. 1-4-(methylsulfonyl) Phenyl]ethanone: 0
Disposed toKSPCB
Authorizeddealer.
3.2,3-tri-o-acetyl-5-deoxy-beta-d-ribofuranose
0
4. Fluconazole 2.40
5. Gabapentin 0
6. Pregabalin 0
7. Theobromine 6.00
8. Darunavir intermediate 0
Total 104.4
2.5 Project Description Including Drawings Showing Project Layout,Components Of Project, Schematic Representations Of The FeasibilityDrawing Giving Information Important For EIA Purpose
2.5.1 Project Description Including Drawings Showing Project Layout,Components of Project
The existing and proposed layout plan demarcating various units within the
plant and the boundaries with land use pattern is provided in Figure 2-7 and
enclosed as Annexure 8. Land document is attached as Annexure 2.
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 61 of 263
Figure 2-7 Project Site Layout
The total land area is 5056 sq m (1.25 Acres). The land use pattern is
Collected in leakproof containers anddisposed only toKSPCB registeredauthorized re-processor
28.1 Organic Residue(MTPA) 0 10 10 Collected in
carboys and stored
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 68 of 263
in Hazardous wastestorage area andhanded over toKSPCB authorizedincinerator
28.3 Spent Carbon(MTPA) 36 60 96
Collected inpolythene bags andstored in Hazardouswaste storage area.Will be sent toKSPCB authorizeddealer.
33.1 MS Drums(MTPA) 2 3 5 Stored in secure
manner and handedover to KSPCBauthorized recycler33.1 HDPE Used Liners
(MTPA) 0.2 0.4 0.6
35.3
MEESludge/Chemicalsludge from clarifierand evaporator(MTPA)
0.5 9 9.5
Collected inpolythene bags andstored in Hazardouswaste storage area.and handed over toKSPCB authorizedTSDF
2.7 Infrastructure facilities
The sanitation and restroom will be provided to the labor force during the
construction phase. During operation phase the office room, rest room and
canteen are being provided to the employees. The site layout plan is enclosed
as Annexure 8.
2.8 Machinery & Equipment Details
The detailed list of machinery & equipments in the industry installed &
proposed to be procured for the manufacture of products are provided in the
Table 2-15.
Table 2-15 List of Machinery & Equipments-Existing
S. No Description of Main Machineries Capacity NosReactors
1. GLR 6.2KL 3
2. GLR 4KL 2
3. GLR 5KL 1
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 69 of 263
4. GLR 2 KL 1
5. SS 5KL 1
6. SS 4KL 1
7. SS 3KL 4
8. SS 2KL 1
9. SS 1KL 1
10. Slurry prep. –PP VAT 8 KL 2
11. MS-FRP 20 KL 2
12. MEE- SS 30 KLD 1
Filter/Drier13. Nutsch filter MS FRP 4KL 1
14. DRIER TRAYS SS 96 TRAY 5
15. LEAF FILTER SS 250Ltrs 1
16. LEAF FILTER SS 100 Ltrs 117. SS RECEIVERS 600 LTRS 6
18. PP FRP RECIEVER 600 LTRS 2
MISC19. MS TANK 15 KL 1
20. MS TANK 10 KL 2
21. MS TANK 20KL 1
22. Cooling Tower 300TR 1
23. Boiler -FO 2000kgs/hr 1
24. Chilling plant 18TR 1
25. Brine chilling 20KL 1
26. Cooling Tower 100TR 1
27. DG SET 200 KVA 1
Centrifuges28. SS 316 48 " centrifuge Process 4
29. RUBBER LINED 48 " centrifuge Process 2
30. Filter press40 nosplates 2
Justification for number of products and number of reactors:
The existing product is one number, new products are 7 numbers, and thus
the total proposed products are 8 numbers. The number of existing reactors is
15 numbers with different capacities for the purpose of running reaction, work-
up, solvents distillation and product isolation purpose.
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 70 of 263
The existing product is only one numbers, existing number of reactors are 15,
the number of reactors may seem more with respect to number of existing
products, not all the reactors were in use. All these reactors were present
when factory was acquired by SLC management from Sree Chemicals in
2010.
No additional Machineries & Equipments are required for the proposed
expansion.
2.9 Schematic Representations of the Feasibility Drawing which GiveInformation Important for EIA Purpose
A schematic representation of the overall feasibility and environmental
assessment process is shown in Figure 2-11. The EIA process is composed of
the following stages:
Study of project information
Screening & Scoping
Environmental Pre-Feasibility study & application for approval of TOR
Collection of detailed project management plan/report
Baseline Data collection
Impact identification, Prediction & Evaluation
Mitigation measures & delineation of EMP
Risk Assessment and Safety & Disaster Management plan
Review & finalization of EIA Report based on the TOR requirements.
Submission of EIA report for implementation of mitigation measures &
EMP as well as necessary clearances from relevant Authority.
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 71 of 263
Figure 2-11 Feasibility & Environmental Assessment Process
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 72 of 263
Chapter 3Description of Environment
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 73 of 263
3 Description of Environment
3.1 Preamble
This chapter depicts the existing environmental conditions in and around the
10Km radius from the proposed project with an area of 1.24 Acres (0.505 Ha)
located at Plot No.73 D Kolhar Industrial Area, KIADB, Nizampur Village Bidar
Taluk Bidar District & Karnataka State.The primary baseline data monitored
covered three (3) months i.e., from December 2016 - February 2017, and
secondary data was collected from Government and Semi-Government
organisations. The primary baseline data has been generated by M/s. Hubert
Enviro Care Systems (P) Ltd, Chennai, and a MoEF&CC approved & NABL
certified Environmental Testing Laboratory for the following Terrestrial
environmental components.
Terrestrial Environmental Components
Meteorology
Temperature
Relative Humidity
Rainfall
Wind Speed & Direction
Solar Radiation
Ambient Air Quality
Particulate matter <10 micron size (PM10)
Particulate matter <2.5 micron size (PM2.5)
Sulphur Dioxide (SO2)
Nitrogen Dioxide (NO2)
Carbon Monoxide (CO)
Lead (Pb)
Ozone (O3)
Benzene (C6H6)
Benzo (a) pyrene (C20H12)
Arsenic (As)
Nickel (Ni)
Ammonia (NH3)
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 74 of 263
Hydrogen Fluoride (HF)
Hydrogen Bromide (HBr)
Hydrogen Sulfide (H2S)
Hydrogen Chloride (HCl)
Ambient Noise Levels
Day equivalent noise levels
Night equivalent noise levels
Inland Water Quality
Groundwater Quality
Surface Water Quality
Soil QualityFlora & Fauna (Ecology)
3.2 Study Area
A 10Km radial distance with the proposed project site as the epicentre has
been identified as the General study area / Project Influence Area (PIA) for
assessing the baseline environmental status. The core study area is the
project area and its immediate surroundings to the tune of 1.0 Km radius from
the boundary. The project area is the land where the project is being
developed. Further the Project Impact/Influence Area (PIA) is 10Km from the
boundary of the core area covering Bidar Taluk Bidar District of Karnataka
State. The map showing the study area/PIA for the EIA study is given as
Figure 3-29.
3.3 Description of the Study Area
As described in Chapter 1 Introduction M/s. Sri Lakshmi Chemicals Ltd, it is
situated in KIADB. Kolhar, Bidar district, Karnataka. An overall idea of the
study area with reference to the physical conditions are presented for better
understanding in the following sections before proceeding into the section on
the prevailing environmental conditions of the study area.
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 75 of 263
3.4 Environmentally/Ecologically Sensitive areas
The environmental sensitive areas covering an aerial distance of 15 km PIA
from project boundary is given in Table 3-1
Table 3-1: Environmentally Sensitive Areas within 15 km from ProjectBoundary
S.No Areas Proposed project location boundary
12. Areas protected underinternational conventions, nationalor local legislation for theirecological, landscape, cultural orother related value
Bidar fort- 7.35 Km (locallegislation)
Gurudwara Nanak Jhira Sahib –3.5 Km
Narasimha Jhira Cave Temple –5.7 Km
13. Areas which are important orsensitive for ecological reasons –Wetlands, Watercourses or otherwater bodies, coastal zone,biospheres, mountains, forests
Manjara river - 12.5 Km Bomgondeshwar Lake-4.5 Km Gornalli Keri-5.3 Km Papnash Lake-2.7 Km Andur Lake-2.9 Km Karanja Reservoier-13.8 Km Deciduous Forest Near Andur- 3.5
Km Deciduous Forest Shahpur- 6.1Km Kamthana Reserve Forest- 3.1Km Kaplapur Reserve Forest- 1.2 Km Honnjkere Reserve Forest- 4.1 Km Khanapur Reserve Forest- 6.5Km Chitta Reserve Forest-2.6 Km
14. Areas used by protected, importantor sensitive species of flora orfauna for breeding, nesting,foraging, resting, over wintering,migration
Nil
15. Inland, coastal, marine orunderground waters
Nil
16. State, National boundaries Andra Pradesh – Karnataka 12.25 Km
17. Routes or facilities used by thepublic for access to recreation orother tourist, pilgrim areas
SH105, (Bidar to Hummabad)
18. Defence installations Bidar Defence Airport 0.92 Km19. Densely populated or built-up area Bidar- 2.8 Km
Kohlar Village - 3.1 Km20. Areas occupied by sensitive man-
made land uses (hospitals,Hospitals
DistrictGovt.Hospital-7.1Km
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 76 of 263
schools, places of worship,community facilities)
Guru Nanak Hospital- 6.2 Km Payari Hospital -7.6 Km Vasu Hospital - 7.9 Km Shree Hospital – 7.2 Km
Educational Institutions Gyan Sudha Public School- 6.2 Km Mellenium Public School -5.4 Km Sai Gnyan Public School-5.6 Km Guru Nanak Public School-6.6 Km Guru Nanak DAV Public School-7.1
Km Sri. Dattagiri Maharaj Public School-
7.5 Km Saint Joseph Public School-7.1 Km Joy Kids Public School -6.8 Km N.K.Jabshetty Ayurvedic Medical
College - 6.2 Km Bidar Institute of Medical Sciences -
6.4 Km BVB College-6.2 Km Government Polytechnic Bidar – 6.4
Km sidharth college- 6.9 Km Vasantha college of nursing- 3.9Km Noor college-9.0 Km University of Agricultural Research -
7.2 Km AIMES College Campus 7.6 Km Allama Iqbal Education Society's
Shaheen PU College-7.9 Km Karnataka Veterinary, Animal and
Fisheries Sciences University-4.0 Km Akkamahadevi College of Nursing-3.6
Km Saptagiri ITI College-5.4 Km National College-5.0 Km Vidya PU College-6.5 Km B. V. Bhoomreddy College-5.8 Km Gurunanak Dev Engginering College-
5.7 Km Govt. ITI College 5.6 Km Sai Gnyan Mate Manikeshwari
College-4.9 KmReligious Places
Jara Naraswamy Temple -10.1 Km Papanasham Temple (Shiva Temple)
-6.2 Km Bhavani Temple-8.6 Km Guru Nanak (Gurudwara)- 7.0 Km Eidgah Amlapur – Mosque -5.2 Km Masjid E Ejaz-6.2 Km Al-Farooq Masjid -5.9 Km
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 77 of 263
Jamia masjid amlapur Mosque -6.5Km
21. Areas containing important, highquality or scarce resources,(groundwater resources, surfaceresources, forestry, agriculture,fisheries, tourism, minerals)
Manjara river - 12.5 Km Karanja Reservoier-13.8 Km Bidar fort- 7.3 Km
22. Areas susceptible to naturalhazard which could cause theproject to present environmentalproblems, (earthquakes,subsidence, landslides, erosion orextreme or adverse climaticconditions)
This area is generally plain no prone to anynatural disasters. The area under study fallsin Zone-II, according to the Indian StandardSeismic Zoning Map. Suitable seismiccoefficients in horizontal and verticaldirections respectively, have to be adoptedwhile designing the structures.
3.5 Physical Conditions
wherever possible references to the conditions prevailing in the study area in
particular are also provided. The physical conditions are discussed as under:
District profile
Drainage, land use, geology, Physiography
Natural resources
Climatic conditions, seismic zone characteristics and natural hazards
3.6 PIA District Profile
The Bidar district is the northern most part of the Karnataka state with
geographical area of 5460 sq.km. It lies between 17°35’ and 18°29’ North
latitude and 76°41’ to 77°39’ East longitude. It is bounded by Nizamabad and
Medak districts of Andhra Pradesh state on the eastern side, Latur and
Osmanabad districts of Maharastra state on the western side, Nanded district
of Maharastra state on the northern side and Gulbarga district on southern
side.
The entire district forms a part of the Deccan Plateau and is made up mostly
of solidified lava. The northern part of the district is characterized by expanses
of level and treeless surface punctuated here and there by flat and undulating
hillocks, black soils and basaltic rocks. The southern half of the district is a
high plateau about 715 m above mean sea level and are well drained. The
average elevation of the district is between 580 to 610 m above mean sea
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 78 of 263
level. Alluvial deposit is normally found along the banks of the Manjra river
and its main tributaries.
3.6.1 Climatic Conditions
The district experiences semi-arid climate with extreme summer. The dust
storms and severe heat waves are common in the district between April and
May. The temperature begins to rise towards the end of February till May,
which is the hottest month of the year. Coldest months are December and
January. The temperature varies in the district between 20 ºC and 42 ºC.
The year in the district may be divided into summer season from March to
May, southwest monsoon season from June to September, post-monsoon
season from October to November and winter season from December to
February.
Generally, the monsoon sets in the month of June and reaches its climax in
the month of September. The rainfall generally is spread over 39 to 53 days.
Nearly 75% to 80% of the annual rainfall is during the period of Southwest
monsoon. A few showers are also received during the North- East Monsoon,
generally in the month of December.
Bidar district receives an average rainfall of 827 mm. The normal annual
rainfall over thedistrict ranges from 735 mm to 860 mm.
Source:Ground Water Information Booklet,Bidar District, Karnataka,2008
3.7 Natural Resources of Bidar PIA District
3.7.1 Flora & Fauna
Flora: The weeds and climber found in the forest of the district are not of
much economic value. Some different type of grass which grows in the area
are not of nutrient type for the cattle and therefore useful for thatching roof of
huts and houses. The minor forest produce consist tupra (beedi) leaves,
rousa grass, seetaphal, honey, wax, tamarind and mango fruits. The most
common shrubs are Bikke (Gardenia gummifera, Linn) and Gotti or Challe
(Ziziphus xylopyrus willd). They are mostly used for fencing the fields. The
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 79 of 263
following are the tree species found in the district: Acacia arabica (Jali or
babul), Tamarindus indica, linn (Hunase), Butea frondosa, Palash,
Anogeissus latifolia, wall (Dindiga), and Hardwickia binata.
Fauna: The scantiness of forest accounts for almost a total absence of
denizens of the forest that can be said to belong to the big game variety.
There is no tiger. Occasionally, leopard may be seen. Wolves are found in the
craggy portion of the undulating forest. As many as 30 varieties of bats are
found in the district. Heads of the small deer appears during winter. The more
important among the domesticated animals are the buffalo, the cow, the
sheep, the goat and the camel.Flora and fauna of PIA are discussed in
section 3.11.
3.7.2 Forest Resources
Forest areas of Bidar division are classified as Reserve forests, Protected
forests and Unclassified forests.Bidar Forest division is having 43,592 ha. of
Forest area including
Reserve Forests, Protected forests and Unclassified forests. This area is
about 8.5% of total geographical extent of the district.
3.7.3 Irrigation
In the district the irrigation takes place from surface water and ground water.
The surface water irrigation is through canals, tanks and from medium and
minor irrigation projects. Major irrigation dam has been constructed across the
Karanja river and medium irrigation dam constructed across Chukkenala and
Mullamari rivers. From ground water the irrigation is through dug wells, dug
cum bore wells and bore wells..
3.7.4 Agricultural Resources
The main occupation of the people in the district is agriculture and related
operations.
There are two main seasons in which agricultural practices are carried out.
The two seasons are Kharif and Rabi. Khariff season commences from June
and the crops are harvested in September. Rabi season commences from
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 80 of 263
September and crops harvested in Febuaray. Themain food crops are Jowar,
Paddy, Wheat, Bajra, Maize and pulses. Groundnut, sugarcane and cotton
are the cash crops.
Cereals- Paddy,Jowar,Bajra,Maize
Pulse- Wheat Black gram, Bengalgram,Green Gram and RedGram\Horticulture-Banana,Mango,Papaya,Grapes,Potato TomatoBrijal,
i. In the surface water the pH varies between 6.9-7.76, which are
meeting the IS 10500:2012 for Drinking Water.
ii. The Total Dissolved Solids range varies between 243 mg/l – 374 mg/l
for the surface water. The TDS values are within the acceptable limit of
IS 10500:2012.
iii. The desirable limit of the chloride content is 250mg/l and permissible
limit is 1000 mg/l. The chloride content in the surface water for study
area is ranges between 18.5 mg/l – 38.8 mg/l.
iv. The desirable limit of the sulphate content is 200mg/l and permissible
limit is 400mg/l. The sulphate content of the surface water of the study
area varies between 10.4 mg/l – 15.8 mg/l meeting the desirable limit
of the IS 10500: 2012.
v. The Total hardness ranges is between 107 mg/l - 165 mg/l, within the
acceptable limit of IS 10500: 2012.
3.10.2 Ground water resources
The resource estimation and categorization is carried out as per the
recommendations of ‘Ground Water Resources Estimation Methodology - 97
(GEM -97) considering water shed as a unit. Water shed and hydrological
boundaries do not match with the administrative boundaries. As a result
different parts of taluk fall in different watersheds having different stages of
ground water development and categorization. Pro-rata approach to
consolidate the watershed data into Talukwise data gives only details on
ground water resource, draft, and additional irrigation potential. Pro rata
approach cannot be applied for taluk, as a unit, as far as stage of
development and categorization is concerned. It is observed that Aurad and
Humanabad taluks are completely under safe category. 88% of Bhalki and
91% of Basavakalyan taluks are safe and 79% of Bidar taluk is safe while rest
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 127 of 263
of 21% comes under over exploited area. No area comes under the category
of semi-critical. The overall stage of ground water development in the district
has reached 56.68%. Thus regionally the situation appears to be quite good,
however few areas of the district have attained over exploited stage. In such
areas site specific recharge structures coupled with water conservation
measures are the need of the hour.
The groundwater potential of the gross geographical area of the basin is
estimated on pro-rata basis from the district-wise groundwater resources-
2008 published by the Central Groundwater Board (CGWB) as given in Table3-20. Status of Ground Water Utilisation of Bidar District is given in Figure3-26
Table 3-20: Groundwater Potential in Bidar PIA District
AttributePotential/Quantity
Area of the district 5417.65 Sq.Km
Net Annual groundwater availability of the district 40,594.30 ham
Gross Draft Irrigation 19,767.81 ham
Gross Domestic and Industrial draft 3,240.32 ham
Draft Exceeding the total available ground water
resources leaving23,008.12 ham
Net ground water availability for irrigation 19,130.80 ham
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 128 of 263
Source: District-wise groundwater resources-2008 published by the Central GroundwaterBoard (CGWB)
Figure 3-26: Status of Ground Water Utilisation of Bidar District
Project Site
M/s. Sri Lakshmi chemicals -EIA/EMP report
Page 129 of 263
3.10.2.1 Ground water Quality
Total Eleven (11) ground water monitoring locations were identified for
assessment in different villages around the project site based on the usage of
sub surface water by the settlements/ villages in the study area. The
groundwater results are compared with the desirable and permissible water
quality standards as per IS: 10500 (2012) for drinking water. Groundwater
quality monitoring locations and results are given in Table 3-21 and Table3-22. A map showing the monitoring locations is given as Figure 3-32.
Table 3-21: Details of Groundwater Quality Monitoring Locations
B. Specific Terms of Reference for EIA studies for Synthetic Organic Chemicals Industry(Dyes & Dye Intermediates; Bulk Drugs and Intermediates Excluding DrugFormulations; Synthetic Rubbers; Basic Organic Chemicals, Other Synthetic OrganicChemicals and Chemical Intermediates)
1 Details on solvents to be used, measures for
solvent recovery and for emissions control.
Details on solvents to be used, measures
for solvent recovery is provided in the
Chapter 2, Section 2.4.5 & Table 2.6
Emissions control measure is provided in
Page 221 of 263
S.No
Terms of Reference Compliance
the Chapter 9, Section 9.4.1.
2 Details of process emissions from the
proposed unit and its arrangement to control
Emissions control measure is provided in
the Chapter 9, Section 9.4.1.
3 Ambient air quality data should include VOC,
other process specific pollutants like NH3,
Chlorine, HCl, HBr, H2S, HF, etc., (as
applicable)
Details provided in the Chapter 3, Section3.8.5.3 and Tables 3-8 & 3-9.
4 Work zone monitoring arrangements for
hazardous chemicals
Details provided in the Chapter 9, Section9.5.4.
5 Detailed effluent treatment scheme including
segregation of effluent streams for units
adopting ‘Zero ‘Liquid discharge.
Detailed effluent treatment scheme
including segregation of effluent streams for
units adopting ‘Zero ‘Liquid discharge is
provided in the Chapter 4 & Section4.2.8.2.
6 Action Plan for odour control to be submitted Details provided in the Chapter 9, Section9.4.1.
7 A copy of the Memorandum of
Understanding signed with cement
manufacturers indicating clearly that they c
o-process organic solid/hazardous waste
generated
Details of hazardous waste generation and
their storage and disposal methods are
provided in the Chapter 2, Section 2.6.5and Table 2-14.
8 Authorization/Membership for the disposal of
liquid effluent in CETP and solid/hazardous
waste in TSDF, if any
Facility is ZLD.
TSDF agreement is enclosed as Annexure12.
9 Action plan for utilization of MEE/dryers salts This shall be disposed off to TSDF as this
being hazardous waste.
10 Material safety data sheet for all the
chemicals being used/will be used
Products MSDS Annexure-5 and Raw
materials MSDS Annexure-7.
Page 222 of 263
S.No
Terms of Reference Compliance
11 Details of incinerator if to be installed. No incineration activity in the facility.
12 Risk assessment for storage and handling of
hazardous chemicals/solvents. Action plan
for handling & safety system to be
incorporated
Risk Assessments are enclosed as
Annexure-15.
13 Arrangements for ensuring health and safety
of workers engaged in handling of toxic
materials
Detail on health and safety of workers is
provided in the Chapter 9, Section 9.7.
Additional TOR’s
1. Compliance to CFO conditions as well as
notice issued by the KSPCB and status of
the industry.
Existing CFO is enclosed as Annexure 1and Monitoring report submitted to KSPCB
is enclosed as Annexure 3.
Industry status: Closed.
2. Justification for number of products and
number of reactors provided.
Chapter-2, Section 2.4.2 & Table 2-4Proposed Products with Capacity.
List of Michinery & Eqiupments is provided
in the Chapter-2, Section 2.8 & Table 2-15.
Justification for the number of products and
number of reactors are provided in Chapter-2, Section 2.8.
3. Material balance and mass balance for all
the products
Enclosed as Annexure 4.
4. Detailed study of the soil analysis inside the
premises of the industry is to be done and
provided
Soil samples analysis results were provided
in the Chapter 3, Section 3.11 and Table3-24.
5. Raw material to product and Product to
Waste generation ration for each product to
Enclosed as Annexure 4.
Page 223 of 263
S.No
Terms of Reference Compliance
be given.
6. Impact on the adjacent agriculture land due
to this activity as the proponent is using toxic
raw materials and produces toxic wastes
which may ultimately reach adjoining areas.
M/S. Srilakshmi Chemicals (SLC) is situated
in KIADB (Karnataka Industrial Area
development Board) industrial area.
The raw materials are properly stored and
hadled in closed atmosphere, the raw
materials list is provided in the Annexure 6.
The APC measures are provided in Chapter9, Section 9.4.1 & Table 9-2.
7. Water analysis is to be done for all the
parameters for all the nearby borewells.
Details provided in the Chapter 3, Section3.10.2.1 and Table 3-22.
8. Details of adjecent industries and impact on
the same from this industry.
Adjecent industries details provided in the
Chapter 2, Section 2.2.1 & Table 2-1.
The baseline study during the study period
reveals that no adverse impact on the
environment.
Ambient Air Quality results are well within
the National Ambient Air Quality Standards
for Industrial, Commercial and Residential
areas at all monitoring locations
Air Quality results are provided in Chapter3, Section 3.8.5.3 and Tables 3-8 & 3-9.
Noise: The ambient noise levels in both
Industrial area and in Residential area noise
are slightly exceeded the limit prescribed by
MoEF & CC; Chapter 3, Section 3.9 &Table 3-16.
Water environment is expplained in
Page 224 of 263
S.No
Terms of Reference Compliance
Chapter 3, Section 3.10. Surface water
results Table 3-19 & Ground water results
Table 3-22.
Soil: Soil quality monitoring results are
given in Chapter 3, Section 3.11.1 Table3-24.
9. Existing greenbelt details and proposed with
design to be provided.
The total land area is 5056 sq m (1.25
Acres) and the Greenbelt area is 1845 Sq.
mt (0.45 Acres, 36.5 %).
Existing and proposed greenbelt details
provided in the Chapter 6, Section 6.5.
10. MEE is not in the present layout plan. This
shall be incorporated and modofied layout
plan and scheme and design including
capacity of the same to be provided.
Layout plan is enclosed as Annexure 8.
MEE location is shown in the layout.
MEE scheme and design , Annexure 13.
11. Scheme for Storage and disposal of
hazardous waste as per the hazardous
waste handling and disposal rule to be
provided.
Hazardous waste Management is provided
in the Chapter 2, Section 2.6.5 and Table2-14.
12. Storage and handling method of bromine in
the process.
Stored in a Wooden box filled with sand and
kept in Cool & Dry Place
13. Alternative solvent to Chloroform and EDC in
the process may be given.
It is a process demand, so could not be
replaced.
14. Safety measures taken in the hydrogenation
process to be explained in EIA and explore
the possibility of using alternative catalysts
for hydrogenation process.
Hydrogenation process will be carried out in
completely protected manner.
It is a process demand, so could not be
replaced.
Page 225 of 263
S.No
Terms of Reference Compliance
15. In the monitoring protocols of ambient air,
VOC to be incorporated.
Included.
Air Quality results are provided in Chapter3, Section 3.8.5.3 and Table 3-9.
16. Solvent storage and solvent recovery to be
explained. Explain the % of loss, % of
recovery and disposal of recovered solvents
with sheme is to be furnished.
Solvent storage and recovery details are
provided in the Chapter 2, Section 2.4.5and Table 2-6.
17. Green Chemistry adopted in the process to
be highlighted and explained.
Wherever possible the solvents will be
recovered and re-used. The raw materials
requirement are kept optimum.
Too many byproducts are salable, details
provided in the process and materials
balance Annexure 4.
18. List of banned chemicals to be provided with
alternative chemicals to replace the banned
chemicals.
SLC is not using any banned chemicals.
19. Recent baseline data generated by the
KSPCB/CPCB if any and this shall be
compared with the previous baseline data
generated by the industry.
Baseline data not generated by the
KSPCB/CPCB.
7.7 HAZARD IDENTIFICATION AND SAFETY SYSTEM
Hazard Identified In the Factory
1. Health hazard due to exposure to chemicals and chemical spillages.
2. Fire hazard due to use of flammable chemicals.
3. Fire and explosion hazard due to various chemical reactions.
Page 226 of 263
Scenario Based Emergency Actions
1. Action plan in case of Solvent leakage from flange joints or from bottom valve
etc.,
a. Shift In-charge / Department Head shall be informed immediately.
b. Access the situation.
c. Only trained personnel shall approach the area using suitable personnel
protective equipments.
d. Stop leakage by closing isolation valve.
e. Stop hot work in surrounding area.
f. Isolate the power supply of the respective area.
g. Other than the needy all shall evacuate the area.
h. Cover drains / isolate from other plants with the help of sand or soil.
i. Affected persons shall move to fresh air and seek medical help further.
2. Action plan in case of Fire in Centrifuge due to Solvent vapors
a. Shout and break MCP
b. Trained personnel shall fight the fire with suitable PPEs.
c. Extinguish fire with DCP / CO2 / Foam extinguisher.
d. In case the fire not controlled with the use of portable fire extinguishers, start
fighting by using fire hydrant system with mobile foam unit.
e. Other than the needy all shall evacuate the area.
f. Close valves on solvent pipe lines.
g. Cooldown MLR tank by water spray.
h. Isolate the power supply of the respective area.
i. Close / isolate the drains with sand or soil.
j. Affected persons should be given first aid and moved for medical attention.
3. Action plan in case of Fire or Explosion
Page 227 of 263
a. Shout and break MCP.
b. Trained personnel shall fight the fire with suitable PPEs.
c. Extinguish with DCP / CO2 / Foam Extinguishers installed at site.
d. In case the fire not controlled with the use of portable fire extinguishers, start
fighting by using fire hydrant system and use mobile foam unit for solvent
fire.
e. Isolate the power supply of the respective area.
f. Other than the needy all shall evacuate the area.
g. Cooldown nearby receivers / service tank, reactors etc by water spray.
h. Isolate interconnection of tanks, reactors, service tank, charging valves,
receivers etc.
i. Other pipelines are to be checked for isolation.
j. Close / isolate the drains with sand or soil.
k. Affected persons shall be given first aid and moved for medical attention.
4. Action plan in case of Toxic Release
a. Shift In-charge / Department Head shall be informed immediately.
b. Only trained personnel shall approach the area using suitable personnel
protective equipments like SCBA.
c. Check the wind direction; decide route of escape and evacuating persons
shall run perpendicular to the wind direction and not against / along the wind
direction.
d. Evacuating personnel should use wet handkerchief on their nose.
e. Inform the neighbourhood if required and if they are likely to be affected.
f. Ensure that only essential personnel are in the affected areas.
Page 228 of 263
g. Rescue the persons trapped / injured.
h. Person present in other buildings should close their windows and doors to
prevent any entry of leaked gases.
i. Trace the source of leakage or spillage and isolate the system from other
equipment.
j. Isolate the electrical supply to the affected area.
k. Trap the leakage into a suitable scrubber.
l. Affected persons shall be given first aid and moved for medical attention.
5. Action plan in case of Electric Fire or Shock
a. Isolate the power supply to the affected area immediately before approaching
the site.
b. Do not use water for extinguishing the fire. Use CO2 type or DCP type or dry
sand to extinguishing the fire.
c. Remove any flammable or combustible material from the vicinity of the
incident.
d. Remove the affected person to an open area and check his breathing.
e. If he is unconscious and not breathing initiate artificial resuscitation
procedure.
f. Do first aid for any burn injury.
g. Physically isolate the burnt electrical components. Do not energize till the
entire circuitry is checked with megger or other devices with safety
mechanisms.
6. Action plan in case of leakage or rupture of Solvent / Fuel storage tanks
a. Area shall be evacuated immediately and cordoned off.
Page 229 of 263
b. Affected persons shall be thoroughly washed using clean water and given
necessary medical aid.
c. Personnel entering the area should make use of suitable personnel
protective equipments.
d. Leaked tank must be depressurized immediately by transferring remaining
quantity into another tank or container.
e. Leakage source must be traced and plugged.
f. Isolate the nearby electrical points and prevent any fire being brought
nearby. As a precaution mobilize extra fire extinguishers to the spot to tackle
fire if caught. Spilled material spreading should be contained in a dyke and
transferred to container or it must be absorbed on sand or earth.
g. The contaminated sand or earth must be neutralized and then dumped at
safe place or burned in the fire pit. (flammable liquids should not be absorbed
by combustible solids like saw dust or combustible fibres)
h. If a spilled material in to the trench of electrical cables, then it shall be
drained with natural gradient and wash with large quantity of water
continuously after de energising the cable.
i. If a spilled material gets into the storm water drain or sewer line then it must
be flushed with a continuous flow of large stream of clean water till it is
neutralized fully.
7. Action plan in case of Compressed Gas Cylinder Leakage
a. Move the cylinders to well ventilated area, and barricade the area. Never try
to repair the leaks when the equipment under pressure.
b. Immediately contact supplier to get the necessary information and help.
c. If fire catches to cylinder, do not try to extinguish the cylinder fire. Only cool
(by pouring water) and protect the nearby equipments from the safe distance.
8. Action plan in case of Cryogenic Gas (Liquid Nitrogen) Leakage
Page 230 of 263
a. Allow the spillage to evaporate by providing good ventilation.
b. If you feel the ventilation is insufficient, immediately evacuate the area.
9. Action plan in case of Water Reactive Chemical Spillage
a. Do not put water on the spill.
b. If it is liquid, use neutralizing agent and inert material like dry sand to absorb
spillage.
c. If it is powder / crystalline, avoid generating dusty conditions, sweep up
material.
d. Placed to bag, label the bag and send to ETP for safe disposal.
e. Decontaminate spill site with suitable neutralizing material.
f. Wash the spill area.
10. Action plan in case of Leakage through Pipe Line, Barrel / Drum
a. If the leak in a pipe line, immediately stop the supply to corresponding pipe
line
b. If the leak in a barrel or drum, do not move or transport that barrel or drum.
c. Immediately transfer that content to another non leak barrel or drum.
d. Transferred barrel / drum should be compatible with the material.
e. After the material transferred, empty drums are to be neutralized, washed
and then send to ETP for safe disposal.
f. To remove the spilled material from that area, procedure to be followed
based on the nature of material / chemical.
Page 231 of 263
CHAPTER – 8Project Benefits
Page 232 of 263
8. PROJECT BENEFITS
8.1 PROJECT BENEFITS
The project is of commercial manufacturing of Active Pharmaceutical Ingredients
and Chemical Intermediates that will play a vital role in the respective sector thereby
address the market demand and Social benefits.
The products manufactured at this facility will be exported that will aid in adding to
the revenue of the nation.
The corporate social responsibilities which are taken up by the company will
improve the well-being of the society and the corporate responsibilities towards the
protection of the environment will help in conserving the ecosystem.
It will also provide employment opportunities for additional population.
Page 233 of 263
CHAPTER – 9Environmental Management Plan
Page 234 of 263
9. ENVIRONMENTAL MANAGEMENT PLAN
9.1 Introduction
This Environmental Management Plan (EMP) for the M/s. Sri Lakshmi Chemicals,
identifies the principles, procedures and methods that will be used to control and
minimize the environmental impacts of the proposed operational activities
associated with the expansion project development. It is intended to ensure that
commitments made by the Sri Lakshmi Chemicals to minimize project related
environmental and social impacts.
As part of our ongoing commitment to excellence in environmental and social
performance we will ensure the following:
Fulfill all environmental conditions associated with project approvals.
Develop, promote and foster a shared sense of responsibility for
environmental and performance of the project.
Promote environmental awareness and understanding among employees
and contractors through training, identification of roles and responsibilities
towards environmental management
Linking project performance to overall environmental performance.
To monitor the environmental performance throughout the project and
implement an adaptive management approach for continuous improvement
and to meet the regulations.
9.2 Objectives of EMP
To suggest the formation of a core group (Environment Management Cell)
responsible for implementation of environmental control & protective
measures as well as monitoring of such implementation.
To ensure project components are compliant with all laws and approval
conditions.
Continue baseline monitoring
Facilitate a continual review of post construction and operation activities.
To suggest preventive and mitigation measures to minimize adverse impact
and to maximize beneficial impacts like.
Page 235 of 263
Preparation of afforestation or Greenbelt Development scheme.
Preparation of rain water harvesting scheme and energy conservation
actions
To prepare a capital cost estimate and annual recurring cost for
Environmental Management Plan.
To prepare a detailed action plan for implementation of mitigation measures.
Measure the effectiveness and success of proposed mitigation measures
9.3 EMP Roles and Responsibilities
9.3.1 Environmental Management Cell
All the activities will be monitored to ensure the appropriate implementation
of all environmental mitigation activities and to identify areas where
environmental management plan compliance is not satisfied.
For effective implementation of the system, it is also necessary to have a
permanent organizational set-up. Company has set-up permanent
Environmental Management Cell (EMC) for the effective implementation and
monitoring of environmental management system.
The company assigned responsibility to the concerned for implementation of
environmental control measures.
The Environmental Management Cell (EMC) set-up by the company is given
in the below Figure 9-1.
Figure 9-1 Environmental Management Cell
EHS Head
GM.Manager
ProductionManager
Executive
Supervisor Operator
Page 236 of 263
This section describes the organizational structure and responsibilities for
implementation of the EMP as shown below in Table 9-1.
Executive Director of the company will be responsible for total environmental
management.
Table 9-1 EMC Responsibility
S. No. Name &Designation Responsibilities
1
Executive Director(Mr.SAMINENISURESH ANDMADHU)
Establish an environment management cell. Responsible for overall environmental management. Regularly
coordinate with GM and take feedback regarding all theactivities performed under EMC and give directions tosucceeding component.
Provide sufficient funds for environmental management cell toreduce the environment impacts.
2 GM – Operations(Mr.KAMESH)
Keep aware the Management about all the activities performedunder EMC.
To ensure and study the feasibility of ETP working consideringthe present and future requirements and to suggest forimprovements if any.
To ensure, implement and follow all the required safetyprocedures & facilities, avoid the unsafe act & conditions,organizing safety trainings, mock drills, availability of onsite &off site emergency plans. Plan & implement Good safetycommittee.
3 Dept head(Mr.DINESH PATIL)
Treatment and disposal of trade effluents and sewage effluentas per consent.
Carryout ambient air quality monitoring as per consent. Monitoring the stack / chimney. Hazardous waste management handling and disposal. Plant and maintain adequate numbers of trees and gardens
around the Industry Applying and getting the consent of operation of air & water
and authorization to store the hazardous waste Prepare Management Information System (MIS) reports and
budget for environment management program. To deal with the environmental issues and for ensuring
compliance with the conditions Non compliance / violation of environmental norms, if any are
reported to GM and immediate required action is taken.4 Executive / Officers
Preparation of SOP related documents.
Page 237 of 263
JAGADISH,MANOHAR ANDPREM
Sampling the effluent at different stages and analyzing tocheck the efficiency of the plant such as pH, COD, BOD, TDS,TSS, MLSS, VFA and alkalinity.
Record the readings in the log sheet and preparation of dailyreport.
Coordinating with outside agency to carry out the AAQ, stack,Fugitive emission, noise level monitoring and water qualityparameters checking.
Preparation of monthly returns. Ensuring Plant and Process Safety
In addition to the above, company will have Safety, Health & Environment (SHE)
policy to adhere with standard operating process in order to comply with the
statutory and bring into focus any infringement of any norms and directives with
regards to the SHE and to take further corrective actions.
9.4 EMP for Operational Phase
Monitoring during the operation phase shall reflect those environmental and socio-
economic issues that may persist upon completion of construction activities.
Monitoring shall focus on evaluating the effectiveness of project mitigation
measures and continue baseline monitoring and sampling. The mitigation measures
to prevent adverse impact during the operation phase of the project shall focus on
the following:
1. Air quality
2. Noise environment
3. Water quality and water resources
4. Solid and hazardous waste
5. Land environment
6. Ecology
7. Socio Economic
9.4.1 Air Quality
The major source of emission is from Boiler, reactor stacks & DG stack. The details
of proposed source of air pollution & corresponding Air Pollution control equipment
are already given in Chapter 4 Environmental Impacts and mitigation measures.
Page 238 of 263
APC measures are adequate stack height to disperse the pollutants. Boiler is
provided with cyclone separator to control the pollutants. Adequate green belt has
been developed to mitigate the pollution arising due to movement of vehicles.
Regular monitoring of DG-Stack and Ambient air quality will be carried out.
Table 9-2 Air Pollution Control Measures
S. No. Description of Source ofGeneration APC measures Proposed
Point of Discharge height inMetres
Actual (AGL) KSPCB/CFO
1Reactor Acid fumeemission from ProductionBlocks
Individual scrubber andstacks (4 Nos) 9 3 ARL
2 Boiler 2 TPH Coal fired Stack 21 28AGL
3
DG 1 x 200 KVA Individual Stacks ( 1 Nos) 11 5 ARL
DG 1 x 200 KVA-Proposed Individual Stacks 11 5 ARL
Fugitive emission control
Sri Lakshmi Chemicals has some action plan to control fugitive emission fromreactors. The following is the action plan
The outfall of reactor is connected to primary condenser,
Then outlet of primary condenser is passes through the secondary condenser,emission passes through condenser will get condense.
The condensed emission will be recycled to process.
From vapor condenser cloud it again recycled to reactor,
In case of leakage of emission due to damage will detect manually and repairhappen.
Thus the fugitive emission is arrested
Odour Control
All the waste generated are properly stored and disposed.
Page 239 of 263
The emissions are properly vent out through stacks of adequate height.
All the chemicals including products are handled in closed manner to control
the odour.
9.4.2 Noise Environment
The major source of noise pollution in the industry is DG sets, boilers, reactors, Air
compressors, Boiler feed water pumps. DG sets are provided with integral acoustic
enclosures. Also the ambient noise levels will be ensured within the ambient
standards by inbuilt design of mechanical equipment and buildings apart from
vegetation along the periphery and at various locations within the industry premises.
The plant will be specifically designed with due consideration on minimizing noise
pollution. Higher noise levels will be felt only near the active working areas and
therefore the workers are provided with personal protective equipment as a safety
measure.
Following measures are proposed to mitigate negative impact of operation phase of
the project on the surrounding noise environment.
i. All the noise generating equipments will be designed / operated to ensure
that noise level does not exceed 75-70 dB (A) at plant boundary as per the
requirement of Central / State Pollution Control Board.
ii. Noise generating sources will be maintained properly to minimize noise
generated by them.
iii. Wherever feasible, acoustic enclosures will be provided for compressors, DG
iv. Compliance with noise control norms will be given due importance at the time
of purchase of various equipments and it will be mentioned while placing the
purchase orders and guarantee for noise standards will be sought from
suppliers.
v. Moreover, all the personnel working in other high noise generating areas too
will be provided with sufficient ear protecting devices.
vi. Green belt will act as a noise barrier.
vii. Training will be imparted to personnel to generate awareness about effects of
noise and importance of using PPEs.
Page 240 of 263
9.4.3 Water and Wastewater Management
Total water requirement is 24.8 KLD of which fresh water requirement is 13.3 KLD;
Water source from the KIADB and Private tankers.
Zero liquid discharge system will be maintained in the facilities. The wastewater
management is detailed in the Chapter 4 & Section 4.2.8.2.
9.4.4 Solid and Hazardous waste Management
Solid and hazardous wastes generated in the facility and their disposal methods are
detailed in the Chapter 2 & Section 2.6.5.
9.4.4.1 Solvent Recovery
Solvent Recovery & Re-Use is detailed in the Chapter 2 and Section 2.4.5.
9.4.4.2 Land Environment
Following measures are proposed to mitigate negative impact during operational
phase of the project on the land environment.
Air emissions are effectively controlled by use of scrubbers and therefore
deposition of air pollutants in and around the premises and surrounding area is
not envisaged.
Disposal of solid waste is carried out through authorized vendor.
Plant is being maintained ZLD. No effluent is discharged directly on land without
treatment., impact on the land environment is not envisaged.
Hazardous materials are prohibited to be drained or dumped in the premises.
Accidental spills shall be cleaned, reported and monitored.
Thus, no impact on land is envisaged due to discharge of gaseous emission,
solid waste or liquid effluent from the proposed increment in the production
capacity.
9.4.5 Ecology
The proposed project is equipped with the treatment system and the treated effluent
will be recycled to cooling tower and boiler feed through softener. Solid wastes
generated during the operation phase are disposed off through authorized vendor
Page 241 of 263
and hence no impact is anticipated due to solid waste in and around the site. The
air pollution control devices are already in place in the facility will control release of
air pollutants to a greater extent, however green belt consisting of shrubs and trees
around the periphery of the site has been planned to intercept and arrest air
pollutants released at various heights and to attenuate the increased quantity of air
pollutants released into the environment. It is expected that the ecology of the
region is preserved by these mitigation measures.
9.4.6 Socio – Economic Environment
Due to the proposed project various modes of indirect employment i.e.
transportation, increased business opportunities to shopkeepers, small scale
business entrepreneurs etc. will help for the development of local area.
9.5 AVAILABLE SAFETY SYSTEMS
9.5.1 Fire Hydrant System
A pressurized (7 kg/cm2); automatically operated Fire Hydrant System has been
installed in the plant with rings and wet risers around all blocks to achieve maximum
coverage. Water reservoir of 200 m3 (Hydrant Tank) capacity is provided for
approximately 2 hr fire fighting. Following are the details of the system.
Jockey pump of 40 m3/hrs @ 60m head capacity with pressure switches
Main electrical pump of 130 m3/hrs @ 70m head capacity pressure switchesand delivers water at 6 kg/cm2
Yard Hydrant points - 8 Nos.
Hose Boxes – 7 Nos. (Each Hose Box contains 2 Nos. of hoses and 1 No. ofNozzle)
Hose Reel Drums – 1 Nos.
Foam Concentrate tank of capacity 1000 Lts
Water Monitor – 1 No.
Mobile Foam Unit
Two way fire brigade inlet
Page 242 of 263
Automatic sprinkler system in chemical storage tank area.
9.5.2 Fire Extinguisher
Suitability of fire extinguishers:
Depending on the combustible material, fires have been classified into four types.
Suitability of extinguishing media for different fires is provided in the following Table9-3.
Table 9-3 Suitability of extinguishing media for different fires
S. No Class of fire Suitable Fire Extinguisher
1. Class A:Organic Material i.e. wood, papers, rubber & plastics. DCP, Mechanical Foam
2.Class B:Flammable Liquid and Flammable Gases i.e., PetroleumProducts, Paints, Chemicals etc.
Mechanical Foam, CO2
and DCP
3.Class C:Electrical DCP and CO2
4.Class D:Flammable Metals i.e. Lithium, Sodium, and Potassium etc. Special DCP, Sand
The company has trained personnel for fire fighting and intends to improve the fire
fighting skills of employee by conducting frequent training on Fire fighting.
The unit has different types (CO2, ABC, Water Jet, Mechanical Foam, DCP and
sand buckets) of portable fire extinguishers placed in all prominent places of the
factory. Table 9-4 shows area wise fire extinguisher.
Table 9-4 Extinguisher based on area
LocatonNos
DCP CO2Water
with Foam
Production Block 1 12 5 1
Ware House 6 2 1
Raw Material 5 4 2
Tank Area 4 2 1
Page 243 of 263
DG Set & Panel board room 2 4 1
Chilling plant 2 1
Thermo pack room 2 2
Transformer yard 1 1
Boiler shed 1 1 1
Effluent plant 3 1
Solid waste room 2 1 1
Administrative block 2 1
Security room 2 2 1
Emergency Equipments and PPEs
Existing unit has total 2 number of Emergency cupboards, Production Block -1 and
remaining 1 No. placed in Safety Department.
Each Emergency Cupboard consist the following items
Self Contained Breathing Apparatus (SCBA)- Not available
Nose Mask – 50nos
PVC / Acid Suit
Helmet- Provided to individuals
Ear Plug- 5
Safety Glass- 10 & Face Shield- to individuals
Gum boot- to individuals
Safety Belt- in safety dept.
Manila Rope / Life Safety Rope- not available
Fire Axe
Page 244 of 263
Fire Proximity Suit
Resuscitator
Spill Kit
Safety Ladder
Emergency Flameproof Torches
Hand gloves-10nos
Operation of SCBA (Self Contained Breathing Apparatus)
Procedure for wearing Equipment:
Extend shoulder straps and waist belt. Put on the equipment.
Fasten the buckle and then pull the ends of waist belt away from
buckle until secure and comfortable on the hip. Tuck ends in belt
loops.
Pull down the shoulder straps until the equipment is secure and comfortable.
Tuck strap ends under waist belt.
Extend face piece head harness straps, leaving center straps in position. Put
neck strap over neck
Before opening the cylinder valve press reset button.
Open the cylinder valve fully to pressurize the system and check the pressure
gauge & Carry out pressure leak test.
Procedure for wearing Face piece
Fit harness overhead. Pull it back until the head strap fits
smoothly.
Adjust mask until it fits properly
Tighten the neck straps and temple straps evenly and tighten
the front strap as necessary.
Page 244 of 263
Fire Proximity Suit
Resuscitator
Spill Kit
Safety Ladder
Emergency Flameproof Torches
Hand gloves-10nos
Operation of SCBA (Self Contained Breathing Apparatus)
Procedure for wearing Equipment:
Extend shoulder straps and waist belt. Put on the equipment.
Fasten the buckle and then pull the ends of waist belt away from
buckle until secure and comfortable on the hip. Tuck ends in belt
loops.
Pull down the shoulder straps until the equipment is secure and comfortable.
Tuck strap ends under waist belt.
Extend face piece head harness straps, leaving center straps in position. Put
neck strap over neck
Before opening the cylinder valve press reset button.
Open the cylinder valve fully to pressurize the system and check the pressure
gauge & Carry out pressure leak test.
Procedure for wearing Face piece
Fit harness overhead. Pull it back until the head strap fits
smoothly.
Adjust mask until it fits properly
Tighten the neck straps and temple straps evenly and tighten
the front strap as necessary.
Page 244 of 263
Fire Proximity Suit
Resuscitator
Spill Kit
Safety Ladder
Emergency Flameproof Torches
Hand gloves-10nos
Operation of SCBA (Self Contained Breathing Apparatus)
Procedure for wearing Equipment:
Extend shoulder straps and waist belt. Put on the equipment.
Fasten the buckle and then pull the ends of waist belt away from
buckle until secure and comfortable on the hip. Tuck ends in belt
loops.
Pull down the shoulder straps until the equipment is secure and comfortable.
Tuck strap ends under waist belt.
Extend face piece head harness straps, leaving center straps in position. Put
neck strap over neck
Before opening the cylinder valve press reset button.
Open the cylinder valve fully to pressurize the system and check the pressure
gauge & Carry out pressure leak test.
Procedure for wearing Face piece
Fit harness overhead. Pull it back until the head strap fits
smoothly.
Adjust mask until it fits properly
Tighten the neck straps and temple straps evenly and tighten
the front strap as necessary.
Page 245 of 263
Breathe normally through vent system. During venting observe the gauge-waist
alarm. The alarm should blow at cylinder pressure of 55 bar ± 5 bar.
SCBA - Face piece Remove the equipment in a safe and hazard free area.
Unbuckle the waist belt, lift shoulder strap buckles to loosen and
remove the equipment.
Close the cylinder valve and keep in the box, Cylinder valve should be in upward
direction
After using the equipment, inform to safety department for inspection/checking.
Resuscitator A resuscitator is a device which forces oxygen into lungs of unconscious person
in order to keep him /her oxygenated and alive.
Operating Procedure Clear out the throat
Tilt head back
Fit mask firmly
Squeeze ball
Watch the chest which should rise and fall rhythmically.
If the chest does not rise and fall, there may be a blockage in the victim’s throat.
The tongue has occluded the air way.
There may be excessive leakage around the mask. Hold the mask tighter on the
face and squeeze little faster.
Clear any mucus from the throat every 3-4 minutes.
Continue resuscitation until the victim breathes on his/her own.
Page 246 of 263
Fire Axe
A fire axe is a type of axe which has been designed
specifically for the use of fire-fighters, and it includes several
features which makes it ideally suitable to mitigate emergencyservices.
Helmet
A helmet with face shield is a form of protective gear worn on head
to protect head and face from hazards such as flying objects and
chemical splashes or potentially infectious fluid.
Fire Suit
Fire suit is a protective clothing designed to protect a firefighter from high
temperatures, especially near fires of extreme temperature.
Manila rope
Manila rope is very durable, salt water and damage resistant,
flexible fiber which shall be used to access at height/Confined
space during emergency.
Canvas Stretcher
A stretcher is a medical device used to carry injured or an incapacitated person
from one place to another during emergency.
Smoke escape mask
Smoke masks assist people in safe egress from fire emergencies.
It will provide respiratory protection from particulate matter,
carbon monoxide, and other toxic gases commonly produced by
structural fires.
Compressed Air Pack
An emergency air supply which will provide a sufficient quantity of
air to allow a worker to exit oxygen depleted or contaminated area.
Page 247 of 263
Powered Air purifying respirator
Powered Air Purifying Respirator (PAPR) is a device equipped with a face piece,
hood or helmet, breathing tube, canister, cartridge, filter, canister with filter or
cartridge with filter and a powered blower.
PAPR utilizes a powered mechanism to move ambient air through an air-
purifying element(s) to remove contaminants from the ambient air.
Safety torch
Compact and simple to use, this torch is designed for use in
emergency situations or wherever the need arises for a handheld
safety torch.
Spill Emergency Mitigation Procedure
Spill Kit is kept in all Emergency cupboard.
Once the spill is observed, Spill Kit shall be collected from the nearest
area/emergency cupboard installed and neutralizing agent (if required) based on
the nature of the spill. In case if the spill is not controlled, immediately declare
the emergency as per emergency response procedure.
While handling the spill, use most appropriate PPE's like SCBA, chemical suit,
acid/ alkali proof hand gloves, face shield, safety goggles, gum boots or even
respiratory masks with suitable cartridges.
Once the spill is controlled using Sorbent pad/Boom collect in a double
polythene bag and secure with the plastic ties. Dispose it as per applicable
disposal procedure.
Report the incident of spill to EHS department through online incident reporting
System.
Once in a month, the items of the Spill Kit shall be inspected and recorded by
EHS representatives of the individual area.
Page 248 of 263
9.5.3 Eye Wash Fountain and Safety Shower
The unit has total 2 Nos. of Eye wash fountain / Safety showers at Production
Block.
9.5.4 Work Zone Monitoring Equipments
The unit has multi gas / toxic gas and oxygen detectors in that multi gas detector
can be used to check oxygen, LEL, VOC, CO and H2S concentration in atmosphere
and also in confined spaces like inside the reactor, overhead tanks, underground
tanks, sump etc and oxygen detector can be used for checking oxygen
concentration in atmosphere and also in confined spaces like inside the reactor,
overhead tanks, underground tanks, sump etc.
9.5.5 Wind Sack / Wind Direction Indicator
Wind sacks are placed above the Administration Block buildings.
9.6 OCCUPATIONAL HEALTH CENTRE (OHC)
SLC has done agreement with Dr. Krishnamurthy’s Hospital & Rehab Centre,
Inside Naya kaman, Bidar-585 401, Karnataka for their valuable service during
emergency along with 24/7 ambulance facility.
9.6.1 First Aid Boxes
A first aid kit is a collection of supplies and equipment for use in giving first aid. First
Aid boxes are available in Security Room (ECC), Admin Block and at OHC. First Aid
items will be issued to injure only by authorized persons.
Following are the contents of First Aid Box,
a. Dettol – Antiseptic solution
b. Ciplox – Eye Drops
c. Soframycin – Skin ointment
d. Silverex – Burn ointment
e. Betadine – Microbicidal solution
Page 249 of 263
f. Iodex – Pain reliever
g. Sterilized Cotton Wool
h. Surgical Paper Tape
i. Small Sterilized Dressings
j. Medium Sterilized Dressings
k. Roller Bandage – 5 cm wide
l. Roller Bandage – 10cm wide
m. Band Aid
n. Crocin / Paracetamol Tablet
Along with the above safety systems, company also ensured the below safety
features to ensure Zero Accident.
No ignitable zones are declared and marked so.
Work permit system with strict compliance.
Dedicated chemical storage area with good ventilation and exhaust system
and all chemical are stored as per compatibility.
Dyke walls provided for the day storage chemical tanks.
All reactors provided with safety valves followed by rupture discs and relief
valve outlets are extended.
Calibration is ensured for the gauges of pressure, temperature and vacuum.
All reactors will be hydro tested and certified by the competent person once in
a year.
Body earthing provided to all equipments involved in the process, electrical
earthing, static earthing and instrument earthing provided wherever required.
Page 250 of 263
Ventilation air units (VAUs) and Exhaust air units (EAUs) are provided to
ensure good ventilation in the work environment.
Emergency Organization Chart is provided in the
Figure 9-2.
Figure 9-2 Emergency Organization Chart
9.7 OCCUPATIONAL HEALTH AND SAFETY PROGRAM
M/s. Sri Lakshmi Chemicals (SLC) provides a safe and healthy work environment to
its employees by conducting annual medical check-ups for all the employees.
The main objectives are:
Maintenance and promotion of workers’ health and working capacity.
Improvement of working environment by following well-being program for its
employees.
Monitor the workplace to maintain industrial hygiene practices.
Site Controller
IncidentController
Emergency Coordinator– HR & Admin
(for Hospital, Law,Order & Head Count)
EmergencyCoordinator -Maintenance
EmergencyCoordinator -Safety Squad
Page 251 of 263
Development of work culture in a direction which will support health and safety
at work and thereby promoting positive social climate for smooth operation that
will enhance productivity.
SLC allocates a fund of 1.5 Lakhs .
Area monitoring is done.
Employees undergo annual health check-up.
All personnel are provided with personal Protective equipments individually as
required.
9.7.1 Operation Phase
General Functions of the safety committee are;
Conduct routine workplace inspections.
Provide Personal Protective Equipment.
Develop and implement safe work procedures and rules.
Provide on-going safety training & Enforce safety rules and appropriate
discipline.
Promote safety awareness and reduce the potential for injury/loss.
Identify workplace hazards.
Enforce of safety rules, measure safety performance & reduce
frequency/severity of injuries.
9.7.2 Occupational Health Monitoring
Medical Surveillance Program: Medical surveillance program is essential to assess
and monitor employees' health and fitness both prior to employment and during the
course of work; to determine fitness for duty and to provide emergency and other
treatment as needed. Effectiveness of a medical program depends on active
Page 252 of 263
involvement of employees. SLC medical surveillance program include following
major elements; Medical report is enclosed as Annexure 16.
Developing a OH-IH Medical Surveillance Program.
Pre-Employment Examination and Periodic Medical Examinations
Determination of Fitness for Duty.
Communications.
Emergency Medical Treatment.
Medical Records.
Pre-Employment Screening / Examinations - All employees shall be subject to
pre-placement medical examinations to determine their fitness for the jobs on site.
Potential exposures to the work environment shall be considered before placing an
employee on the job.
Periodic Medical Examinations - Periodic medical examination is the same as the
pre-employment screening and may be modified according to current conditions,
such as changes in the employee's symptoms, site hazards or exposures.
Comparison of sequential medical reports with baseline data is essential to
determine biologic trends that may mark early signs of adverse health effects, and
thereby facilitate appropriate protective measures. The frequency and content of
examinations are normally one year. Apart from this for workers working in
Hazardous area, medical examination is conducted by Doctor Authorized by
Factory Inspectorate.
Page 253 of 263
9.7.3 Safety, Health and Environment Policy
Safety, Health and Environment Policy is appended in the following figure
Figure 9-3.
Page 254 of 263
Figure 9-3 Safety, Health and Environment Policy
Page 255 of 263
9.8 CORPORATE SOCIAL RESPONSIBILITY
The company is aware of the obligations towards the society and to fulfill the social
obligations, company employed semi-skilled and skilled labor from the nearby
villages as much as possible and also try to generate maximum indirect
employment in the nearby villages by appointing local contract workers.
Adequate funds will be earmarked for upcoming years as per the norms.
9.9 Rainwater Harvesting & Groundwater Recharging
The total amount/quantity of water i.e., received in the form of rainfall over an area
is called the rain water endowment of that area, out of which the amount of water
that can be effectively harvested is called the rain water harvesting potential.
The collection efficiency accounts for the fact that all the rain water falling over an
area cannot be effectively harvested due to losses on account of evaporation,
spillage or run off etc.,
The rain water harvesting/recharging pits along the inner periphery of the boundary
will be provided. Each recharging pit will be of 3x3x2m (LBD) dimension. These
recharging pits are filled with graded media comprising of boulder at bottom and
with coarse aggregates to facilitate percolation of harvested rainwater to recharge
ground water table. The recharge pits are interconnected in such a way that the rain
led to the first recharge pit is also led to the next pit. Rain water harvesting is the
Page 256 of 263
techniques through which rain water is captured from the roof catchments with
closed pipe system (without mixing surface water to avoid the spillage
contamination) into the recharge pits. The rain water harvesting and storm water
management layout is provided in the Annexure 8.
Ground coverage = 1303 Sq. mt
Collection efficiencies of 80% = 1042.4 Sq. mt
Runoff of coefficients for Roofs Conventional = 0.70 to 0.80
Runoff of coefficients taken as = 0.75
Annual average rainfall for Bidar district = 827mm
(Source:Ground Water Information Booklet,
Bidar District, Karnataka,2008
Volume of water received (m3) = Area of catchment in Sq.mt x
Runoff coefficient x Rainfall per day (m)
Volume of water received (m3) = (1042.4x 0.75 x 0. 827)/365
= 1.77 KL/Day
Page 257 of 263
CHAPTER – 10Summary & Conclusion
Page 258 of 263
10. SUMMARY & CONCLUSION
10.1 Summary
An environmental Impact Assessment Study has been carried out and assessed for
the proposed project based on the TOR and baseline quality data collected for the
study area. Identification and anticipation of the potential environmental impacts due
to the proposed project with a delineation of appropriate impact mitigation measures
in an Environmental Management plan during both construction and operation
phases is provided in the EIA report prepared.
The proposed project will ensure that the industrial activities relevant to the project
are environmentally sound with no adverse impacts posed on the natural
environment in the surrounding area.
The marginal impacts that might be caused by the proposed activity will be
mitigated by the existing pollution control and environmental management
measures.
In a true and a larger sense, in view of the considerable benefits from the project
with no major impacts, the proposed project is said to be more beneficial to the
nation.
The EMP that will be implemented for the operation phase of the project will include:
Air Pollution control and management
Noise Control and Management
Hazardous and Solid waste Management
Sewage treatment and Management
Effluent treatment and Management
Hazardous and solid waste management
Risk Assessment and Onsite emergency Plan
Page 259 of 263
In order to effectively implement the EMP planned, the environmental management
system will be fully adhered.
10.2 Conclusion
The baseline study carried out for the study area indicates that all the physical,
chemical and biological characteristics of the environmental attributes in the
surrounding area are mostly within the permissible limits except few minor
exceedences.
Based on this environmental assessment, the possible impacts during post-project
phase are anticipated and the necessary adequate control measures are formulated
to meet the statutory compliances.
With very minute negative impacts, the project positively leads to commercial
business opportunities, Employment opportunities, increased revenue and
infrastructural development.
Thus this project may kindly be granted Environmental Clearance.
Page 260 of 263
CHAPTER – 11Disclosure of Consultant
Page 261 of 263
11. DISCLOSURE OF CONSULTANT
In order to assess the potential environmental impacts due to the proposed
expansion of the Bulk Drugs and Intermediates Manufacturing Unit by M/s. Sri
The company is specialized in executing projects right from concept development,
supply, erection, commissioning and operation on turnkey basis. HECS has
successfully executed more than 200 environmental engineering projects for
various industrial sectors both in India and overseas.
HECS has state-of-art facilities to provide quality environmental consultancy and
engineering solutions.
Page 262 of 263
Strengths of HECS
Number of EmployeesTotal no of Employees : 674No of Employees engaged in EIA : 105Consultancy : 25Laboratory : 80Projects : 13Operation & Maintenance : 556
Quality Policy of HECS
Page 263 of 263
QCI-NABET - EIA Accreditation
Consultancy Hubert Enviro Care Systems Pvt. Ltd.,Chennai
NABET Certificate No NABET/ EIA/ 1618/SA 0015
MoEFF Reg. Lab F.No. Q-15018/29/2007-CPW
National Accreditation Board for Education & Training (NABET) is a constituent
board of the Quality Council of India (QCI). QCI, NABET has accredited HECS for
carrying out Category ‘A & Category B’ EIA studies in the following sectors:
Mining of minerals including Open cast only (Sector # 1 as per NABETscheme)
*Offshore and onshore oil and gas exploration development & production
(Sector # 2 as per NABET scheme)
Thermal Power Plants (Sector # 4 as per NABET scheme)
Petroleum refining industry (Sector # 10 as per NABET scheme)
Petro-chemical complexes (industries based on processing of petroleum
fractions & natural gas and/or reforming to aromatics) (Sector # 18 as perNABET scheme)
Synthetic organic chemicals industry (dyes & dye intermediates, bulk drugs and
intermediates excluding drug formulations, synthetic rubbers, basic organic
chemicals, other synthetic organic chemicals and chemical intermediates)
(Sector # 21 as per NABET scheme)
Oil & gas transportation pipeline (crude and refinery/petrochemical products),
passing through national parks/sanctuaries/coral reefs/ecologically sensitive
areas including LNG terminal (Sector # 27 as per NABET scheme)
*Industrial Estates/Parks/Complexes/Areas, Export Processing Zone (EPZs),
Special Economic Zones (SEZs), Biotech Parks and Leather Complexes
(Sector # 31 as per NABET scheme)
Common Effluent Treatment Plants (CETPs) (Sector # 36 as per NABETscheme)
Page 264 of 264