Top Banner
17-04-2013 1 Sabarmati River Front Development Project one of the most innovative projects towards urban regeneration in the world to make the city livable & sustainable (KPMG ) Sabarmati Riverfront Development A Multidimensional Environmental Improvement and Urban Rejuvenation Project Sabarmati River before the Project Sabarmati River before the Project
20
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 17-04-2013

    1

    Sabarmati River Front Development Project

    one of the most innovative projects towards urban regeneration in the world to make the city livable &

    sustainable (KPMG )

    Sabarmati Riverfront Development

    A

    Multidimensional

    Environmental Improvement

    and

    Urban Rejuvenation Project

    Sabarmati River before the Project Sabarmati River before the Project

  • 17-04-2013

    2

    Sabarmati River before the Project Sabarmati River before the Project

    Sabarmati River after the Project Sabarmati River after the Project

  • 17-04-2013

    3

    Down stream of Subhash Bridge- Near Gandhi Ashram

    Current

    D/s of Dr. Ambedkar Bridge

    Current

    Gandhi Bridge West D/s

    Gandhi Bridge D/s

    Sabarmati River

    Narmada River

    Vasana Barrage

    Fatehwadi Canal

    Catchment Area

    under control

    Dharoi Dam

    Hatmati Dam

    Guhai Dam

    Ahmedabad

  • 17-04-2013

    4

    The Challenges

    12000 hutments on both banks of the river occupying nearly 20% of critical project area.

    Unorganized Gujari Bazaar of more than 1200 vendors on the eastern bank and Court Litigation.

    Nearly 200 Dhobis using both the banks of the river for washing activities.

    Thoroughly polluted and contaminated Sabarmati through 40 storm water outlets.

    Resettlement & Rehabilitation: A committee formed under an ex-High Court Judge

    for finalization of beneficiaries.

    More than 11200 families allotted houses for resettlement.

    Comprehensive Settlement under the supervision of Hon. Gujarat High Court.

    Construction of Riverfront Market for rehabilitation of Gujari Bazaar vendors.

    Construction of modern Dhobi Ghat for the ousted dhobis.

    Housing* for Resettlement

    *Dwelling unit of 36.5 sq m Built Up area (26.77 sq m carpet area) Rehabilitation

  • 17-04-2013

    5

    Structural Works Diaphragm Wall, Anchor Slab, Ghats and Ramps

    Retaining Wall, Staircases and Ramps

    Interceptor Sewage Line, Extension of Outfalls & Manholes

    General Earth Fill

    Pumping Station

    Development Works (Ongoing) Lower Promenade

    Road and Road Below Bridge

    Gardens

    Riverfront Market Dhobi Ghat

    Further Development Exhibition Centre, Events & Cultural Amenities Recreational Amenities Commercial Development

    Structural Works 1. Diaphragm Wall, Anchor Slab, Ghats and Ramps

    2. Retaining Wall, Staircases and Ramps

    3. Interceptor Sewage Line, Extension of Outfalls & Manholes

    4. General Earth Fill

    5. Pumping Station

    Diaphragm Wall

    Vasna

    Barrage

    Sardar

    Bridge

    Gandhi

    Bridge

    Nehru

    Bridge

    Subhash

    Bridge

    Ellis

    Bridge

    Ambedkar

    Bridge

    Dadhichi Rishi

    Bridge

    Cantonment

    Area

    Railway

    Bridge

    Completed

    To be started

    Anchor Slab

    Vasna

    Barrage

    Sardar

    Bridge

    Gandhi

    Bridge

    Nehru

    Bridge

    Subhash

    Bridge

    Ellis

    Bridge

    Ambedkar

    Bridge

    Dadhichi Rishi

    Bridge

    Cantonment

    Area

    Railway

    Bridge

    Completed

    Ongoing

    To be started

  • 17-04-2013

    6

    Ghats

    29 Ghats Completed

    Vasna

    Barrage

    Sardar

    Bridge

    Gandhi

    Bridge

    Nehru

    Bridge

    Subhash

    Bridge

    Ellis

    Bridge

    Ambedkar

    Bridge

    Dadhichi Rishi

    Bridge

    Cantonment

    Area

    Railway

    Bridge

    Completed

    Ongoing

    Ramps

    Vasna

    Barrage

    Sardar

    Bridge

    Gandhi

    Bridge

    Nehru

    Bridge

    Subhash

    Bridge

    Ellis

    Bridge

    Ambedkar

    Bridge

    Dadhichi Rishi

    Bridge

    Cantonment

    Area

    Railway

    Bridge

    Completed

    Ongoing

    To be started

    Retaining Wall

    Vasna

    Barrage

    Sardar

    Bridge

    Gandhi

    Bridge

    Nehru

    Bridge

    Subhash

    Bridge

    Ellis

    Bridge

    Ambedkar

    Bridge

    Dadhichi Rishi

    Bridge

    Cantonment

    Area

    Railway

    Bridge

    Completed

    Ongoing

    To be started

    Retaining Wall

  • 17-04-2013

    7

    Staircases

    104 Staircases Completed

    Vasna

    Barrage

    Sardar

    Bridge

    Gandhi

    Bridge

    Nehru

    Bridge

    Subhash

    Bridge

    Ellis

    Bridge

    Ambedkar

    Bridge

    Dadhichi Rishi

    Bridge

    Cantonment

    Area

    Railway

    Bridge

    Completed

    Ongoing

    To be started

    Interceptor Sewage Line, Extension of Outfalls and Manholes

    Vasna

    Barrage

    Sardar

    Bridge

    Gandhi

    Bridge

    Nehru

    Bridge

    Subhash

    Bridge

    Ellis

    Bridge

    Ambedkar

    Bridge

    Dadhichi Rishi

    Bridge

    Cantonment

    Area

    Railway

    Bridge

    Completed

    To be started

    General Earth Fill

    Vasna

    Barrage

    Sardar

    Bridge

    Gandhi

    Bridge

    Nehru

    Bridge

    Subhash

    Bridge

    Ellis

    Bridge

    Ambedkar

    Bridge

    Dadhichi Rishi

    Bridge

    Cantonment

    Area

    Railway

    Bridge

    Completed

    Virtually completed

    Ongoing

    To be started

    General Earth Fill

  • 17-04-2013

    8

    Development Works (Ongoing) 1. Lower Promenade

    2. Road and Road Below Bridge

    3. Gardens

    4. Riverfront Market

    5. Dhobi Ghat

    Original Riverbed

    Vasna

    Barrage

    Sardar

    Bridge

    Gandhi

    Bridge

    Nehru

    Bridge

    Subhash

    Bridge

    Ellis

    Bridge

    Ambedkar

    Bridge

    Dadhichi Rishi

    Bridge

    Cantonment

    Area

    Railway

    Bridge

    Reclaimed Land

    Vasna

    Barrage

    Sardar

    Bridge

    Gandhi

    Bridge

    Nehru

    Bridge

    Subhash

    Bridge

    Ellis

    Bridge

    Ambedkar

    Bridge

    Dadhichi Rishi

    Bridge

    Cantonment

    Area

    Railway

    Bridge

    Reclaimed Land

  • 17-04-2013

    9

    Reclaimed Land

    Reclaimed Land

    Land Use Plan

    Area: 202 Ha

    Vasna

    Barrage

    Sardar

    Bridge

    Gandhi

    Bridge

    Nehru

    Bridge

    Subhash

    Bridge

    Ellis

    Bridge

    Ambedkar

    Bridge

    Dadhichi Rishi

    Bridge

    Cantonment

    Area

    Railway

    Bridge

    Land Use

    Approved by Govt of Gujarat (under GTPUD Act 1976)

    Sr

    No

    Sanctioned Land Use Area Sq m Area Ha %

    1 Roads 4,44,378 44 22

    2 Garden 2,74,585 27 14

    3 Open Space 3,71,198 37 18

    4 Public Purpose 2,88,875 29 14

    5 Lower Promenade 2,66,462 27 13

    6 Multi Use for sale 2,94,083 29 14

    7 Sports 72,503 7 4

    8 Residual (Utilities,

    Residential, Commercial,

    General, Education

    15,787 2 1

    Total 20,27,871 202.8

  • 17-04-2013

    10

    Development Works (Ongoing)

    Dhobi Ghat

    Ashram Baug

    Paldi

    Urban Forest

    Riverfront Market

    Usmanpura

    Garden

    Lower

    Promenade Road

    Area: 101 Ha (50% of Total Development) - Ongoing 10 km Completed

    Vasna

    Barrage

    Sardar

    Bridge

    Gandhi

    Bridge

    Nehru

    Bridge

    Subhash

    Bridge

    Ellis

    Bridge

    Ambedkar

    Bridge

    Dadhichi Rishi

    Bridge

    Cantonment

    Area

    Railway

    Bridge

    Completed

    Virtually completed

    Ongoing

    To be started

    Lower Promenade

    Lower Promenade

    Seats

    Tree Plantation

    With Tree Guard

    Flooring

    (Ghat) Lights

    Concrete

    Flooring

    Vendors

    Platforms

    Waste

    Basket

    Flooring

    (Staircase) Seats

    Lower Promenade

  • 17-04-2013

    11

    Lower Promenade

    Lower Promenade

    Lower Promenade

    Lower Promenade

  • 17-04-2013

    12

    Boating Facilities at Lower Promenade

    Road

    Road

    Ashram Baug

    Paldi

    Urban Forest

    Usmanpura

    Garden

    Parks

  • 17-04-2013

    13

    Ashram Baug (East Side)

    Ashram Baug (East Side)

    Ashram Baug (East Side)

    Ashram Baug (East Side)

  • 17-04-2013

    14

    Paldi Urban Forest Tree Plantation (West Side)

    Riverfront Market (Informal Market : Gujari Bazaar)

    Total vendor spaces created: 1600 (1000 laries, 600 vendor platforms)

    Facilities provided: Parking, toilets, food-court, drinking water space, seating

    area, pedestrian lights, separate service road for vendors, tree plantation &

    landscape

    Riverfront Market Service road and Access

    Fort Wall Pedestrian Area Stalls Service Road

    Riverfront Market

  • 17-04-2013

    15

    Open Air Market Riverfront Market

    Ambedkar Bridge Urban Forest

    Vasna Barrage Dhobi Ghat Facility

    Dhobi Ghat

    Dhobi Ghat

    Further Development 1. Exhibition Centre, Events & Cultural Amenities

    2. Recreational Amenities

    3. Commercial Development

  • 17-04-2013

    16

    1. Exhibition Centre, Events & Cultural Amenities

    Development: Exhibition Centre, Event Ground etc.

    Exhibition Centre, Event Ground & Riverfront Market

    Exhibition Centre

    Riverfront Market

    Event Ground

    Fort Wall Riverfront

    Market

    Exhibition

    Hall 2

    Exhibition

    Hall 1

    Business

    Centre

    Stage Temporary

    Event Halls

    Parking

    Connection across New Pedestrian Bridge Exhibition Centre Interior View

  • 17-04-2013

    17

    Exhibition Centre Exhibition Centre View from River

    2. Recreational Amenities

    Water Sports, Floating Restaurants, Zip Line, Amphibian Bus etc.

    Non Motorized Boating

  • 17-04-2013

    18

    Amphibian Bus / Ferry Service

    Zip Line (Recreational)

    3. Commercial Development

    Total Amount of Land 2,94,082 sqm (14.5% of reclaimed land )

    Total Floor Area (Construction) 8,40,000 sq.m.

    Total Value of Investment 1400 Million (US $)

    Type of Development: Hotels, Corporate Houses,

    Malls, Exhibition Centre

    A Revenue Sustainable Project

    Multi Use Land for Sale 14.5 % of Total Area Total sq.m. to be sold 2,94,082 sq. m.

    Total saleable floor area - 8,40,000 sq.m. (approx. 90 lac sq. ft.)

    Total CAPEX by SRFDCL so far is Rs. 750 Cr. and likely to be Rs. 1200 Cr.

  • 17-04-2013

    19

    New Skyline For Ahmedabad Illustrative Commercial Development: Office Buildings, Hotels along Khanpur

    Likely revenue from sale of land Rs. 1700 Cr.

    Out of which, Rs. 1200 Cr. to be returned by SRFDCL to AMC

    A Corpus of Rs. 500 Cr. to be kept aside for O & M Exp. of the project

    A Revenue Sustainable Project And now..