1 November 12, 2019 Squalicum Creek Corridor Upcoming Projects
15

Squalicum Creek Corridor Projects Presentation · Squalicum Creek Corridor Upcoming Projects Squalicum Creek Re-route and Orchard Drive Extension Analiese Burns Habitat and Restoration

Aug 17, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Squalicum Creek Corridor Projects Presentation · Squalicum Creek Corridor Upcoming Projects Squalicum Creek Re-route and Orchard Drive Extension Analiese Burns Habitat and Restoration

1

November 12, 2019

Squalicum Creek Corridor

Upcoming Projects

Page 2: Squalicum Creek Corridor Projects Presentation · Squalicum Creek Corridor Upcoming Projects Squalicum Creek Re-route and Orchard Drive Extension Analiese Burns Habitat and Restoration

2

Vicinity Map

Page 3: Squalicum Creek Corridor Projects Presentation · Squalicum Creek Corridor Upcoming Projects Squalicum Creek Re-route and Orchard Drive Extension Analiese Burns Habitat and Restoration

3

Overview

• Squalicum Creek Re-route Phases 3 and 4: The latest phases in a series to re-route Squalicum Creek in order to improve water quality and fish habitat

• Orchard Drive Extension: This street construction project will provide a key transportation link under I-5 and an alternative route between St. Joseph’s Hospital, Guide Meridian, and James Street

Page 4: Squalicum Creek Corridor Projects Presentation · Squalicum Creek Corridor Upcoming Projects Squalicum Creek Re-route and Orchard Drive Extension Analiese Burns Habitat and Restoration

4

Squalicum Creek• Provides habitat for

coho, chum, pink, and Chinook and steelhead

• Does not meet State water quality standards for temperature, dissolved oxygen, and bacteria

Page 5: Squalicum Creek Corridor Projects Presentation · Squalicum Creek Corridor Upcoming Projects Squalicum Creek Re-route and Orchard Drive Extension Analiese Burns Habitat and Restoration

5

Fish-passable culvert

Squalicum Creek Re-route Phases 3 & 4

Page 6: Squalicum Creek Corridor Projects Presentation · Squalicum Creek Corridor Upcoming Projects Squalicum Creek Re-route and Orchard Drive Extension Analiese Burns Habitat and Restoration

6

Potential Impacts to Cornwall Neighbors

• Minimal traffic impacts

• Greatest impacts during

culvert installation– Squalicum Parkway reduced to one

lane for 2-3 weeks in June 2020

• Emergency vehicles will

always be expedited

Page 7: Squalicum Creek Corridor Projects Presentation · Squalicum Creek Corridor Upcoming Projects Squalicum Creek Re-route and Orchard Drive Extension Analiese Burns Habitat and Restoration

7

Anticipated Construction Timeline

• April 2020: construction

vehicles begin to arrive onsite

• June 2020: construction work is

expected to begin

• December 2020: construction

work is expected to finish

Page 8: Squalicum Creek Corridor Projects Presentation · Squalicum Creek Corridor Upcoming Projects Squalicum Creek Re-route and Orchard Drive Extension Analiese Burns Habitat and Restoration

8

Orchard Drive Extension (Birchwood Ave)

Page 9: Squalicum Creek Corridor Projects Presentation · Squalicum Creek Corridor Upcoming Projects Squalicum Creek Re-route and Orchard Drive Extension Analiese Burns Habitat and Restoration

9

Project Benefits

• Improved hospital access and

EMS response

• Grade-separated crossing of I-5

• Eased traffic on Sunset, Ellis

and Meridian

• Multimodal, including bicycle

lanes and sidewalks

Page 10: Squalicum Creek Corridor Projects Presentation · Squalicum Creek Corridor Upcoming Projects Squalicum Creek Re-route and Orchard Drive Extension Analiese Burns Habitat and Restoration

10

Potential Project Impacts

• Additional truck traffic

• Periodic flaggers

• Minimal impacts expected

Page 11: Squalicum Creek Corridor Projects Presentation · Squalicum Creek Corridor Upcoming Projects Squalicum Creek Re-route and Orchard Drive Extension Analiese Burns Habitat and Restoration

11

Anticipated Construction Timeline

• June 2020:

construction begins

• June 2021: new

street will open

Page 12: Squalicum Creek Corridor Projects Presentation · Squalicum Creek Corridor Upcoming Projects Squalicum Creek Re-route and Orchard Drive Extension Analiese Burns Habitat and Restoration

12

Tentative Community Outreach Plans

• March - December 2020: Regular email updates sent to stakeholders and interested community members.

• April 2020: Press release announcing project construction and details.

• May 2020: On-site messaging prior to lane restriction on Squalicum Parkway to alert regular travelers.

• October 2020: Community work party, ribbon cutting, and Squalicum Creek tour.

• As needed: In-person meetings with stakeholders and answers to questions (email [email protected]).

Page 13: Squalicum Creek Corridor Projects Presentation · Squalicum Creek Corridor Upcoming Projects Squalicum Creek Re-route and Orchard Drive Extension Analiese Burns Habitat and Restoration

13

Questions?

Find more info: https://www.cob.org/services/environment/restoration/Pages/squalicum-creek-reroute.aspx

Page 14: Squalicum Creek Corridor Projects Presentation · Squalicum Creek Corridor Upcoming Projects Squalicum Creek Re-route and Orchard Drive Extension Analiese Burns Habitat and Restoration

14

Funding

Page 15: Squalicum Creek Corridor Projects Presentation · Squalicum Creek Corridor Upcoming Projects Squalicum Creek Re-route and Orchard Drive Extension Analiese Burns Habitat and Restoration

15

Presented by:

Squalicum Creek Corridor Upcoming ProjectsSqualicum Creek Re-route and Orchard Drive Extension

Analiese BurnsHabitat and Restoration ManagerPublic Works Natural Resources

360.778.7968 [email protected]

Craig MuellerProject Engineer

Public Works Engineering360.778.7922 [email protected]

Amy CloudCommunications and Outreach

Public Works360.778.7912 [email protected]