*Sq@ " Ref No: CGC&PL/201 8.201 9/EC/EDS To NAKODA GROUP Date: 16 Jan 2019 The Member Secretary, Additional Director, (lA-Coal Mining) Ministry of Environment, Forests and Climate Change, Indira Paryavaran Bhavan, Jor Bag, New Delhi- 110 003 E-mail: sk [email protected]Kind attention: Shri S. t<. Srivastava (Member Secretary - Coal Mining Projects) Sub: Submission of information, clarification & documents for Closure of EDS Ref: EDS Generated on 21" Nov 2018 under Proposal No |A/CG/CMIN/2577412014 of Proposed 2 x 2 MTPA Coal washery (wet process) at Village: Batari, Tahsil: Katghora, District: Korba, Chhattisgarh (M/s. CG Coal & Power Ltd). Respected Sir, We would like to submit the following information, clarification and documents etc for closure of EDS generated on 21" Nov 2018: 1. The detail of products mentioned in column 8.2 of Form-2 with complete mass balance is enclosed (Annexure-A) 2. The potential consumers of our washed coal shall be lron & Steel Plants (Annexure-B), Power Plants(Annexure-C), Cement Plants (Annexure-D), and Other Consumers. a. The copy of MOUs executed with some of our prospecting job providers for processing of Raw Coal are enclosed {Annexure'E (Colly)} b. The copy of MOUs executed with some of our prospecting buyers for purchase of reject coal are enclosed {Annexure-F (Colly)} It is respectfully submitted that we have made sincere efforts for execution of MOUs with some of our prospecting consumers {Annexure-G (Colly)}; but most theprospecting job providers of raw coal and procurers of reject coal have shown their inability for execution of MOUs until actual establishment of coal washery at Village: Batari, Tahsil: Katghora, District: Korba, in the State of Chhattisgarh for avoiding possible future investigation and complications etc. lt is further submitted that some of our prospecting consumers company's matter is pending adjudication before National Company Law Tribunal for corporate restructuring under the Insolvency and Bankruptcy CG COAL & POWER LIMITED. Regd. Office.: Near Railway Crossing, Vidhan Sabha Road, Mowa, p.O, Saddu, Raipur - 492O14 (C.G.) T el. i + 9 t -7 7 !-2282230, 228233,0. Faoti +9I-77L-2282L3O. CIN Nc U23109CT2002Pt,C015its www,nakodagroup.com ffi
42
Embed
*Sq@ - environmentclearance.nic.in · Sr. No. Name of Company Registered Office Address 18 Adhunik Thermal Energy Ltd 605 Central Plaza, 2/6 Sarat Bose Road, Near Minto Road, Kolkatta-700020,
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
*Sq@ "
Ref No: CGC&PL/201 8.201 9/EC/EDS
To
NAKODA GROUP
Date: 16 Jan 2019
The Member Secretary,Additional Director, (lA-Coal Mining)Ministry of Environment, Forests and Climate Change,Indira Paryavaran Bhavan, Jor Bag,
Sub: Submission of information, clarification & documents for Closure of EDSRef: EDS Generated on 21" Nov 2018 under Proposal No |A/CG/CMIN/2577412014
of Proposed 2 x 2 MTPA Coal washery (wet process) at Village: Batari, Tahsil:Katghora, District: Korba, Chhattisgarh (M/s. CG Coal & Power Ltd).
Respected Sir,
We would like to submit the following information, clarification and documents etc forclosure of EDS generated on 21" Nov 2018:
1. The detail of products mentioned in column 8.2 of Form-2 with complete massbalance is enclosed (Annexure-A)
2. The potential consumers of our washed coal shall be lron & Steel Plants(Annexure-B), Power Plants(Annexure-C), Cement Plants (Annexure-D), andOther Consumers.
a. The copy of MOUs executed with some of our prospecting job providersfor processing of Raw Coal are enclosed {Annexure'E (Colly)}
b. The copy of MOUs executed with some of our prospecting buyers forpurchase of reject coal are enclosed {Annexure-F (Colly)}
It is respectfully submitted that we have made sincere efforts for execution of MOUswith some of our prospecting consumers {Annexure-G (Colly)}; but mosttheprospecting job providers of raw coal and procurers of reject coal have shown theirinability for execution of MOUs until actual establishment of coal washery at Village:Batari, Tahsil: Katghora, District: Korba, in the State of Chhattisgarh for avoidingpossible future investigation and complications etc. lt is further submitted that some ofour prospecting consumers company's matter is pending adjudication before NationalCompany Law Tribunal for corporate restructuring under the Insolvency and Bankruptcy
CG COAL & POWER LIMITED.Regd. Office.: Near Railway Crossing,Vidhan Sabha Road, Mowa, p.O, Saddu,Raipur - 492O14 (C.G.)
T el. i + 9 t -7 7 !-2282230, 228233,0.Faoti +9I-77L-2282L3O.CIN Nc U23109CT2002Pt,C015its
www,nakodagroup.com
ffi
Code'2016; in which resolution professional was appointed and new board were
constituted; during the pendency of matter, the company cannot interred into any fresh
agreement and/or executed MOUs.
ln the aforesaid facts and circumstances; we humbly request for waiver of MOUs
conditions for consideration of our proposal by the EAC, we undertake to abide by all
environment compliances, as suggested by the EAC committee and/or MoEFCC forgrant of Environment Clearance for our proposed Coal washery project.
Please find the aforesaid information, clarification and documents etc in order and
request to close the generated EDS dated 21't Nov 2018 and put the matter before EAC
1. Zuari Cement Ltd - Chennai Grinding Unit TAMIL NADU
2. Zuari Cement Ltd - Sitapuram TELANGANA
3. Zuari Cement Ltd - Yerraguntla ANDHRA PRADESH
Content Owned, Updated and Maintained by Department of Industrial Policy & Promotion.
Website designed & hosted by National Informatics Centre Last Updated on 30-12-2016
Companywise Plant List http://eaindustry.nic.in/cement/report2.asp
7 of 7 05-Jan-19, 1:52 PM
r@CHHATTISGARH
H
$ tn,, MoU is made on o4t!
g following parties:
H lVt/t CG Coal & Power Ltd., accompany registered under the provision of Company Act' L956having its registered office at Near Railway Crossing, Mowa, Vidhan Sabha Road, pO Saddu,
f Raipur Chattisgarh 492oL4 through Shri Virendra Goel, Director (Here in after referred to as
the "CGC&PL" which expression shall, unless repugnant to the context or the meaning thereofH include its successor and assign) as the first part
B nruo
M/s Vandana Global Ltd., a company registered under the provision of Company Act' 1956
. having its registered office at Siltara Industrial Area, Phase-tt, Siltara 4g3ttL, Raipur (C.G.) throughE sf,ri vijia Agarwal, Director (Here in after referred to as the 'VGL" which expression shall, unless
,repugnant to the context or the meaning thereof include its successor and assign) as the other" part.
E
WHEREAS "CGC&PL" is in process for establishment of 2*2 MTPA Capacity Coal Washery (WetEProcess) nearer to operational Coal Mines of South Eastern Coalfields Limited plant at village:
_Batari, Tahsil: Katghora, District: Korba, Chattisgarh, and willing to process Indigenous Raw CoalEof "VGL".
For, VANDRNA GI"0TAL [TD. .
\h*W
K 778972
Memorandum of Understanding
day of April 2018 at Raipur, Chattisgarh by and between the
Annexure - E(Colly) - Processing of Raw Coal MoU
AND WHEREAS "VGL" is presently having 24 MW Capacity Power Plant at Siltara Industrial Area, Phase'
tf, siltara 4g3Llt,Raipur (c.G.) and desirous to process their Indigenous Raw coal (shall be receive /obtain from Dipika, Gevra, Kusmunda and other Coal mines of south Eastern Coalfield,s Limited
under their existing/proposed FSA/SpecialAuction/Forward Auction /spot Auction etc) in
NOW THEREFORE, the "CGC&PL" and the "VGL" have agreed to execute this MoU on the
following terms, assurances and commitment:
1. That; the 'cGc&PL" has agreed to process arouno 1O5OO metric tons per month of
Indigenous Raw coal and the "CGC&PL" has agreed to process the said quantity from
"vGL" in their proposed coal Benification / coal washery Plant'
z. That, the terms & condition etc for such process will be mutually decided time to time
by the ,.cGC&pl"and the 'vGL" and separate agreement / contract note in this regard
will be executed / issued in due time'
3. That, the ,,CGC&pL"shall obtain all the necessary, desirable and mandatory clearance
and permission etc for processing of Indigenous Raw Coal of "VGL" in the proposed Coal
Benification I Coal Washery Plant and similarly "VGL" shall obtain all the necessary,
desirable and mandatory clearance and permission etcfor processing of Indigenous Raw
Coal in the proposed Coal Benification I Coal Washery Plant of 'CGC&PL"'
4. That, the validity period of this MOU is upto 31-'t March 2O?1 and the same shall be
extended for such further period, on the mutually agreed terms and conditions, as
agreed between Parties.
lN wINESS WHEREOF In witness whereof, the parties hereto have set and subscribed their
respective hand to this MOU on this O4th day of April 2018
Signed and Delivered bY
For CG Coal & Power Lim For Vandana Global Limited
\q(VirendraGod r)
Director
Witnesses
L
(VijitAgarwal)Director
Witnesses
1,
ffiKN*.ly
gtr'dtr'sa
fucHHATTISGARH
ONE
RUPEES
K 7V 8968
Memorandu m of Understanding
This N'lOLr is nrade on 29th dal of March 20ltl lt Ilaipur. Chhattisgarh bl'and between thefollo*'ing parties:
M/s CG Coal & Power Limited, a compan)' registered under the provision of CompanyAct'1956 having its registered office at Near Railr.rar Crossing. Mowa. Vidhan SabhaRoad,PO Saddu, Raipur, Chhattisgarh 4920i4 throLrgh Shri Virendra Goel, Director (Here-in-after referred to as the "CGC&PL" which expression shall, unless repugnant to the contextor the meaning thereof include its successor and assign) as the first part
AND
M/s Sk1'Alloys and Power Pvt. Ltd. a conrpany registerecl under the provision of CompanyAct'1956 having its registered office at Llouse No 16 Recreation Road Choubey ColonyRaipur (C.G.) * 492001 through Shri Sanjay Goyal, Director (Here-in-after referred to as
the "SAPPL" rvhich expression shall, unless repugnant to the context or the meaning thereofinclude its successor and assign) as the other palt.
WHEREAS "CGC&PL" is in process lirr establisirment of 2*2 MTPA Capacity CoalWashery (Wet Process) nearer to operational Coal Mines of South Eastern Coalfield Limitedplant at village: Batari, Tahsil: Katghora" District: Korba, Chhasttisharh, and willing toprocess Indigenous Raw Coal of "SAPPL"
\9
{-\i'"fi
RictEwi
Rs. 100
F. 100 HUNDRED
+TT-T INDIAIND JUDI
qt..oft
(r.s
w
=02=
AND WHEREAS "SAPPL" is presently having 16 MW capacity Power plant at Village
Temtema, Robetson Kharasia Dist- Raigarh and having Coal Linkage of lr2l44 tons with
SECL for supply of G-6 to G-15 grade of coal tiom Dipka, Gevra, Kusmunda' Amadand'
Bagdeva & chirmiri and other coal mines under their existing / proposed FSA / Special
Auction / Forward Auction / Spot Auction etc and desirous to process their Indigenous Raw
Coal in "CGC&PL" proposed 2x2 MTPA Coal Beneficiation I Coal Washery Plant'
Now THERFORE, the,.cGC &pL- and the "sAppIJ" have agreed to execute this MoU on
the following terms, assurances and commitment:
1. That; ..CGC&PL,, has agreed to process around 9345 metric tons per month of
Indigenous Raw coal and the "CGC&PL" has agreed to process the said quantity of
"CGC&PL" in their proposed Coal Beneficiation / Coal Washery plant'
2. That, the terms & condition etc fbr such process will be mutually decided time to time
by the "CGC&PL" and the "SAPPL" and separate agreement / contract note in this
regards will be executed / issued in due time'
3. That, the ..CGC&PL,, shall obtain all the necessary, desirable and mandatory
clearance and permission etc for processing of lndigenous Raw Coal of "sAPPL" in
the proposed coal Beneficiation / coal washery plant and similarly "SAPPL" shall
obtain all the necessary, desirable and mandatory clearance and permission etc for
processing of Indigenous Raw coal in the proposed coal Beneficiation / coal
WasherY Plant of "CGC&PL"'
4. That, the validity period of this Mou is up to 3l't March 2021and the same shall be
extended for such further period, on the mutually agreed terms and condition' as
agreed between Parties'
IN WITNESS WHEREOF In witness whe|eot. the parties hereto have set and subscribed
their respective hand to this Mou on this 29tt' day of March 2018
Signed and Delivered bY Signed and Delivered bY
For CG r Limited For Sky A
(Virendra Goel)Director
Witnesses
l.
7
(Sanjay GoYal)
Director
Witnesses
1.
)
&\in le./*{ I
rltr'rfisrA Rs. 100ONE
s. 100 HUNDRED RUPEES
qTTqCT INDIAIN
trfiFFg cHHArrrscARH
Memorandum of UnderstandingE
This MOU is made on 04th day of April 2018 at Raipur. Chhattisgarh by and between the
f, following parties:
M/s CG Coal & Power Limited, a company registered under the provision of CompanyAct'1956 having its registered office at Near Railway Crossing, Mowa, Vidhan Sabha Road,
PO Saddu, Raipur, Chhattisgarh 492014 through Shri Virendra Goel, Director (Here-in-after referred to as the "CGC&PL" whicl-r expressiorr shall, unless repugnant to the contextor the meaning thereof include its successor and assign) as the first part
AND
Mis API Ispat & Powertech (P) Ltd., a company registered under the provision ofCompany Act'1956 having its registered otfice at Near h-rdustrial Growth Centre, Phase II,Siltara, Raipur (Chhattisgarh) 493111 through Shri Ritesh Jindal, Vice President (Here-in-after referred to as the "APII&PPL" which expression shall, unless repugnant to the contextor the meaning thereof include its successor and assign) as the other part.
WHEREAS "CGC&PL" is in process fbr establishment of 2*2 MTPA Capacity CoalWashery (Wet Process) nearer to operational Coal Mines o1'South Eastern Coalfield Limitedplant at village: Batari, Tahsil: Katghora, District: Korba, Chhasttisharh, and willing toprocess Indigenous Raw Coal of "APII&PPL".
ffi{risqqi
K 77 8969
E
aE
4
g
\sl3F;
=02=
AND WHEREAS "APII&PPL" is presently having 700 TPD capacity of Sponge Iron plant
at Near Industrial Growth Centre, Phase II, Siltara, Raipur-493111, Chhattisgarh, and
desirous to process their Indigenous Raw Coal (sliall be receive / obtain from Dipka, Gevra,
Kusmunda and Other Coal mines of South Eastern Coalfield Limited under their existing /
proposed FSA / Special Auction / Forward Auction / Spot Auction etc) in "CGC&PL"proposed 2*2MTPA Coal Beneficiation I Coal Washery Plant,
NOW THERFORE. the "CGC&PL" and the "APII&PPL" have agreed to execute this
MOU on the following terms, assurances and commitment:
1. That; 66APII&PPL" has agreed to process around 10000 Metric Tons per month ofIndigenous Raw Coal and the "CGC&PL" has agreed to process the said quantity of,,10000 MT" in their proposed coal Beneficiation / coal washery plant.
2. That, the terms & condition etc for such process will be mutually decided time to time
by the "CGC&PL" and the "APII&PPL" and separate agreement / contract note in
this regards will be executed / issued in due time.
3. That, the "CGC&PL" shall obtain all the necessary, desirable and mandatory
clearance and permission etc for processing of Indigenous Raw Coal of "APII &
PPL" in the proposed Coal Beneficiation i Coal Washery plant and similarlyr,APII&PPL" shall obtain all the necessary, desirable and mandatory clearance and
permission etc for processing of Indigenous Raw Coal in the proposed Coal
Beneficiation / Coal Washery plant of "CGC&PL".
4. That, the validity period of this MOU is up to 31't March 2021 and the same shall be
extended for such further period, on the mutually agreed terms and condition, as
agreed between parties.
IN WITNESS WHEREOF In witness whereof, the parties hereto have set and subscribed
their respective hand to this MOU on this 04th day of April 2018
This MOU is made on 04th day of April 2018 at Raipur, Chhattisgarh by and between the
following parties:
M/s CG Coal & Power Limited, a company registered under the provision of Company
Act'1956 having its registered office at Near Railway Crossing, Mowa, Vidhan Sabha Road,
PO Saddu, Raipur, Chhattisgarh 492014 through Shri Virendra Goel, Director (Here-in-
after referred to as the "CGC&PL" which expression shall, unless repugnant to the context
or the meaning thereof include its successor and assign) as the first part
AND
M/s Shivalay Ispat & Power Pvt. Ltd., a company registered under the provision ofCompany Act'1956 having its registered office at Guma-Urla Road, Village-Kara, Raipur
(Chhattisgarh) 493221through Shri Ritesh Jindal, Director (Here-in-after referred to as the
"SI&PPL" which expression shall, unless repugnant to the context or the meaning thereofinclude its successor and assisn) as the other part.
WHEREAS "CGC&PL" is in process for establishment of 2*2 MTPA Capacity Coal
Washery (Wet Process) nearer to operational Coal Mines of South Eastern Coalfield Limitedplant at village: Batari, Tahsil: Katghora. District: Korba, Chhasttisharh, and willing to
process Indigenous Raw Coal of "SI&PPL".---,'....'i',^ r' .^-''/,' r) i,., \. .^-,
' 'j'.,' -'..
.:
Rs. 100
s. 100 HUNDRED
q{TIGT INDIAFFTSqV{fi
lr\ A \.-- \\ \ \t,$-l_/' \ \^)\" \-\\
p3b.D\ -r'' /sG#n
=02:
AND WHEREAS "SI&PPL" is presently having 300 TPD capacity of Sponge Iron plantat Guma-Urla Road, Village-Kara, Raipur- 493221, Chhattisgarh, and desirous to processtheir Indigenous Raw Coal (shall be receive / obtain from Dipka, Gevra, Kusmunda andOther Coal mines of South Eastern Coalfield Limited under their existing/proposedFSA/Special Auction/Forward AuctiorVSpot Auction etc) in "CGC&PL" proposed 2*2MTPA Coal Beneficiation I Coal Washery Plant,
NOW THERFORE, the "CGC&PL''and the "SI&PPL" have agreed to execute this MOUon the following terms, assurances and commitment:
1. That; "SI&PPL" has agreed to process around 6000 Metric Tons per month ofIndigenous Raw Coal and the "CGC&PL" has agreed to process the said quantity of" 6000 MT" in their proposed Coal Beneficiation i Coal Washery plant.
2. That, the terms & condition etc for such process will be mutually decided time to timeby the "CGC&PL" and the 66SI&PPL" and separate agreement / contract note inthis regards will be executed / issued in due tirne.
3. That, the "CGC&PL" shall obtain all the necessary, desirable and mandatoryclearance and permission etc for processing of Indigenous Raw Coal of "SI&PPL"in the proposed Coal Beneficiation I Coal Washery plant and similarly "SI&PPL"shall obtain all the necessary, desirable and mandatory clearance and permission etcfor processing of Indigenous Raw Coal in the proposed Coal Beneficiation I CoalWashery plant of "CGC&PL".
4. That, the validity period of this MOU is up to 31't March 2021 andthe same shall be
extended for such further period, on the mutually agreed terms and condition, as
agreed between parties.
IN WITNESS WHEREOF In witness whereof, the parties hereto have set and subscribedtheir respective hand to this MOU on this 04th day of April 2018
Signed and Delivered by Signed and Delivered by
Witnesses Witnesses
l., kL-''5^rru ffiouat't1".* Ufr'ry eYoftfh)
(Virendra Goel) ffi/V)\N^, kiPw Cg
Ittll
C G Coal & Power LtdProposed 2*2 MTPA Capacity Coal Washery
Summary of MOU Executed for Processing of Raw coal
4 04.04.2018 API lsoat & Powertech Pvt Ltd c Sponge lron 7OO TPD 10000 120000
Siltara, Raipur, CG
3s84s 4301.40
u-frSqq cHHATTISGARH K' 7 V'597 1
't-
Memorandum of UnderstandingH- This MOU is made on 04th day of April 2018 at Raipur, Chattisgarh by and between the
fl following parties:
H M/s CG Coal & Power Ltd., accompany registered under the provision of Company Act' L956
having its registered office at Near Railway Crossing, Mowa, Vidhan Sabha Road, PO Saddu,
I naipur Chattisgarh 492Ot4 through Shri Virendra Goel, Director (Here in after referred to as
the "CGC&PL" which expression shall, unless repugnant to the context or the meaning thereoft include its successor and assign) as the first part
E nr.ro
M/s Vandana Global Ltd., a company registered under the provision of Company Act' l-956
, having its registered office at Siltara Industrial Area, Phase-ll, Siltara 493ttt, Raipur (C.G.) throughEshrivijitAgarwal,- Director (Here in after referred to as the "VGL" which expression shall, unless
grepugnant to the context or the meaning thereof include its successor and assign) as the otherpart.
H
WHEREAS 'CGC&PL" is in process for establishment of 2*2 MTPA Capacity Coal Washery (Wet
I trocess) nearer to operational Coal Mines of South Eastern Coalfields Limited plant at village:
,Batari, Tahsil: Katghora, District: Korba, Chattisgarh, and willing to supply coal reject of its coalE- washerv to "VGL".
H
H
For, VAMANA c[0BAt tTD.
h,P','fF$$,i$7 \$', \p
Annexure - F(Colly) - Purchase of Reject Coal MoU
AND WHEREAS "VGL" is having 24 MW Capacity Power Plant and desirous to purchase coal reject from
"CGC&PL" for their captive consumption'
NOW THEREFORE, the "CGC&PL" and the "VGLI have agreed to execute this MOU on the
following terms, assurances and commitment:
L. That; the 'CGC&PL"has agreed to supply about 5000 metric tons per month of coal
reject to "VGL"and the "VGL"has agreed to purchase the said quantity from "CGC&PL".
Z. That, the terms & condition etc for such sale / purchase will be mutually decided time to
time by the "CGC&PL"and the"VGL" and separate agreement / contract note in this
regard will be executed / issued in due time.
3. That, the "CGC&PL"shall obtain all the necessary, desirable and mandatory clearance
and permission etc for supply of "Coal Reject" to "VGL" and similarly "VGL" shall obtain
allthe necessary, desirable and mandatory clearance and permission etc for purchase of
"Coal Reject" from "CGC&Pl".
4. That, the validity period of this MOU is up to 31't March 2021 and the same shall be
extended for such further period, on the mutually agreed terms and conditions, as
agreed between Parties'
lN WINESS WHEREOF In witness whereof, the parties hereto have set and subscribed their
respective hand to this MoU on this 04th day of April 2018
Signed and Delivered by
For Vandana GlobalFo.r, VANDANA
(Vijit Agarwal)Director
Witnesses
LimitedGTORAL tTI[
tr tl Illl. I ll-rrwl\llIF[v-\|l- |
Witnesses
For CG Coal & Power Limited
R-.ffi-,ffi,
u@cHHATTTscARH
Memorandum of Understanding
'l'his MOU is made on29th day of March 2018 at Raipur, Chhattisgarh by and betweenthelollowing parties:
N4/s CG coal & Power Ltd, a company registered under the provision of Company Act'1956having its registered office at Near Railw'a1 ('r'ossing" \'1orrya. Vidhan Sabha Road, PO Saddu,
Raipur, Chhattisgarh 492014 through Shri Virendra (ioel, Director (Here-in-after referred toas the "CGC&PL" which expression shail, unless fepLrgnant to the context or the meaning
thereof include its successor and assign) as the first palt
AND
M/s Sky Alloys and Power Pvt. Ltd. a conrpanv legistered under the provision of Company
$.ct'1956 havirrg its registered otfice at House No l6 Recreation Road Choubey ColonyRaipur (C.G.) - 492001through Shri Sanjay Goyal, Director (Here-in-after referred to as
the "SAPPL" rvhich expression shall, unless repugnant to the context or the meaning thereofinclude its successor and assign) as the olhel pafi.
WHEREAS "CGC&PL" is in process lirr establishment of 2*2 MTPA Capacity Coal
Washery (Wet Process) nearer to operational Cloal lViines of South Eastern Coalfield Limitedplant at village: Batari, Tahsil: Katghora, District: i(orba, Chhasttisharh,and willing to supply
coal re3ect of its coal washery to "SAPPL"
K 77 ge67
's&^\--\%
TH}
\ft4/
=02=
AND WHEREAS "SAPPL" is having 16 MW capacity Power plant and desirous topurchase coal reject from "cGC&PL" for their captive consumption.
NOW THERFORE, the "CGC&PL" and the "SAPPL" have agreed to execute this MOUon the following terms, assurances and commitment:
1 ' That; the "CGC&PL" has agreed to supply about 4166 metric tons per month of coalreject to "CGC&PL" and the "SAPPL" has agreed to purchase the said quantity from..CGC&PL''.
2. That, the terms & condition etc for such sale / purchase will be mutually decided timeto time by the "CGC&PL" and the "SAPPL" and separate agreement / contract notein this regards will be executed / issr_red in due time.
3. That, the "CGC&PL" shall obtain all the necessary, desirable and mandatoryclearance and permission etc for supply of "Coal Reject" to "SAppL', and similarly"SAPPL" shall obtain all the necessary, desirable and mandatory clearance andpermission etc for purchase of "coal Reiect" from "cGC&pL L".
4. That, the validity period of this MOU is up to 3l't March 2021 andthe same shall beextended for such further period, on the mutually agreed terms and condition, asagreed between parties.
IN WITNESS WHEREOF In witness whereof, the parties hereto have set and subscribedtheir respective hand to this Mou on this 2gth day of March 201 g
Signed and Delivered
For CG Coal & Powe
(VirendraDirector
Witnesses
l.
)
oet.)
by Signed and Delivered by
and Power
(Sanjay Goyal)Director
Witnesses
l.
)
C G Coal & Power LtdProposed 2*2 MTPA Capacity Coal Washerv
Summary of MOU Executed for Sale of Reject Coal
End Use Plant Per Year
29.03.20L8Sky Alloys & Power Pvt Ltd,
emtema, Raigarh, CGPower Plant
Vandana Global Limited,
Siltara, Raipur, CGPower Plant
!
'
Shree Nakoda Ispat Ltd. Mail - Request for Execution of MOU for ' https://mai Lgoogle.com/mai l/u/0?ik:e95b03 8eb-5&view:pt&searc"'
Arvind Kumar Sharma <aksharma@nakodagroup,com>
Request for Execution of MOU for purchase of Reject Coal from ourproposed washery2 messages
Plsarrangetoprovidedulyfiledup/finalizedMoUsfortakingprintoutonstamppapers,thereafterweshallprovide you the MOUs for obtaining signature of your authorized concerned person'
If you in need of a,ny other information / documents in this matter' pls advice'
Pls ack its receiPt
Tks & regards
Arvind Kumar Sharma
GM CorPorate Affairs
Shree Nakoda IsPat LtdNear RailwaY Crossing, Mowa
PO Shankar Nagar, Raipur (CG) 492007
Mobile: 09826144470
Of ,on.' Q7 7 l) 2282230' 2282330' 2282390
yahoo Mair - Request tbr execution of MoU for processing of Ind... https://mail'yahoo'com/d/folders/505/messagesl28962?'intl:in&'1"'
RequestforexecutionofMoUforprocessingoflndigenousCoaIandPiotrt.tent of Reject Coal
From: arvind sharma (raipur-sharma@yahoo'com)
To: director@vandanaglobal'com
Cc: virendra@nakodagrouP'com
Date: MondaY 26 March 2018' 8:53 PM IST
Respected Sir
We do hope that our request for execution of MOUs is under your consideration'
For early execution of MOUs, we are ready and willing to provide you additional information' documents and
clarification etc, if so desired by you;
we hv already purchased neoessary stamp papers etc for execution of MoU with your esteemed organization'
on Wednesday, 6 June, 2018,4:42..08PM IST, Subhasis das <subhasis.das@f|smidth.com> wrote:
Dear Mr. Arvind'
It was my pleasure talk to you today on your requirement ol-Coal Washery'
we are working on the viabre sorution tJ *""t the requiremeni exptained by you and shat come back
to You shortlY.
Best regards,
;l:l"il;-?i:.74832s2. Mobile +el e8403 8554e fav +el 4427470301t2
subhasis'das@flsmidth com
MarketingFLSmidth3e ;qatoor, Kelambakkam Tamil Nadu 603 103 India
1.t *6t qqqtqSl0OO fsv +91 4427470301
www.flsmidth com
iicome ta" Permanent Account
Number: MACF4997N
tt
f.ffiNffiTil{
I nf O
28-Dec-18, 4:56 PN
,.;:.#'l
@ ;,.*lNAKODA GROUP
No : CGC& P L/2017 * 201"8/EClMO U/Reject Coa I
To,
Dr Sanjay Kumar GuptaVice PresidentAdani Ports and SEZ LtdAllM, At ShantigramNr Vaishnodevi Circle, SG HighwayAhmedabad -382421
Date:19th May 201"8
Sub: Request for Execution of MoU for purchase of Reject Coal from our proposed washery
Dear Sir
We are in process for establishment of 2*2 MTPA Capacity Coalwashery plant (Wet process) nearerto operational coal mines of South Eastern Coalfield Limited at Village: Batari, Tahsil: Katghora,District: Korba in the State of Chhattisgarh.
Recently on oTth Feb 2018, the public hearing under E14-2006 Notification was successfullyconcluded and now, we are in process for obtaining Environmental Clearance from MoEFCC underthe prevailing rules and regulations. In the process, the MoEFcc has sought Mou with the existing /proposed plant desirous to purchase washery reject coal for their captive consumption
we are aware that Adani Group are running power plants in the state of chhattisgarh and otherState and might be in need of Washery Reject Coalfrom Coal Washery situated nearer to coal minesof South Eastern Coalfield Limited, thus we hereby offer for supply'and sale of Washery Reject Coalon competitive rate to your esteemed organisation, hence request you to please execute MOU withour company for procurement / purchase of washery reject coal for your captive consumptions.
Please do the needful in this matter and oblige
Tks and regards
Yours SincerelyFor CG Copal & Power Ltd
(Sanjay Goel)
Mob: 9893115005Email lD: sanjay@nakod
CG COAL & POWER LIMITED.Regd. Office,: Near Railway CrossingVidhan Sabha Road, Mowa, P,O. Saddu,Raipur - 492014 (C,G.)
T el.i +91-77 t-2282230, 2282330.Fax: +9L-777-2282!3A.CIN No. tt23109CT2002PLC015315
www.nakodagroup.com
EFFORTS TAKEN FOR EXECUTION OF MoU
Sr. No.
Name of Company (Request made for execution of MoU)