EDMS NO. REV. VALIDITY 1973138 0.1 DRAFT REFERENCE SPS-E-EC-0004 Date: 2018-10-17 Note: When approved, an Engineering Change Request becomes an Engineering Change Order. This document is uncontrolled when printed. Check the EDMS to verify that this is the correct version before use. CERN CH-1211 Geneva 23 Switzerland SPS ENGINEERING CHANGE REQUEST Renovation of the electrical infrastructure in the BA and BB buildings: new electrical layout BRIEF DESCRIPTION OF THE PROPOSED CHANGE(S): The consolidation of the electrical infrastructure in the BA buildings covers the 18 kV network (Stable and Pulsed), the 400 V network, the UPS network and the 48 V DC system. The consolidation will introduce changes to the physical location of the equipment due to the addition and the size of the new equipment. Therefore, a new arrangement of the electrical equipment within the existing electrical area is needed. The works described in this ECR will be executed in BA1, BA2, BA3, BB3, BA4, BB4 and BA6. DOCUMENT PREPARED BY: DOCUMENT TO BE CHECKED BY: DOCUMENT TO BE APPROVED BY: D. Katsanikos (EN-EL) G. Velázquez Gutiérrez (EN-EL) C. Bertone, S. Bertolasi, R. Billen, K. Cornelis, D. del Alamo, M. Dole, R. Fernandez, R. Folch, A. Funken, F. Galleazzi, G. M. Georgiev, J.L. Grenard, G. Gros, E. Jensen, A. Martinez Selles, D. Mcfarlane, V. Montabonnet, T. Otto, D. Parchet, J. Ridewood, D. Raffourt, A. Suwalska, M. Tavlet, Y. Thurel, W. Van Den Broucke, H. Vincke + SPS ECR distribution list R. Losito EN (on behalf of the IEFC) DOCUMENT SENT FOR INFORMATION TO: IEFC members and alternates SUMMARY OF THE ACTIONS TO BE UNDERTAKEN:
31

SPS - Indico...REFERENCE EDMS NO. REV. VALIDITY SPS-E-EC-0004 1973138 0.1 DRAFT Page 7 of 31 3.2.2 BA2 Intermediate Layout - After LS2 The equipment to be renovated in …

Jan 26, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • EDMS NO. REV. VALIDITY

    1973138 0.1 DRAFT

    REFERENCE

    SPS-E-EC-0004

    Date: 2018-10-17

    Note: When approved, an Engineering Change Request becomes an Engineering Change Order.

    This document is uncontrolled when printed. Check the EDMS to verify that this is the correct version before use.

    CERN CH-1211 Geneva 23 Switzerland

    SPS

    ENGINEERING CHANGE REQUEST

    Renovation of the electrical infrastructure in the

    BA and BB buildings: new electrical layout BRIEF DESCRIPTION OF THE PROPOSED CHANGE(S):

    The consolidation of the electrical infrastructure in the BA buildings covers the 18 kV

    network (Stable and Pulsed), the 400 V network, the UPS network and the 48 V DC

    system. The consolidation will introduce changes to the physical location of the equipment

    due to the addition and the size of the new equipment. Therefore, a new arrangement of

    the electrical equipment within the existing electrical area is needed.

    The works described in this ECR will be executed in BA1, BA2, BA3, BB3, BA4, BB4 and

    BA6.

    DOCUMENT PREPARED BY: DOCUMENT TO BE CHECKED BY: DOCUMENT TO BE APPROVED BY:

    D. Katsanikos (EN-EL)

    G. Velázquez Gutiérrez (EN-EL)

    C. Bertone, S. Bertolasi,

    R. Billen, K. Cornelis,

    D. del Alamo, M. Dole,

    R. Fernandez, R. Folch,

    A. Funken, F. Galleazzi,

    G. M. Georgiev, J.L. Grenard,

    G. Gros, E. Jensen,

    A. Martinez Selles,

    D. Mcfarlane, V. Montabonnet,

    T. Otto, D. Parchet,

    J. Ridewood, D. Raffourt,

    A. Suwalska, M. Tavlet, Y. Thurel,

    W. Van Den Broucke,

    H. Vincke

    +

    SPS ECR distribution list

    R. Losito EN

    (on behalf of the IEFC)

    DOCUMENT SENT FOR INFORMATION TO:

    IEFC members and alternates

    SUMMARY OF THE ACTIONS TO BE UNDERTAKEN:

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 2 of 31

    1. EXISTING SITUATION AND INTRODUCTION

    EN-EL plans to renovate the electrical infrastructure in the BAs as part of the project

    “Consolidation SPS electrical infrastructure” [1], due to the ageing of the electrical

    equipment.

    The consolidation of the electrical infrastructure in the BA buildings covers the 18 kV

    network (Stable and Pulsed) and the 400 V General Services network, the UPS network

    and the 48 V DC system.

    The works described in this ECR will be executed continuously from LS2 till end of LS3.

    2. REASON FOR THE CHANGE

    The electrical infrastructure needs to be consolidated because of its age, which in turn

    makes the operation and maintenance of the network more complicated.

    In addition, to improve the operation and maintenance of the network, and the interface

    with the users, a new topology for the low voltage distribution network will be

    implemented.

    The aim of the design is to group the loads related to the same user or function into

    dedicated switchboards. Figure 1 illustrates the new LV network distribution applicable

    in BA1-BA2-BA3-BA4-BA6 (EZD switchboards are present only in BA2 & BA3).

    Figure 1 - Low voltage distribution1

    1 Not all the existing switchboards located in BA3 are represented in Figure 1.

    2 MVA

    EZD1/Ax

    EMD1/Ax – 18 kV Stable loop

    EBD1/AxEBD2/Ax (Backup)

    EWD1/Ax (CV)EZD2/Ax

    2 MVA 2 or 3.15 MVA

    Re-alim

    EBD11/Ax

    (Canalis, racks, etc)

    EBD12/Ax(Sockets, lighting, etc)

    EBD13/Ax(Tunnel)

    BAxEMD2/Ax – 18 kV Pulsed loop

    EDD1/Ax

    Future evolution of the network

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 3 of 31

    3. DETAILED DESCRIPTION

    The works described in this ECR will be executed continuously from LS2 till end of LS3

    in the building indicated in Table 1:

    Table 1 – Buildings to be renovated during LS2 and LS3

    Works during LS2 Works during LS3

    BA1 YES YES

    BA2 YES YES

    BA3 YES YES

    BB3 YES YES

    BA4 YES YES

    BB4 NO YES

    BA6 YES YES

    3.1 Renovation of the electrical infrastructure in BA1

    3.1.1 BA1 Current Layout

    Figure 2 shows the electrical equipment affected by the consolidation.

    Figure 2 - BA1 current layout (ST0296458_01). In red frames the equipment to be affected.

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 4 of 31

    3.1.2 BA1 Intermediate Layout - After LS2

    Figure 3 - BA1 intermediate layout - after LS2 (ST0296458_01). 48V and UPS renovated

    Table 2 shows the detailed equipment to be consolidated in building BA1 during LS2.

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 5 of 31

    3.1.3 BA1 Future Layout– After LS3

    The equipment to be renovated in LS3 is the existing LV switchgear. Figure 4 illustrates

    the proposed layout after LS3.

    Figure 4 - BA1 future layout - after LS3 (ST0296458_01). LV switchboards renovated.

    Table 3 shows the detailed equipment to be consolidated in building BA1 during LS3.

    The installation of the new equipment will be done within the existing electrical area.

    The new and the old equipment are within the same range of weight.

    Modifications on the frame of the false floor may be required when it is not possible to

    reuse the existing frames.

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 6 of 31

    3.2 Renovation of the electrical infrastructure in BA2

    3.2.1 BA2 Current layout

    Figure 5 shows the electrical equipment affected by the consolidation.

    Figure 5 - BA2 current layout (ST0277743_01). In red bubbles the equipment to be affected.

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 7 of 31

    3.2.2 BA2 Intermediate Layout - After LS2

    The equipment to be renovated in BA2 during LS2 is the 48V system and the UPS. Figure

    6 illustrates the proposed layout after LS2.

    Table 4 shows the detailed equipment to be consolidated in building BA2 during LS2.

    Figure 6 - BA2 Intermediate layout - after LS2 (ST0277743_01). New UPS and 48V systems.

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 8 of 31

    3.2.3 BA2 Future layout – After LS3

    The equipment to be renovated in LS3 is the existing LV switchgears. Figure 7 illustrate

    sthe proposed layout after LS3.

    Table 5 shows the detailed equipment to be consolidated in building BA2 during LS3.

    Figure 7 - BA2 future layout - after LS3 (ST0277743_01). LV switchboards renovated

    The installation of the new equipment will be done within the existing electrical area.

    The new and the old equipment are within the same range of weight.

    Modifications on the frame of the false floor may be required when it is not possible to

    reuse the existing frames.

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 9 of 31

    3.3 Renovation of the electrical infrastructure in BA3 and BB3

    3.3.1 BA3 Current layout.

    Figure 8 show the electrical equipment affected by the consolidation. The layout can be

    consulted in SPSEY___3001.

    Figure 8 - BA3 Current layout (ST0261577_01)

    https://edms.cern.ch/document/245303/AR

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 10 of 31

    3.3.2 BA3 Intermediate Layout - After LS2

    Figure 9 illustrates the proposed layout after LS2.

    Figure 9 - BA3 Intermediate layout – after LS2 (ST0992011_01)

    Table 6 shows the detailed equipment to be consolidated in building BA1 during LS3.

    3.3.3 BB3 Current layout

    Figure 10 show the electrical equipment affected by the consolidation. The layout can

    be consulted in SPSEY___3000.

    Figure 10 - BB3 current layout (ST0591578_02)

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 11 of 31

    3.3.4 BB3 Intermediate layout - After LS2

    Figure 11 illustrates the proposed layout for BB3. Table 8 shows the detailed equipment

    to be consolidated in building BB3 during LS2.

    Figure 11 - BB3 Intermediate layout (ST0591578_02)

    3.4 Renovation of the electrical infrastructure in BA4 and BB4

    3.4.1 BA4 Current layout

    Figure 12 shows the electrical equipment affected by the consolidation.

    Figure 12 - BA4 current layout (ST0269141_01). Equipment to be modified in red frame

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 12 of 31

    3.4.2 BA4 Intermediate layout – After LS2

    The equipment to be renovated in BA4 during LS2 is the 48V system and the UPS. Figure

    13 illustrates the proposed layout after LS2.

    Figure 13 - BA4 intermediate layout - after LS2 (ST0269141_01). 48V and UPS systems

    Table 9 shows the detailed equipment to be consolidated in building BA4 during LS2.

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 13 of 31

    3.4.3 BA4 Future Layout – After LS3

    The equipment to be renovated in LS3 is the existing LV switchgear. Figure 14 illustrates

    the proposed layout after LS3.

    Table 10 shows the detailed equipment to be consolidated in building BAA during LS3.

    Figure 14 - BA4 future layout - after LS3 (ST0269141_01). LV switchboards renovated

    The installation of the new equipment will be done within the existing electrical area.

    The new and the old equipment are within the same range of weight.

    Modifications on the frame of the false floor may be required when it is not possible to

    reuse the existing frames.

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 14 of 31

    3.4.4 BB4 Current Layout

    Figure 15 shows the electrical equipment affected by the consolidation.

    Figure 15 - BB4 current layout (ST0601491_01). Equipment to be affected in red frame

    3.4.5 BB4 Future Layout – After LS3

    Figure 16 illustrates the proposed layout after LS3. Table 11 shows the detailed

    equipment to be consolidated in building BB4 during LS3.

    Figure 16 - BB4 future layout - after LS3 (ST0601491_01)

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 15 of 31

    3.5 Renovation of the electrical infrastructure in BA6

    3.5.1 BA6 Current Layout

    Figure 17 illustrates the electrical equipment affected by the consolidation.

    Figure 17 - BA6 current layout (ST0266000_01). Equipment to be modified in red frame

    3.5.2 BA6 Intermediate Layout – After LS2

    The equipment to be renovated in BA4 during LS2 is the 48V system and the UPS. Figure

    189 illustrates the proposed layout after LS2.

    Figure 18 - BA6 Intermediate layout - after LS2 (ST0266000_01). 48V and UPS systems

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 16 of 31

    Table 12 shows the detailed equipment to be consolidated in building BA6 during LS2.

    3.5.3 BA6 Future Layout – After LS3

    The equipment to be renovated in LS3 is the existing LV switchgear. Figure 1920

    illustrates the proposed layout after LS3.

    Table 13 shows the detailed equipment to be consolidated in building BA6 during LS3.

    Figure 19 - BA6 future layout - after LS3 (ST0266000_01). LV switchboards renovated.

    The installation of the new equipment will be done within the existing electrical area.

    The new and the old equipment are within the same range of weight.

    Modifications on the frame of the false floor may be required when it is not possible to

    reuse the existing frames.

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 17 of 31

    4. IMPACT ON OTHER ITEMS

    4.1 IMPACT ON ITEMS/SYSTEMS

    General services network

    Punctual power cuts to be agreed with the users/coordination.

    Machine network Schedule to be agreed with coordination and users

    Integration and layout drawing:

    The 3D images showed in the document are not from Integration, it has to be checked and confirmed by EN-ACE-INT

    4.2 IMPACT ON UTILITIES AND SERVICES

    Raw water: None

    Demineralized water: None

    Compressed air: None

    Electricity, cable pulling (power, signal, optical

    fibres…):

    Internal EN-EL

    DEC/DIC: None

    Racks (name and location):

    See section 3 and 10

    Vacuum (bake outs, sectorisation…):

    None

    Special transport/ handling:

    Transport needed to remove and install the new equipment.

    Temporary storage of conventional/radioactive

    components:

    None

    Alignment and positioning:

    None

    Scaffolding: None

    Controls: None

    GSM/WIFI networks: None

    Cryogenics: None

    Contractor(s): None

    Surface building(s): BA1-BA2-BA3-BB3-BA4-BB4-BA6 – the arrangement of the electrical equipment will change within the existing electrical area

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 18 of 31

    Others: Existing structure to be checked and modified by SMB.

    5. IMPACT ON COST, SCHEDULE AND PERFORMANCE

    5.1 IMPACT ON COST

    Detailed breakdown of the change cost:

    Points SPS 1-2-3-4-5-6-7 & Tunnel: 32.2 MCHF (C&S review 2017 of EN-EL consolidation projects)

    Budget code: SPS1: 51256

    SPS2: 51282

    SPS3: 51251

    SPS4: 51249

    SPS6: 51257

    5.2 IMPACT ON SCHEDULE

    Proposed installation schedule:

    From LS2 till end of LS3. Detailed planning submitted to the SPS coordination

    Proposed test schedule (if applicable):

    Estimated duration: See planning submitted to SPS coordination. Plan number: 10091, 10092, 10093, 10094, 10096.

    Urgency:

    Flexibility of scheduling: To be discussed with coordination if required

    5.3 IMPACT ON PERFORMANCE

    Mechanical aperture: NA

    Impedance: NA

    Optics/MADX NA

    Electron cloud (NEG coating, solenoid…)

    NA

    Insulation (enamelled flange, grounding…)

    NA

    Vacuum performance: NA

    Others:

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 19 of 31

    6. IMPACT ON OPERATIONAL SAFETY

    [This chapter aims at assessing the impact of the modification on people safety, on the

    environment, and on the safety of operations, including maintenance, access, egress,

    circulation and evacuation.]

    6.1 ÉLÉMENT(S) IMPORTANT(S) DE SECURITÉ

    [Indicate if the change will have an impact on an Elément Important de Sécurité (EIS).

    The list of EIS components is available in EDMS document: 1182293 – “Définition et

    Inventaire des EIS-Faisceau et EIS-Machine en Opération”.]

    Requirement Yes No Comments

    EIS-Access X

    EIS-Beam X

    EIS-Machine X

    6.2 OTHER OPERATIONAL SAFETY ASPECTS

    Have new hazards been

    created or changed?

    No

    Could the change affect existing risk control measures?

    No

    What risk controls have to be put in place?

    NA

    Safety documentation to update after the modification

    SPS Safety file to be compiled regarding electrical and other risks.

    Define the need for training or information

    after the change

    NA

    7. WORKSITE SAFETY

    [Refer to EDMS document: 1155899 – “Working on the CERN Site”.]

    [Following the implementation of the change, the Safety File of the facility shall be

    updated. In the temporary absence of the Safety File, the hazards inventory and risk

    analysis of the concerned installation shall be established.]

    https://edms.cern.ch/document/1182293/https://edms.cern.ch/document/1155899

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 20 of 31

    7.1 ORGANISATION

    Requirement Yes No Comments

    IMPACT – VIC: X To be organized as required

    Operational radiation protection (surveys, DIMR…):

    X

    Radioactive storage of material:

    X

    Radioactive waste: X

    Non-radioactive waste: X Wastes from electrical and electronic equipment, iron and steel

    Fire risk/permit (IS41) (welding, grinding…):

    X Possible fire risk during the welding of the metallic structures

    Alarms deactivation/activation (IS37):

    X

    Others:

    7.2 REGULATORY TESTS

    Requirement Yes No Responsible Group

    Comments

    Pressure/leak tests: X

    Electrical tests: X EN-EL Users will be requested to participate in the tests when their equipment is powered.

    Others:

    7.3 PARTICULAR RISKS

    Requirement Yes No Comments

    Hazardous substances (chemicals, gas, asbestos…):

    X

    Work at height: X

    Confined space working: X

    Noise: X

    Cryogenic risks: X

    Industrial X-ray (tirs radio):

    X

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 21 of 31

    Ionizing radiation risks (radioactive components):

    X

    Others:

    8. FOLLOW-UP OF ACTIONS BY THE TECHNICAL COORDINATION

    Action Done Date Comments

    Carry out site activities:

    Carry out tests:

    Update layout drawings:

    Update equipment drawings:

    Update layout database: NA

    Update naming database: NA

    Update optics (MADX) NA

    Update procedures for maintenance and operations

    Update Safety File according to

    EDMS document 1177755:

    Others:

    9. REFERENCES

    [1] G. Velazquez Gutierrez, “BA3 & BB3 Conceptual Design Report - Technical description,” EDMS 1975905, 2018.

    https://edms.cern.ch/document/1177755/1.0

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 22 of 31

    10. ANNEXES

    10.1 Summary of the consolidation in BA1

    Table 2 - Equipment to be consolidated in BA1 during LS2

    Eq.

    removed Weight

    (kg)

    Dimensions

    (m)

    Eq.

    installed

    Weight

    (kg)

    Dimensions

    (m)

    Owner

    EBD2/A1 ~6000 kg 0.75*7.0 EOD1/A1 0.4*2.0 LS2

    EBD41/A1 0.75*2.0 EOD2/A1 0.4*1.0 LS2

    EBD250/A1 0.35*1.4 EOD3/A1 0.4*3.0 LS2

    EOD211/A1 0.4*1.8 EOD5/A1 0.4*2.0 LS2

    EOD212/A1 0.4*1.8 ESD5A/1 0.4*1.0 LS3

    EOD1/A1 0.3*0.5 ECD21/A1 ~4500 kg

    0.4*1.0 LS2

    ERD1/A1 0.75*3.2 ECD1/A1 0.6*1.0 LS2

    ERD24/A1 0.4*1.0 EYS01/A1 0.6*1.0 LS2

    ERD25/A1 0.4*1.0 ECX100/A1 0.3*0.7 LS2

    ERD64/A1 0.4*1.0 ECX104/A1 0.3*0.7 LS2

    ESD5/A1 0.4*1.0 ECG01/A1 0.6*1.0 LS2

    EYY0338/A1 ~2500 kg 0.8*0.6 EAS11/A1 0.6*0.7 LS2

    EYY0337/A1 0.8*0.6 EAT11/A1 0.6*0.7 LS2

    EYM03/A1 0.8*0.6 EBS1/A1 1.0*1.0 LS2

    EYM02/A1 0.8*0.6 EBD12/A1 1.0*1.0 LS2

    EYU0746/A1 0.8*0.6 EJG1/A1 1.0*1.0 LS2

    EYU0745/A1 0.8*0.6 EJG12/A1 1.0*1.0 LS2

    EYY0741/A1 0.8*0.6

    EBS22/A1 ~4000 kg 0.8*1.0

    EBS24/A1 0.45*0.75

    ECD21/A1 0.5*1.0

    EGD23/A1 ~0.8*0.6

    ESU21/A1 ~0.8*0.6

    ESU22/A1 ~0.8*0.6

    ESU23/A1 ~0.8*0.6

    ECG21/A1 ~0.8*0.6

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 23 of 31

    ECG22/A1 ~0.8*0.6

    Table 3 - Equipment to be consolidated in BA1 during LS3

    Eq.

    removed Weight

    (kg)

    Dimensions

    (m)

    Eq.

    installed

    Weight

    (kg)

    Dimensions

    (m)

    Owner

    EMD109/A1 ~9000 kg

    0.85*1.16 EBD1/A1 ~4500 kg

    0.8*5.84 LS3 EN-EL

    EMD110/A1 0.85*1.16 ERD1/A1 0.8*2.4 LS3

    EMD111/A1 0.85*1.16 EWD1/A1 0.8*5.6 LS3

    EMD112/A1 0.85*1.16 EBD11/A1 ~4500 kg

    0.6*3.8 LS3

    EMD210/A1 0.85*1.16 EBD12/A1 0.6*2.0 LS3

    EMD211/A1 0.85*1.16 EBD13/A1 0.6*2.0 LS3

    EMD212/A1 0.85*1.16 EBD250/A1 0.4*2.5 LS3

    EMD213/A1 0.85*1.16 ERD8/A1 0.4*1.0 LS3

    EMD214/A1 0.85*1.16 ERD9/A1 0.4*1.0 LS3

    10.2 Summary of the consolidation in BA2

    Table 4 - Equipment to be consolidated in BA2 during LS2

    Eq.

    removed Weight (kg)

    Dimensio

    ns

    (m)

    Eq.

    installed

    Weight

    (kg)

    Dimensions

    (m)

    Owner

    EMD211/A2 0.85*1.16 EOD1/A2 0.4*1.5 LS2

    EMD212/A2 0.85*1.16 EOD2/A2 0.4*1.0 LS2

    EMD213/A2 0.85*1.16 EOD3/A2 0.4*2.5 LS2

    EMD214/A2 0.85*1.16 ESD5/A2 0.4*1.0 LS3

    EBD2/A2 ~6000 kg 0.75*7.5 ECD21/A2 ~4500 kg 0.4*1.0 LS2

    ERD1/A2 0.75*2.0 ECD1/A2 0.6*1.0 LS2

    ERD3/A2 0.75*3.4 EYS01/A2 0.6*1.0 LS2

    ERD5/A2 0.75*2.2 ECX100/A2 0.3*0.7 LS2

    EBD250/A2 0.35*1.4 ECX104/A2 0.3*0.7 LS2

    EBD6/A2 0.75*1.0 ECG01/A2 0.6*1.0 LS2

    ECD21/A2 0.4*1.0 EAS11/A2 0.6*0.7 LS2

    EOD211/A2 0.4*1.4 EAT11/A2 0.6*0.7 LS2

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 24 of 31

    EOD212/A2 0.4*1.4 EBS1/A2 1.0*1.0 LS2

    EOD1/A2 0.3*0.5 EBD12/A2 1.0*1.0 LS2

    ESD5/A2 0.4*1.0 EJG1/A2 1.0*1.0 LS2

    EYN447/A2 ~3000 kg 0.8*0.6 EJG12/A2 1.0*1.0 LS2

    EYN448/A2 0.8*0.6

    EYC545/A2 0.8*0.6

    EYY553/A2 0.8*0.6

    EYM01/A2 0.8*0.6

    EYM02/A2 0.8*0.6

    EYM03/A2 0.8*0.6

    EYM04/A2 0.8*0.6

    EYM05/A2 0.8*0.6

    EBS22/A2 ~3500 kg 0.8*1.0

    EBS23/A2 0.8*1.0

    EBS24/A2 0.8*1.0

    EGD23/A2 ~0.8*0.6

    ESU21/A2 ~0.8*0.6

    ESU22/A2 ~0.8*0.6

    ESU23/A2 ~0.8*0.6

    ECG21/A2 ~0.8*0.6

    ECG22/A2 ~0.8*0.6

    ECG23/A2 ~0.8*0.6

    Table 5 - Equipment to be consolidated in BA2 during LS3

    Eq.

    removed Weight (kg)

    Dimensio

    ns

    (m)

    Eq.

    installed

    Weight

    (kg)

    Dimensions

    (m)

    Owner

    EMD110/A2 ~13000 kg 0.85*1.16 EBD1/A2 ~6000 kg 0.8*5.8 LS3 EN-EL

    EMD111/A2 0.85*1.16 ERD1/A2 0.8*4.4 LS3

    EMD112/A2 0.85*1.16 ERD2/A2 0.8*7.0 LS3

    EMD113/A2 0.85*1.16 EWD1/A2 0.8*5.4 LS3

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 25 of 31

    EMD114/A2 0.85*1.16 EBD11/A2 ~4500 kg 0.6*3.0 LS3

    EMD115/A2 0.85*1.16 EBD12/A2 0.6*4.0 LS3

    EMD116/A2 0.85*1.16 EBD13/A2 0.6*2.0 LS3

    EMD117/A2 0.85*1.16 EBD250/A2 0.4*2.5 LS3

    EMD210/A2 0.85*1.16 EZD1/A2 0.6*3.0 LS3

    10.3 Summary of the consolidation in BA3

    Table 6 - Equipment to be consolidated in BA3 during LS2

    Eq. removed Weight

    (kg)

    Dimensions

    (m) Eq. installed

    Weight

    (kg)

    Dimensions

    (m)

    Owner

    EMD104/A3

    ~12000

    kg

    0.9*1.5 EST99/A3

    EBG99/A3

    ESS99/A3

    ~300 kg ~2.4*1.6

    LS2

    EN-EL

    EMD105/A3 0.9*1.5

    EMD106/A3 0.9*1.5 EBD1/A3 ~4000 kg ~3.5*1.6

    LS2

    EMD107/A3 0.9*1.5 LS2

    EMD108/A3 0.9*1.5 EBD12/A3

    EBD13/A3 ~300 kg ~2.4*1.6

    LS2

    EMD109/A3 0.9*1.5 LS2

    EMD110/A3 0.9*1.5

    EMD111/A3 0.9*1.5 EMD200/A3

    ~12000

    kg

    0.7*2 LS2

    EMD112/A3 0.9*1.5 EMD201/A3 0.7*2 LS2

    EMD113/A3 0.9*1.5 EMD202/A3 0.7*2 LS2

    EMD114/A3 0.9*1.5 EMD203/A3 0.7*2 LS2

    EMD208/A3

    ~7000 kg

    0.9*1.5 EMD204/A3 0.7*2 LS2

    EMD209/A3 0.9*1.5 EMD205/A3 0.7*2 LS2

    EMD210/A3 0.9*1.5 EMD206/A3 0.7*2 LS2

    EMD211/A3 0.9*1.5 EMD207/A3 0.7*2 LS2

    EMD212/A3 0.9*1.5 EMD208/A3 0.7*2 LS2

    EMD213/A3 0.9*1.5 EMD209/A3 0.7*2 LS2

    EMD214/A3 0.9*1.5 EMD210/A3 0.7*2 LS2

    EMD215/A3 0.9*1.5 EMD211/A3 0.7*2 LS2

    EBD208/A3

    ~4000 kg 0.8*9 EBD2/A3

    (old)

    ~3000

    kg ~5.6*0.8

    LS2

    EBD209/A3 LS2

    EBD210/A3 LS2

    EBD211/A3 LS2

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 26 of 31

    EBD212/A3 LS2

    EBD213/A3 LS2

    EBD214/A3 LS2

    EBD215/A3 LS2

    EBD216/A3 LS2

    EBD207/A3 ~0.6*0.8 EBD11/A3

    ~3000

    kg ~5*0.8

    LS2

    EBD208/A3 ~0.6*0.8 LS2

    EWD1/A3 ~3000

    kg ~5*0.8

    LS2

    Protection

    racks ~100 kg ~5.6*0.8

    LS2

    Table 7 - Equipment to be moved in BA3 during LS2

    Eq. moved Weight (kg) Dimensions

    (m)

    EBD17/A3

    ~2000 kg ~4.5*0.8

    EBD18/A3

    EBD19/A3

    EBD220/A3

    EBD221/A3

    EBD222/A3

    10.4 Summary of the consolidation in BB3.

    Table 8 - Equipment to be consolidated in BB3 during LS2

    Eq. removed Weight

    (kg)

    Dimensions

    (m) Eq. installed

    Weight

    (kg)

    Dimensions

    (m)

    Owner

    EMD2/B3 ~8000 kg 9*1.5 EBD1/B3 ~4000kg ~2.4*1.6 LS2

    EN-EL

    EMD1/B3 ~10000

    kg 10*1.5 EMD4/B3

    ~10000

    kg ~10*2

    LS2

    SVC EMD1/B3 ~12000

    kg ~10*2

    LS2

    EWD1/B3 ~3000

    kg ~5*0.8

    LS2

    Protection

    racks ~80 kg ~3*0.8

    LS2

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 27 of 31

    10.5 Summary of the consolidation in BA4

    Table 9 - Equipment to be consolidated in BA4 during LS2

    Eq.

    removed Weight (kg)

    Dimensio

    ns

    (m)

    Eq.

    installed

    Weight

    (kg)

    Dimensions

    (m)

    Owner

    EMD301/A4 0.85*1.16 EOD1/A4 0.4*1.5 LS2

    EMD302/A4 0.85*1.16 EOD2/A4 0.4*1.0 LS2

    EMD303/A4 0.85*1.16 EOD3/A4 0.4*2.5 LS2

    EMD304/A4 0.85*1.16 ESD5/A4 0.4*1.0 LS3

    EMD305/A4 0.85*1.16 ECD21/A4 ~4000 kg 0.4*1.0 LS2

    EMD306/A4 0.85*1.16 ECD1/A4 0.6*1.0 LS2

    EMD307/A4 0.85*1.16 EYS01/A4 0.6*1.0 LS2

    EMD308/A4 0.85*1.16 ECX100/A4 0.3*0.7 LS2

    EMD309/A4 0.85*1.16 ECX104/A4 0.3*0.7 LS2

    EMD310/A4 0.85*1.16 ECG13/A4 0.6*1.0 LS2

    EMD311/A4 0.85*1.16 EAS11/A4 0.6*0.7 LS2

    EBD2/A4 ~7500 kg 0.75*7.5 EAT11/A4 0.6*0.7 LS2

    ERD1/A4 0.75*2.0 EBS1/A4 1.0*1.0 LS2

    ERD3/A4 0.75*3.4 EBD12/A4 1.0*1.0 LS2

    EBD4/B4 0.75*2.2 EJG1/A4 1.0*1.0 LS2

    EBD250/A4 0.35*1.4 EJG12/A4 1.0*1.0 LS2

    EBD260/A4 0.75*1.0

    EBD6/A4 0.4*1.0

    ECD21/A4 0.4*1.0

    EOD211/A4 0.4*1.4

    EOJ22/A4 0.3*0.5

    EOD1/A4 0.3*0.5

    ERD25/A4 0.4*0.6

    ESD5/A4 0.4*1.0

    EYM02/A4 ~2000 kg 0.8*0.6

    EYM03/A4 0.8*0.6

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 28 of 31

    EYM04/A4 0.8*0.6

    EYM31/A4 0.8*0.6

    EYM32/A4 0.8*0.6

    EYM33/A4 0.8*0.6

    EBS22/A4 ~2000 kg 0.8*1.0

    EBS24/A4 0.8*1.0

    ESU21/A4 ~0.8*0.6

    ESU22/A4 ~0.8*0.6

    ESU23/A4 ~0.8*0.6

    ECG22/A4 ~0.8*0.6

    Table 10 - Equipment to be consolidated in BA4 during LS3

    Eq.

    removed Weight (kg)

    Dimensio

    ns

    (m)

    Eq.

    installed

    Weight

    (kg)

    Dimensions

    (m)

    Owner

    EMD201/A4 ~22000 kg 0.85*1.16 EBD1/A4 ~6000 kg 0.8*5.8 LS3 EN-EL

    EMD202/A4 0.85*1.16 ERD1/A4 0.8*7.2 LS3

    EMD203/A4 0.85*1.16 ERD2/A4 0.8*6.2 LS3

    EMD204/A4 0.85*1.16 EWD1/A4 0.8*4.6 LS3

    EMD205/A4 0.85*1.16 EBD11/A4 ~4500 kg 0.6*4.0 LS3

    EMD206/A4 0.85*1.16 EBD12/A4 0.6*2.0 LS3

    EMD207/A4 0.85*1.16 EBD13/A4 0.6*3.0 LS3

    EMD208/A4 0.85*1.16 EBD250/A4 0.4*2.5 LS3

    EMD300/A4 0.85*1.16 ERD9/A4 0.4*1.2 LS3

    10.6 Summary of the consolidation in BB4

    Table 11 - Equipment to be consolidated in BB4 during LS3

    Eq.

    removed Weight (kg)

    Dimensio

    ns

    (m)

    Eq.

    installed

    Weight

    (kg)

    Dimensions

    (m)

    Owner

    EBD4/B4 ~5000 kg 0.8*5.0 EBD1/B4 ~3000 kg 0.8*5.8 LS3 EN-EL

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 29 of 31

    EBD42/B4 0.4*1.0 EBD11/B4 0.8*2.0 LS3

    EBD450/B4 0.4*1.0 EBD12/B4 0.8*1.0 LS3

    EBD451/B4 0.4*1.0 EWD1/B4 0.8*4.0 LS3

    ECD61/B4 0.3*0.5 EBD450/B4 0.6*1.0 LS3

    ECD63/B4 0.3*0.5

    EGD431/B4 0.3*0.5

    EOD220/B4 0.4*1.0

    EBU415/B4 0.4*0.8

    EBU43/B4 0.4*0.8

    ESU210/B4

    0.4*1.0

    EBU21/B4 0.4*1.0

    EBU22/B4 0.4*1.0

    EBU23/B4 0.4*1.0

    EOD420/B4 0.4*1.0

    10.7 Summary of the consolidation in BA6

    Table 12 - Equipment to be consolidated in BA6 during LS2

    Eq.

    removed Weight (kg)

    Dimensio

    ns

    (m)

    Eq.

    installed

    Weight

    (kg)

    Dimension

    s

    (m)

    Owner

    EMD118/A6 0.85*1.16 EOD1/A6 0.4*1.5 LS2

    EMD119/A6 0.85*1.16 EOD2/A6 0.4*1.0 LS2

    EMD120/A6 0.85*1.16 EOD3/A6 0.4*2.5 LS2

    EMD121/A6 0.85*1.16 ESD5/A6 0.4*1.0 LS3

    EMD210/A6 0.85*1.16 ECD21/A6 ~3000 kg 0.4*1.0 LS2

    EMD211/A6 0.85*1.16 ECD1/A6 0.6*1.0 LS2

    EMD212/A6 0.85*1.16 EYS01/A6 0.6*1.0 LS2

    EMD213/A6 0.85*1.16 ECX100/A6 0.3*0.7 LS2

    EMD214/A6 0.85*1.16 ECX104/A6 0.3*0.7 LS2

    EMD215/A6 0.85*1.16 EAS11/A4 0.6*0.7 LS2

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 30 of 31

    EMD216/A6 0.85*1.16 EAT11/A6 0.6*0.7 LS2

    EMD217/A6 0.85*1.16 EBS1/A6 1.0*1.0 LS2

    EMD218/A6 0.85*1.16 EBD12/A6 1.0*1.0 LS2

    EMD219/A6 0.85*1.16 EJG1/A6 1.0*1.0 LS2

    EBD2/A6 ~6500 kg 0.75*7.5 EJG12/A6 1.0*1.0 LS2

    ERD1/A6 0.75*2.0 ECG13/A6 1.0*1.0 LS2

    ERD3/A6 0.75*3.4 EAJ11/A6 1.0*1.0 LS2

    EBD4/A6 0.75*2.2

    EBD250/A6 0.35*1.4

    ECD21/A6 0.4*1.0

    EOD211/A6 0.4*1.4

    EOD212/A6 0.4*1.4

    EGD23/A6 0.4*1.4

    EOD1/A6 0.4*1.0

    EOD21/A6 0.4*1.0

    ESD5/A6 0.4*1.0

    EYM03/A6 ~1200 kg 0.8*0.6

    EYM04/A6 0.8*0.6

    EYM05/A6 0.8*0.6

    EJC24/A6 0.8*0.6

    EBS21/A6 ~2000 kg 0.8*1.0

    EBS22/A6 0.8*1.0

    EBS24/A6 0.8*1.0

    ESU21/A6 ~0.8*0.6

    ESU22/A6 ~0.8*0.6

    ESU23/A6 ~0.8*0.6

    ECG22/A6 ~0.8*0.6

    ECG23/A6 ~0.8*0.6

  • REFERENCE EDMS NO. REV. VALIDITY

    SPS-E-EC-0004 1973138 0.1 DRAFT

    Page 31 of 31

    Table 13 - Equipment to be consolidated in BA6 during LS3

    Eq.

    removed Weight (kg)

    Dimensio

    ns

    (m)

    Eq.

    installed

    Weight

    (kg)

    Dimension

    s

    (m)

    Owner

    EMD109/A6 ~21000 kg 0.85*1.16 EBD1/A6 ~5000 kg 0.8*5.8 LS3 EN-EL

    EMD110/A6 0.85*1.16 ERD1/A6 0.8*8.0 LS3

    EMD111/A6 0.85*1.16 ERD2/A6 0.8*4.5 LS3

    EMD112/A6 0.85*1.16 EWD1/A6 0.8*4.6 LS3

    EMD113/A6 0.85*1.16 EBD11/A6 ~5000 kg 0.6*4.0 LS3

    EMD114/A6 0.85*1.16 EBD12/A6 0.6*2.0 LS3

    EMD115/A6 0.85*1.16 EBD13/A6 0.6*3.0 LS3

    EMD116/A6 0.85*1.16 EBD250/A6 0.4*1.8 LS3

    EMD117/A6 0.85*1.16 ERD8/A6 0.4*1.2 LS3

    1. EXISTING SITUATION AND INTRODUCTION2. REASON FOR THE CHANGE3. DETAILED DESCRIPTION3.1 Renovation of the electrical infrastructure in BA13.1.1 BA1 Current Layout3.1.2 BA1 Intermediate Layout - After LS23.1.3 BA1 Future Layout– After LS3

    3.2 Renovation of the electrical infrastructure in BA23.2.1 BA2 Current layout3.2.2 BA2 Intermediate Layout - After LS23.2.3 BA2 Future layout – After LS3

    3.3 Renovation of the electrical infrastructure in BA3 and BB33.3.1 BA3 Current layout.3.3.2 BA3 Intermediate Layout - After LS2Figure 9 illustrates the proposed layout after LS2.3.3.3 BB3 Current layout3.3.4 BB3 Intermediate layout - After LS2

    3.4 Renovation of the electrical infrastructure in BA4 and BB43.4.1 BA4 Current layout3.4.2 BA4 Intermediate layout – After LS23.4.3 BA4 Future Layout – After LS33.4.4 BB4 Current Layout3.4.5 BB4 Future Layout – After LS3

    3.5 Renovation of the electrical infrastructure in BA63.5.1 BA6 Current Layout3.5.2 BA6 Intermediate Layout – After LS23.5.3 BA6 Future Layout – After LS3

    4. IMPACT ON OTHER ITEMS4.1 IMPACT ON ITEMS/SYSTEMS4.2 IMPACT ON UTILITIES AND SERVICES

    5. IMPACT ON COST, SCHEDULE AND PERFORMANCE5.1 IMPACT ON COST5.2 IMPACT ON SCHEDULE5.3 IMPACT ON PERFORMANCE

    6. IMPACT ON OPERATIONAL SAFETY6.1 ÉLÉMENT(S) IMPORTANT(S) DE SECURITÉ6.2 OTHER OPERATIONAL SAFETY ASPECTS

    7. WORKSITE SAFETY7.1 ORGANISATION7.2 REGULATORY TESTS7.3 PARTICULAR RISKS

    8. FOLLOW-UP OF ACTIONS BY THE TECHNICAL COORDINATION9. REFERENCES10. ANNEXES10.1 Summary of the consolidation in BA110.2 Summary of the consolidation in BA210.3 Summary of the consolidation in BA310.4 Summary of the consolidation in BB3.10.5 Summary of the consolidation in BA410.6 Summary of the consolidation in BB410.7 Summary of the consolidation in BA6