Sprinter (Caf/Civity) manufacturer CAF year built 2017 - 2019 number of seats and standing capacity number of trains output Continuous output: length 3-car train set: 59.5 metres 4-car train set: 75.7 metres weight 3-car train set: 110 tonnes 4-car train set: 138 tonnes additional information The first train will run on NS tracks in 2018. It is also called the Sprinter New Generation (SNG). 118 Number of seats: 20,000 Standing capacity: 15,900