Specification for piling and embedded retaining walls • Specification • Contract documentation and measurement • Guidance notes The Institution of Civil Engineers in collaboration with the Highways Agency, Ove Arup & Partners, and the Federation of Piling Specialists 47~.’— .A~ ThE INSTITUTION OI~ Ci’ii. ENGINEERS H UGH WAYS AGENCY ARUP~ — — w — .$ 0. C’ Thomas Telford
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Distributorsfor ThomasTelfordbooksareUSA: AmericanSociety of Civil Engineers,PublicationsSalesDepartment,345East47th Street,NewYork, NY 10017—2398Japan:MaruzenCo.Ltd, BookDepartment,3—10 Nihonbashi2-chome,Chuo-ku,Tokyo 103Australia: DA BooksandJournals,648WhitehorseRoad,Mitcham3132,Victoria
A cataloguerecordfor this book is availablefrom the British Library
All rights,including translationreserved.Exceptfor fair copying, no partof thispublicationmaybereproduced,storedin a retrievals~stemortransmittedin anyform or by any means,electronic, mechanical,photocopyingor other-wise.without thepriorwritten permissionof theBooksPublisher,PublishingDivision.ThomasTelford ServicesLtd, I HeronQuay,London£14 4JD.
This book is publishe.don the understandingthat the authorsare solelyresponsiblefor thestatementsmadeandopinionsexprcssedin it and that itspublicationdoesnot necessarilyimply thatsuchstatementsand...~oropinionsareor reflecttheviewsor opinions of the ptihlishcrs.F~eixeffort hasheenmadetoeiisttre that thestatementsmadeandtheopinionsexpressediii this publicationprovide accurate no esponsibilitvof an~a safeand guide: ho\vever, liability or rkind can be acceptedin this respectby thepublishersor theauthors.SpeciFiersof piles or retaitiing walls are responsiblefor ensuring that the standardrequirementsof this specificationareappropriatefor particularprojectsandforamending the specification where necessaryfor their pr~itct5 particularcircumstaiICes.
Typesetby \VestKevLtd. Falmouth.Cornwall.
I
I The Institution of Civil EngineersSpecificationis basedon the HighwaysAgencySeries1600 SpecificationPiling andEmbeddedRetainineWallswhichis Crowncopyrightandhasbeenadaptedwith the permissionof theControllerof Her Majesty’sStationeryOffice ahdtheHighwaysAgency.
Prin ted and bound in GreatBritain by Galliard (Printers Ltd. GreatYarmouth.Norfolk.
Foreword
TheInstitution of Civil EngineersSpec2[/ication forpiling, publishedin 1988,providedanew standarddocumentationfor thedifferentpilingconstructiontechniques.It wasthewish of theWorkingPartywhich producedit thatit shouldbequotedasastandardspeciftCa-
tion in contract documentationin the sameway as the thenDepartmentof TransportSpeczficalionfor highwayworks.
ThisnewSpecificationincludesmanysignificantchangesandit isbelievedthat it cannowbe adoptedas the defaclonationalstandardfor deepfoundationworks in the UK. Its origins startedwith aworkingpartyin theICEwhosetaskwasto extendthe 1988specifica-tionto covertheincreasinglyimportantfield ofembeddedretainingwalls.In 1992,OveArup andPartnerswerecommissionedby thenowreriamedHighwaysAgencyto reviewcompletelytheAgency’sSpec~fi-
0 cationforpiling anddiaphragmwalling. Ove Arup andPartnersaskedtheICEfor permissiontousethedraftdevelopedby theworkingpat-tvon embeddedwalls and to usethe existing ICE Specification as•astartingpoint. In addition,theywereaskedby the HighwaysAgencyto ensurethat the specialistcontractors,throughtheir tradefedera-tion, theFederationofPilingSpecialists,wereconsultedthroughoutthe development.The result is anew HighwaysAgencydocumentwhichprovidesacomprehensivespecificationformostload-bearingandembeddedretainingwall techniques.
The GroundBoard of the ICE consideredthat the HighwaysAgencydocumentationcould be revisedto leaveintact the techni-calcontentof the specificationbut to removereferencesto specificAgency standardsanddocumentation,and therebyto createanational standardspecification.The Highways Agency withouthindranceagreedto the ICE usingtheir new documentationandthis generouscontribution is acknowledgedby the inclusion oftheir logo on the ICE documentation.The ICE Specificationpre-
K sented herein is the endproduct of this collaboration.This isconsideredto be asignificantstepforwardfor the UK constructionindustry as it will mean that all deepfoundationworks can beLtndertakento acommonset of rulesandexpectations,with spe-cialistcontractoi-sableto developtheir own worksproceduresto aitniversallyusablestandard.
The first part of this volumecomprisesthe Spec~ficationforpilingandembeddedretainingwalls.It is anticipatedthatspecifierswill referonly to this Specificationand that it does not needto be repro-ducedfor eachcontract.Thedocumentneedsto containonly thespecialamenclmentsto theSpecificationthat the specifierswish tomakeandtheParticularSpecificationdetailscalled ttp by eachofthe relevantchapters.The secondpatt of the volttme contatnsgttidanceon particularissues(substantiallybasedon the ContractDocumentationandMeasurement~‘olumeof the ICE Spec~ficationforpiling. 1988).andthe third partcontainsspecificusernotesforeachchapterbasedon theHighwaysAgencyNotesforguidance.Partstwo andthreewottld not form part of a contractualspecification.bttt the advicecontainedin tlwm would normally be reflectedii:
contractdocumentation.
It is the aim of the Institution of Civil Engineersthat this Speci-fication should becomethe national Speczficationfor piling andembeddedretainingwalls.It is acknowledgedthattherearemanywhowould have avaluablecontribution to makewho havenot beenconsultedin the evolution of this Specification.Anybody withcomments,correctionsor improvementswhich the~’would like tosuggestfor considerationfor inclusion in the nexteditionof thisSpecificationshouldwrite to the Chairmanof the GroundBoardat the Institution of Civil Engineers.To allow sufficient time for abody of experiencewith this Specificationto develop,aseminarwill beheldattheendof 1998to reviewitscontentandto nominateaworkingparty to re~isethe Specification.
The co-operationbetweendesignersandspecialistcontractorsand that of the Highways Agency in the developmentof thisdocumentationhasbeenexceptional,andis surelya modelof howconstructionshouldbeundertaken.As with anytaskof thisnature,theamountof time andeffort expendedin the voluntaryservicegiven by the working parties and those providing constructivecommenthas beenunstinting, and the contributions are most
gratefullyacknowledged.
0
R H WrightChairman, ICE Ground Board
Acknowledgements
1988Working Partyfor ICE Speczficationfor pilingS.Thorburn,OBE, FEng,FICE,FiStructE,FASCE,MConsE;W. G.K FlemingBSc, PhD, MICE; J. Bickerdike BSc, DIG, FICE; A.Fawcett BSc, PhD: D. J. Palmer, MA, FICE, MConsE; J. MayBSc(Eng);I. H. McFarlaneBSc(Eng);D. Waite, FlStructE,MICE;J.Woodhouse.
ICE Working Group for draft Spec~ficationfor embeddedretainingwallsF. R.D. Chartres, BSc,CGeol, MICE;J. D. Findlay (Chairman), BSc,MSc, MICE; E. T. flaws, MA, FICE, FIPENZ; D. E. Sherwood,BSc,FICE; V. M. Troughton, BSc, MICE.
0 Highways Agency Specificationfor piling and embeddedretainingwalls, 1994D.I. Bush, BSc, PhD, MICE; T. J. P. Chapman, BE, MSc, MIEI,MICE; K W. Cole, BSc, MSc, FICE; B. Simpson, BA, MA, PhD,FICE; V. M. Troughton, BSc, MICE, D. Twine, BSc, MSc, MICE.This specification benefited from earlier contributions by J.Mitchell and A. Turner.
FPSMirror Groupfor HighwaysAgencySpec~ficationA. Fawcett,BSc,PhD;J. Findlay, BSc, MSc,MICE; W. G. K fleming(Chairman), BSc, PhD, MICE; L. Stansfield, FICE, FlStructE.
ICE Specification,for piling and embeddedretaining walls,1996T. J. P. Chapman, BE, MSc, MIEI, MICE; J. Findlay, BSc, MSc.MICE; J. A. Lord, BA, MA, PhD, FICE, MConsE; M. Alexander.
I
I
Contents
Specification 1
1. General requirements for piling work 31.1. DefinitionsandStandards 3
1.1.1. Definitions 31.1.2. British Standardsandother Codesof
Practice 4
1.2. ParticularSpecification 41.3. Progressreport1.4. Pile layout, designandconstruction1.5. MaterialsL6. Safety a
.9.2.6. Time of testing 52 09.2.7. Measurementof set 539.2.8. Results 53
10. Static load testing of piles 5510.1. General 5510.2. ParticularSpecification 5510.3. Constructionof apile to betested 55
10.3.1. Notice of construction 5510.3.2. Methodof construction 5510.3.3. Boringor driving record 5510.3.4. Concretetestcubes 5510.3.5. Pi-eparationof working pile to be
tested 5610.3.6. Cut-off level 56
10.4. Supervision 5610.5. Safetyprecautions 56
10.5.1. General 5610.5.2. Kentledge 5610.5.3. Tensionpiles, reactionpilesand
17.8. Durability andprotection17.9. Piling records
9697
18. Integrity testing of wall elements18.1. Method of testing18.2. ParticularSpecification18.3. Ageof wall elementsat time of testing18.4. Preparationof headsor tops ofwall elements18.5. Specialistsub-contractor18.6. Interpretationof tests18.7. Report18.8. Anomalousresults
19. Instrumentation for piles andembeddedwalls19.1. ParticularSpecification19.2. Typeof instrumentation19.3.
19.4.19.5.19.6.19.7.
Extensometers19.3.1. General19.3.2. Rod extensometers19.3.3. MagneticextensometersInclinometersLoad cellsPressurecellsStraingauges19.7.1. General19.7.2. Straingaugesattachedto steel or
piles I ~b5.9. Precastconcrete.timberandsteel piles I 3(~5.10. Jointedprecastconcretesegmentalpiles 1385.11. Preliminarypiles I 3=5.12. Testson working piles I ~=
1.1. Definitions and In this Specificationthe terms‘submitted’, ‘demonstrated’, noti-Standards fled’ and ‘reqUired’ mean‘submitted to the Engineer’, ‘demon-1.1.1. Definitions stratedto the Engineer’, ‘notified to the Engineer’and ‘required
by the Engineer’respectively.
Allowable pile capacity: a capacity which takesinto account thepile’s bearingcapacity, the materialsfrom which the pile ismade,the requiredloadfactor,settlement,pile spacing,down-drag, the overall bearingcapacityof the ground beneaththepiles and other relevant factors. The allowable pile capacityindicates the ability of the pile to meet the specified loadingrequirementsand is thereforerequiredto benot lessthan the
specifiedworkingload.Commencingsurface:is the level at which the piling equipment
first enterstheground.This neednot be the sameas the piling0 platform level.Compressionpile: a pile which is designedto resistanaxial force
suchas wouldcauseit to penetratefurther into theground.Constantrateof penetration(CRP) test: a testin which the pile is
madeto penetratethe soil ataconstantcontrolledspeed,whilethe force appliedat the top of the pile to maintainthe rateofpenetrationis continuouslymeasured.
Constant rateof uplift (CRU) test: a testin which thepile is madeto lift out of the soil ata constantcontrolledspeed,while theforce applied at the top of the pile to maintain the rate ofextractionis continuouslymeasured.
Cut-off level: is the level to which the pile concreteis trimmed inorderto connectthe pile to the structure.
DesignVerification Load (DVL): a loadwhich will besubstitutedfor the SpecifiedWorking Load for the purposeof a test andwhichmar be appliedto an isolatedor singlyloadedpile at thetime of testingin thegiven conditionsof the Site.The loadwillbe particularto eachPreliminaryor other testpile andshouldtake into accountthe maximumSpecifiedWorking Load for apile of the samedimensionsand materials,allowancesfor soilinducedforces such as downdrag(which may act in reverseunder temporal-v loading conditions), pile spacing and anyotherJ)articularconditionsof the testsuchasavariationof pileheadcastinglevel.
Kentledge:deadloadusedin a loading testLoad:a forceappliedto a pile undertest or in service.Load factor: theratio betweenthepilesultimatebearingcapaclt\
andmaximumsafebearingcapacity.The loadfactorrelatesonlyto the failure of tV’e pile—soil interface.Theallowablepile capa—city is determinedfrom the maximum safe bearingcapacitymakingall necessaryallowances.
Maintainedload test: a loading test in which eachinci-ement ofloadis heldconstanteitherfor a definedperiod of time or until
the rateof movement(settlementor uplift) falls to a specifiedvalue.
Pilesettlement:Theaxial movementat the top of thepile from tV
Specificationfor piling andembeddedretainingwalls. Thomas Te~ford, London, 1996. 3
positionbefore thecommencement/startof loading.For pilesloadedandunloadedthrough a numberof cycles, settlementshallbe the cumulativeverticalmovement.
Preliminary pile: a testpile installedbeforethecommencementofthe main piling worksor specificpartof theWorks.
Proof load: a load applied to a selectedworking pile to confirmthatit is suitablefor the loadatthesettlementspecified.A proofload shouldnot normallyexceedthe DesignVerification Loadplus 50% of the SpecifiedWorking Load.
Raking pile: apile installedat an inclination to thevertical.Reactionsystem: the arrangementof the kentledge,piles,anchor-
agesor spreadfoundationsthat provide a resistanceagainstwhich the pile is loadtested.
Resistance:theforcedevelopedby a pile in responseto a load.SpecifiedWorking Load (SWL): the specifiedloadon the headof
the pile as statedin the relevantParticularSpecification.Tensionpile: apile which is designedto resistan axial forcesuch
aswould causeit to beextractedfrom the ground.Testpile: anypile to which atest loadis, or is to be,applied.Ultimate bearing capacity: themaximum resistanceofferedby the
pile when the strengthof the soil is fully mobilized. If the 0ultimate bearingcapacityis to be derivedfrom a test in whichthe displacementis not largeenoughto mobilize thestrengthof the soil fully, the ultimate bearingcapacitymaybe derivedfrom an extrapolationof the testresults.
Working pile: one of the piles forming the foundation of astructure.
1.1.2. British Standards All materialsand workmanshipshall be in accordancewith theand other Codes of appropriateBritish Standards,Codesof Practiceandotherspeci-Practice fled standardscurrent at the date of tender exceptwhere the
requirementsoftheseStandardsor CodesofPracticearein conflictwith this Specification in which case the requirementsof thisSpecificationshall takeprecedence.
1.2. Particular The following mattersare, where appropriate,describedin theSpecification ParticularSpecification:
(a) supervisingofficer(b,) locationanddescriptionof the site(c~ natureof the works(d) workingarea(e,) sequenceof theworks(J) otherworksproceedingat thesametime(g) contractdrawings(12) office andotherfacilities for the Engineer(i,) submissionof information (in addition to Table 1.1)Q) responsibilityfor design(.4) performancecriteria for the structureto be supportedon
the piles(1) performancecriteria for pilesundertest (seeTable 1.3)(in) permissibledamagecriteria for existingciitical structures
or services0?) site datumandsite grid(0) restrictionson permissibleworking hours(‘p) detailsof groundinvestigationreports(q) additional ground investigation(r) conixnencingsurface(s) other particular requirements
I
4 Specification forpiling and embedded retaining walls. Thomas Telford. London, 1996.
1.3. ProgressReport
1.4. Pile layout,designandconstruction
TheContractorshallsubmitto theEngineeron thefirst dayof eachweekaprogressreportshowing thecurrentrate of progressandprogressduringthepreviousperiodon all importantitemsof eachsectionof theWorks.
Option 1 — Con tractor design
The Contractoris requiredto designandconstructpileshavingthe qualities of materialsandworkmanshipspecifiedandwhichupon testing meet the requirementsof the Specification forload—settlementbehaviour. The Contractor~sdesign shallcomprisethe calculationof individual pile lengthsbasedon theground conditionsrevealedby the site investigationto carry theSpecified Working Loads within the specified limits forload—settlementbehaviour.
The Contractorshallprovidewith his tenderascheduleof sizesandlengthsoftheworkingpilesincludingreinforcementandtheircorrespondingallowablecapacitiesto meet the requirementsofthe Specification.
Option2 — Engineerdesign
The Contractoris requiredto constructpiles of the type(s) anddimensionsspecifiedand having the qualitiesof materialsandworkmanshipspecified.Beforethecommencementof installationof theworkingpilestheContractorshallprovidetheEngineerwithascheduleof pile sizesandlengths.
1.5. Materials
1.6. Safety1.6.1. Standards
1.6.2. Life-savingappliances
1.6.3. Diving
1.7. Ground conditions
K
The sourcesof supplyof materialsshall not be changeduntil theContractorhas demonstratedthat the materials from the newsourcecan meetall the requirementsof the Specification.
Materials failing to comply with the Specificationshall be re-movedpromptlyfrom the site.
Safetyprecautionsshall complywith all currentlegislationinclud-ing the Health andSafety at Work Act 1974 or any subsequentre-enactmentthereofandwith BS 8004 and BS 8003.
The Contractorshall provide andmaintain on the Site sufficientproperandefficient life-savingappliances.The appliancesmustbeconspicuousandavailablefor useatall umes.
Site operativesshallbe conversantwith the useof safetyequip-mentanddrills shallbe carriedout sufficientlyfrequentlyto ensurethat all necessaryprocedni-escan becorrectlyobserved.
Diving operationsshall be carried out in accordancewith theDi~ing Operationsat Work Regulations(198]), Health andSafetyExecutive Publication 399, and any amendmentsor additionsthereto.
Before anydiving is undertakentheContractorshallsupply theEngineerwith two copiesof the codeof signalsto be employed.~nd shall haveacopy of the Codeprominentlydisplayedadjacentto the diving control station on the craft or structurefrom whichanydiving operationtakesplace.
No responsibilityis acceptedby theEngineeror Emploxerfor anyopinions or conclusionsgiven in any factual or interpretativegroundinvestigationreports.The Contractorshall reportimmedi-atelv to theEngineeranx circumstancewhich indicatesthat in theContractor~~opinion the ground conditionsdiffer from those
0
Specification forpiling and embedded retaining walls. Thomas Telford, London, 1996. 5
Table 1.1. Submissionofinformation. (Thefollowingsubmissionsshall be madeto theEngineerat thetimestated. Detailedrequirementsare listedunder the clausenumberindicatedin the relct’antposition.)
Section item AtTender
Prior tocommencingthe_War-ks
1.10
1.12.21.12.31.131.13
Duringthe Works
progress ReportPile layout, design and constructionPiling methodPiling programmeIRecordsMonitoring surveysIPiling sequenceSupervisorIOuallty Plan
IA.11.9
i.io
1.3
110
2 Material test recordsPile jointsMeans of maintaining concrete coverPrestressing recordsIGrouting recordsPile qualityHandling, loading of pilesPerformance of driving equipmentLength of pliesDriving procedureUplift and lateral displacement
24.2
2.122.13.3
2.3
2.9.32.9.122.10
2.13.42.13.52.13.7
3 Permanent casingStability of pile borecontinuity of construction .Means of maintaining concrete coverPressure grouting methodUplift reference framePressure grouting records
3.6.23.6.33663 73112.2
3.12.4 3.12.6
4 Monitoring grout propertiesIMonitoring system and records
4.8.24.10 4.10
5 Performance of drivihg equipmentILength of plIesDriving procedureUplift and lateral displacementMeans of maintaining concrete cover
5725.73
5.11
5.7.45.7.6
6 ordering of pliesInspection and test certificatesWelding proceduresManufacturing processesWeld testsProtection coatsIPerformance of driving equipmentLength of pilesDriving procedureUplift and lateral displacement
6.3
6.66.7
6.11.2
6.4.8
6.8.26.9.9
6.11.36.11.46.11.6
7 Origin of hardwoodInspectionTreatment with preservativePerformance of driving equipment .Length of pilesDriving procedureUplift and lateral dispiacement
10 Load application system• Notice of start of construction
Inclined piles for tension tests• Use of working piles as reaction
Adequate reactionMeasurement of loadNotice of testResultsRecoroed data
10.110.3.110.6.2
10.6.310.6.510.810.1210.14.110.14.2
6
0
Specification for piling and embedded retaining walls. Thomas Telford, London, 1996.
Table 1.1. Continued
Section Item AtTender
Prior to Duringcommencing the Works
the Works19 Instrumentation supplier etc.
Inclinometer-sCalibration and data checking
~Specialist Instrumentation contractor
19.219.419.8.2
19.8.419.8.5
•20 Types of cementCertificates of cement conformityWater testsConcrete workabllliltyEvidence of ASR complianceDetailed information on concrete mixTrial mixesWorkability of each batchConcrete cube tests
20.2.120.2.120.4.2
20.6.220.6.220.6.320.7.2
20.8.220.8.3
21 Support fluId mix 21.1Use and complIance 21.3
reportedin or which could havebeeninferredfrom thegroundinvestigationreportsor preliminarypile results.
1.8. Tolerances1.8.1. Setting out
1.8.2. Position
1.8.3. Verticality
1.8.4. Rake
1.8.5. Forciblecorrections to piles
1.9. Piling method
1.10. Pilingprogramme
Marker pinsfor the pile positionsshallbe setout andinstalledbythe Contractor.Immediatelyprior to installationof the piles, thepile positionsshallbe checkedby the Contractor.
Forapile with aspecifiedcut-offlevelator abovethecommencingsuifacethemaximumpermitteddeviationof thepile centrefromthe centre-pointshownin the setting-outshallbe 75 mm in anydirectionatcommencingsurfacelevel.An additionaltoleranceforapile with aspecifiedcut-off levelbelow commencingsurfacewillbe permittedin accordance~~ithClauses1.8.3and/or1.8.4.
The maximum permitteddeviationof the finished pile from theverticalat anylevel is 1 in 75.
Themaximumpermitteddeviationof anypart of thefinishedpilefrom the specifiedrakeis I in 25 for piles rakingup to 1 in 6 andI in 15 for pilesraking morethan I in 6.
Forciblecorrectionsto concretepiles to overcomeerrorsof posi-tion or alignmentshall not be made.If forcible correctionsaremade to steel piles the Contractorshall demonstratethat theintegrity, durability andpeiformanceof the piles havenot beenadverselyaffected.
TheContractorshall submitwith his tendei-all relevantdetailsofthe method of piling, the plant and monhoringequipmentheplansto adopt.Alternativepiling methodsmay be usedprovidedit is demonstratedthat theysatisfythe requirementsof theSpecifi-cation.
The Contractorshall submit a provisional programmefor theexecution of the Works at the time of tender and a detailedprogrammeprior to commencementoftheWorks.Heshall informthe Engineereachdayof the intendedprogrammeof piling forthe following dayandshall give 24 hours’ noticeof his intentionto work outside normal hours and at weekends.where this ispermitted.
‘U
I
Specification forpiling and embedded retaining walls. Thomas Telford, London, 1996, 7
i.ii. Records The Contractorshall keeprecordsas indicatedby an asteriskinTable 1.2 for the installation of eachpile andshall submit twosignedcopiesof theserecordsto theEngineernot later thannoonof the nextworking day after the pile was installed. The signedrecordswill form arecordof the work.
Any unexpecteddriving or boring conditionsshall benotedintherecords.
Table 1.2. Recordsto be kept (indicatedby an asterisk)
Notes
1. Pile types: A Driven precast concrete and steel pilesB Driven segmental concrete pilesC Driven cast-in-place concrete piles0 Bored cast-in-place concrete pilesE continuous flight auger concrete or grout piles
2. All levels shall be relative to the Datum specified in the Particular specification
3. All times shall be given in 24 hour format
Pile type
Data. A B C D E
contract * *
Pile reference number Ilocationi * *
* * *
Pile typeNominal cross-sectional dimensions or diameter * *
Nominal diameter of underream/baseLength of preformed pileStanding groundwater level from direct observation * *
or given site investigation dataDate and time of driving, redriving or boring from *
startto finish * *
Date of concreting * *
Ground level at pile position at commencement ofinstallation of pile (commencing surfacel * * * *
Working level on which piling base machine stands * *
Depth from ground level at pile position to pile toe * * * *
Toe level * * *
Pile head level as constructed * * *
Pile cut-off level *
Length of temporary casingLength of permanent casing 0
Type, weight, drop and mechanical condition ofhammer and equivalent information for other 0 *
equipmentNumber and type of packing used and type andconditions of dolly used during driving of the pile
set of pile or pile tube In millimetres per-lablows or number of blows per 25 mm of penetration
Temporary compression of ground and pileDriving resistance taken at 0.25 m Intervals *
Soil samples taken and in-situ tests carried out * * *
during pile formation or adjacent to pile positionLength and details ofand cover-to reinforcement * *
Concrete mix * *
Volume of concrete supplied to pile where thisis practical * *
All information regarding obstructions delays andother interruptions to the sequence of work
Pile forming equipment including rig no. *
Description of ground excavated *
Depth from commencing surface to changes in strataand to standing ground water and any fluctuations
Depth to average levels of concrete surface beforeand after withdrawing temporary lining
Type, torque, assessed efficiency of motorDepth to concrete surface after every concrete-loadFor raking piles, angle of rakeSupport fluid tests *
Monitoring information referred to in Section 4,8Level of top of reinforcement cage, as constructed
‘Ueup
I’
Pt’cm’
PfI
N
ml
Ni
K— I
UB Specification forpiling and embedded retaining walls. Thomas Telford, London, 1996.
The Contractorshallcarryout the work in sucha mannerandatsuch timesas to minimizenoise,vibration andotherdisturbancein orderto complywith currenten~ironmentallegislation.
Permissibledamagecriteriafor adjacentstructuresor servicesaregiven in the ParticularSpecification.If in the opinion of theContractordamagemaybe causedto otherstructuresor servicesby his executionof the Works he shall immediately notifx- theEngineer.TheContractorshallsubmithisplansfor makingsurveysand monitoring movementsor vibration beforethe commence-mentof the Works.
The Contractorshall ensurethat duringthe courseof the work.displacementor damagewhich wouldimpair eitherperformanceor durabilitydoesnot occurto completedpiles.
The Contractorshall submit to the Engineerhis plannedse-quenceandtimingfor driving or boringpiles,havingregardto theavoidanceof damageto adjacentpiles.
TheContractorshallensurethatwhererequired,anypermanentlyfree-standingpiles are temporarilybracedor stayedimmediatelyafter driving to preventlooseningof thepiles in theground andto ensurethatno damageresultingfrom oscillation, vibration ormovementcan occur.
The Contractorshall keep upon the Works a competentsitesupervisorto be in chargeof pile constructionandinstallation.
The site supervisormust be experiencedin the type of pileconstructionnecessitatedby the Contract.A curriculum vitae ofthe supervisorshall be submittedprior to commencement.Thewhole time of the site supervisorshall be devotedto the pilingworks. The site supervisoi-shallnot be removedfrom the Workswithout theEngineerbeingnotified in advancewith atleastoneweek’snotice.
TheContractorshallsubmitoneweekprior to commencementof piling works his Qualit~- Plan for the Works. Subsequentrevi-sions,amendmentsor additionsshall be submittedprior to theirimplementation.Quality-AssuranceandQualityControldocumen-tation shallbemadeavailableon request.
Table1.3. Performancecriteriafor I)iles
Permittedsettlementat DVL.mm
Permittedsettlementat DVL+
1SWL,mm
lkNl
Maximum Maximumsettlement settlement
40
PileRef.Nos
Permittedtypeisi —
SpecifictionSection No.
Specifiedworkingload
Piledesig-nation
Loadfactor
DesignverificationLoad DVLlwhereapplicablel
Minimumpilelengthfromcut-offto toe
lkNl
K’
Minimumpilediameterordimensionsof cross-Section
Specification for piling and embedded retaining walls. Thomas Telford. London, 1996. 9
Precastreinforced and prestressedconcretepiles and precast reinforced concretesegmentalpiles
2.1. General
2.2. ParticularSpecification
All materialsandwork shallbein accordancewith Sections1, 2 and20 of this Specification,exceptwhere there may- be conflict ofrequirements,in which casethis Sectionshall take precedence.
The following mattersare, ~~-hereappropriate,describedin theParticularSpecification:
(a) specifiedworkingloads(b) additional performancecriteria for pilesunder test (also
seeTable 1.3)(c)(d)(e)(f}
(g)
(Iz)(i)(I)(k)(1)(in)
(12)
(o)
(p)(q)(r)
tvperof cementtypesandsizesof aggregategradesof concretedesignedor prescribedmixesandmaximumfreewatertocementratiomethodof testingconcreteworkabilitygradesandty’pes of andcoverto reinforcementtypesof prestressingtendongroutmarkingof pilespenetrationor depthor toe leveldriving resistanceor dynamicevaluationor settrial drives
p-elin~inarypilesuplift/latei-al displacementtiialspile shoes(whererequired)preboring or jetting or other means of easing piledriveability
2.4. Materialsandcomponents2.41. Steel and ironcomponents
The Contractorshall ensurethat thepilesateavailablein timeforincorporationin theWorks.All pilesandproductionfacilities shallbe madeavailablefor inspectionat anytime. Pilesshall beexam-ined at the time of clelivei-v and any faulty units x-eplaced.Therecordsof testingof the concreteandsteel usedin the pilesshallbe submitted.
In the manufactureof precastconcretepilesandjointed pt-ecastconcretesegmentalpiles. fabricatedsteelcomponentsshallcomplywith BS 4360Grades43A or 50Aor BS ENIO 025 GradesFe 430Aot- Fe 510A, caststeel componentswith BS 3100,gtacleA (Al, A2or A3) andductileu-on componentswith BS 2789 Grades420/12.40(1,”] S or350~
2.
0
&
10 Specification forpiling and embedded retaining walls. Thomas Telford, London, 1996.
Thejointsshallbe close-fittingfaceto faceandthelockingmethodshallbe suchas to hold thefacesin intimatecontact.Detailsof thedesign, manufactureand tests of the jointing systemshall besubmittedprior to the commencementof theContract.
Thewelding of ajoint to mainreinforcementin lieu of a]appedconnectionwith projectingbarsaffixed to thejoint shall not bepermitted.
Eachpile joint shall be squareto the axis of the pile within atoleranceof 1 in 150. The centroidof the pilejoint shall lie within5 mm of thetrue axisof the pile element.
Pile toesshall be constructedso as to ensurethat damageis notcausedto thepile duringinstallation.
Pile headsshallbe so reinforcedor bandedas to preventburstingof the pile underdriving.
The cross-sectionaldimensionsof the pile shall be not less thanthosespecifiedand shall not exceedthem by more than6 mm.Eachfaceof apile shallnot deviateby morethan6 mm from anx-straightline 3 m longjoining two pointson thatface,nor shall thecentreofareaof thepile atanycross-sectionalongitslengthdeviateby more than 1/500 of the pile length from a line joining thecentresof areaat theendsof thepile. Wherea pile is lessthan3mlong the permitteddeviationfrom straightnessshallbe reducedbelow 6 mm on apro ratabasis in accordancewith actual length.
The headof apile elementor theendof the pile uponwhichthe hammeractsshallbesquareto the pile axiswithin atoleranceof 1 in 150.
Themainlongitudinalreinforcingbarsin pilesnotexceeding12min length shall be in onecontinuouslength. In piles more than12 m long,jointswill bepermittedin main longitudinalbarsso thatthenumberofjoints is minimized.Jointsin reinforcementshallbesuch that the full su-engthof the bar is effective acrossthejoint,following theguidanceof BS 8110.
Lap or splicejointsshallbe providedwith sufficient link barstoresist eccentricforces. Reinforcementshall be incorporatedforlifting andhandlingpurposes.
Spacersshall be designedand manufacturedusing dutablematerialswhich shallnot leadto corrosionof thereinforcementorspallingof the concretecover. Details of the meansby which theContractorplansto ensurethecorrectcoverto andpositionof thereinforcementshallbesubmitted.
If a pile is constructedwith a shapedpoint or shoe,thentheendof the pile shallbe symmetricalaboutthe longitudinal axisof thepile. Holesfor handlingor pitching,whereprovidedin thepile, shallbe lined with steel tubes:alternatively,insertsmay becastin.
Spacersshall be designedand manufacturedusing durablematerialswhichshallnot leadto corrosionof the reinforcementorspallingof the concretecover. Detailsof the meansby which the
0
Specification for piling and embedded retaining walls. ThomaS Telford, London, 1996. 11
Formworkshallbe robust,cleanandso constructedas to preventloss of grout or aggregatefrom the wet concreteandensuretheproductionof uniform pile sections,free from defects.The pilesshallbe removedfrom the formworkin suchamannerthatsignifi-cantdamageto the pile is prevented.
Themethodof placingandcompactingthe concreteshallbesuchas to ensurethat the concretein its final position is denseandhomogeneous.
Immediatelyafter compaction,concreteshallbe adequatelypro-tectedfrom the harmful effectsof the weather,including wind,rain, rapid temperaturechangesandfreezing. Curing shall becarriedout in accordancewith BS 8110.
Pilesshallnot be removedfrom formwork until a sufficientpileconcretestrengthhasbeenachievedto allow thepile to behandledwithout significantdamage.
When acceleratedcuring is used the curing procedureshallensureno deleteriouseffects to the pile. Fourhoursmust elapsefrom thecompletionof placingconcretebefore the temperatureis raised.Therisein temperatureof theconcretewithin anyperiodof 30 minutesshall not exceed100Candthe maximumtempera-tureattainedshallnotexceed700C.Therateofsubsequentcoolingshallnot exceedthe rateof heating.
The Contractorshall ensurethat the Engineeris given adequatenoticeandeveryfacility for inspectingthe manufacturingprocess.
Prestressingoperationsshall be carried out only under thedirectionof an experiencedandcompetentsupervisor.All person-nel operatingthe stressingequipmentshall havebeentrained inits use.
The extensionsandtotal forces,includingallowancefor losses,shallbe calculatedbeforestressingcommences.
Stressingoftendonsandtransferofprestressshallbe carriedoutat agradualandsteadyrate. The force in the tendonsshall beobtainedfrom readingson arecentlycalibratedloadcell or pres-suregaugeincorporatedin the equipment.The extensionof thetendonsunderthe total forcesshall bewithin 5% of the calculatedextension.
The Contractor shall cast sufficient cubes,cured in the samemanneras the piles, to be ableto demonstrateby testingtwo cubesata time, with appropriateintervalsbetweenpairsof cubes,thatthe necessaryin Situ strengthof the concretehasbeenreached.
Concretein the piles shall not be stresseduntil two test cubesattain thenecessarystrength.
The Contractorshall keepdetailedrecordsof timesof tensioning.measuredextensions,pressuregaugereadingsor load cell readingsandtheamountof pull-in at eachanchorage.The Contractorshallalsocheckthecoverto reinforcementof eachpile andshallensureit isatleastthatspecified.Copiesof theserecordsshallbesubmittedwithin such reasonabletime from completionof eachtensioningoperationas ma\’ be required,andin anycasenot laterthannoonon the following working day.
0
(__
12 Specification for piling and embedded retaining walls. ThomasTelford, London, 1996.
2.9.4. Post-tensionedpiles
2.9.5. Groutingprocedure
2.9.6. Grout
0
2.9.7. Testing Worksgrout
2.9.8. Batching grout
2.9.9. Mixing grout
2.9.10.grout
Transporting
2.9.11. Placing grout incold weather
Apart from the requirementfor ductsandventsin post-tensionedpilesto begroutedafterthe transferof prestress,therequirementsfor pre-stressedpiles apply. Where specified in the ParticularSpecification,facilities shall be provided for retensioningpilesafterdriving.
Grout shall be mixed for a minimum of 2 minutesand until auniform consistencyis obtained.
Groutfor prestressingshallhavethe following properties.
(a) The design and workability of grout to be used in theformationof pilesshallproducea mix which is suitableforpumping.
(b,) Grout shall consist only of Portlandcement,water andadmixtures.Admixturesareonly to be usedin accordancewith theManufacturefsinstructionsandshall compl~’withSection21.
(c,) Grout shall haveawater/cementratio as low as possibleconsistentwith the necessarvworkability, and the watercementratio shallnot exceed0.40.
(d,) Groutshall not bleedin excessof 2% after 3 hours,or amaximumof4%,whenmeasuredat 180Cin acoveredglasscylinderapproximately100 mm in diameterwith aheightof grout of approximately100 mm, andthewatershall bereabsorbedafter 24 hours.
Cubestrengthtestingshall be carriedout in accordancewith BSiSSi. A sampleshall consistof asetof six 100mmcubes.Threecubesshall be testedatseven daysandthe remainingthreeat 28daysafter casting.
The weighing andwater-dispensingmechanismsshall be main-tainedat all timesto within the limits of accuracydescribedin BS1305.
The weightsof eachcomponentof the mix shallbewithin 2%of the respectiveweightsper batch.
The groutshallbe mixed on site until a homogeneousgrout isobtainedandshallbekeptin continuousmovementuntil it is usedl.It shallbe usedwithin 30 minutesfrom thestartof mixing. Follow-ing mixing. the grout shall be passcdl through a 5 mm aperturesieveandi shallbe remixedif lumpsareretained.
Grout shall be transportedfrom the mixer to the l)osition of thepile in sucha mannerthat segregationd.f the mix doesnot occur.
Grout shall have a minimum temperatureof 50C when placed.
No frozen material or material con tainin~ ice shall be used for
C
(V
Specification forpiling and embedded retaining walls. Thomas Telford, London. 1996. 13
makinggrout.All plant andequipmentusedin the transportingandplacingof groutshallbe freeof ice that couldenterthegrout.
2.9.12. Records
2.10. Pile quality
2.11. Marking of piles
2.12. Handling,transportation andstorage of piles
2.13. Driving piles2.13.1. strength ofpiles
2.13.2. Leaders andtrestles
2.13.3. Performance ofdriving equipment
TheContractorshallkeeprecordsof grouting,including thedate,the pro.portionsof thegrout andany admixturesused,thepres-sure, detailsof interruptionand toppingup required.Copiesoftheserecordsshallbe submittedwithin suchreasonabletimeaftercompletionof eachgroutingoperationas maybe required,andinanx’ casenot laterthannoonon the following working day.
A certificateof qualityfrom thepile manufacturershallbeprovidedstating that the requirementsof this Specificationhavebeenful-filled during manufacture.
~~~iththe recordsof manufacturewhich shall state the date of
casting, the cement~pe, concretegrade, elementlength, theprestressingforcewhereappropriateandanyotherrelevantdata.On deliverythe pilesshallbe accompaniedby recordsof manufac-ture.Lifting positionsshallbemarkedon eachpile in accordancewith the requirementsof design.
The methodandsequenceof lifting, handling, transportingandstoringpilesshallbe suchas to avoid shockloadingandto ensurethatthepilesarenotdamaged.Only designedlifting andsupportpointsshall be used.During transportandstorage,pilesshallbeappropriately’supportedunder themarkedlifting pointsor fullsupportedalongtheir length.
All pileswithin a stackshall be in groupsof the samelength.Packingof uniform thicknessshallbeprovidedbetweenpilesatthelifting points.
Concreteshallat no time be subjectedto loading,including itsown weight,whichwill inducea stress it exceedinocompressive in0.33 of its strengthat the time of loading or of the specifiedstrength,whicheveris the lesser.For this purposethe assessmentof thestrengthof the concreteandof thestressesproducedby theloadsshallbe submitted.
A pile shall be rejectedwhen the width of anytransversecrackexceeds0.3mm.The measurementshallbe madewith the pile inits workingattitude.
Pilesshallnotbedrivenuntil theconcretecubeshaveachievedthespecifiedcharacteristicstrengthand the pile has attained thestrengthto resistdriving stresses,whicheveris the greater.
At all stagesduringdriving anduntil incorporationinto thestruc-turethepile shallbeadequatelysupportedandrestrainedby meansof leaders,trestles,temporarysupportsor other guide arrange-mentsto maintainposition andalignmentandto preventsignifi-cantdamageto the pile
The efficiency and energyof the driving equipmentincludingwhenfollowers are usedshallbe notified. \Thererequiredin theParticularSpecification.dynamicevaluationandanalysisshallbeprovided.
Wherea drop hammeris used,themassof thehammershallbeat leasthalf thatof the pile. Forothertypesof hammertheenergydeliveredto the pile per blow shall be at leastequivalentto thatof
0
K
Q
14 Specification forpiling and embedded retaining walls. Thomas Telford, LondOn, 1996.
2.13.4. Length ofpiles
a drop hammer ofthestatedmass.Drophammersshallnotbeusedfrom floating craft in such a manneras to causeinstability of thecraftor significantdamageto the pile.
The length of pile to be driven in anyp9sition shall complywiththeContractor’sscheduleunlessotherwisespecifiedin theParticu-lar Specification.During the executionof the Woi~ks anx amend-mentsto thescheduledlengthsshallbe reportedto theEngineergiving adequatenoticeprior to installationof the pilesconcerned.
of the driving of the first pile.The Contractorshallgive adequatenoticeandprovideall nec-
essaryfacilities to enabletheEngineerto checkdriving resistances,setsandtemporarycompressions.
The driving of eachpile shallbecontinuousuntil the depthorset as required by the design hasbeenreached.In the eventofunavoidableinterruption to driving, the pile may be redrivenprovided it can subsequentlybe driven to the designeddepthand/orresistanceor setwithout damage.A follower shallnot beusedunlessthe setis revisedwhereapplicablein orderto takeintoaccountreductionin the effectivenessof thehammerblow.
Driving recordsshallbe madefor evervpile. This record shallcontaintheweightandfall of thehammeror ramandthenumberof blowsfor each0.25 in of penetration,unlessotherwisespecifiedin theParticularSpecification.
The Contractorshall inform the Engineerwithout delayif anunexpectedchangein driving characteristicsis noted.
The set and temporarycompressionshall be measuredand re-cordedforeachpile at thecompletionof driving unlessotherwisestatedin theParticularSpecification.
Whenaset is beingmeasured,the following requirementsshallbe met.
(a) The exposedpart of the pile shall be in good conditionwithout damageor distortion.
(b,,) The helmet,dolly andanypackingshall be in soundcon-di ti on.
(7,) Thehammerblowshallbein line with the pile axisandtheimpactsurfacesshallbe flat andat right anglesto the pileandhammeraxis.
(d) The hammershall be in good condition, delivering ade-quateenergyperblow, andoperatingcorrectly.
(7,) The temporarycompressionof thepile shall be recordedif required in theParticularSpecification.
Thesetshallberecordedeitheras thepenetrationin millimetre5per 10 blows or as the numberof blows required to produceapenetrationof 25 mm.
2.13.7. Drivingsequence and risenpiles
K~.
Piles shall be driven in a seqtienceto minimise an~’ detrimenuti
effects of heave and lateral displacementof the grotind. Thesequenceand method of piling including preboring shall limituplift andlateralmovementso that the final position of each pileis within the specified tolerances.At all times the deflectionsofeachpile from its axisasdriven shallnotbe suchas to causedamageor impair durability of the pilesor anystructuresor services.
The maximumpermitted uplift of eachpile cltie to am onepiledriven within a pile centreto centreradiusof eight pile diameters
Specification forpiling and embedded retaining walls. Thomas Telford, London, 1996. 15
is 3 mm unlessit can bedemonstratedby static load testingthatuplift exceedingthisamountdoesnot affect theability of the pileto meetthe requirementsof thisSpecification.
Evenif duringtheinstallationof preliminarypilesuplift is shownto be within the permitted maximum andthe preliminary pilestestedmeetthe requirementsof theSpecificationchecksof uplifton working pilesshallbe madeby the Contractoratleastonceaweek throughoutthe period of the piling work and the resultsreportedto theEngineer.
If preliminarypilesare not installed the Contractorshallcom-menceinstallationof workingpiles takingmeasuresto reduceoreliminateuplift until it can be establishedby site measurementsthatsuchmeasuresare no longernecessary.Thereafterchecksonuplift shallbe madeby theContractoratleastonceaweekandtheresultsreportedto the Engineer.
If a static loadtest showsthatapile which uplifted more thanthe maximumpermittedamountdueto anypile driven within aradiusof eightpile diametersdoesnot complywith the require-mentsof theSpecificationall suchpilesthatmax’ havebeenupliftedshallbe redriven.
If recordsandmeasurementsshowthatpileshavebeenlaterallydisplacedsoas to be outsidethepermittedtolerance,damagedorare of impaired durability the measuresthe Contractorplans toadoptto enablethe pilesto complywith the Specificationshallbeprovidedto the Engineer.
Laterallydisplacedpilesshallnot be correctedby forcible cor-rection.at the heads.
2.13.8. Prebo ring
2.14. Repair andlengthening of piles2.14.1. Repair ofdamaged pile heads
If preboringis specified,thediameteranddepthof preboreshallbe as stipulatedin theParticularSpecification.
Other meansto easepile drivability maybe usedprovidedthecompletedpilesmeetthe requirementsof the Specification.
If it isnecessaryto repairtheheadof apile beforeit hasbeendrivento its final level, theContractorshall carryout stich repairin awaywhich allows the pile-driving to be completedwithout furtherdamage.If the driving of a pile hasbeencompletedbut the levelof soundconcreteof the pile is belowthe requiredcut-offlevel, thepile shall be madegood to the cut-off level, or the pile cap orsubstructuremaybelocallydeepened,so thatthecompletedfoun-dation will safelywithstandthe specifiedworkingload.
Any provision for lengtheningpiles incorporatedat the time ofmanufactureshall be designedby the Contractor to resist allstressesto which it maybe subjected.
If no provision for lengtheningpileswas incorporatedat thetime of manufacttire,any methodfor lengtheningshall be suchthat the extendedpile including anyjoints is capableof takingsafely the sttessesduringdriving andunderload.
Repairedor lengthenedpilesshall not he driven until cubesfor theaddedconcretehavereachedthe specifiedcharacteristicstrengthof theconcreteof thepile.
0
16 Specification forpiling and embedded retaining walls. Thomas Telford, LondOn, 1996.
2.15. Cutting off pileheads
When the driving of apile hassatisfiedthe Specification require-mentsthe concreteof the headof the pile shallbe cut off to thelevelspecified.Reinforcingbarsprojectingabovethislevelshallbeas specified.
Careshall be takento avoid shatteringor otherwisedamagingthe restof the pile. An~’ crackedor defectiveconcreteshallbe cutawayandthe pile repairedto providea full andsoundsection tocut-offlevel.
I
I0
Specification for piling and embedded retaining walls. Thomas Te!ford, London, 1996. 17
3. Bored cast-in-placepiles
3.1. General
3.2. ParticularSpecification
All materialsandworkshallbe in accordancewith Sections1, 3 and20 of this Specification,exceptwherethere may be conflict ofrequirements,in which casethis Sectionshall takeprecedence.
The following mattersare, whereappropriate,describedin theParticularSpecification:
(a) specifiedworkingloads(b~ additional performancecriteria for piles undertest (also
Wheresupportfluid is usedto maintainthe stabilityof theexcava-tion it shall be in accordancewith Section21.
TheContractorshallcheckthecasingpositionforeachpile duringand immediatelyafter placing of the casing.Any checksby theEngineershallnot relievetheContractorof his responsibility.
The diameterof apile shallbe not lessthanthespecifieddiameter.Theaugerwidth shallbe checkedas necessaryandrecordedfor
eachpile to ensurethe specifieddiameteris achieved.A toleranceof 5%. on theaugerwidth is permissible.
Piles shall be bored in an order and in such a mannerthat nosignificantdamageis sustainedby previouslyformedpiles.
Temporarycasingsshall be of quality of material, length andthicknessadequatefor thepurposeof preventingwaterandunsta-ble soil from entering the pile excavations.A short length oftemporary casing shall be provided for all piles to provide anupstandof at leastI m abovesurroundinggroundlevel for safetyand to l)re\e1~tcontamination of the concretein thebore.
I0
18 Specification for piling and embedded retaining walls. Thomas Telford, London, 1996.
Temporarycasingsshall maintainthe excavationsto their fulldimensionsandensurethatpilesarecompletedto their full cross~sectionaldimensions.
The useof a vibrator to insertandwithdraw temporarycasingsis subjectto compliancewith Clause1.12 and to the methodnot
causingdisturbanceof thegroundwhichwouldadverselyaffecttheconstructionor the capacityof piles.
Temporarvcasingsshallbefreefrom significantdistortion.Theyshall be of uniform cross-sectionthroughout each continuouslength.During concretingtheyshallbe free from internalprojec-tions and encrustedconcretewhich might adverselyaffect theproperformationof piles.
Wherepilesareboredunderwaterorsupportfluid in an unlinedstate,the insertion of a full-length loosely fitting casing to thebottomof theboreprior to placingconcretewill notbepermitted.
Permanentcasingsshallbe as specifiedin the ParticularSpeci-fication.
Wheretheuseofa permanentcasingis specified,theContractorshall submit details of the type of casing and the method ofinstallationat the time of tender.
3.6.3. Stability ofpilebore
3.6.4. Spillage anddisposal ofsupportfluid
3.6.5. Pumping frompile bores
3.6.6. Continuity ofconstruction
Whereboring takesplace throughunstablewater-bearingstrata.the processof excavationand the support fluid and depth oftemporarycasingwhereemployed shall be such that soil fromoutsidethe areaof the pile is not drawn into the pile sectionandcavities are not createdoutsidethe temporarycasingas it is ad-vanced.
\Vhere a support fluid is usedfor maintaining the stability of abore, an adequatetemporarycasingshall be usedin conjunctionwith the supportfluid so as to ensurestabilitr of the strataneargroundlevel until concretehasbeenplaced.During constructionthe levelof drilling fluid in the pile excavationshallbe maintainedwithin the casedor stableboresothat it is not lessthan2 m abovethelevelofexternalstandinggroundwateratall times.unlessstatedotherwisein theParticularSpecification.
In theeventof a lossof supportfluid from a pile e>~cavation,theContractorshallnotify theEngineerof his intended actionbefore
contintling the work.
All reasonablestepsshallbe takento preventthespillageof supportfluid on the Site in areasoutsidethe immediate~icinitv of boring.Discardedfluid shall be removed from the Site without undtmedelay.Any disposalof fluid shallcomplywith the requirementsofcurrent legislationand all relevantauthorities.
Pumpingfrom pile boresshallnot be permitted unlessthe bome
hasbeensealedagainstfurther water entrv by casingor unlesstIjesoil is stableandwill allow pumpingto takeplacewithotit grounddlisturbancebelow or aroundthe pile.
The pile shall he boredand theconcreteshall be placed withoutstichdelayas wouldl leadto impairmentof the performanceof thc
pile.The time period during which each l)ild’ is excavatedand tIn-
concreteis l)l~Icedl shallnot exceed12 hours.The timeperiodshallstart when excavation b&low the temporary lining tubes com-mences(exceptfor casingsstmchasusedin secantpiling which lea~a significant annulusbetweenthe casingandthe soil). \~‘here the
sequenceis suchthat the time j)eriodl of 12 hourswi Ihe exceededleven if no delaysare taken into account, a realistic
0
forpiling and embedded retaining walls. ThomasTelford, London, 1996.
timeperiodduringwhich thepile is excavatedandconcreteplacedshallbestatedin theContractor’smethodstatement.The Contrac-tor shall adviseon the likely effect of this extensionof the pileconstructionperiodon theperformanceandcapacityof the pile.
3.6.7. Enlarged pilebases
3.6.8. Cleanliness ofpile bases
3.6.9. Inspection
3.7. Reinforcement
A mechanicallyformedenlargedbaseshallbe no smallerthanthedimensionsspecifiedandshallbe concentricwith the pile shafttowithin atoleranceof 10% oftheshaftdiameter.Theslopingsurfaceof thefrustumformingtheenlargementshallmakean angleto theaxisof the pile of notmorethan350,
At the specifieddiameterof theunderreamat theperimeterofthe basethereshallbe a minimum height of 150 mm.
On completionof boring loose,disturbedor softenedsoi] shallberemovedfrom theboreusingappropriatemethods,whichshallbedesignedto clean while at the same time minimizing grounddisturbancebelowthe pile bases.Whereused,support fluid shallbemaintainedatsuchlevelsthroughoutandfollowing thecleaningoperationthat stability of theboreis preserved.At all timeswhenthe pile headis unattended,the boreshallbe clearlymarkedandfencedoff soas not to causeasafetyhazard.
Eachpile borewhich doesnot containstandingwateror supportfluid shallbe inspectedfrom thegroundsurfaceprior to concretebeingplacedin it to ensurethe baseis adequatelyclean andthatthe shaft is stableandwithin the specified tolerances.Adequate
meansof lighting, measuringtapesand a means of measuringverticalityshallbeused.Forpilesof 750mmdiameteror largerandwhere mannedinspection of the pile baseis specified in theParticularSpecification,equipmentshall be providedby the Con-tractor to enablehis representativesto descendinto the boreforthepurposeof inspection.The Contractorshallprovideall neces-sarv facilities to enabletheEngineerto makean inspectionof anypile excavationincluding facilities to checkthe depth,verticalityandposition.Thefull requirementsof BS 8008shallbe followed.
The Contractorshall designatea Supervisorto superviseeachinspection.The Supervisorshallhaveacopy of BS 8008andshallensurethatevervpersoninvolved in the descentof piles is familiarwith its requirements.
The numberofjoints in longitudinal steelbarsshallbekeptto aminimum.Jointsin steelreinforcementshallbe such that thefullstrengthof eachbaris effectiveacrossthejoint andshall be made
so that thereis no detrimentaldisplacementof the reinforcementduring the constructionof the pile, following the guidanceof BS8110.Reinforcementshall be maintainedin its correctpositionduring concretingof the pile. to allow a vertical toleranceof÷1507—50mm on the level of the reinforcementprojectingabovethefinal cut-off level. Wherereinforcementis madeup into cages.theyshallbe sufficiently rigid to enablethem to be handled,placedand concretedwithotit damage.If thecageis to beweldedtogether,weldingshall hecarriedotit to therequirementsof 135 7123.Detailsof the proceduresshotild be submittedprior to commencementofthe works.
Unless otherwise51)ecifiedl, reinforcement shall extendto thebaseof thepild~ or to at least3 in belowthebottom ofthe temporarycasin(T whicheveris the lesser.
Spacers shall be designed and manufactured using durablematerialswli ich shallnot lead tu corrosionof therein furcementor
I0
(
20 Specification forpiling and embedded retaining walls. Thomas Telford, Londo~
spallingof the concretecover.Detailsof the meansby which theContractorplansto ensurethecorrectcoverto andpositionof thereinforcementshallbe submittedprior to commencementof theworks.
3.8. Placing concrete3.8.1. General
3.8.2. Workability of
concrete
3.8.3. Compaction
3.8.4.in dry
Placing concreteborings
3.8.5. Placing concreteunder water or supportfluid
The workability and methodof placing of the concreteshall besuch thatacontinuousmonolithicconcreteor grout shaft of thefull cross-sectionis formed.Concreteshallbe transportedfrom themixer to thepositionof thepile in sucha mannerthatsegregationof the mix doesnot occur.
Theconcreteshallbeplacedwithoutsuchinterruptionaswouldallow thepre~iouslyplacedbatchto haveachievedastiffnesswhichpreventsproperamalgamationof the two concretebatches.
The Contractorshall take all precautionsin the designof themix andplacingof theconcreteto avoid archingof the concretein a temporarvcasing.No soil, liquid or otherforeignmattershallbepermittedto contaminatethe concrete.
Workability measuredat the time of dischai-geinto the pile boreshall bein accordancewith the limits shownin Table3.1.
Internalvibratorsshallnot be usedto compactconcrete.
Measuresshall be takento ensurethat the structuralstrengthoftheconcreteplacedin all piles is not impaired throughgroutloss.segregationor bleeding.
The method of placing shall be such as to ensurethat theconcreteor grout in its final position is denseandhomogeneous.Concreteshallbe introducedinto thepile via ahopperandsuitablelength of rigid delivery tube to ensurethat the concretefallsvertically and centrallydown the shaft. The tubeshallbeat least3 m long.
Before placing concrete,measuresshall be taken in accordancewith Clauses3.6.8and3.6.9to ensurethereis no accumulationofsilt or othermaterialatthe baseof the boring,andtheContractorshall ensurethatheavily contaminatedsupportfluid, which couldimpair the free flow of concretefrom the tremie pipe, has notaccumulatedin the bottomof the hole.
A sampleof supportfluid shallbetakenfrom thetopandbottomof the boring using an appropriatedevice. The fluid shall beprepared,sampledandtestedasstatedin theContractor’ssubmis-sion. If testsshowthe fluid doesnot complx with the limits statedby theContractorfor theparticulartypeof stipportfluid, the fltiiclshall be wholly or partly replacedas appropriatebeforeconcreteis placed.
Concreteto be placedtinder water or support fluid shall beplacedby tremie in one continuousoperationand shall not bedischargedfreely into the water or support fluid. Pumping ofconcretemaybe usedwhereappropriate.The bottom endl of thetremiemustbe squareto the axisof the tremieandits circumfej--
mustbe continuous.The tremie mtist be fully charged wi ticoncretebefore ii. is lifted off the baseof the pile.
The concreteshall be of high workability in accordancewit iTable3.1, NIix C andcementcontentin accordancewith Secti(~2() andTable 3.1,Mix C.
The concreteshallbeplacedin suchamannerthatwill not cau\rsegregati d)n d)f the mix.
The dlepthsto the surfaceof theconcreteshall be meastiredan j
0
I
Specification forpiling and embedded retaining walls. Thomas Telford. London, 1996.
the lengthof the tremietubesrecordedatregularintervalscorres-ponding to the placing of each batch of concrete.The depthsmeasuredandvolumesplacedshall be plottedimmediatelyon agraph and comparedwith the theoretical relationshipof depthagainstvolume.
Thehopperandpipeof the tremieshallbe cleanandwatertightthroughout.The pipeshall extendto the baseof thebore andasliding plug orbarriershallbe placedin thepipeto preventdirectcontactbetweenthe first chargeof concretein thetremieandthewater or support fluid. The pipe shall at all times penetratetheconcretewhich haspreviouslybeenplacedwith a minimum em-bedmentof 3 m andshallnotbe withdrawnfrom the concreteuntilcompletionof concreting.A sufficientquantityof concreteshallbemaintainedwithin the pipe to ensurethat the pressurefrom itexceedsthatfi-om thewaterorsupportfluid. Theinternaldiameterof the pipe of the tremie shallbe of sufficient size to ensuretheeasyflow of concrete.It shallbesodesignedthatexternalprojec-tionsare minimized,allowing thetremie to passwithin reinforcinocageswithoutcausingdamage.The internalfaceof thepipeof thetremieshallbe free from projections.
Temporary~casingsshall be extractedwhile the concretewithinthem remainssufficiently workableto ensurethat the concreteisnot lifted. During extraction the motion of the casingshall bemaintainedin an axial direction relativeto the pile.
Whenthecasingis beingextracted,asufficientquantityof concreteshallbemaintainedwithin it to ensurethatpressurefrom externalwater, supportfluid or soil is exceededandthat thepile is neitherreducedin sectionnor contaminated.
The concretelevel within a temporarycasingin adryboremaybe toppedup wherenecessaryduringthecourseof casingextrac-tion so that the baseof the casingis always below the concretesurfaceuntil the castingof the pile hasbeencompleted.
Adequateprecautionsshall be takenin all caseswhereexcess
Table3. 1. Pilingmix workability
Piling mixworkability
Workability Typical Conditions of use
IThe concrete and aggregate sizes must
Target slump
be compatible with the reinforcement spacingi
flow range,mm mm
A not 75—1 25 Placed into water-free unlined or permanentlyapplicable lined bore of 600mm diameter or over, or where
casting level lies below temporary casingreinforcement spaced at 100mm centres crgreater, leaving ample room for free movementof concrete between bars.
B Target Slump~ Where reinforcement is spaced at less tharflow 100—175 100 mm centres: where cut•off level of concrete500 +1—50 is within temporary casing; where pile bore is
water-free and the diameter is less than 600 mm.
c Target Slump Where concrete is to be placed by tremie underflow iso or water or support fluid or by pumping or by550 +1—SO more continuous flight auger.
.me slump test method is not suited to these very high workabilities and the flow test is to be preferreo.
op
22 Specification forpiling and embedded retaining walls. Thomas Telford, London, 1996.