Top Banner
Report for SAACKE customers in the UK and Ireland On-line Product Information System The SAACKE On-line Product Information System (SOPIS) is being phased in from 2014 as existing service contracts are renewed or new contracts signed. This will be an additional (free-of-charge) benefit for the duration that the service contract remains in place. Labels having a unique QR code for each site and boiler-house are provided, to be applied to the boiler/combustion equip- ment and for use by portable devices. Data may be accessed by computer using the site specific URL link. The Health & Safety Executive expect Operation and Maintenance Manuals, and as-installed drawings to be readily available for anyone on site who is responsible for the operation, routine maintenance and fault finding of the plant. ‘SOPIS’ meets this requirement by providing instant access to this documentation when original hard copies may be damaged, lost or become outdated. This new system will offer you many benefits including: Unique code for each site and boiler-house Easy access to site data via portable devices Availability of O/M manuals and drawings to aid operation, fault finding and maintenance Enhanced safety for personnel and plant Historical data store for commissioning data, service records and personnel training Bernies Hot Tips Medium Combustion Plant Directive (MCPD) Are you aware ‘The Clean Air Policy Package’ pub- lished by the European Commission is likely to impact on over 17000 plants in the UK, which could include you. We will provide more information on this and how it may impact on your business in our first Newsletter of 2015 and in our Regional Conferences. 2015 Regional Conferences Due to the success of the Regional Conferences held in 2014, we will continue with these events in 2015. More local conferences, additional information to assist you in improving efficiency, tips to ensure the safe opera- tion of your plant and keeping up to date with changes in legislation. Winter Fuel Costs It is that time of year again when the reliability and efficiency of your plant should not be overlooked along with the routine testing of your back up fuels. Do not leave it too late. Remember lowering the O2 concentration by 2% can save 1% in fuel costs. A Spotlight ISSUE 3 - 2014 Online Product Information Site Name Scan QR Code or visit http;//sopis.co 1 MARINE FOCUS PAGE TWO BERNIES HOT TIPS PAGE ONE SAACKE UK TEAM SNIPPETS PAGE FOUR
4

Spotlight A - SAACKE · 2016-09-10 · Spotlight A Testimonials We have been using SAACKE since our burners and controls were installed in 1994 under the original contract number

Jun 20, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Spotlight A - SAACKE · 2016-09-10 · Spotlight A Testimonials We have been using SAACKE since our burners and controls were installed in 1994 under the original contract number

Report for SAACKE customers in the UK and Ireland

On-line Product Information System

The SAACKE On-line Product Information System (SOPIS) is being phased in from 2014 as existing service contracts are renewed or new contracts signed. This will be an additional (free-of-charge) benefit for the duration that the service contract remains in place.

Labels having a unique QR code for each site and boiler-house are provided, to be applied to the boiler/combustion equip-ment and for use by portable devices. Data may be accessed by computer using the site specific URL link.

The Health & Safety Executive expect Operation and Maintenance Manuals, and as-installed drawings to be readily available for anyone on site who is responsible for the operation, routine maintenance and fault finding of the plant. ‘SOPIS’ meets this requirement by providing instant access to this documentation when original hard copies may be damaged, lost or become outdated.This new system will offer you many benefits including:

• Uniquecodeforeachsiteandboiler-house

• Easyaccesstositedataviaportabledevices

• AvailabilityofO/Mmanualsanddrawingstoaid operation, fault finding and maintenance

• Enhancedsafetyforpersonnelandplant

• Historicaldatastoreforcommissioningdata, service records and personnel training

Bernies Hot Tips

Medium Combustion Plant Directive (MCPD)

Are you aware ‘The Clean Air Policy Package’ pub-lished by the European Commission is likely to impact on over 17000 plants in the UK, which could include you. We will provide more information on this and how it may impact on your business in our first Newsletter of 2015 and in our Regional Conferences.

2015 Regional Conferences

Due to the success of the Regional Conferences held in 2014, we will continue with these events in 2015. More local conferences, additional information to assist you in improving efficiency, tips to ensure the safe opera-tion of your plant and keeping up to date with changes in legislation.

Winter Fuel Costs

It is that time of year again when the reliability and efficiency of your plant should not be overlooked along with the routine testing of your back up fuels. Do not leave it too late.

Remember lowering the O2 concentration by 2% can save 1% in fuel costs.

ASpotlightISSUE 3 - 2014

Online Product Information

Site Name

Scan QR Code or visit

http;//sopis.co

1MARINEFOCUSPAGE TWO

BERNIES HOTTIPSPAGE ONE

SAACKE UKTEAM SNIPPETSPAGE FOUR

Page 2: Spotlight A - SAACKE · 2016-09-10 · Spotlight A Testimonials We have been using SAACKE since our burners and controls were installed in 1994 under the original contract number

existing propulsion system, to make it seaworthy for the two-month passage from the Chinese shipyard to Rio Grande, near the oil-producing region. For this purpose, the two existing 75 t/h boilers were stripped and re-tubed. To generate the process steam required for FPSO operation at the usage site, the boilers were equipped with three Dual Fuel DDZG burners each, including new fittings, steam system instruments and controls (fail safe PLC system). The SAACKE components are therefore able to generate both superheated steam for the turbine propulsion and the process steam needed for processing and stabilizing the crude oil on board the ship.

SummaryThanks to state-of-the-art combustion equipment, the FPSO unit P-63 is now ready for 15 to 20 years of service at sea – without dry-docking. The conversion including international project coordination was performed by SAACKE in a close collaboration with the customer. After a transitional phase, the FPSO was handed over to Petrobras, the operator.

Benefits at a glance• Global project management from a single source• Reliable compliance with the applicable NOX

threshold value• Extremely efficient combustion technology for propulsion and crude oil processing• Use of different fuels• Convenient operation and top availability• Broad control range• Extremely long lifespan and easy to maintain

FPSO Conversion successfully comple-ted – BW NISA now PETROBRAS P-63

Customer from Europe – refit in Asia –usage in South AmericaBesides the operative modernization, global project management from a single source was crucial. How should the plant modules be designed? How should the material flows be arranged? These are questions that are particularly important given the lack of space on a ship. The international coordination, the engineering in Bremen, the production in China and Croatia, the assembly in the Chinese shipyard, and the commission-ing in the Brazilian region of Rio Grande – the scope of the P-63 project required the involvement of the entire SAACKE group.

“The completion of this very challenging inter-national project is a joint success of the global SAACKE group.” Matthias Flies – Project manager SAACKE Marine Systems

The SAACKE Solution in detailSAACKE modernized the boiler system for the ship‘s

2BERNIES HOTTIPSPAGE ONE

SAACKE GROUPIN ACTIONPAGE TWO

CUSTOMERSTESTIMONIALSPAGE THREE

Page 3: Spotlight A - SAACKE · 2016-09-10 · Spotlight A Testimonials We have been using SAACKE since our burners and controls were installed in 1994 under the original contract number

ASpotlight

Testimonials

We have been using SAACKE since our burners and controls were installed in 1994 under the original contract number VG: 6300. Since then we have built up a strong working relationship with the service Engineers and personnel who attend site to service our equipment and attend to breakdowns.

With an acute hospital such as St Helier, speedy response to breakdown emergencies is always a prime concern. In the past we have had to call on SAACKE following instances of power failure caused by other faults. The nature of the burner controls ensures that they fail safe in the event of a loss of power, in some circumstances it is not an easy task to reset our critical plant. One such event occurred a few months ago where the boilers would not reset following a loss of power and subsequent loss of water supply as a result. This caused the steam pressure to drop in the hospital thus losing the heating and hot water supply to several acute areas.

SAACKE were able to attend site at short notice and assist our staff in regaining the safe operation of the boilers and supply of steam to the hospital. Following this event, we utilized SAACKE to give a training course to our on call staff to able them to respond more effectively to rare instances such as this.

We are very happy with the overall service we receive from SAACKE as a company and would recommend their services to anyone that has not used them before.

Richard JarvisEstates ManagerEpsom and St Helier University Hospitals NHS Trust

3INTRODUCINGPAGE FOUR

SOPISPAGE ONE

BERNIES HOTTIPSPAGE ONE

ISSUE 3 - 2014

SAACKE customers comments

“As usual we get excellent help and assistance from SAACKE engineers and the office team – when we have a problem they do there upmost to get an engineer to site ASAP”

“Good service by competent and professional technicians”

“We operate a TPM (Total Production Maintenance) culture at site, the engineers at SAACKE who attend the site have all been responsive to this way of working- in a nutshell it is a total care for the plant operation as well as maintenance and the plants up keep- it is clean, tidy and well looked after”

“First class experience from start to finish (as usual)”

“Your technical staff that we have used are some of the best that I have ever used, they understand our needs (being a hospital) and always act accordingly”

“The standard of service that we receive from SAACKE is second to none. They fully appreciate our needs as a business and respond to it accordingly”

Page 4: Spotlight A - SAACKE · 2016-09-10 · Spotlight A Testimonials We have been using SAACKE since our burners and controls were installed in 1994 under the original contract number

Report for SAACKE customers in the UK and Ireland

ASpotlightISSUE 3 - 2014

Sporting a ChallengeCongratulations to Rob Chapman that took part in RIDE 24’s London to Land’s End!! 310 miles in 24hrs - stretching through the South of Britain – the route is broken down into 7 stages of approximately 40 / 45 miles each. Rob finished the ride in 24 hours and 23 minutes and raised over £1100 for Macmillan Cancer.

Youngest addition to the foldWe at SAACKE would like to congratulate Hannah Payne-Cook for the birth of her daughter Poppy Elizabeth on 25th August 2014 weighing in at 7lbs exactly.

SAACKE UK Team Snippets

To celebrate his 60th birthday Eddie Harris, our Sales Office Manager, was given a birthday surprise of a sky dive with Skydive UK Ltd, in Devon. On the 4th October Eddie braved the winds and plummeted towards the ground at speeds of over 120mph an experience to remember for the rest of your life. Eddie commented “You can see why people get hooked on this, it was brilliant”.

New EmployeesWe are pleased to welcome the following personnel who have joined the company since our last newsletter:

Wendy ScottSouthern Regional Office Administrator

Alex AttemannApprentice Alex will be studying as an Electro Mechanical Apprentice on a 4 year apprenticeship and is currently studying at PETA.

High in the sky

Introducing

CUTOMERSTESTIMONIALSPAGE THREE

INTRODUCINGPAGE FOUR

BERNIES HOTTIPSPAGE ONE

SAACKE Combustion Services Ltd.Langstone Technology ParkLangstone Road, Havant,Hampshire, PO9 1SA. EnglandTelephone: +44(0) 2392 333900Website: www.saacke.com

4