Top Banner
. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expects to complete fabrication of first magnet before Christmas Unit #1 cold mass assembly is ready to install in vacuum vessel, cold mass supp’ts load tested Other Unit #1 progress: vacuum vessel, thermal shield and support stands fabrication complete Winding of 2 nd magnet including banding complete Installation of quench protection system and instrumentation in 2 nd magnet
8

Spectrometer Solenoid Fabrication Update

Jan 11, 2016

Download

Documents

manning

Spectrometer Solenoid Fabrication Update. Vendor still expects to complete fabrication of first magnet before Christmas Unit #1 cold mass assembly is ready to install in vacuum vessel, cold mass supp’ts load tested - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Spectrometer Solenoid Fabrication Update

1S. Virostek - LBNL

Spectrometer Solenoid Fabrication Update

•Vendor still expects to complete fabrication of first magnet before Christmas•Unit #1 cold mass assembly is ready to install in vacuum vessel, cold mass supp’ts load tested•Other Unit #1 progress: vacuum vessel, thermal shield and support stands fabrication complete•Winding of 2nd magnet including banding complete•Installation of quench protection system and instrumentation in 2nd magnet is under way•Cryocooler testing conducted by Bert Wang and Mike Green is to be complete this week

Page 2: Spectrometer Solenoid Fabrication Update

2S. Virostek - LBNL

Magnet warm bores and inner thermal shields

Page 3: Spectrometer Solenoid Fabrication Update

3S. Virostek - LBNL

Outer thermal shield

Page 4: Spectrometer Solenoid Fabrication Update

4S. Virostek - LBNL

Vacuum vessel outer shell

Page 5: Spectrometer Solenoid Fabrication Update

5S. Virostek - LBNL

End walls and flanges

Page 6: Spectrometer Solenoid Fabrication Update

6S. Virostek - LBNL

Support structure assembly

Page 7: Spectrometer Solenoid Fabrication Update

7S. Virostek - LBNL

Cold mass support load testing

Page 8: Spectrometer Solenoid Fabrication Update

8S. Virostek - LBNL

Completed cold mass assembly