SERIES 600EARTHWORKS
Contents
Clause Title Page
#601 Classification,DefinitionsandUsesof EarthworksMaterials 2
602 GeneralRequirements 4
603 FormingofCuttingsandCuttingSlopes 5
604 ExcavationforFoundations 6
605 SpecialRequirementsforClass3Material 7
606 Watercourses 7
#607 ExplosivesandBlastingforExcavation 8
608 ConstructionofFills 9
609 GeotextilesUsedtoSeparateEarthworks Materials 10
610 FilltoStructures 11
611 FillAboveStructuralConcreteFoundations 12
612 CompactionofFills 12
613 Sub-formationandCapping 14
614 CementStabilisationtoFormCapping 16
615 LimeStabilisationtoFormCapping 17
616 PreparationandSurfaceTreatmentof Formation 18
617 UseofSub-formationorFormationby ConstructionPlant 19
618 (05/01)Topsoiling 19
619 EarthworkEnvironmentalBunds 20
620 LandscapeAreas 20
621 StrengthenedEmbankments 20
622 EarthworksforReinforcedSoiland AnchoredEarthStructures 20
623 EarthworksforCorrugatedSteelBuried Structures 21
624 GroundAnchorages 22
625 CribWalling 22
626 Gabions 23627 SwallowHolesandOtherNaturally OccurringCavities 23
628 DisusedMineWorkings 23
629 InstrumentationandMonitoring 23
630 GroundImprovement 23
631 EarthworksMaterialsTests 24
#632 DeterminationofMoistureCondition Value(MCV)ofEarthworksMaterials 24
633 DeterminationofUndrainedShearStrength ofRemouldedCohesiveMaterial 25
634 (11/05)DeterminationofIntactLumpDry Density(IDD)ofChalk 25
635 (05/04)LosAngelesandOtherTestsfor ParticleSoundness 25
636 DeterminationofEffectiveAngleof InternalFriction(j/)andEffective Cohesion(c/)ofEarthworksMaterials 25
MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS
VOLUME 1 SPECIFICATION FOR HIGHWAY WORKS
Amendment-November2009 1
Clause Title Page
637 DeterminationofResistivity(rs)toAssess CorrosivityofSoil,RockorEarthworks Materials 26
638 DeterminationofRedoxPotential(Eh)to AssessCorrosivityofEarthworks MaterialsforReinforcedSoiland AnchoredEarthStructures 27
639 DeterminationofCoefficientofFriction andAdhesionBetweenFillandReinforcing ElementsorAnchorElementsfor ReinforcedSoilandAnchoredEarth Structures 27
640 DeterminationofPermeabilityof EarthworksMaterials 28
641 DeterminationofAvailableLimeContent ofLimeforLimeStabilisedCapping 28
642 DeterminationoftheConstrainedSoil Modulus(M*)ofEarthworksMaterials forCorrugatedSteelBuriedStructures 28
643 (05/01)LimeandCementStabilisationto FormCapping 29
644 (11/03)DeterminationofSulfateContent 30
(05/04)Tables6/1to6/6 31
NATIONAL ALTERATIONS OF THEOVERSEEING ORGANISATIONS OF
SCOTLAND, WALES AND NORTHERN
IRELAND
Scotland
Clause Title Page
601TS (11/06)Classification,DefinitionsandUses ofEarthworksMaterials S1
632TS (11/06)DeterminationofMoisture
ConditionValue(MCV)ofEarthworks MaterialsinScotland S3
Northern Ireland
601NI Classification,DefinitionsandUsesof EarthworksMaterials N1
607NI ExplosivesandBlastingforExcavation N3
# denotesaClauseorSampleAppendixwhichhasasubstituteNational ClauseorSampleAppendixforoneormoreoftheOverseeing OrganisationsofScotland,WalesorNorthernIreland.
7/28/2019 Specification for Highway Works series 600: earthworks
2/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
EARTHWORKS
#601 Classification, Definitions and Uses ofEarthworks Materials
General Classification
1 Earthworksmaterialsshallfallintooneorotherof
thefollowinggeneralclassifications:
(i) acceptablematerial:materialexcavatedfromwithintheSiteorimportedontotheSite
whichmeetstherequirementsofTable6/1
andAppendix6/1foracceptabilityforusein
thePermanentWorks;
(ii) (11/04)unacceptablematerialClassU1Aas
definedinsub-Clauses2(i)(a)and2(i)(b)of
thisClause:materialexcavatedfromwithintheSitewhich,unlessprocessedsothatit
meetstherequirementsofTable6/1and
Appendix6/1,shallnotbeusedinthePermanentWorks;
(iii) (11/04)unacceptablematerialClassU1Bas
definedinsub-Clause2(ii)(a)ofthisClause:materialexcavatedfromwithintheSite
which,unlessprocessedsothatitmeetstherequirementsofTable6/1andAppendix6/1,shallnotbeusedinthePermanentWorks;
and
(iv) (11/04)unacceptablematerialClassU2as
definedinsub-Clause3(i)ofthisClause:materialexcavatedfromwithintheSite
whichshallnotbeusedinthePermanent
Works.
(11/04) Unacceptable Materials
2 (11/04)UnacceptablematerialClassesU1AandU1B:
(i) (11/04)unacceptablematerialClassU1Ashall
be:
(a) (11/04)materialwhichdoesnotcomplywiththepermittedconstituentsand
materialpropertiesofTable6/1and
Appendix6/1foracceptablematerial;
and
(b) (11/04)material,orconstituentsof
materials,composedofthefollowing
unlessotherwisedescribedinAppendix6/1:
peat,materialsfromswamps,marshesandbogs;
logs,stumpsandperishable
material;
materialsinafrozencondition;
clayhavingaliquidlimit
determinedinaccordancewithBS1377:Part2,exceeding90or
plasticityindexdeterminedin
accordancewithBS1377:Part2,
exceeding65;
materialsusceptibletospontaneous
combustionexceptunburntcollieryspoilcomplyingwith
sub-Clause15ofthisClause;
(ii) (11/04)unacceptablematerialClassU1Bshall
be:
(a) (11/05)contaminatedmaterials,includingcontrolledwastes(asdefinedinthe
EnvironmentalProtectionAct1990Part
IIA)whoselevelofcontaminationisabovethatgiveneitherinAppendix
6/14orinAppendix6/15,butexcluding
allhazardouswastes(asdefinedintheHazardousWaste(EnglandandWales)
Regulations2005)andradioactive
wastes(asdefinedintheRadioactiveSubstancesAct1993).
3 UnacceptablematerialClassU2shallbe:
(i) (11/05)hazardouswaste(asdefinedinthe
HazardousWaste(EnglandandWales)
Regulations2005)andradioactivewaste(asdefinedintheRadioactiveSubstancesAct
1993).
4 (11/04)WhererequiredinAppendix6/1,
unacceptablematerial(otherthanClassU2)shallbe
processedbymechanical,chemicalorothermeanstorenderthematerialacceptableforuseinthePermanent
WorksinaccordancewiththerequirementsofTable6/1
andAppendix6/1.
Definitions
5 Chalkshallmean:(i) anyporousmaterialofnaturalorigin
composedessentiallyofcalciumcarbonate
Amendment-November2005 2
7/28/2019 Specification for Highway Works series 600: earthworks
3/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
andidentifiedaschalkonthemapsproduced
bytheBritishGeologicalSurvey;
(ii) materialdesignatedasClass3inAppendix6/1.
6 Argillaceousrockshallmeanshalesmudstones
siltstonesslatesandmicaceousschistscomposedofparticlesofclayandsiltandmica.Itshallinclude
unburntcollieryspoil.
7 Pulverised-fuelashshallmeansolidmaterialextractedbyelectrostaticandmechanicalmeansfrom
thefluegasesoffurnacesfiredwithpulverised
bituminouscoal.Itshallhaveamaximumparticlesizeof3mm.
8 Furnacebottomashshallmeanagglomerated
pulverised-fuelashobtainedfromthebottomofthepowerstationfurnaceandhavingparticlesizenolarger
than10mm.
9 Formationshallbethetopsurfaceofcapping.Wherenocappingisrequiredformationshallbethetop
surfaceofearthworksattheundersideofsub-base,
unlessotherwiseshownontheDrawings.
10 Sub-formationshallbethetopsurfaceof
earthworksattheundersideofcapping.
11 (05/01)Stabilisationshallmeanthespreadingof
cementorlimeorbothonalayerofdepositedorintact
granularorcohesivematerial,andthesubsequentprocessofpulverisingandmixingfollowedby
appropriatecompactiontoformthewholeora
constituentlayerofacapping.
12 (11/07)Whererecycledaggregateisusedinthis
Series,thematerialshallbeaggregateresultingfromthe
processingofmaterialusedinaconstructionprocess.Theaggregateshallhavebeentestedinaccordancewith
Clause710,andthecontentofothermaterials(ClassX)
includingwood,plasticandmetalshallnotexceed1%bymass.Whererecycledaggregateexceptrecycled
asphaltisusedinthisSeries,theaggregateshallhave
beentestedinaccordancewithClause710.Contentofasphalt(mineralaggregatewithabituminousbinder)
shallnotexceed2%bymass,andthecontentofother
materials(ClassX)includingwood,plasticandmetalshallnotexceed1%bymass.
Use of Fill Materials
13 (05/01)Inadditiontoanygradingrequirementsthe
maximumparticlesizeofanyfillmaterialshallbenomorethantwo-thirdsofthecompactedlayerthickness
exceptthatcobbleshavinganequivalentdiameterof
morethan150mmshallnotbedepositedbeneathvergesorcentralreserveswithin1.30mofthefinished
surface.
Amendment-November2009 3
14 (11/07)Materialshallnotbedepositedwithin
500mm,orotherdistancesdescribedinAppendix6/3,
ofconcrete,cementboundmaterials,othercementitiousmaterialsorstabilisedcappingformingpartofthe
PermanentWorksif,whentestedinaccordancewithTRLReport447either:
(i) (11/05)thewater-solublesulfate(WS)content
exceeds1500mgofsulfate(asSO4)perlitre
(TestNo.1);or
(ii) (11/09)theoxidisablesulfides(OS)contentexceeds0.5%ofsulfate(asSO
4)(TestNo.2
andTestNo.4);or
(iii) (11/09)unlessotherwisespecifiedinTable6/1orTable6/3,the2:1watertosoilextract
preparedforthedeterminationofwater-
solublesulfatein(i)hasapHvalueoflessthan7.2,whentestedusingtheelectrometric
methodofpHdeterminationinaccordance
withBS1377-3.
(11/09)Atleastfivesamplesofeachmaterialshallbe
testedforWS,OSandpHvalue.Themeanofthe
highesttwovaluesshallbeusedforcomparisonwith
thelimitingvalues.Thisalsoappliesifsixtonineresultsareavailable.Iftenormoreresultsareavailable,
themeanofthehighest20%oftheresultsshallbeused
forcomparisonwiththelimitingvalues.
15 (11/07)Materialshallnotbedepositedwithin500mm,orotherdistancesdescribedinAppendix6/3,
ofmetallicstructuralelementsformingpartofthePermanentWorksif,whentestedinaccordancewith
TRLReport447either:
(i) (11/05)thewater-solublesulfate(WS)content
exceeds300mgofsulfate(asSO4)perlitre
(TestNo.1);or
(ii) theoxidisablesulfides(OS)contentexceeds
0.06%ofsulfate(asSO4)(TestNos.2
and4).
(11/05)Atleastfivesamplesofeachmaterialshallbe
testedforWSandOS.Themeanofthehighesttwovaluesshallbeusedforcomparisonwiththelimiting
values.Thisalsoappliesifsixtonineresultsare
available.Iftenormoreresultsareavailable,themeanofthehighest20%oftheresultsshallbeusedfor
comparisonwiththelimitingvalues.
(11/07)Therequirementsin(i)and(ii)aboveshallnot
applytometallicitemsprotectedbyconcreteandancillarymetallicitemssuchasthetopsofchambers
andgullies.
16 (05/01)UnburntcollieryspoilmaybeusedasgeneralfillprovideditiscompactedincompliancewithClause612andcomplieswiththerequirementsof
Appendix6/1.
7/28/2019 Specification for Highway Works series 600: earthworks
4/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
17 (05/01)Pulverised-fuelashshallnotbeplaced
withinthedimensiondescribedinAppendix6/3,belowsub-formationorformation.
18 (05/01)Wherepulverised-fuelashisused,the
Contractorshallforeachconsignment,makeavailabletotheOverseeingOrganisationarecordofthetypeand
sourceofthematerialandthenameofthepowerstation
fromwhichitwasobtainedandacertificateofresultsoftestsshowingthatthematerialcomplieswiththe
requirementsofTable6/1.
602 General Requirements
1 TheContractorshallemployonlyplantandworkingmethodswhicharesuitedtothematerialstobe
handledandtraversed.Heshallberesponsibleformaintainingthenatureoftheacceptablematerialsothatwhenitisplacedandcompacteditremainsacceptable
inaccordancewiththeContract.Acceptabilityshallbe
determinedinaccordancewithTable6/1andanyspecialrequirementsinAppendix6/1.
2 Haulageofmaterialtoembankmentsorotherareas
offillshallproceedonlywhensufficientspreadingandcompactionplantisoperatingattheplaceofdeposition
toensurecompliancewithClause612.
3 (11/04)Noexcavatedacceptablematerialor
unacceptablematerialrequiredtobeprocessed,otherthansurplustotherequirementsoftheContract,shall
beremovedfromtheSiteunlessindicatedotherwisein
Appendix6/1.MaterialwhichisunacceptableonlybyreasonofbeingfrozenshallberetainedonSitewhenin
thatcondition.WheretheContractorispermittedto
removeacceptablematerial,orunacceptablematerialrequiredtobeprocessed,fromtheSitetosuithis
operationalprocedure,thenheshallmakegoodany
consequentdeficitofmaterialarisingtherefrom.EnvironmentalrequirementsforprocessingofClass
U1Bmaterial,intermsoflimitingvaluesof
contaminantsorotherrequirements,shallbesetoutinAppendix6/1intheearthworksClassforwhichthe
processedmaterialistobeused.
4 Ifanyacceptablematerialorunacceptablematerialrequiredtobeprocessedis,wherepermittedby
Appendix6/1,usedbytheContractorforpurposesother
thanforgeneralfill,sufficientacceptablefillmaterialto
occupy,afterfullcompaction,avolumecorrespondingtothatwhichtheexcavatedmaterialoccupiedshallbe
providedbytheContractor.
5 (11/04)Acceptablematerial(otherthanClass5Aor
anyClass5BmaterialreplacingClass5Amaterialinaccordancewithsub-Clause3ofthisClause)surplusto
thetotalrequirementsofthePermanentWorksandall
unacceptablematerialClassU1Anotrequiredtobe
processedshall,unlessindicatedotherwisein
Appendix6/1,beruntospoilintipsprovidedbytheContractor.Inthecaseofunacceptablematerial,Class
U1BandClassU2,theContractorshallcomplywithanyspecificrequirementsfordisposaldescribedinAppendix6/2.
6 Wheretheexcavationrevealsacombinationof
acceptableandunacceptablematerialstheContractorshall,unlessindicatedotherwiseinAppendix6/3,carry
outtheexcavationinsuchamannerthattheacceptable
materialsareexcavatedseparatelyforuseinthePermanentWorkswithoutcontaminationbythe
unacceptablematerials.Unlessotherwisedescribedin
theContractClassesoffillmaterialrequiredtobedepositedseparatelyshallbeexcavatedseparately
withoutcontaminationbyotherClassesofmaterial.
7 TheContractorshallmakehisownarrangementsforstockpilingofacceptablematerial,andunacceptable
materialtobeprocessed,andfortheprovisionofsites
forthepurpose.
8 TheContractorshallensurethathedoesnot
adverselyaffectthestabilityofexcavationsorfillsby
hismethodsofstockpilingmaterials,useofplantorsitingoftemporarybuildingsorstructures.
9 (05/01)Existingtopsoilmaterialshall,exceptwhere
itistobeleftinplaceinthelocationsdescribedinAppendix6/8,bestrippedtodepthsasdescribedin
Appendix6/8forClass5Amaterialfromallareasofcuttingandfromallareastobecoveredbyembankment
orbyotherareasoffill.WherestatedinAppendix6/8
existingtopsoilshallbestrippedasturfinaccordancewithsub-Clause3005.13.
10 (05/01)Topsoilshallwhereverpracticablebeused
immediatelyafteritsstrippingandifnotshallbestored
instockpilesofheightsnotexceeding2morotherheightsstatedinAppendix6/8.Unlessotherwisestated
inAppendix6/8,topsoilshallnotbestockpiledformore
thantwoyears.Topsoilshallnotbeunnecessarilytraffickedeitherbeforestrippingorwheninastockpile.
Stockpilesshallnotbesurchargedorotherwiseloaded
andmultiplehandlingshallbekepttoaminimum.
11 AllClass5AtopsoilarisingfromtheSite,orany
Class5BmaterialreplacingClass5Amaterialin
accordancewithsub-Clause3ofthisClause,inexcessoftherequirementsfortopsoiling,shallbesubjecttothe
requirementsdescribedinAppendix6/8.
12 Excavationsforfoundationsandtrenchesshallbeadequatelysupportedatalltimes,andexceptwhere
otherwisedescribedinAppendix6/3,shallnotbebattered.WhereexcavationsarepermittedtobebatteredtheyshallbebenchedasdescribedinAppendix6/3
Amendment-November2009 4
7/28/2019 Specification for Highway Works series 600: earthworks
5/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
priortobackfillingandcompaction.Theadditional
workandmaterialsshallbeprovidedbytheContractor.
Sheetingandotherexcavationsupportsshallberemovedasfillingproceedsexceptwheretheyare
requiredinAppendix6/3tobeleftinposition.13 Excavationsrequiringbackfillingshallremainopenonlyfortheminimumperiodnecessary.
14 Excavationsrequiringbackfillinginexistingpaved
orothersurfaces,includingthosepavedareastobereconstructedorrepaired,shallbecarriedoutand
reinstatedincompliancewithClause706.
15 TheContractorshallkeepearthworksfreeofwaterincluding:
(i) arrangingfortherapidremovalofwater:
(a) shedontotheearthworks;
(b) enteringtheearthworksfromany
source;
(ii) loweringandmaintainingbyappropriatemeasures,thewaterlevelinexcavations,
sufficientlytoenablethePermanentWorksto
beconstructed.
16 Incarryingouttherequirementsofsub-Clause15
ofthisClausetheContractorshall:
(i) formandmaintaincuttings,embankments
andotherareasoffillwithappropriatefallsandgradientandsealedsurfaces;
(ii) providewherenecessarytemporary
watercourses,drains,pumpingandthelike;
(iii) dischargeaccumulatedwaterand
groundwaterintothepermanentoutfallsof
thedrainagesystemwherepracticable;
(iv) provideadequatemeansfortrappingsilton
temporarysystemsdischarginginto
permanentdrainagesystems.
17 TheContractorshallcarryoutandmaintainanygroundwaterloweringorothertreatmentrequiredin
Appendix6/1.
18 (11/04)WherematerialsaredesignatedintheContractaseitherClassU1BorClassU2,the
Contractorshallcarryoutanyspecialrequirementsfor
theirhandlingdescribedinAppendix6/2.Wheresuchmaterialsareencounteredduringtheprogressofthe
Works,theContractorshallmakeallnecessary
arrangementsfortheirsafehandlinganddisposalafterconsultationwiththeappropriateenvironmental
authority.
19 (05/04)Subjecttothesurfaceleveltolerancesgiven
inClause613andsub-Clause616.1,materialshallnotbefrostsusceptibleifitisusedwithin450mmofthe
designedfinalsurfaceofaroadorpavedcentralreserve,
or350mmiftheannualfrostindexofthesiteisless
than50.Materialshallbeclassifiedasnon-frost-susceptibleifthemeanheaveis15mmorless,when
testedinaccordancewithBS812:Part124:1989,orBS1924:Part2:1990forlimestabilisedcapping,amendedasgiveninsub-Clause801.7.
603 Forming of Cuttings and Cutting Slopes
1 Cuttingsshallbeexcavatedtothelinesandlevels
describedinAppendix6/3.
2 Cuttingslopesortoesofcuttingsshallonlybe
undercutwhenrequiredintheContractfortrenchor
otherexcavations.Suchexcavationsshallberestricted
inextentasdescribedinAppendix6/3andwheretheyrequirebackfillingshallremainopenonlyforthe
minimumperiodnecessary,soastopreventrisktothePermanentWorks.
3 ExceptwhereotherwisedescribedinAppendix6/3,
theexcavationofcuttingsmaybehaltedatanystageprovidingatleast300mmofmaterialasaweather
protectionisleftinplaceabovetheformationorabove
thesub-formation,subjecttotherequirementsofClauses613and616.
4 Wherepre-splitblastingisrequiredorpermittedin
Appendix6/3,itshallcomplywithClause607andanyotherrequirementsinAppendix6/3.Fulldetailsofthe
methodsandarrangementstobeadoptedshallbemade
availabletotheOverseeingOrganisationbeforecommencementofdrillingoperations.
5 Finalfacesofcuttingswhicharenottoreceive
topsoilshall:
(i) whereverpossiblebeleftwithoutscarsor
damagefromconstructionplant;and
(ii) toachieveanaturalappearance,whenthestratumpermitsandwhenpre-splitblastingis
notadopted,havethefaceleftirregularwithintolerancesgiveninAppendix6/3;and
(iii) havebouldersorotherrockfragmentsthatcanbemovedbyhandwithouttools,
removed;and
(iv) whererequiredinAppendix6/3havematerialthatcanbeblownawaybyairline
hose,havingpressuresnogreaterthanthose
statedtherein,soremoved;and
(v) haveadequateaccesstoenableinspectionto
becarriedouttodeterminetheextentofworkrequiredbythissub-Clause.
6 WhererequiredinAppendix6/3,facesofcuttings
whicharenotrequiredtoreceivetopsoilshallhaveone
Amendment-November2009 5
7/28/2019 Specification for Highway Works series 600: earthworks
6/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
ormoreofthefollowingmeasurescarriedoutas
appropriate:
(i) (11/03)Isolatedpatchesofsoft,fragmentedandinsecurematerialshalleachbe
excavatedtoadepthofatleast200mmunlessotherdepthsarestatedinAppendix6/3andreplacedassoonas
practicablewithST2concreteto
Clause2602wellrammedintothecleanedoutvoid.
(ii) Areasofcuttingfacerequiringtheirsurface
tobemadestableshallbetrimmedbackbyanominal50mmorotheramountrequiredin
Appendix6/3andtheresultingsurface
togetherwithanareaofanysurrounding
intactmaterialasdetailedinAppendix6/3,shallhaveasuitablecementbasedgroutor
sprayedconcrete,appliedbypressuretoformatotalnominalthicknessof40mmunless
therequiredthicknessisstatedin
Appendix6/3.WhererequiredinAppendix6/3,reinforcementshallbefixedto
thesurfacebeforeapplicationoftheconcrete
orgrout.Weepholesusingpermanentformersshallbeconstructedtothe
requirementsofAppendix6/3andatthe
locationsdescribedinAppendix6/3.
(iii) (11/03)Softorinsecurematerial,interlayeredwithrockshallbeexcavatedtothedepth
behindthefacedescribedinAppendix6/3.TheresultingcavityshallbefilledwithST2
concretetoClause2602orwithmasonry
infillcomplyingwiththeSeries2400andprovidedwithweepholesallinaccordance
withrequirementsinAppendix6/3.
(iv) NettingorothersheetcoveringasdescribedinAppendix6/3orrockboltsasdescribedin
Appendix6/10.
7 (05/01)WhererequiredinAppendix6/3,facesofcuttingswhicharetoreceivetopsoilshallhaveoneor
moreofthefollowingmeasurescarriedoutas
appropriate:
(i) BebenchedtoretaintopsoilasdescribedinAppendix6/3.
(ii) Beharrowedtoadepthof50mm.Such
harrowingshallbecarriedoutimmediatelypriortotopsoiling,diagonally,atanangle
between5to45tothelineofthetoe,
measuredontheplaneoftheslope.
(iii) Isolatedpatchesofsoft,fragmentedor
insecurematerialshallbeexcavatedand
either:
(a) filledbywellramminginaClassoffill
withsimilarcharacteristicsasthesurroundingintactmaterial;or
(b) excavatedanddealtwithasdescribedin
sub-Clause6(i)ofthisClause.
(iv) Otherareasrequiredtobemadestableshall
bedealtwithasstatedinAppendix6/3.
8 Theconcrete,referredtoinsub-Clauses6(i)and6(iii)ofthisClause,permanentlyexposedonthefaceof
thecuttingshallhavesurfacefeaturesasnearlyas
possiblematchingthoseoftheadjacentintactface.Suchconcreteandthegroutreferredtoinsub-Clause6(ii)of
thisClauseshallhaveaconsistentcolourasnearlyas
possiblematchingthatoftheadjacentintactface.
604 Excavation for Foundations
1 (11/09)Thebottomofallfoundationexcavationsshallbeformedtothelinesandlevelsshownonthe
Drawings.Pocketsofsoftsoilorlooserockshallbe
removedandtheresultingvoidsandanynaturalvoidsshallbefilledwithST1concretetoClause2602(or
othermaterialasrequiredbyAppendix6/3)exceptin
excavationsforcorrugatedsteelburiedstructureswhenClass6Klowerbeddingfillmaterialcomplyingwith
Table6/1shallbeused.
AfterplacingofanyblindingconcreteshownontheDrawings,notrimmingofthesidefacesofthe
excavationshallbecarriedoutfor24hours.
2 TheContractorshallmakegood:
(i) (11/09)anylateraloverbreakoftheexcavationabovethebottomofthefoundationgreater
thanthenetvolumerequiredforthe
PermanentWorkswithmaterialofthesameClassasusedforfillabovestructural
concretefoundationstocomplywith
Clause611(exceptthatforcorrugatedsteel
buriedstructuresClass6Klowerbeddingmaterialshallbeused)or,wherethe
excavationistoonarrowtoallowthecompactionofearthworksmaterials,with
ST1concretetoClause2602;
(ii) (11/09)anyadditionalexcavationatorbelow
thebottomoffoundations,includingthatresultingfromremovalofmaterialwhichthe
Contractorhasallowedtodeteriorate,with
ST1concretetoClause2602(orother
materialrequiredbyAppendix6/3)except
thatundercorrugatedsteelburiedstructuresClass6Klowerbeddingmaterialshallbe
used.
Amendment-November2009 6
7/28/2019 Specification for Highway Works series 600: earthworks
7/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
3 Class6Klowerbeddingmaterialreferredtointhis
ClauseshallbedepositedandcompactedincompliancewithClauses608and612andTable6/1.
605 Special Requirements for Class 3Material
1 WhenAppendix6/1designatesamaterialasClass
3tobeusedortoremainintactinthePermanentWorks
thefollowingshallapply:
(i) NoearthworksinvolvingClass3materialor
traffickingofareaswhichconsistofClass3
material,unlesstheyareprotected,shallbecarriedoutduringtheperiodsdescribedin
Appendix6/4.
(ii) ExcavationofClass3materialshallbebymeansofafaceshovel,whichshallexcavate,
swingandunloadwithoutmovingthechassis
orundercarriageduringoneoperatingcycle,orbymeansofasimilarshovel-loading
machine,soastoreducethedegradationof
thematerialtoaminimum.
(iii) WhenexcavatingClass3materialthe
Contractorshallarrangehismethodof
workingsoastomaintainaworkingfaceofminimumheight3morotherheightrequired
inAppendix6/4withinClass3materialexceptthatwherethedepthofthecuttingislessthan3mthefullheightofClass3
materialshallformtheworkingface
excludinganyprotectionrequiredtotheformationorsub-formation.
(iv) Materialotherthanchalkcontainedwithin
thevolumedesignatedasClass3materialintheContractshallbeexcavatedanddeposited
separatelyfromchalkandnotbemixedwith
it.
(v) TraffickingofareasofClass3materialshallnotbepermittedbyvehicleshavinga
capacitywhenstruckofmorethan15m3unlessotherwisedescribedinAppendix6/4.
(vi) Class3materialshallnotbestockpiledorbe
subjectedtomultiplehandling.
(vii) Class3materialshallnot,unlessrequiredin
Appendix6/4,belayeredwithotherfill
materialintheconstructionofembankmentsandotherareasoffill.
(viii) WhenrequiredinAppendix6/4
embankmentsandotherareasoffillconstructedofClass3materialshalleither:
(a) uponreachingalevel600mmbelow
sub-formationor,wherethereisno
capping,alevel600mmbelow
formation,beleftforaminimumof4weeksorotherperiodstatedin
Appendix6/4,beforecontinuingfillingwhichshall,inallcases,becontinuedincompliancewithsub-Clause608.9;or
(b) becontinuedabovesub-formationor
formationwithaprotectivelayerinaccordancewithsub-Clause608.9(ii)
butwhichshallbeofClass3material.
Suchmaterialshallthenbeleftforaminimumof4weeksorotherperiod
statedinAppendix6/4beforeremoval
oftheprotectivelayerandshallbeimmediatelycontinuedwiththe
preparationofsub-formationorformation,asappropriate,inaccordancewithClauses613and616.
(ix) Wheretemporaryinstabilityoccursinchalk
duringdepositionorcompactionduetoexcessiveworkingbyplantortoinclement
weather,theContractorshalldelaythe
furtherdepositionofClass3materialuntilthechalkhasrecoveredsufficientstrength
forworktoproceed.Adetailedrecordofthe
areasofinstabilityshallbemadeavailableto
theOverseeingOrganisation.(x) Attheendofeachworkingdayoffilling,
exposedClass3materiallaidthatdayshall,unlessotherwisestatedinAppendix6/4be
rolledwithtwopassesofasmoothwheeled
rollerhavingamasspermetrewidthofrollexceeding2100kg.
(xi) TheotherspecialrequirementsforClass3
materialdescribedinsub-Clauses613.11(i),613.12(i),616.1(ii)and616.3shallalso
apply,togetherwithanyotherspecial
requirementsdescribedinAppendix6/1orAppendix6/4.
606 Watercourses
1 Theclearanceandmodificationofexisting,orthe
constructionofnewwatercourses,includingditches,streams,rivers,lagoonsandponds,shallbeasdescribed
inAppendix6/3includinganyprotection,lining,
revetmentorotherworksandshallcomplywithsub-Clauses2to4ofthisClause.
2 Clearanceofexistingwatercoursesshallincludethe
removalofvegetation,vegetablematterandallotherdepositswithinthewatercourseprofile.Materials
resultingfromthisclearanceshallbedealtwithas
unacceptablematerial.
Amendment-November2009 7
7/28/2019 Specification for Highway Works series 600: earthworks
8/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
3 Newwatercoursesandclearedexisting
watercoursesshallbemaintainedinaclearcondition.
4 Redundantwatercoursesshall,whererequiredin
Appendix6/3,bedrainedandclearedinaccordance
withsub-Clause2ofthisClauseandmaterialoutsidethewatercourseprofileexcavatedanddealtwithas
unacceptablematerial.Theexcavationsshallbetothe
dimensionsstatedintheContractandthewholefilledwithgeneralorselectedfillsoftheClassdescribedin
Appendix6/3complyingwithTable6/1depositedand
compactedincompliancewithClause608and612.Wherethesurfaceistoremainexposeditshallbe
topsoiledandseeded,orreceiveothertreatment,allas
describedinAppendix6/3.
#607 Explosives and Blasting for Excavation
1 BlastingforexcavationshallnotbeemployedunlesspermittedorrequiredinAppendix6/3andsuch
blastingshallbeconfinedtothelocationsandtowithin
thetimelimitsstatedtherein.
2 TheContractorshall:
(i) notcarryoutplastershooting;
(ii) foreachlocationwhereblastingistobeundertaken,givewrittennoticetothe
OverseeingOrganisationoftheprogramme
ofblasting,includingtrialexplosions,atleast10daysbeforeitcommencesandgive
writtennoticeofeachblastingeventas
describedin(v)below,atleast12hoursbeforehand;
(iii) carryouttrialexplosionsstartingwith
reducedquantitiesofexplosiveinordertodeterminethesizeoftheactualexplosive
chargesandtheirdisposition,foruseinthe
mainblastingoperations,soasnottoexceedthevaluesforvibrationalamplitudeand
vibrationalpeakparticlevelocitystatedin
(vi)belowatthepositionsdescribedtherein;
(iv) determinedangerzoneslikelytobecreated
bytheblastingoperations,includingtrial
explosions,withinwhichblastedmaterialmaybeprojectedandutilisesuitable
arrangementsincludingTemporaryWorks,to
retainsuchprojectilesandensurethatnoinjuryordamageiscausedtopersonsor
propertythereby;
(v) limitblastingtoasmallnumberofeventsduringpermittedhoursperday,wherean
eventshallcompriseasingleexplosionoragroupofexplosionseachseparatedbyashorttimeinterval,thegrouplastinglessthana
minute;
(vi) ensurethat:
(a) structuresandearthworks,existingor
underconstruction,onandofftheSite,
donotexperience,duringblasting
operationsincludingtrialexplosions,avibrationalamplitudeexceeding0.2mm
andaresultantpeakparticlevelocityexceeding50mmpersecond,orother
limitsstatedinAppendix6/3,atthe
sametimeorindividually;and
(b) peakoverpressures,ofmagnitudesuch
astoendangerwindowsandglazed
areasofstructures,donotoccur.
(vii) whereinstrumentationandmonitoringis
appropriate:
(a) rigidlyfixtostructuresandinsertinearthworksdescribedin(vi)(a)above,
suitableinstrumentstomeasurethe
vibrationalamplitudeandresultantvibrationalpeakparticlevelocity,and
peakoverpressures,experiencedduring
blastingoperationsincludingtrialexplosions;
(b) makeavailabledetailsoftheproposed
instrumentationwithintheSite;
(c) unlessotherwisestipulatedin
Appendix6/3,makehisown
arrangementsforinstallinginstrumentsonpropertyofftheSiteincluding
negotiatingwithlandownersandother
interestedparties;
(d) readsuchinstrumentsandtake
measurementsthroughouttheperiodof
blastingoperations,includingtrialexplosions;
(e) forinstrumentsonstructuresor
earthworksontheSiteand,whererequiredinAppendix6/3,onproperty
offtheSite,makeavailabletheresults
totheOverseeingOrganisationattheendofeachdaysblasting.
(viii) takemeasurementsofvibrationalamplitude
andpeakparticlevelocityineachofthreemutuallyperpendicularplanesanddetermine
thepeakvalue,takenasthemaximum
resultantcalculatedbyvectorsummationof
thethreecomponentsofamplitudeandvelocityrespectively,measuredas
instantaneouslyastheresolutionoftherecordinginstrumentpermits;
Amendment-November2009 8
7/28/2019 Specification for Highway Works series 600: earthworks
9/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
(ix) ensurethatnoisefromblastingoperationsis
controlledinaccordancewithClause109;
(x) useexplosivesinthequantitiesandinthemannerrecommendedbythemanufacturer;
(xi) storeexplosivesinregisteredpremisesina
licensedstoreormagazineprovidedwithaseparatecompartmentfordetonatorsoruse
themunderanImmediateUseCertificate
issuedbythepolice;
(xii) onlypermitexplosivestobeusedorhandled
byorundertheimmediatecontrolofa
competentpersoninaccordancewiththeConstruction(GeneralProvisions)
Regulations1961(Regulation19)and
subsequentamendingRegulations;
(xiii) ensurethereisnounauthorisedissueor
improperuseofexplosivesbroughtonthe
Siteandmaintainastrictcheckonquantitiesissuedandconsumed;
(xiv) complywiththerequirementsofBS6657in
respectoftheuseofelectricaldetonatorsinthevicinityofstaticandmobileradio
transmitters,includingnormalradioand
televisionbroadcastingstationsandradarunitsassociatedwithaircraftmovements,
electricitygeneratingplantandtransmission
lines.
608 Construction of Fills
1 Allfills,includingembankments,shallbeconstructed:
(i) inthelocationsdescribedinAppendix6/3to
thelinesandlevelsstatedtherein;
(ii) ofClassesofmaterialsrequiredorpermittedinAppendix6/1,complyingwithTable6/1
with,unlessotherwisedescribedintheContract,onlyClass6Amaterialdepositedintoopenwater;
(iii) bydepositing,assoonaspracticableafter
excavation,inlayerstomeetthecompactionrequirementsofClause612asrequiredfor
eachClassofmaterialinTable6/1,except
that:
(a) materialrequiringendproduct
compactionshallbedepositedinlayers
notexceeding250mmuncompacted
thickness;(b) materialplacedintoopenwatershallbe
depositedbyendtippingwithoutcompaction;
(c) materialdepositedinareastoreceive
dynamiccompactioncomplyingwithClause630shallbedepositedand
compactedtotherequirementstherein.
(iv) totherequirementsofthisClauseandanyotherrequirementsforfillinthisSeries.
2 StarterlayersofClasses6B,6Cor6Dmaterialsas
describedinAppendix6/3shallbedepositedasthefirstlayerorlayersoffillaboveexistinggroundlevelor,if
appropriate,aboveanygroundimprovementrequiredby
Appendix6/13.StarterlayersbelowClass2Epulverised-fuelashgeneralfillshallbeClass6D
material.Plantmovementacrossstarterlayermaterial
shallberestrictedtothatplantwhichisnecessaryforitsdeposition,spreadingandcompactionincompliance
withthisClauseandClause612andanyplantrequiredtocarryoutanygroundimprovementbeneathitifrequiredbyClause630.TheContractorshalltakeall
reasonablemeasurestopreventdamagetothe
underlyingstrata,whichmayincludeuseoflighterspreadingplantorareductionofthenumberofpasses
ofcompactionplant.
3 CoarsegranularmaterialClasses1Cand6Bshall,beforecompaction,bespreadinlayersbyacrawler
tractorofnotlessthan15tonnestotalmass.After
compactioneachlayershall,ifvoidsremain,beblinded
withanapprovedClassofgranularmaterialcomplying
withTable6/1sothatallsurfacevoidsarefilledbeforethenextlayerandbeforeanycappingorsub-baseis
constructed.
4 Embankmentsandotherareasoffillshall,unless
otherwiserequiredintheContract,beconstructed
evenlyovertheirfullwidthandtheirfullestpossibleextentandtheContractorshallcontrolanddirect
constructionalplantandothervehiculartraffic
uniformlyoverthem.Damagebyconstructionalplantandothervehiculartrafficshallbemadegoodbythe
Contractorwithmaterialhavingthesamecharacteristics
andstrengthasthematerialhadbeforeitwasdamaged.5 Embankmentsandotherareasofunsupportedfills
shallnotbeconstructedwithsteepersideslopes,orto
greaterwidthsthanthosedescribedinAppendix6/3,excepttopermitadequatecompactionattheedges
beforetrimmingback,ortoobtainthefinalprofile
followinganysettlementofthefillandtheunderlyingmaterial.Howeveranyoversteepeningorincreasein
widthshallnotexceedanylimitsdescribedin
Appendix6/3andshallremainonlyfortheminimumperiodsnecessaryconsistentwiththesafetyofthe
PermanentWorks.
6 Stagedconstructionoffillsandanycontrolledratesoffilling,shallbecarriedout,inaccordancewithany
requirementsdescribedinAppendix6/3including
Amendment-November2009 9
7/28/2019 Specification for Highway Works series 600: earthworks
10/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
installationofinstrumentationanditsmonitoring,in
compliancewithClause629.
7 WhererequiredinAppendix6/3theContractorshallsurchargeembankmentsorotherareasoffill,as
describedthereinfortheperiodsstated.Ifsettlementofsurchargedfillresultsinanysurchargingmaterial,whichisunacceptableforuseinthefillbeing
surcharged,lyingbelowtheformationor,wherethereis
acapping,thesub-formation,theContractorshallremovethisunacceptablematerialanddisposeofitin
accordancewithClause602.Heshallthenbringthe
resultantleveluptoformationorsub-formation,asappropriate,withacceptablematerial.
8 Wherepipesinembankmentsorinotherareasof
fillarepermittedinAppendix5/1tobeconstructed
otherthaninatrench,thefillshallbebroughtuptoandoverthemequallyonbothsides.Thefillshallbe
depositedinevenlayersandshallnotbeheapedabovethepipe.Spreadingandcompactionshallbecarriedout
evenlywithoutdislodging,distortingordamagingthe
pipe.Powerrammersarenottobeusedwithin300mmofanypartofthepipeorjoint.
9 Thelast600mmdepthoffilluptosub-formation
level,orformationlevelasappropriate,shall,unlessotherwiserequiredintheContract,becarriedoutforthe
fullwidthofembankments,orbetweentheouter
extremitiesofthevergesinotherareasoffill,ina
continuousoperation.TheContractorshallthencontinuewithoutdelaytocarryouteither(i)or(ii)
below:
(i) formthesub-formationorformation,allinaccordancewithClauses613and616,
followingimmediatelyeitherby:
(a) theconstructionofthefullthicknessofcappingorsub-baseasappropriate;or
(b) ifpermittedinAppendix6/3,the
constructionofalesserthicknessof
cappingorsub-baseasdescribedthereinlaidasaweatherprotectionlayer;
(ii) placeanadditional300mmminimumcompactedthicknessofmaterialabove
sub-formationlevelorformationlevelas
appropriateforthefullwidthofthefillingtoformaweatherprotection.Thisweather
protectionshallbecomposedofthesame
materialasthesub-formationorformationandcompactedincompliancewithTable6/1.
Thematerialshallbeprovidedfromthe
Contractorsownresourcesandthe
protectionlayershallbeconstructedinacontinuousoperation.Forstabilisedcapping,
theprotectivelayershallconsistofunstabilisedmaterial.
10 Duringconstructionofembankmentsandotherfills,exposedsidesofClasses2Eand7Bpulverised-
fuelashmaterialshallbeprotectedagainstscourand
erosionfromanysource.
11 (05/01)CompletedslopesofClasses2Eand7BfillmaterialshallbecoveredimmediatelybyClass5topsoil
asrequiredinAppendix6/8orturforothermaterial,as
requiredinAppendix30/5.
12 Wheneverfillistobedepositedagainstthefaceof
anaturalslope,orslopingearthworksfaceincluding
embankments,cuttings,otherfillsandexcavations,suchfacesshallbebenchedorotherwiseshapedasrequired
inAppendix6/3immediatelybeforeplacingthe
subsequentfill.
13 Allpermanentfacesofsideslopesofembankments
andotherareasoffillformedinClasses2or7cohesivematerialsotherthanpulverised-fuelash,shall,subsequenttoanytrimmingoperations,bere-worked
andsealedbytrackingatrackedvehicle,suitableforthe
purpose,ontheslope,orbyothersuitablemethods.
609 Geotextiles Used to Separate EarthworksMaterials
1 GeotextilesrequiredaspartofthePermanent
Workstoseparateearthworksmaterialsatlocations
describedinAppendix6/5shallbemanufacturedfromsyntheticorotherfibresasrequiredthereinandbeinthe
formofthinpermeablemembranes.
2 TheContractorshallprovideevidencetothe
OverseeingOrganisation,beforethegeotextileis
incorporatedinthePermanentWorks,thatthegeotextile
willbesufficientlydurable,wheninstalledincontactwiththematerialstobeseparated,tomaintainits
integrityforatleastthelifeperiodrequiredin
Appendix6/5.
3 Geotextilesshallbeprotectedatalltimesagainst
mechanicalorchemicaldamage.ThosesusceptibletodamagebylightshallnotbeuncoveredbetweenmanufactureandincorporationinthePermanentWorks.
Temporaryexposureshallnotexceed5hours.
4 ThemethodofselectionandtherequirednumberofsamplesareasdescribedinAppendix6/5.Samplesshall
betakenfromtheconsignmentofgeotextiletobeused
inthePermanentWorks.Samplesandtestpiecescutfromthemshallcomplywithsub-Clause7ofthis
Clauseandtestpiecesshallbetestedatalaboratoryto
provethatthegeotextilemeetsthefollowingcriteriaorothercriteriadescribedinAppendix6/5:
(i) Thegeotextileshallsustainatensileloadof
notlessthanthatvaluegiveninAppendix6/5,determinedinawidestrip
Amendment-November2009 10
7/28/2019 Specification for Highway Works series 600: earthworks
11/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
tensiletestcarriedoutinaccordancewith
BS6906:Part1.Thecharacteristicstrength
shallbetakenasthevalueofthestrengthofthematerialbelowwhichnotmorethan5%
ofthetestresultsmaybeexpectedtofall.Thisrepresentsthestrengthat1.64standarddeviationsbelowthemeanstrength.
(ii) Thegeotextileshallallowwatertoflow
throughit,atrightanglestoitsprincipalplane,ineitherdirection,atarateofnotless
than10litres/m2/sunderaconstantheadof
waterof100mm,determinedinaccordance
withBS6906:Part3.Theflowratedeterminedinthetestshallbecorrectedto
thatapplicabletoatemperatureof15C
usingpublisheddataonvariationinviscosity
ofwaterwithtemperature.
(iii) Thegeotextileshallhaveasizedistribution
ofporeopeningssuchthatthemean090,is
between100micronsand300microns,determinedinaccordancewith
BS6906:Part2.
5 ThegeotextileshallbelaidandlappedasdescribedinthisClauseorasdescribedinAppendix6/5and
wherelappingisemployedadjacentsheetsorstripsof
geotextileshallbeoverlappedbyatleast300mm,orotherdimensiondescribedinAppendix6/5.
6 Thelayerofmaterialonwhichthegeotextileisto
beplacedshallnothaveprotrusionsorsharpprojectionswhicharelikelytodamagethegeotextileduring
installationorinservice.Themethodofinstallation
shallensurethatthegeotextileisincontinuouscontactwiththesurfaceonwhichitistobeplacedandthe
geotextileshallnotbestretchedorbridgedoverhollows
orhumps.Operationofconstructionplantdirectlyontheinstalledgeotextilewillnotbepermittedandits
coveringwithfillmaterialshalltakeplaceimmediately
afteritslaying.
7 Allsamplesandtestpiecescutfromthemshallbemaintainedinacleananddrycondition,exceptfor
normalcontaminationandwettingduringtesting,andshallberetainedbytheContractorinaccordancewith
Appendix6/5.Priortodeterminationofporesizeand
tensilestrength,testpiecesshallbeconditionedandbroughtintoequilibriumatatemperatureof202C,
andarelativehumidityof655%.Thedryweightof
thegeotextiletestedshallbequoteding/m.
8 Thenumberoftestsonsamplesshallbeasrequired
inAppendix6/5.
610 Fill to Structures
1 ThisClauseshallapplytofilltostructuresotherthan:
(i) fillforreinforcedearthstructures,includingassociateddrainagelayers;
(ii) fillforanchoredearthstructuresincluding
associateddrainagelayers;
(iii) fillforsurroundandbeddingofcorrugated
steelburiedstructures;
(iv) fillabovestructuralconcretefoundations
unlessotherwiserequiredinAppendix6/6.
2 Materials,asrequiredorpermittedinAppendix6/6ofClasses6N,6P,7Aor7Bandcomplyingwith
Table6/1shallbeusedasfilltostructures,inthelocationsdescribedinAppendix6/6.
3 TheContractorshallcompact,incompliancewith
Clause612,end-productcompaction,Class6N,6P,7A
and7BmaterialtosatisfythecompactionrequirementsforthoseClassesaslistedinTable6/1,butsubjecttothe
restrictionsinsub-Clauses4and5ofthisClause.
4 Wherefilltostructuresisrequiredtothesamelevelonmorethanonesideofastructuralelementorburied
structure(exceptwhereClause623applies)itshallbe
maintainedatheightsnotdifferingbymorethan250
mmaftercompactiononopposingsidesofthestructuralelementasfillingproceeds.
5 TheContractorshallrestrictcompactionplantusedonfilltostructures,within2mofastructure,tothe
followingitemsasdescribedinsub-Clause612.10and
listedinTable6/4:
(i) vibratoryrollerhavingamasspermetre
widthofroll,asdeterminedbysub-Clause
612.10,notexceeding1,300kgwithatotalmassnotexceeding1,000kg;
(ii) vibratingplatecompactorhavingamassnot
exceeding1,000kg;
(iii) vibro-tamperhavingamassnotexceeding
75kg.
Thecompactedlevelofthefillwithinthiszoneshallnotdifferduringconstructionfromthecompactedlevelof
theremainderoftheadjoiningfilltostructuresbymore
than250mm.
6 WhererequiredinAppendix6/6,Class6N,6Pand
7Bmaterialshallbeshown,bymeansofatrialutilising
notlessthan20m3ofthematerial,depositedand
compactedinaccordancewiththisClause,tobestable,whenitistrimmedtoaslopeof1verticalto1
horizontal,orotherslopedescribedinAppendix6/6.
Amendment-November2009 11
7/28/2019 Specification for Highway Works series 600: earthworks
12/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
611 Fill Above Structural ConcreteFoundations
1 Filldepositedabovestructuralconcretefoundations
shallbe,asshownontheDrawings:
(i) Class6N,6P,7Aor7BselectedfillmaterialcomplyingwithClause610including
compactionrequirements;
(ii) Class6Mselectedfillmaterial,depositedandcompactedinaccordancewithClause623,
abovethefoundationofarchprofile
corrugatedsteelburiedstructures;
(iii) anotherclassofselectedfillorgeneralfill
complyingwithTable6/1depositedand
compactedincompliancewithClauses608
and612andinadditionbesubjecttosub-Clauses610.4and5.
612 Compaction of Fills
General
1 Exceptfordynamiccompaction,whichshall
complywithClause630,andunlessotherwisedescribed
inAppendix6/3,theContractorshallcarryoutcompactionincompliancewiththisClause,assoonas
practicableafterdeposition,onallthoseClassesoffill
inTable6/1whichrequiretobecompacted.
2 Compactionshallbeeithermethodorend-product
asrequiredfortheClassoffillinTable6/1,usingplant
appropriatetotheClassoffillandthesiteconditions.
3 TheContractorshallobtainpermissionfromthe
OverseeingOrganisationbeforecarryingout
compactionoutsidenormalworkinghours.
Method Compaction
4 Wheremethodcompactionisrequiredtobe
adopteditshallcomplywithsub-Clauses5to10ofthisClause.
5 Exceptasstatedinsub-Clause6ofthisClause,
methodcompactionshallbeundertakenusingtheplantandmethodsinTable6/4appropriatetothecompaction
requirementsaslistedinTable6/1fortheClassof
materialbeingcompacted.
6 PlantandmethodsnotincludedinTable6/4shall
onlybeusedprovidingtheContractordemonstratesat
sitetrialsthatastateofcompactionisachievedbythealternativemethodequivalenttothatobtainedusingthe
specifiedmethod.7 Earthmovingplantshallnotbeacceptedascompactionequipmentnorshalltheuseofalighter
categoryofplanttoprovideanypreliminarycompactiontoassisttheuseofheavierplantbetakenintoaccount
whenassessingtheamountofcompactionrequiredfor
anylayer.
8 IfmorethanoneClassofmaterialisbeingusedinsuchawaythatitisnotpracticabletodefinetheareas
inwhicheachClassoccurs,theContractorshallcompactwithplantoperatingasifonlythematerial
whichrequiresthegreatercompactiveeffortisbeing
compacted.
9 TheContractororOverseeingOrganisationmay
carryoutfielddrydensitytestsasdescribedinsub-
Clause15ofthisClauseonmaterialcompactedtomethodrequirementsatafrequencydefinedin
Appendix6/3.Iftheresultsoffieldtestsshowdensities
whichindicatethestateofcompactiontobeinadequate,thenifthisisduetofailureoftheContractortocomply
withtherequirementsoftheContract,theContractor
shallcarryoutsuchfurtherworkasisrequiredto
complywiththeContract.
10 ForthepurposesofTable6/4thefollowingshall
apply:
(i) TheminimumnumberofpassesNistheminimumnumberoftimesthateachpointon
thesurfaceofthelayerbeingcompacted
shallbetraversedbytheitemofcompaction
plantinitsoperatingmode,orstruckbypowerrammersorfallingweightcompactors.
Disthemaximumdepthofthecompactedlayer.
(ii) IncolumnheadedN#thenumberofpasses
shownistobedoubledformaterialClasses1A,1B,2A,2B,2Cand2Dwhensuch
materialsoccurwithin600mmofsub-
formation(ifcappingisrequired)orformation.Suchextracompactionshall,
unlessotherwisedescribedinAppendix6/3,
eitherbecarriedoutforthefullwidthofthe
embankmentor,inotherareasoffillwhicharetoreceiveapavement,betweentheouter
extremitiesoftheverges.
(iii) ThecompactionplantinTable6/4is
categorisedintermsofstaticmass.Themass
permetrewidthofrollisthetotalmassontherolldividedbythetotalrollwidth.Where
asmoothwheeledrollerhasmorethanone
axlethecategoryofthemachineshallbedeterminedonthebasisoftheaxlegivingthe
highestvalueofmasspermetrewidth.
(iv) Agridrollerisamachinewithacompactingrollorrollsconstructedofheavysteelmesh
ofsquarepattern.
Amendment-November2009 12
7/28/2019 Specification for Highway Works series 600: earthworks
13/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
(v) Adeadweighttampingrollerisamachine
witharollorrollsfromwhichfeetproject
andwheretheprojectedendareaofeachfootexceeds0.01mandthesumofthe
areasofthefeetexceeds15%oftheareaofthecylindersweptbytheendsofthefeet.Therequirementsfortampingrollersapplyto
machinesthathave2rollsintandem.Ifonly
onetampingrolltraverseseachpointonthesurfaceofthelayeronanyonepassofthe
machine,theminimumnumberofpasses
shallbetwicethenumbergiveninTable6/4plusanyfurtherdoublingrequiredtosatisfy
(ii)above.
(vi) Forpneumatic-tyredrollersthemassper
wheelisthetotalmassoftherollerdivided
bythenumberofwheels.Inassessingthenumberofpassesofpneumatic-tyredrollers
theeffectivewidthshallbethesumofthewidthsoftheindividualwheeltracks
togetherwiththesumofthespacings
betweenthewheeltracksprovidedthateachspacingdoesnotexceed230mm.Wherethe
spacingsexceed230mmtheeffectivewidth
shallbethesumofthewidthsoftheindividualwheeltracksonly.
(vii) Avibratorytampingroller,whichmaybe
self-propelledortowed,isamachinehaving
ameansofapplyingmechanicalvibrationtooneormorerolls.Therollorrollshave
projectingfeetwheretheheightofeachfoot
exceeds10%oftheradiusoftherolldrum,theprojectedendareaofeachfootexceeds
0.1%oftherolldrumsurfacearea,andthe
sumoftheareasofthefeetexceeds10%oftheareaofthecylindersweptbytheendsof
thefeet.
Therequirementsfortheoperationof
vibratorytampingrollersshallbethesameas
thosestatedforvibratoryrollersinsub-Clause(viii)exceptthatvibratorytamping
rollersoperatingwithoutvibrationwillbeclassifiedasdeadweighttampingrollers.
(viii) Vibratoryrollersareself-propelledortowed
smooth-wheeledrollershavingmeansof
applyingmechanicalvibrationtooneormorerollsexceptthatvibratoryrollersemployed
forMethod5compactionshallbesingleroll
types.
Vibratoryrollersoperatingwithoutvibration
willbeclassifiedassmooth-wheeledrollers. Therequirementsforvibratoryrollersare
basedontheuseofthelowestgearonaself-propelledmachinewithmechanical
transmissionandaspeedof1.5to2.5km/h
foratowedmachine,oraself-propelledmachinewithhydrostatictransmission.If
highergearsorspeedsareusedanincreased
numberofpassesshallbeprovidedinproportiontotheincreaseinspeedoftravel.
Wherethemechanicalvibrationisappliedto
tworollsintandem,theminimumnumberofpassesshallbehalfthenumbergivenin
Table6/4fortheappropriatemasspermetre
widthofonevibratingrollbutifonerolldiffersinmasspermetrewidthfromthe
otherthenumberofpassesshallbe
calculatedasfortherollwiththesmallestvalue.Alternativelytheminimumnumberof
passesmaybedeterminedbytreatingthe
machineashavingasinglevibratingrollwithamasspermetrewidthequaltothatof
therollwiththehighervalue.
Vibratoryrollersshallbeoperatedwiththeirvibratorymechanismoperatingonlyatthe
frequencyofvibrationrecommendedbythe
manufacturers.Wheremorethanoneamplitudesettingisavailableand/orarange
offrequenciesisrecommended,themachine
shallbeoperatedatthemaximumamplitudesettingandatthemaximumrecommended
frequencyforthatsetting. Vibratoryrollersshallbeequippedor
providedwithdevicesindicatingthefrequencyatwhichthemechanismis
operatingandthespeedoftravel.Both
devicesshallbecapableofbeingreadbyaninspectoralongsidethemachine.
(ix) Vibrating-platecompactorsaremachines
havingabase-platetowhichisattachedasourceofvibrationconsistingofoneortwo
eccentricallyweightedshaftsand:
(a) themasspersquaremetreofthebase-plateofavibrating-plate
compactoriscalculatedbydividingthe
totalmassofthemachineinitsworkingconditionbyitsareaincontactwith
compactedmaterial;
(b) vibrating-platecompactorsshallbeoperatedatthefrequencyofvibration
recommendedbythemanufacturers.
Theyshallnormallybeoperatedattravellingspeedsoflessthan1km/hbut
ifhigherspeedsarenecessarythenumberofpassesshallbeincreasedinproportiontotheincreaseinspeedof
travel.
Amendment-November2009 13
7/28/2019 Specification for Highway Works series 600: earthworks
14/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
(x) Vibro-tampersaremachinesinwhichan
engine-drivenreciprocatingmechanismacts
onaspringsystemthroughwhichoscillationsaresetupinabase-plate.
(xi) Powerrammersaremachineswhichareactuatedbyexplosionsinaninternalcombustioncylinder,eachexplosionbeing
controlledmanuallybytheoperator.
(xii) Droppingweightcompactorsaremachinesinwhichadeadweightisdroppedfroma
controlledheightusingahoistmechanism
andtheyincludeself-propelledmachineswithmechanicaltraversingmechanisms
capableofcompactingsoilintrenchesand
closetostructures.
(xiii) Inthecaseofpowerrammersanddropping-weightcompactorsonepasswillbe
consideredasmadewhenthecompactingshoehasmadeonestrikeontheareain
question.
(xiv) Foritemsmarked*intheMethod3columnofTable6/4therollershallbetowedby
track-layingtractors.Self-propelledrollers
areunsuitable.
(xv) Wherecombinationsofdifferenttypesor
categoriesofplantareused,thefollowing
shallapply:
(a) thedepthoflayershallbethatforthetypeofplantrequiringtheleastdepthof
layer;and
(b) thenumberofpassesshallbethatforthetypeofplantrequiringthegreatest
numberofpasses.
End-product Compaction
11 Whereend-productcompactionisrequireditshall
complywithsub-Clauses12to15ofthisClause.
12 (05/01)TheContractorshallatleast7daysbefore
commencementofend-productcompactionmakeavailablethefollowingtotheOverseeingOrganisation:
(i) thevaluesofmaximumdrydensityandthe
optimummoisturecontentobtainedinaccordancewithBS1377:Part4usingthe
2.5kgrammermethodorvibratinghammer
methodasappropriateforeachofthefillshe
intendstousewhichmeettherequirementsofthepermittedClassorClasses(where
withinanyClassofmaterialthefillcontains
materialhavingdifferentmaximumdrydensitiesandoptimummoisturecontentsthe
Classshallbefurthersub-divided,by
extendingtheidentificationsystem,inorder
tomonitorthecompacteddensity);
(ii) agraphofdensityplottedagainstmoisture
contentfromwhicheachofthevaluesin(i)
aboveofmaximumdrydensityandoptimummoisturecontentweredeterminedand,for
Class7Amaterial,aplotofthe5%airvoids
curveforeachsub-division.
13 Oncetheinformationcontainedinsub-Clause12of
thisClausehasbeenmadeavailabletotheOverseeing
Organisationitshallformthebasisforcompaction.
14 Fillcompactedtoend-productrequirementsshall
haveafielddrydensity,measuredinaccordancewith
sub-Clause15ofthisClause,equaltoorgreaterthanthepercentagegiveninTable6/1ofthemaximumdry
densityfortherelevantClassoffillpreviouslymadeavailabletotheOverseeingOrganisationinaccordancewithsub-Clause12ofthisClause.
15 Thefielddrydensityreferredtoinsub-Clause14
ofthisClauseshallbemeasuredinaccordancewithBS1377:Part9,exceptthatnuclearmethodsshallonly
beusedwhererequiredorpermittedinAppendix6/3.
Wherenuclearmethodsareused,thegaugeshallbecalibratedinaccordancewithBS1377:Part9.
613 Sub-formation and Capping
1 (05/01)Cappingshallbeprovidedonlyinthoselocations,andtotheextent,particularlystatedin
Appendix6/7tobeconstructedwithcapping.Itshall
complywiththisClauseandinaddition,forstabilisedcapping,withClauses614,615and643asappropriate.
2 (05/04)CappingshallbeconstructedwithClass
6F1,6F2,6F3,6F4,6F5,6S,9A,9B,9C,9D,9Eor9F
materialasrequiredorpermittedinAppendix6/7andcomplyingwithTable6/1.
3 (05/04)Unlessotherwisedescribedin
Appendix6/7,cappingshalleitherconsistofoneClassofcappingmaterialthroughoutitsdepthlaidinoneor
morelayersofcompactedthicknesscomplyingwith
Clause612,orbeformedofnotmorethantwoelementsofdifferentcappingmaterials.Eachelementshallbe
formedofoneormorelayersofthesamecapping
material,eachofcompactedthicknesscomplyingwithClause612.Class9Dor9Estabilisedcappingmaterial
shallnotbeplacedorconstructedaboveClass6F
granularcappingmaterialorClass6Sgranularfilterlayermaterial.
4 WhererequiredinAppendix6/7,beforecommencingtheconstructionofcappinginthePermanentWorks,theContractorshalldemonstratethe
methods,equipmentandmaterialsheproposestouseby
Amendment-November2009 14
7/28/2019 Specification for Highway Works series 600: earthworks
15/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
constructinganarea,orareasasappropriate,ofcapping
onatypicalpreparedsub-formationtothesame
thicknessasrequiredinthePermanentWorks.Theareaofeachcappingconstructiondemonstrationshallbenot
lessthan700m.5 (05/01)ThematerialsplacedduringthedemonstrationmayformpartofthePermanentWorks,
providedtheymeettherequirementsoftheContract,or
becarriedoutelsewhereontheSitewherethisisdetailedinAppendix6/7.Aftercompletionofeach
demonstrationareatheContractorshallwithinaperiod
ofnotgreaterthan5daysandbeforecommencingthemainconstructionoftheappropriatecappinginthe
PermanentWorks,carryouttestsoneachdemonstration
areaandprovidetheOverseeingOrganisationwith
recordssubstantiatingcompliancewiththestipulated
criteriaofAppendix6/7.WhererequiredbyAppendix6/7theContractorshallprovidesheeting,to
protectthedemonstrationarea.
6 Thedemonstrationareashall,ifitdoesnotmeetthe
requirementsforthePermanentWorksorislocated
elsewhereonsite,beremovedandtheareareinstatedinaccordancewithAppendix6/7.
7 Themethodsandmaterialsusedintheaccepted
demonstrationshallnotbechangedduringthecourseoftheWorkswithouttheconstructionofafurther
demonstrationwheresuchdemonstrationsarerequired
byAppendix6/7.
8 UnlessotherwisestatedinAppendix6/7,the
sub-formationshallhavethesamelongitudinalgradient,
crossfallandsurfaceleveltolerancesastheformation.
9 TheContractorshalllimitanyunprotectedareaof
sub-formation,whichistoreceivecappingtosuitthe
outputoftheplantinuseandtherateofdepositionofcapping.
10 Nounprotectedsub-formationwhichistoreceive
cappingshallremaincontinuouslyexposedtorain
causingdegradation,norbeleftuncoveredovernight.11 (05/01)IncuttingstheContractorshall,aspermittedorrequiredinAppendix6/7carryoutoneofthe
followingprocedures:
(i) (05/04)forClass6FgranularcappingmaterialorClass6Sgranularfilterlayermaterial,
excavatebelowformationleveltoadepthto
acceptthecapping,trimthesurfacetoformthesub-formationandimmediatelycompact
withonepassofasmooth-wheeledroller
havingamasspermwidthofrollnotless
than2,100kgoravibratoryrollerhavingamasspermwidthofrollnotlessthan700kg
oravibratingplatecompactorhavingamass
permofnotlessthan1,400kg,exceptthat
onlysmoothwheeledrollersshallbeusedon
Class3chalkmaterial,andimmediatelydepositandcompactaboveitacappingin
Class6FgranularcappingmaterialorClass
6Sgranularfilterlayermaterial;or(ii) forClass9A,9B,9C,9D,9Eor9Fcapping
materialconstructthecappingbystabilising
theintactmaterial,providingitcomplieswithClass6E,6R,7E,7F,7Gor7Imaterial
requirements,immediatelybelowformation
toformClass9A,9B,9C,9D,9Eor9Fmaterial,respectively;or
(iii) (05/04)excavatebelowformationtosufficientdepthtoenablestabilisationofintactClass
6E,6R,7E,7F,7Gor7Imaterialtobe
carriedout,toproduceClass9A,9B,9C,9D,9Eor9Fmaterialformingthelowerelement
ofthecapping(afterstabilisationofthis
element,thecappingshallbecompletedbydepositingafurtherlayerorlayersofClass
6E,6R7E,7F,7G,or7Imaterialand
stabilisingittoformClass9A,9B,9C,9D,9Eor9Fcappingordepositingand
compactingClass6Fgranularcapping
materialtoformtheupperelementofthecapping);or
(iv) (05/04)excavatetosub-formationleveland
depositmaterialcomplyingwithClasses6E,6R,7E,7F,7G,or7ItobestabilisedtoformacappingofClass9A,9B,9C,9D,9Eor9F
layers.
Whereastabilisedlayerisdirectlyoverlain
byClass6Fgranularcappingmaterialthestabilisedlayershallbecompactedasfora
sub-formationin11(i)above.
12 (05/01)OnembankmentsandotherareasoffilltheContractorshall,aspermittedorrequiredin
Appendix6/7carryoutoneofthefollowingprocedures:
(i) (05/04)completetheembankmenttoformthesub-formationorremoveanyprotectionlayer
andtrimthesurfacetoformthesub-
formation,andinbothcasescompactwithonepassofasmooth-wheeledrollerhavinga
masspermwidthofnotlessthan2,100kgor
avibratoryrollerofnotlessthan700kgpermwidthoravibratingplatecompactor
havingamasspermofnotlessthan
1,400kg,(exceptthatonlysmooth-wheeled
rollersshallbeusedonClass3chalk
material)andimmediatelyconstructaboveit,inoneormorelayers,Class6Fgranular
cappingmaterialorClass6Sgranularfilterlayermaterial;or
Amendment-November2009 15
7/28/2019 Specification for Highway Works series 600: earthworks
16/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
(ii) constructtheembankmenttosufficient
heightandcarryoutstabilisationtoforma
cappingofClass9A,9B,9C,9D,9Eor9Fmaterialinoneormorelayersutilisingwhere
appropriateanyprotectionlayerpreviouslyconstructed;or
(iii) (05/04)formulti-elementcapping,
incorporatingstabilisedmaterial,construct
theembankmenttosufficientheighttocarryouttheworkdescribedin12(ii)aboveand
immediatelyconstructaboveitoneormore
layersofClass6Fgranularcappingmaterial.
WhereastabilisedlayerisdirectlyoverlainbyClass6Fgranularcappingmaterialthe
stabilisedlayershallbecompactedasfora
sub-formationin12(i)above.13 ForClass6F3materialOptimumMoistureContent
shallbedeterminedaccordingtoBS1377:Part4
Method3.7(vibratinghammertest).Measurementsofmoisturecontentbothforcontrolpurposesandfor
optimummoisturecontentdeterminationshallbe
accordingtoBS1377:Part2Method3(ovendrymethod)butusinganovenonareducedtemperature
settingof45to50C.
14 (05/04)FilterlayersconstructedofClass6Sgranular
filterlayermaterialshallbeprotectedfromdamageby
trafficandconstructionplant.TheContractorshallsoorganiseworkthatonlythetrafficdirectlyengagedin
depositing,spreadingandcompactingthefilterlayershallbepermittedaccesstothesurfaceofthislayer.At
notimeshalltheContractorpermittheleadingedgeof
thefilterlayertoextendmorethan100metresbeyondtheleadingedgeofthesucceedinglayerofsubbase.
614 Cement Stabilisation to Form Capping
1 Wherecappingistoconsistof,eitherwhollyorin
part,cementstabilisedmaterialClass9A,9Bor9C,this
Clauseshallapplytotheconstructionofthosepartswhicharestabilisedwithcement.
2 MaterialtobestabilisedwithcementshallbeClass6E,Class7FandClass7Gmaterialsallcomplyingwith
Clause601andTable6/1.Unlessotherwisedescribedin
Appendix6/7cementshallbePortlandcementcomplyingwithClause1001.
3 Class6E,7For7Gmaterialtobestabilisedshall
haveaddedtoit,atanypoint,thatquantityofcementmeasuredasapercentageofitsdryweightas
determinedonthedemonstrationarea,tomeetthe
requiredbearingratioinAppendix6/1,subjecttoaminimumof2%cement.
4 Theappropriatequantityofcementshallbe
uniformlyspread,byasuitablespreadingmachine,ontopofthelayertobeprocessed.Usingacollectingtray
andbalancetheContractorshallchecktherateofspread
ofthemachineonceforevery500mofcementspread.5 UnlessindicatedotherwiseinAppendix6/7,Class
6E,7For7Gmaterialshallbestabilisedinasingle
layerifitscompactedthicknessis250mmorless.Ifitscompactedthicknessisgreater,thematerialshallbe
stabilisedinlayersnotlessthan130mmandnotmore
than250mmthick,includinganycutting-inrequiredbysub-Clause9ofthisClause.
6 TheContractorshallnotcarryoutcement
stabilisationwhentheshadetemperatureisbelow3Cunlessonarisingthermometerabove0C.Cement
stabilisationshallnotbecarriedoutduringperiodsofrainorwhenrainisimminent.Whencementisspreadonmateriallikelytocauseprematurehydration,
processinginaccordancewithsub-Clause7ofthis
Clauseshallfollowimmediately.
7 UnlessindicatedotherwisebyAppendix6/7,Class
6E,7For7Gmaterialformingthelayertobestabilised
shallbeprocessedbypulverisingandmixinginthecementbymeansofasufficientnumberofpassesofa
suitablemobilestabilisingmachineuntil95%ofthesilt
andclayfractionisreducedtoparticlesorlumpspassingaBS28mmsieveafterdrysievingandthe
pulverisationcomplieswithTable6/1.
8 (11/05)Duringprocessing,sufficientwatershallbeavailableinthematerialtohydratethecementand
enablesatisfactorymixingandcompactiontobe
achieved.Anyaddedwatershallbethroughanintegral
spray-baronthestabilisingmachine.Anyaddedwatershallhaveasulfatecontentnotexceeding1400mg/las
SO4,whentestedinaccordancewithTestNo.1of
TRLReport447.
9 Thestabilisingmachineshallbeequippedwitha
deviceforcontrollingthedepthofprocessingwhich
shallbemaintainedatthecorrectsettingatalltimes.Anoverlapof150mmshallbemadebetweenadjacent
passesofthestabilisingmachine.Whereasubsequent
layerofmaterialisplacedonalayerpreviouslystabilisedthetinesorbladesofthestabilisingmachine
shallbesetsothattheycutintothepreviouslystabilised
layerbelowbyatleast20mm.
10 (11/05)EachlayerofClass9A,9Bor9Cprocessedmaterialshallbecompactedassoonaspossibleafter
thefinalpassofthestabilisingmachine.Compaction
shallbecompletedwithin2hoursfollowingthemixing
ofthecementintothematerialtobestabilised.ImmediatelybeforecompactionClass9Bprocessed
materialshallhaveaMoistureConditionValue(MCV)ofnotgreaterthan12norlessthanthefigurestatedin
Amendment-November2009 16
7/28/2019 Specification for Highway Works series 600: earthworks
17/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
Appendix6/1forClass9Bcementstabilisedmaterial,
bothasdeterminedinaccordancewithClause632.
WatershallbeaddedifnecessaryinauniformmannertoenablethisMCVrequirementtobemet.Anyadded
watershallhaveasulfatecontentnotexceeding1400mg/lasSO4whentestedinaccordancewithTest
No.1ofTRLReport447.
11 ThecompactionofeachlayerofClass9Aor9B
materialshallcomplywithClause612,Table6/4
Method6orMethod7respectively,exceptthatiflayersofClass9Aor9Bgreaterthan250mmthicknessareto
beconstructed,thenumberofpassesofthecompaction
plantshallbedeterminedfromtheresultsofademonstrationareaasdetailedinAppendix6/7.
12 ThecompactionofClass9Cmaterialshallcomply
withClause612,endproductcompaction,tosatisfythecompactionrequirementsgiveninTable6/1ofthis
Class.
13 Class9A,9Band9CmaterialsshallbecuredinaccordancewithClause1035.Duringperiodswhenthe
airtemperatureisforecasttodropbelow3Corwhen
groundfrostisforecastClass9A,9Band9Cmaterialshallbeprotected,topreventfreezing,foraperiodof
7daysfromthetimeofcompletionofcompaction.Such
protectionshallbesealedtopreventtheingressofmoisture.
14 Class9A,9Band9CmaterialsshallnothaveothermaterialdepositedorcompactedabovethemuntilsuchtimeastherequiredbearingratioinAppendix6/1has
beenachieved.Therelaxationallowedinsub-Clause
617.2shallnotapplybeforethistime.
615 Lime Stabilisation to Form Capping
1 ThisClauseshallapplyonlytothosecapping
materialswhicharetobestabilisedwithlimetoform
materialClass9D.
2 MaterialtobestabilisedwithlimeshallbeClass7E
materialcomplyingwithClause601andTable6/1.
3 (11/03)Limeforlimestabilisationshall,asrequiredinAppendix6/7,beeitherquicklimeorhydratedlime
complyingwithBSEN459-1.Quicklimeshallwhen
sievedhave100%passingaBS10mmsieveandatleast95%bymasspassingaBS5mmsieve.
4 TheContractorshallmakeavailabletothe
OverseeingOrganisationforeachsourceoflimeareportofachemicalanalysisforavailablelimemade
inaccordancewithsub-Clause641.2.Suchreportsshall
bemadeavailabletotheOverseeingOrganisationprior
totheincorporationoflimeinthePermanentWorksatweeklyorotherintervalsdefinedinAppendix6/7
duringperiodswhenlimestabilisationiscarriedout.
5 Class7Ematerialtobestabilisedshallhaveaddedtoit,atanypoint,thepercentageofitsdryweightof
lime,asdeterminedonthedemonstrationarea,tomeet
therequiredbearingratioinAppendix6/1,subjecttoaminimumof2%byweightofavailablelimeasa
percentageofthedryweightoftheClass7Ematerial.
6 Limeofquantitycomplyingwithsub-Clause5ofthisClauseshallbeuniformlyspreadbyasuitable
spreadingmachineontopofthelayertobestabilised.
UsingacollectingtrayandbalancetheContractorshallchecktherateofspreadbyweight,onceforevery
500moflimespreadoradifferentrateoftestingfor
therateofspreadasdescribedinAppendix6/7.AtthesametimetheContractorshallcollectsamplesoflime
depositedonthetrayandtestthemforavailablelime
contentinaccordancewithClause641.
7 UnlessindicatedotherwiseinAppendix6/7,the
materialshallbestabilisedinasinglelayerifits
compactedthicknessis250mmorless.Ifitscompactedthicknessisgreater,thematerialshallbestabilisedin
layersnotlessthan130mmandnotmorethan250mm
thick,includinganycutting-inrequiredbysub-Clause12ofthisClause.
8 UnlessindicatedotherwiseinAppendix6/7lime
stabilisationshallbecarriedoutonlyduringthemonthsofMarchtoSeptemberinclusiveandwhentheshade
temperatureisnotbelow7C.Onlywhenthespecified
bearingratioisattainableatashadetemperaturelessthan7C,maylimestabilisationbecarriedoutatsuch
lowertemperature.Limestabilisationshallbe
suspendedifrainfallwillhaveanadverseeffectonthe
materialbeingstabilised.Thespreadingoflimeshallnotbecarriedoutinamannerorunderconditionsthat
willresultinlimebeingblownfromthesiteonto
adjacentlandorproperty.
9 UnlessindicatedotherwiseinAppendix6/7,the
materialformingthelayerstobestabilisedshallbe
processedbypulverisingandmixinginthelimeby
meansofsufficientnumberofpassesofasuitablemobilestabilisingmachineuntil95%oftheClass9D
processedmaterialpassesaBS28mmsieveafterdrysievingandthepulverisationcomplieswithTable6/1.
10 (11/05)Duringprocessingsufficientwatershallbe
availableinthematerialtoslakethequicklime(ifused)
andtoenablesatisfactorymixingandcompactiontobeachieved.Anyaddedwatershallbethroughanintegral
spray-baronthestabilisingmachine.Anyaddedwater
shallhaveasulfatecontentnotexceeding1400mg/lasSO
4whentestedinaccordancewithTestNo.1of
TRLReport447.
11 (11/05)Thelayershallreceiveatleasttwopassesof
thestabilisingmachinetopulveriseandmixthelimeandsoil,afterwhichtheprocessingshallbeinterrupted
Amendment-November2009 17
7/28/2019 Specification for Highway Works series 600: earthworks
18/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
byaperiodofnotlessthan24hoursandnotgreater
than72hours,toenablethelimetoreactwiththesoil.
Beforethisperiodcommencesthesurfaceofthelayershallbesealedwithonepassofasmoothwheeledroller
havingamasspermetrewidthofrollofnotlessthan2700kgorapneumatictyredrollerofnotlessthan1000kgperwheel.Attheendofthisperiodthelayer
shallreceiveonefurtherpassofthestabilisingmachine
ormoreifrequiredtoenablethematerialtocomplywithsub-Clauses9and13ofthisClause,addingwater
uniformlyifnecessary.Anyaddedwatershallhavea
sulfatecontentnotexceeding1400mg/lasSO4when
testedinaccordancewithTestNo.1ofTRLReport447.
12 Thestabilisingmachineshallbeequippedwitha
deviceforcontrollingthedepthofprocessingwhich
shallbemaintainedatthecorrectsettingatalltimes.An
overlapof150mmshallbemadebetweenadjacentpassesofthestabilisingmachine.Whereasubsequent
layerofmaterialisplacedonalayerpreviouslystabilisedthetinesorbladesofthestabilisingmachine
shallbesetsothattheycutintothepreviouslystabilised
layerbelowbyatleast20mm.
13 EachlayerofClass9Dprocessedmaterialshallbe
compactedassoonaspossibleafterthefinalpassofthe
stabilisingmachine.ImmediatelybeforecompactiontheprocessedmaterialshallhaveaMoistureCondition
Value(MCV)ofnotgreaterthannorlessthanthe
figuresstatedinAppendix6/1,forClass9Dlimestabilisedmaterial,bothasdeterminedinaccordance
withClause632.
14 Ifthereisadelayfollowingthefinalpassand
beforecommencementofcompactionthesurfaceshallbesealedbynotlessthan2passesofasmooth-wheeled
rollerhavingamasspermetrewidthofnotlessthan
2,700kgorofapneumatictyredrollerofnotlessthan1,000kgmassperwheel.Onrecommencementand
beforecompactionthelayershallbere-processed
withouttheadditionoflime,byasufficientnumberofpassesofthestabilisingmachinetomeettheMCV
requirementsofsub-Clause13ofthisClauseaddingwateruniformlyifnecessary.
15 Thecompactionofeachlayershallcomplywith
Clause612,Table6/4Method7exceptthatiflayers
morethan250mmthickareconstructedthenumberofpassesofthecompactionplantshallbethose
determinedfromresultsobtainedonademonstration
areaasdetailedinAppendix6/7.
16 Class9Dmaterialshallnothaveothermaterial
depositedorcompactedaboveituntilsuchtimeasthe
requiredbearingratioinAppendix6/1hasbeen
achieved.Therelaxationallowedinsub-Clause617.2shallnotapplybeforethistime.
616 Preparation and Surface Treatment ofFormation
1 Theformationshall,aftercompletionofany
subgradedrainage,andimmediatelybeforelayingsub-
baseonareasofcompletedformation,haveasurfaceleveltolerancewithin+20mmand-30mm,orother
leveloftolerancedefinedinAppendix6/7relativetoits
designedlevelaftercompletionofthefollowingoperationsasnecessary:
(i) (11/04)Anyprotectionlayershallberemoved
andanysoftordamagedareasshallbe
rectifiedbyexcavatingthemandreplacingwithacceptablematerialhavingthesame
characteristicsandstrengthasthe
surroundingmaterial.Thesurfaceofthe
formationshallbetrimmedandimmediatelycleanedfreefrommudandslurrywhichshall
bedealtwithasunacceptablematerialinaccordancewithsub-Clause#601.2.
(ii) Theformationshallimmediatelybe
compacted,inadditiontothecompactionrequiredforthefill.Thisadditional
compactionshallforthispurposebeassumed
tobeasforalayerof250mmfinishedthicknesscompactedincompliancewith
Clause612andTable6/4Method6except
forClass3materialswhereMethod4shallbeused.Immediatelyaftertheadditional
compactiontheformationshallbetrimmed
toachievethetolerancesofthissub-Clause.
2 Wherethetolerancesinsub-Clause1ofthisClause
areexceeded,theContractorshalldeterminethefull
extentoftheareawhichisoutoftoleranceandshallmakegoodtheformationasfollows:
(i) ifthesurfaceistoohighitshallbe
re-trimmedandre-compactedincompliancewithClause612andsub-Clause1ofthis
Clause;
(ii) ifthesurfaceistoolowitshallbecorrectedbytheadditionofacceptablematerial
complyingwithTable6/1having
characteristicsandstrengthmatchingtheoverlainmaterial,depositedandcompacted
incompliancewithClause608and612and
sub-Clause1ofthisClause.IncohesivematerialsClasses2and7,wherethislow
surfaceislessthan150mmbelowformation,
materialshallberemovedtoadepthofatleast150mmbelowformationbeforethe
additionalmaterialisdepositedandcompacted.
Amendment-November2009 18
7/28/2019 Specification for Highway Works series 600: earthworks
19/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
3 Aftertrimming,orre-trimmingifnecessary,the
formationshallberolledwithonepassofasmooth-wheeledrollerhavingamasspermetrewidth
ofrollnotlessthan2100kgor,exceptforClass3
material,avibratoryrollerhavingamasspermetrewidthofvibratingrollofnotlessthan700kgora
vibratingplatecompactorhavingamasspermunder
thebaseplateofnotlessthan1,400kg.
4 WhererequiredinAppendix6/7orwherethe
tolerancesinsub-Clause1ofthisClausecannotbe
achievedinthepreparationofformationinrockthenoneofthefollowingshallbecarriedoutsoastoachieve
theabovetolerances:
(i) thematerialshallbeexcavatedbelowformationtothedepthdescribedin
Appendix6/7.TheexcavatedmaterialshallbeprocessedasdescribedinAppendix6/7andre-depositedandcompactedin
compliancewithClauses608and612and
Table6/4Method6incompactedlayersnotgreaterthan250mmthick;or
(ii) (11/03)wheretherocksurfaceistabularitshallberegulatedbydepositingand
compactingcementboundmaterialas
describedinAppendix6/7,complyingwiththe1000Series,orST1concreteto
Clause2062.
5 TheContractorshalllimitanyareasofcompletedformationtosuittheoutputofplantinuseandtherate
ofdepositionofsub-base.Noformationofcohesive
materialClasses2and7shallremaincontinuouslyexposedtoraincausingdegradationorbeleftuncovered
overnight.
6 Thepreparationofformationonexistingsub-basematerialshallbecompletedasdescribedin
Appendix6/7.
617 Use of Sub-formation or Formation byConstruction Plant
1 Constructionplantandothervehiculartraffic
(exceptthatrequiredfortheconstructionofcapping)shallnotbeoperatedonthesub-formation,unless
adequateprotection,ifnecessaryinadditiontoany
weatherprotection,isprovided.
2 Constructionplantandothervehiculartraffic
(exceptforthatrequiredforpreparationoftheformation
incompliancewithClause616)shallnotbeoperatedontheformationunlessadequateprotection,ifnecessaryin
additiontoanyweatherprotectionisprovided.3 Inadditiontotherequirementsofsub-Clauses1and2ofthisClause,theContractorshallmakeavailable
totheOverseeingOrganisationhisproposalsforthe
protectionofthesub-formationorformationinareas
wheretheyarewithin300mmoftheexistinggroundlevel,aftertopsoilhasbeenstripped,beforeusing
constructionplantorothervehiculartrafficatorabove
sub-formationorformation.
618 (05/01) Topsoiling
1 TopsoilingshallbecarriedoutusingClass5
materialcomplyingwithTable6/1.
2 Importedtopsoil,Class5Bmaterial,shallonlybe
importedwhenrequiredinAppendix6/8,or
Appendix30/6.
3 WhenrequiredinAppendix6/8topsoilshallnotbe
excavatedfromstockpiles,whetheronsiteorimported:
(i) whichhavebeenexposedtoacumulativerainfallexceeding100mm,orotherfigurestatedinAppendix6/8,overthepreceding28
daysmeasuredatapointdetailedin
Appendix6/8;or
(ii) whenheavyrainisfalling;or
(iii) withatrackedvehicle;or
(iv) whichhavebeenstockpiledformorethan2years;or
(v) whicharefrozen;or
(vi) inthecaseoftopsoilwhichhasbeenstockpiledformorethan6months,unlessthe
stockpilehasbeentreatedwithatotal,
non-residualherbicideasrecentlyasisseasonallypossible(allowingtheperiodof
timerecommendedbythemanufacturerto
elapsepriortoexcavation).
4 Topsoilshall:
(i) bedepositedandspreadontheareas,tothe
thicknessesdescribedinAppendix6/8,inlayersnotexceeding150mm.Eachlayer
shallbefirmedbeforespreadingthenext.Thethicknessshallbereducedwherenecessarytoallowforanysubsequentturfing
requiredinAppendix30/5(itshallnotbe
spreadusingatrackedvehicle,whensostipulatedinAppendix6/8);
(ii) havestonesandotherdebrisremovedand
disposedoffSitewhichhave:
(a) dimensionsgreaterthan100mm
equivalentdiameter,unlessotherwise
permittedinAppendix6/8;and
(b) dimensionsgreaterthan50mm
equivalentdiameterwhichliewithin
50mmofthesurface;
Amendment-November2009 19
7/28/2019 Specification for Highway Works series 600: earthworks
20/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
(iii) begradedtosmoothcontours,eliminatingall
moundsanddepressionswherewatermay
collect;
(iv) nothavestonesorotherdebrisprotruding
abovethesurfacebymorethan30mm,andcomplywiththefurtherrequirementsofClauses3004and3005.
619 Earthwork Environmental Bunds
1 Earthworkenvironmentalbundsshallbe
constructedinthelocationsdescribedinAppendix6/9withfillmaterialscomplyingwiththerequirements
thereinandClause601andTable6/1.Depositionshall
beinaccordancewithClause608andcompactionwith
therequirementsofTable6/1unlessotherwisedescribedinAppendix6/9ortherequirementsof
sub-Clauses2or3ofthisClauseapply.
2 Earthworkenvironmentalbundsformedof
reinforcedoranchoredearthshallbeconstructedin
compliancewithClauses2502and622.
3 Earthworkenvironmentalbundsformedof
strengthenedembankmentsshallbeconstructedin
accordancewithClause621.
4 (05/01)WhererequiredinAppendix6/9earthworkenvironmentalbundsshallbetopsoiledinaccordance
withClause618andseeded,orturfed,allinaccordancewithClause3005.
620 Landscape Areas
1 Landscapeareasshallbeconstructedinthe
locationsshowninAppendix6/9withClass4material
asdescribedthereinandcomplyingwithTable6/1.
2 UnlessmethodcompactiontoClause612is
requiredinAppendix6/9thedegreeofcompactionof
Class4materialshallbesufficienttoremovelarge
voidsandtoproduceacoherentmasswhilstpreventingover-compactionandanybuildupofexcesspore
pressures.
3 Followingcompletionoffillingoflandscapeareas,
Class4materialshallwhererequiredinAppendix6/9,
beshapedasdescribedtherein.
4 Class4materialshallbedepositedinlandscape
areasafteranyadjoiningembankmentorotherareaof
fillhasbeencompleted.WherepermittedinAppendix6/9andprovidedtheadjoiningembankment
orotherareaoffillisalwayskeptatleast1mhigher
thanthelandscapeareafill,constructionofsuchlandscapeareamayproceeduntilcompletion.
5 (05/01)Landscapeareasshallbetopsoiledin
accordancewithClause618andseededorturfedinaccordancewithClause3005totherequirementsof
Appendix30/5.
621 Strengthened Embankments
1 Strengthenedembankmentsshallbeconstructedin
thelocationsandtothedetailsdescribedin
Appendix6/9withfillmaterialsandstrengthening
materialsdescribedtherein.
622 Earthworks for Reinforced Soil andAnchored Earth Structures
1 Theconstructionofearthworksforreinforcedsoil
andanchoredearthstructurestogetherwithassemblyanderectionofreinforcingandanchorelementsand
associatedcomponentsshallbeincompliancewiththisClauseandClause2502.
2 Excavationshallbecarriedoutincompliancewith
Clause604.
3 Fillforreinforcedsoilstructuresshall,exceptfor
theirassociateddrainagelayers,beofClass6I,6J,7B,
7Cor7DselectedmaterialcomplyingwithTable6/1aspermittedinAppendix6/1togetherwithanyother
additionalrequirementstherein.WhereClass7B
conditionedpulverised-fuelashisusedforfill,onlynon-metallicreinforcingelementsshallbeusedand
metallicfastenersshallbeofstainlesssteel.
4 Fillforanchoredearthstructuresshall,exceptfortheirassociateddrainagelayers,beof6Ior6Jselected
materialcomplyingwithTable6/1aspermittedin
Appendix6/1togetherwithanyotheradditionalrequirementstherein.
5 Drainagelayerstoreinforcedsoilandanchored
earthstructuresshallbeoneofthefollowingasappropriate:
(i) Class6HmaterialcomplyingwithTable6/1
andAppendix6/1.
(ii) (05/04)forusewithClass7Bmaterial,
uncrushed,partiallycrushedorcrushedgravelsandcomplyingwithBSEN12620,
finescontentcategoryf3andsizes0/4(CP),
0/4(MP)or0/2(MP)and,whenincontactwithmetalliccomponents,withthe
propertieslistedinTable6/3.
(iii) TypeBfilterdrainmaterialcomplyingwith
Clause505foruseonlyinhorizontaldrainagelayers.
Amendment-November2009 20
7/28/2019 Specification for Highway Works series 600: earthworks
21/75
Volume1 Series600SpecificationforHighwayWorks Earthworks
Verticallayersofdrainagelayermaterial
shallbebroughtupatthesamerateasthe
adjoiningfillmaterialwithoutmixingorcontamination.
6 Inadditiontotherequirementsofsub-Clauses7and8ofthisClause,fillforreinforcedsoilandanchoredearthstructuresshallbedepositedand
compactedincompliancewithClauses608and612and
Table6/1,withmethodcompactionforClasses6H,6I,6J,7Cand7Dmaterialsandend-productcompaction
forClass7Bmaterial.Drainagelayermaterialother
thanClass6HshallbedepositedinaccordancewithClause608andcompactedasdescribedin
Appendix6/3.
7 Reinforcedsoilandanchoredearthstructuresshall
have:(i) thedepositionandcompactioncarriedoutso
thatalllayersofreinforcingandanchorelementsarefixedattherequiredlevelson
topofcompactedfill;
(ii) thedeposition,spreading,levellingandcompactionofthefillcarriedoutgenerallyin
adirectionparalleltothefacingandexecuted
instagestoalternatewiththeplacingandfixingofthereinforcingandanchorelements
andthefacingelements;
(iii) thereinforcingandanchorelementskeptasfreeaspossiblefromdamageor
displacementduringdeposition,spreading,
levellingandcompactionofthefill(alsothe
programmeoffillingshallbearrangedsothatnomachinesorvehiclesrunonthe
reinforcingoranchorelements);
(iv) allconstructionplant,andallothervehicles,havingamassexceeding1,000kg,keptat
least2mawayfromthebackofthefacing;
(v) within2mofthebackofthefacing,the
plantusedforcompactingthefillrestrictedtothefollowingitemsasdescribedin
sub-Clause612.10andlistedinTable6/4:
(a) vibratoryrollerhavingamasspermetre
widthofrollnotexceeding1,300kg
withatotalmassnotexceeding1,000kg;
(b) vibratingplatecompactorhavingamass
notexceeding1,000kg;
(c) vibrotamperhavingamassnot
exceeding75kg;
(vi) attheContractorsoption,thereinforcedsoilandanchoredearthfillbeyondthe2mzone
referredtoin(v)above,raisedinthicker
layersthanwithinthe2mzone,providing
thisiscompatiblewiththearrangementof
thereinforcingandanchorelementsandthedifferenceincompactedleveldoesnot
exceed300mm;
(vii) duringconstructionofthereinforcedsoiloranchoredearthstructuretheretainedfillat
therearofthestructure,asdefinedinsub-
Clause8ofthisClause,maintainedatthesamelevelastheadjoiningreinforcedsoilor
anchoredearthfill;
(viii) iftheretainedmaterialattherearofthereinforcedsoiloranchoredearthstructure,as
definedinsub-Clause8ofthisClause,isan
existingearthworkornaturalslopewhich
requiressupportingbytemporaryshoring,thisshoringshallberemovedprogressively
astheworkproceedstopreventthe
formationofvoids.
8 Therearofthereinforcedsoiloranchoredearth
structureisthepositioncoin