    SERIES 600EARTHWORKS

    Contents

    Clause Title Page

    #601 Classification,DefinitionsandUsesof EarthworksMaterials 2

    602 GeneralRequirements 4

    603 FormingofCuttingsandCuttingSlopes 5

    604 ExcavationforFoundations 6

    605 SpecialRequirementsforClass3Material 7

    606 Watercourses 7

    #607 ExplosivesandBlastingforExcavation 8

    608 ConstructionofFills 9

    609 GeotextilesUsedtoSeparateEarthworks Materials 10

    610 FilltoStructures 11

    611 FillAboveStructuralConcreteFoundations 12

    612 CompactionofFills 12

    613 Sub-formationandCapping 14

    614 CementStabilisationtoFormCapping 16

    615 LimeStabilisationtoFormCapping 17

    616 PreparationandSurfaceTreatmentof Formation 18

    617 UseofSub-formationorFormationby ConstructionPlant 19

    618 (05/01)Topsoiling 19

    619 EarthworkEnvironmentalBunds 20

    620 LandscapeAreas 20

    621 StrengthenedEmbankments 20

    622 EarthworksforReinforcedSoiland AnchoredEarthStructures 20

    623 EarthworksforCorrugatedSteelBuried Structures 21

    624 GroundAnchorages 22

    625 CribWalling 22

    626 Gabions 23627 SwallowHolesandOtherNaturally OccurringCavities 23

    628 DisusedMineWorkings 23

    629 InstrumentationandMonitoring 23

    630 GroundImprovement 23

    631 EarthworksMaterialsTests 24

    #632 DeterminationofMoistureCondition Value(MCV)ofEarthworksMaterials 24

    633 DeterminationofUndrainedShearStrength ofRemouldedCohesiveMaterial 25

    634 (11/05)DeterminationofIntactLumpDry Density(IDD)ofChalk 25

    635 (05/04)LosAngelesandOtherTestsfor ParticleSoundness 25

    636 DeterminationofEffectiveAngleof InternalFriction(j/)andEffective Cohesion(c/)ofEarthworksMaterials 25

    MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS

    VOLUME 1 SPECIFICATION FOR HIGHWAY WORKS

    Amendment-November2009 1

    Clause Title Page

    637 DeterminationofResistivity(rs)toAssess CorrosivityofSoil,RockorEarthworks Materials 26

    638 DeterminationofRedoxPotential(Eh)to AssessCorrosivityofEarthworks MaterialsforReinforcedSoiland AnchoredEarthStructures 27

    639 DeterminationofCoefficientofFriction andAdhesionBetweenFillandReinforcing ElementsorAnchorElementsfor ReinforcedSoilandAnchoredEarth Structures 27

    640 DeterminationofPermeabilityof EarthworksMaterials 28

    641 DeterminationofAvailableLimeContent ofLimeforLimeStabilisedCapping 28

    642 DeterminationoftheConstrainedSoil Modulus(M*)ofEarthworksMaterials forCorrugatedSteelBuriedStructures 28

    643 (05/01)LimeandCementStabilisationto FormCapping 29

    644 (11/03)DeterminationofSulfateContent 30

    (05/04)Tables6/1to6/6 31

    NATIONAL ALTERATIONS OF THEOVERSEEING ORGANISATIONS OF

    SCOTLAND, WALES AND NORTHERN

    IRELAND

    Scotland

    Clause Title Page

    601TS (11/06)Classification,DefinitionsandUses ofEarthworksMaterials S1

    632TS (11/06)DeterminationofMoisture

    ConditionValue(MCV)ofEarthworks MaterialsinScotland S3

    Northern Ireland

    601NI Classification,DefinitionsandUsesof EarthworksMaterials N1

    607NI ExplosivesandBlastingforExcavation N3

    # denotesaClauseorSampleAppendixwhichhasasubstituteNational ClauseorSampleAppendixforoneormoreoftheOverseeing OrganisationsofScotland,WalesorNorthernIreland.

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    2/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    EARTHWORKS

    #601 Classification, Definitions and Uses ofEarthworks Materials

    General Classification

    1 Earthworksmaterialsshallfallintooneorotherof

    thefollowinggeneralclassifications:

    (i) acceptablematerial:materialexcavatedfromwithintheSiteorimportedontotheSite

    whichmeetstherequirementsofTable6/1

    andAppendix6/1foracceptabilityforusein

    thePermanentWorks;

    (ii) (11/04)unacceptablematerialClassU1Aas

    definedinsub-Clauses2(i)(a)and2(i)(b)of

    thisClause:materialexcavatedfromwithintheSitewhich,unlessprocessedsothatit

    meetstherequirementsofTable6/1and

    Appendix6/1,shallnotbeusedinthePermanentWorks;

    (iii) (11/04)unacceptablematerialClassU1Bas

    definedinsub-Clause2(ii)(a)ofthisClause:materialexcavatedfromwithintheSite

    which,unlessprocessedsothatitmeetstherequirementsofTable6/1andAppendix6/1,shallnotbeusedinthePermanentWorks;

    and

    (iv) (11/04)unacceptablematerialClassU2as

    definedinsub-Clause3(i)ofthisClause:materialexcavatedfromwithintheSite

    whichshallnotbeusedinthePermanent

    Works.

    (11/04) Unacceptable Materials

    2 (11/04)UnacceptablematerialClassesU1AandU1B:

    (i) (11/04)unacceptablematerialClassU1Ashall

    be:

    (a) (11/04)materialwhichdoesnotcomplywiththepermittedconstituentsand

    materialpropertiesofTable6/1and

    Appendix6/1foracceptablematerial;

    and

    (b) (11/04)material,orconstituentsof

    materials,composedofthefollowing

    unlessotherwisedescribedinAppendix6/1:

    peat,materialsfromswamps,marshesandbogs;

    logs,stumpsandperishable

    material;

    materialsinafrozencondition;

    clayhavingaliquidlimit

    determinedinaccordancewithBS1377:Part2,exceeding90or

    plasticityindexdeterminedin

    accordancewithBS1377:Part2,

    exceeding65;

    materialsusceptibletospontaneous

    combustionexceptunburntcollieryspoilcomplyingwith

    sub-Clause15ofthisClause;

    (ii) (11/04)unacceptablematerialClassU1Bshall

    be:

    (a) (11/05)contaminatedmaterials,includingcontrolledwastes(asdefinedinthe

    EnvironmentalProtectionAct1990Part

    IIA)whoselevelofcontaminationisabovethatgiveneitherinAppendix

    6/14orinAppendix6/15,butexcluding

    allhazardouswastes(asdefinedintheHazardousWaste(EnglandandWales)

    Regulations2005)andradioactive

    wastes(asdefinedintheRadioactiveSubstancesAct1993).

    3 UnacceptablematerialClassU2shallbe:

    (i) (11/05)hazardouswaste(asdefinedinthe

    HazardousWaste(EnglandandWales)

    Regulations2005)andradioactivewaste(asdefinedintheRadioactiveSubstancesAct

    1993).

    4 (11/04)WhererequiredinAppendix6/1,

    unacceptablematerial(otherthanClassU2)shallbe

    processedbymechanical,chemicalorothermeanstorenderthematerialacceptableforuseinthePermanent

    WorksinaccordancewiththerequirementsofTable6/1

    andAppendix6/1.

    Definitions

    5 Chalkshallmean:(i) anyporousmaterialofnaturalorigin

    composedessentiallyofcalciumcarbonate

    Amendment-November2005 2

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    3/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    andidentifiedaschalkonthemapsproduced

    bytheBritishGeologicalSurvey;

    (ii) materialdesignatedasClass3inAppendix6/1.

    6 Argillaceousrockshallmeanshalesmudstones

    siltstonesslatesandmicaceousschistscomposedofparticlesofclayandsiltandmica.Itshallinclude

    unburntcollieryspoil.

    7 Pulverised-fuelashshallmeansolidmaterialextractedbyelectrostaticandmechanicalmeansfrom

    thefluegasesoffurnacesfiredwithpulverised

    bituminouscoal.Itshallhaveamaximumparticlesizeof3mm.

    8 Furnacebottomashshallmeanagglomerated

    pulverised-fuelashobtainedfromthebottomofthepowerstationfurnaceandhavingparticlesizenolarger

    than10mm.

    9 Formationshallbethetopsurfaceofcapping.Wherenocappingisrequiredformationshallbethetop

    surfaceofearthworksattheundersideofsub-base,

    unlessotherwiseshownontheDrawings.

    10 Sub-formationshallbethetopsurfaceof

    earthworksattheundersideofcapping.

    11 (05/01)Stabilisationshallmeanthespreadingof

    cementorlimeorbothonalayerofdepositedorintact

    granularorcohesivematerial,andthesubsequentprocessofpulverisingandmixingfollowedby

    appropriatecompactiontoformthewholeora

    constituentlayerofacapping.

    12 (11/07)Whererecycledaggregateisusedinthis

    Series,thematerialshallbeaggregateresultingfromthe

    processingofmaterialusedinaconstructionprocess.Theaggregateshallhavebeentestedinaccordancewith

    Clause710,andthecontentofothermaterials(ClassX)

    includingwood,plasticandmetalshallnotexceed1%bymass.Whererecycledaggregateexceptrecycled

    asphaltisusedinthisSeries,theaggregateshallhave

    beentestedinaccordancewithClause710.Contentofasphalt(mineralaggregatewithabituminousbinder)

    shallnotexceed2%bymass,andthecontentofother

    materials(ClassX)includingwood,plasticandmetalshallnotexceed1%bymass.

    Use of Fill Materials

    13 (05/01)Inadditiontoanygradingrequirementsthe

    maximumparticlesizeofanyfillmaterialshallbenomorethantwo-thirdsofthecompactedlayerthickness

    exceptthatcobbleshavinganequivalentdiameterof

    morethan150mmshallnotbedepositedbeneathvergesorcentralreserveswithin1.30mofthefinished

    surface.

    Amendment-November2009 3

    14 (11/07)Materialshallnotbedepositedwithin

    500mm,orotherdistancesdescribedinAppendix6/3,

    ofconcrete,cementboundmaterials,othercementitiousmaterialsorstabilisedcappingformingpartofthe

    PermanentWorksif,whentestedinaccordancewithTRLReport447either:

    (i) (11/05)thewater-solublesulfate(WS)content

    exceeds1500mgofsulfate(asSO4)perlitre

    (TestNo.1);or

    (ii) (11/09)theoxidisablesulfides(OS)contentexceeds0.5%ofsulfate(asSO

    4)(TestNo.2

    andTestNo.4);or

    (iii) (11/09)unlessotherwisespecifiedinTable6/1orTable6/3,the2:1watertosoilextract

    preparedforthedeterminationofwater-

    solublesulfatein(i)hasapHvalueoflessthan7.2,whentestedusingtheelectrometric

    methodofpHdeterminationinaccordance

    withBS1377-3.

    (11/09)Atleastfivesamplesofeachmaterialshallbe

    testedforWS,OSandpHvalue.Themeanofthe

    highesttwovaluesshallbeusedforcomparisonwith

    thelimitingvalues.Thisalsoappliesifsixtonineresultsareavailable.Iftenormoreresultsareavailable,

    themeanofthehighest20%oftheresultsshallbeused

    forcomparisonwiththelimitingvalues.

    15 (11/07)Materialshallnotbedepositedwithin500mm,orotherdistancesdescribedinAppendix6/3,

    ofmetallicstructuralelementsformingpartofthePermanentWorksif,whentestedinaccordancewith

    TRLReport447either:

    (i) (11/05)thewater-solublesulfate(WS)content

    exceeds300mgofsulfate(asSO4)perlitre

    (TestNo.1);or

    (ii) theoxidisablesulfides(OS)contentexceeds

    0.06%ofsulfate(asSO4)(TestNos.2

    and4).

    (11/05)Atleastfivesamplesofeachmaterialshallbe

    testedforWSandOS.Themeanofthehighesttwovaluesshallbeusedforcomparisonwiththelimiting

    values.Thisalsoappliesifsixtonineresultsare

    available.Iftenormoreresultsareavailable,themeanofthehighest20%oftheresultsshallbeusedfor

    comparisonwiththelimitingvalues.

    (11/07)Therequirementsin(i)and(ii)aboveshallnot

    applytometallicitemsprotectedbyconcreteandancillarymetallicitemssuchasthetopsofchambers

    andgullies.

    16 (05/01)UnburntcollieryspoilmaybeusedasgeneralfillprovideditiscompactedincompliancewithClause612andcomplieswiththerequirementsof

    Appendix6/1.

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    4/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    17 (05/01)Pulverised-fuelashshallnotbeplaced

    withinthedimensiondescribedinAppendix6/3,belowsub-formationorformation.

    18 (05/01)Wherepulverised-fuelashisused,the

    Contractorshallforeachconsignment,makeavailabletotheOverseeingOrganisationarecordofthetypeand

    sourceofthematerialandthenameofthepowerstation

    fromwhichitwasobtainedandacertificateofresultsoftestsshowingthatthematerialcomplieswiththe

    requirementsofTable6/1.

    602 General Requirements

    1 TheContractorshallemployonlyplantandworkingmethodswhicharesuitedtothematerialstobe

    handledandtraversed.Heshallberesponsibleformaintainingthenatureoftheacceptablematerialsothatwhenitisplacedandcompacteditremainsacceptable

    inaccordancewiththeContract.Acceptabilityshallbe

    determinedinaccordancewithTable6/1andanyspecialrequirementsinAppendix6/1.

    2 Haulageofmaterialtoembankmentsorotherareas

    offillshallproceedonlywhensufficientspreadingandcompactionplantisoperatingattheplaceofdeposition

    toensurecompliancewithClause612.

    3 (11/04)Noexcavatedacceptablematerialor

    unacceptablematerialrequiredtobeprocessed,otherthansurplustotherequirementsoftheContract,shall

    beremovedfromtheSiteunlessindicatedotherwisein

    Appendix6/1.MaterialwhichisunacceptableonlybyreasonofbeingfrozenshallberetainedonSitewhenin

    thatcondition.WheretheContractorispermittedto

    removeacceptablematerial,orunacceptablematerialrequiredtobeprocessed,fromtheSitetosuithis

    operationalprocedure,thenheshallmakegoodany

    consequentdeficitofmaterialarisingtherefrom.EnvironmentalrequirementsforprocessingofClass

    U1Bmaterial,intermsoflimitingvaluesof

    contaminantsorotherrequirements,shallbesetoutinAppendix6/1intheearthworksClassforwhichthe

    processedmaterialistobeused.

    4 Ifanyacceptablematerialorunacceptablematerialrequiredtobeprocessedis,wherepermittedby

    Appendix6/1,usedbytheContractorforpurposesother

    thanforgeneralfill,sufficientacceptablefillmaterialto

    occupy,afterfullcompaction,avolumecorrespondingtothatwhichtheexcavatedmaterialoccupiedshallbe

    providedbytheContractor.

    5 (11/04)Acceptablematerial(otherthanClass5Aor

    anyClass5BmaterialreplacingClass5Amaterialinaccordancewithsub-Clause3ofthisClause)surplusto

    thetotalrequirementsofthePermanentWorksandall

    unacceptablematerialClassU1Anotrequiredtobe

    processedshall,unlessindicatedotherwisein

    Appendix6/1,beruntospoilintipsprovidedbytheContractor.Inthecaseofunacceptablematerial,Class

    U1BandClassU2,theContractorshallcomplywithanyspecificrequirementsfordisposaldescribedinAppendix6/2.

    6 Wheretheexcavationrevealsacombinationof

    acceptableandunacceptablematerialstheContractorshall,unlessindicatedotherwiseinAppendix6/3,carry

    outtheexcavationinsuchamannerthattheacceptable

    materialsareexcavatedseparatelyforuseinthePermanentWorkswithoutcontaminationbythe

    unacceptablematerials.Unlessotherwisedescribedin

    theContractClassesoffillmaterialrequiredtobedepositedseparatelyshallbeexcavatedseparately

    withoutcontaminationbyotherClassesofmaterial.

    7 TheContractorshallmakehisownarrangementsforstockpilingofacceptablematerial,andunacceptable

    materialtobeprocessed,andfortheprovisionofsites

    forthepurpose.

    8 TheContractorshallensurethathedoesnot

    adverselyaffectthestabilityofexcavationsorfillsby

    hismethodsofstockpilingmaterials,useofplantorsitingoftemporarybuildingsorstructures.

    9 (05/01)Existingtopsoilmaterialshall,exceptwhere

    itistobeleftinplaceinthelocationsdescribedinAppendix6/8,bestrippedtodepthsasdescribedin

    Appendix6/8forClass5Amaterialfromallareasofcuttingandfromallareastobecoveredbyembankment

    orbyotherareasoffill.WherestatedinAppendix6/8

    existingtopsoilshallbestrippedasturfinaccordancewithsub-Clause3005.13.

    10 (05/01)Topsoilshallwhereverpracticablebeused

    immediatelyafteritsstrippingandifnotshallbestored

    instockpilesofheightsnotexceeding2morotherheightsstatedinAppendix6/8.Unlessotherwisestated

    inAppendix6/8,topsoilshallnotbestockpiledformore

    thantwoyears.Topsoilshallnotbeunnecessarilytraffickedeitherbeforestrippingorwheninastockpile.

    Stockpilesshallnotbesurchargedorotherwiseloaded

    andmultiplehandlingshallbekepttoaminimum.

    11 AllClass5AtopsoilarisingfromtheSite,orany

    Class5BmaterialreplacingClass5Amaterialin

    accordancewithsub-Clause3ofthisClause,inexcessoftherequirementsfortopsoiling,shallbesubjecttothe

    requirementsdescribedinAppendix6/8.

    12 Excavationsforfoundationsandtrenchesshallbeadequatelysupportedatalltimes,andexceptwhere

    otherwisedescribedinAppendix6/3,shallnotbebattered.WhereexcavationsarepermittedtobebatteredtheyshallbebenchedasdescribedinAppendix6/3

    Amendment-November2009 4

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    5/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    priortobackfillingandcompaction.Theadditional

    workandmaterialsshallbeprovidedbytheContractor.

    Sheetingandotherexcavationsupportsshallberemovedasfillingproceedsexceptwheretheyare

    requiredinAppendix6/3tobeleftinposition.13 Excavationsrequiringbackfillingshallremainopenonlyfortheminimumperiodnecessary.

    14 Excavationsrequiringbackfillinginexistingpaved

    orothersurfaces,includingthosepavedareastobereconstructedorrepaired,shallbecarriedoutand

    reinstatedincompliancewithClause706.

    15 TheContractorshallkeepearthworksfreeofwaterincluding:

    (i) arrangingfortherapidremovalofwater:

    (a) shedontotheearthworks;

    (b) enteringtheearthworksfromany

    source;

    (ii) loweringandmaintainingbyappropriatemeasures,thewaterlevelinexcavations,

    sufficientlytoenablethePermanentWorksto

    beconstructed.

    16 Incarryingouttherequirementsofsub-Clause15

    ofthisClausetheContractorshall:

    (i) formandmaintaincuttings,embankments

    andotherareasoffillwithappropriatefallsandgradientandsealedsurfaces;

    (ii) providewherenecessarytemporary

    watercourses,drains,pumpingandthelike;

    (iii) dischargeaccumulatedwaterand

    groundwaterintothepermanentoutfallsof

    thedrainagesystemwherepracticable;

    (iv) provideadequatemeansfortrappingsilton

    temporarysystemsdischarginginto

    permanentdrainagesystems.

    17 TheContractorshallcarryoutandmaintainanygroundwaterloweringorothertreatmentrequiredin

    Appendix6/1.

    18 (11/04)WherematerialsaredesignatedintheContractaseitherClassU1BorClassU2,the

    Contractorshallcarryoutanyspecialrequirementsfor

    theirhandlingdescribedinAppendix6/2.Wheresuchmaterialsareencounteredduringtheprogressofthe

    Works,theContractorshallmakeallnecessary

    arrangementsfortheirsafehandlinganddisposalafterconsultationwiththeappropriateenvironmental

    authority.

    19 (05/04)Subjecttothesurfaceleveltolerancesgiven

    inClause613andsub-Clause616.1,materialshallnotbefrostsusceptibleifitisusedwithin450mmofthe

    designedfinalsurfaceofaroadorpavedcentralreserve,

    or350mmiftheannualfrostindexofthesiteisless

    than50.Materialshallbeclassifiedasnon-frost-susceptibleifthemeanheaveis15mmorless,when

    testedinaccordancewithBS812:Part124:1989,orBS1924:Part2:1990forlimestabilisedcapping,amendedasgiveninsub-Clause801.7.

    603 Forming of Cuttings and Cutting Slopes

    1 Cuttingsshallbeexcavatedtothelinesandlevels

    describedinAppendix6/3.

    2 Cuttingslopesortoesofcuttingsshallonlybe

    undercutwhenrequiredintheContractfortrenchor

    otherexcavations.Suchexcavationsshallberestricted

    inextentasdescribedinAppendix6/3andwheretheyrequirebackfillingshallremainopenonlyforthe

    minimumperiodnecessary,soastopreventrisktothePermanentWorks.

    3 ExceptwhereotherwisedescribedinAppendix6/3,

    theexcavationofcuttingsmaybehaltedatanystageprovidingatleast300mmofmaterialasaweather

    protectionisleftinplaceabovetheformationorabove

    thesub-formation,subjecttotherequirementsofClauses613and616.

    4 Wherepre-splitblastingisrequiredorpermittedin

    Appendix6/3,itshallcomplywithClause607andanyotherrequirementsinAppendix6/3.Fulldetailsofthe

    methodsandarrangementstobeadoptedshallbemade

    availabletotheOverseeingOrganisationbeforecommencementofdrillingoperations.

    5 Finalfacesofcuttingswhicharenottoreceive

    topsoilshall:

    (i) whereverpossiblebeleftwithoutscarsor

    damagefromconstructionplant;and

    (ii) toachieveanaturalappearance,whenthestratumpermitsandwhenpre-splitblastingis

    notadopted,havethefaceleftirregularwithintolerancesgiveninAppendix6/3;and

    (iii) havebouldersorotherrockfragmentsthatcanbemovedbyhandwithouttools,

    removed;and

    (iv) whererequiredinAppendix6/3havematerialthatcanbeblownawaybyairline

    hose,havingpressuresnogreaterthanthose

    statedtherein,soremoved;and

    (v) haveadequateaccesstoenableinspectionto

    becarriedouttodeterminetheextentofworkrequiredbythissub-Clause.

    6 WhererequiredinAppendix6/3,facesofcuttings

    whicharenotrequiredtoreceivetopsoilshallhaveone

    Amendment-November2009 5

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    6/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    ormoreofthefollowingmeasurescarriedoutas

    appropriate:

    (i) (11/03)Isolatedpatchesofsoft,fragmentedandinsecurematerialshalleachbe

    excavatedtoadepthofatleast200mmunlessotherdepthsarestatedinAppendix6/3andreplacedassoonas

    practicablewithST2concreteto

    Clause2602wellrammedintothecleanedoutvoid.

    (ii) Areasofcuttingfacerequiringtheirsurface

    tobemadestableshallbetrimmedbackbyanominal50mmorotheramountrequiredin

    Appendix6/3andtheresultingsurface

    togetherwithanareaofanysurrounding

    intactmaterialasdetailedinAppendix6/3,shallhaveasuitablecementbasedgroutor

    sprayedconcrete,appliedbypressuretoformatotalnominalthicknessof40mmunless

    therequiredthicknessisstatedin

    Appendix6/3.WhererequiredinAppendix6/3,reinforcementshallbefixedto

    thesurfacebeforeapplicationoftheconcrete

    orgrout.Weepholesusingpermanentformersshallbeconstructedtothe

    requirementsofAppendix6/3andatthe

    locationsdescribedinAppendix6/3.

    (iii) (11/03)Softorinsecurematerial,interlayeredwithrockshallbeexcavatedtothedepth

    behindthefacedescribedinAppendix6/3.TheresultingcavityshallbefilledwithST2

    concretetoClause2602orwithmasonry

    infillcomplyingwiththeSeries2400andprovidedwithweepholesallinaccordance

    withrequirementsinAppendix6/3.

    (iv) NettingorothersheetcoveringasdescribedinAppendix6/3orrockboltsasdescribedin

    Appendix6/10.

    7 (05/01)WhererequiredinAppendix6/3,facesofcuttingswhicharetoreceivetopsoilshallhaveoneor

    moreofthefollowingmeasurescarriedoutas

    appropriate:

    (i) BebenchedtoretaintopsoilasdescribedinAppendix6/3.

    (ii) Beharrowedtoadepthof50mm.Such

    harrowingshallbecarriedoutimmediatelypriortotopsoiling,diagonally,atanangle

    between5to45tothelineofthetoe,

    measuredontheplaneoftheslope.

    (iii) Isolatedpatchesofsoft,fragmentedor

    insecurematerialshallbeexcavatedand

    either:

    (a) filledbywellramminginaClassoffill

    withsimilarcharacteristicsasthesurroundingintactmaterial;or

    (b) excavatedanddealtwithasdescribedin

    sub-Clause6(i)ofthisClause.

    (iv) Otherareasrequiredtobemadestableshall

    bedealtwithasstatedinAppendix6/3.

    8 Theconcrete,referredtoinsub-Clauses6(i)and6(iii)ofthisClause,permanentlyexposedonthefaceof

    thecuttingshallhavesurfacefeaturesasnearlyas

    possiblematchingthoseoftheadjacentintactface.Suchconcreteandthegroutreferredtoinsub-Clause6(ii)of

    thisClauseshallhaveaconsistentcolourasnearlyas

    possiblematchingthatoftheadjacentintactface.

    604 Excavation for Foundations

    1 (11/09)Thebottomofallfoundationexcavationsshallbeformedtothelinesandlevelsshownonthe

    Drawings.Pocketsofsoftsoilorlooserockshallbe

    removedandtheresultingvoidsandanynaturalvoidsshallbefilledwithST1concretetoClause2602(or

    othermaterialasrequiredbyAppendix6/3)exceptin

    excavationsforcorrugatedsteelburiedstructureswhenClass6Klowerbeddingfillmaterialcomplyingwith

    Table6/1shallbeused.

    AfterplacingofanyblindingconcreteshownontheDrawings,notrimmingofthesidefacesofthe

    excavationshallbecarriedoutfor24hours.

    2 TheContractorshallmakegood:

    (i) (11/09)anylateraloverbreakoftheexcavationabovethebottomofthefoundationgreater

    thanthenetvolumerequiredforthe

    PermanentWorkswithmaterialofthesameClassasusedforfillabovestructural

    concretefoundationstocomplywith

    Clause611(exceptthatforcorrugatedsteel

    buriedstructuresClass6Klowerbeddingmaterialshallbeused)or,wherethe

    excavationistoonarrowtoallowthecompactionofearthworksmaterials,with

    ST1concretetoClause2602;

    (ii) (11/09)anyadditionalexcavationatorbelow

    thebottomoffoundations,includingthatresultingfromremovalofmaterialwhichthe

    Contractorhasallowedtodeteriorate,with

    ST1concretetoClause2602(orother

    materialrequiredbyAppendix6/3)except

    thatundercorrugatedsteelburiedstructuresClass6Klowerbeddingmaterialshallbe

    used.

    Amendment-November2009 6

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    7/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    3 Class6Klowerbeddingmaterialreferredtointhis

    ClauseshallbedepositedandcompactedincompliancewithClauses608and612andTable6/1.

    605 Special Requirements for Class 3Material

    1 WhenAppendix6/1designatesamaterialasClass

    3tobeusedortoremainintactinthePermanentWorks

    thefollowingshallapply:

    (i) NoearthworksinvolvingClass3materialor

    traffickingofareaswhichconsistofClass3

    material,unlesstheyareprotected,shallbecarriedoutduringtheperiodsdescribedin

    Appendix6/4.

    (ii) ExcavationofClass3materialshallbebymeansofafaceshovel,whichshallexcavate,

    swingandunloadwithoutmovingthechassis

    orundercarriageduringoneoperatingcycle,orbymeansofasimilarshovel-loading

    machine,soastoreducethedegradationof

    thematerialtoaminimum.

    (iii) WhenexcavatingClass3materialthe

    Contractorshallarrangehismethodof

    workingsoastomaintainaworkingfaceofminimumheight3morotherheightrequired

    inAppendix6/4withinClass3materialexceptthatwherethedepthofthecuttingislessthan3mthefullheightofClass3

    materialshallformtheworkingface

    excludinganyprotectionrequiredtotheformationorsub-formation.

    (iv) Materialotherthanchalkcontainedwithin

    thevolumedesignatedasClass3materialintheContractshallbeexcavatedanddeposited

    separatelyfromchalkandnotbemixedwith

    it.

    (v) TraffickingofareasofClass3materialshallnotbepermittedbyvehicleshavinga

    capacitywhenstruckofmorethan15m3unlessotherwisedescribedinAppendix6/4.

    (vi) Class3materialshallnotbestockpiledorbe

    subjectedtomultiplehandling.

    (vii) Class3materialshallnot,unlessrequiredin

    Appendix6/4,belayeredwithotherfill

    materialintheconstructionofembankmentsandotherareasoffill.

    (viii) WhenrequiredinAppendix6/4

    embankmentsandotherareasoffillconstructedofClass3materialshalleither:

    (a) uponreachingalevel600mmbelow

    sub-formationor,wherethereisno

    capping,alevel600mmbelow

    formation,beleftforaminimumof4weeksorotherperiodstatedin

    Appendix6/4,beforecontinuingfillingwhichshall,inallcases,becontinuedincompliancewithsub-Clause608.9;or

    (b) becontinuedabovesub-formationor

    formationwithaprotectivelayerinaccordancewithsub-Clause608.9(ii)

    butwhichshallbeofClass3material.

    Suchmaterialshallthenbeleftforaminimumof4weeksorotherperiod

    statedinAppendix6/4beforeremoval

    oftheprotectivelayerandshallbeimmediatelycontinuedwiththe

    preparationofsub-formationorformation,asappropriate,inaccordancewithClauses613and616.

    (ix) Wheretemporaryinstabilityoccursinchalk

    duringdepositionorcompactionduetoexcessiveworkingbyplantortoinclement

    weather,theContractorshalldelaythe

    furtherdepositionofClass3materialuntilthechalkhasrecoveredsufficientstrength

    forworktoproceed.Adetailedrecordofthe

    areasofinstabilityshallbemadeavailableto

    theOverseeingOrganisation.(x) Attheendofeachworkingdayoffilling,

    exposedClass3materiallaidthatdayshall,unlessotherwisestatedinAppendix6/4be

    rolledwithtwopassesofasmoothwheeled

    rollerhavingamasspermetrewidthofrollexceeding2100kg.

    (xi) TheotherspecialrequirementsforClass3

    materialdescribedinsub-Clauses613.11(i),613.12(i),616.1(ii)and616.3shallalso

    apply,togetherwithanyotherspecial

    requirementsdescribedinAppendix6/1orAppendix6/4.

    606 Watercourses

    1 Theclearanceandmodificationofexisting,orthe

    constructionofnewwatercourses,includingditches,streams,rivers,lagoonsandponds,shallbeasdescribed

    inAppendix6/3includinganyprotection,lining,

    revetmentorotherworksandshallcomplywithsub-Clauses2to4ofthisClause.

    2 Clearanceofexistingwatercoursesshallincludethe

    removalofvegetation,vegetablematterandallotherdepositswithinthewatercourseprofile.Materials

    resultingfromthisclearanceshallbedealtwithas

    unacceptablematerial.

    Amendment-November2009 7

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    8/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    3 Newwatercoursesandclearedexisting

    watercoursesshallbemaintainedinaclearcondition.

    4 Redundantwatercoursesshall,whererequiredin

    Appendix6/3,bedrainedandclearedinaccordance

    withsub-Clause2ofthisClauseandmaterialoutsidethewatercourseprofileexcavatedanddealtwithas

    unacceptablematerial.Theexcavationsshallbetothe

    dimensionsstatedintheContractandthewholefilledwithgeneralorselectedfillsoftheClassdescribedin

    Appendix6/3complyingwithTable6/1depositedand

    compactedincompliancewithClause608and612.Wherethesurfaceistoremainexposeditshallbe

    topsoiledandseeded,orreceiveothertreatment,allas

    describedinAppendix6/3.

    #607 Explosives and Blasting for Excavation

    1 BlastingforexcavationshallnotbeemployedunlesspermittedorrequiredinAppendix6/3andsuch

    blastingshallbeconfinedtothelocationsandtowithin

    thetimelimitsstatedtherein.

    2 TheContractorshall:

    (i) notcarryoutplastershooting;

    (ii) foreachlocationwhereblastingistobeundertaken,givewrittennoticetothe

    OverseeingOrganisationoftheprogramme

    ofblasting,includingtrialexplosions,atleast10daysbeforeitcommencesandgive

    writtennoticeofeachblastingeventas

    describedin(v)below,atleast12hoursbeforehand;

    (iii) carryouttrialexplosionsstartingwith

    reducedquantitiesofexplosiveinordertodeterminethesizeoftheactualexplosive

    chargesandtheirdisposition,foruseinthe

    mainblastingoperations,soasnottoexceedthevaluesforvibrationalamplitudeand

    vibrationalpeakparticlevelocitystatedin

    (vi)belowatthepositionsdescribedtherein;

    (iv) determinedangerzoneslikelytobecreated

    bytheblastingoperations,includingtrial

    explosions,withinwhichblastedmaterialmaybeprojectedandutilisesuitable

    arrangementsincludingTemporaryWorks,to

    retainsuchprojectilesandensurethatnoinjuryordamageiscausedtopersonsor

    propertythereby;

    (v) limitblastingtoasmallnumberofeventsduringpermittedhoursperday,wherean

    eventshallcompriseasingleexplosionoragroupofexplosionseachseparatedbyashorttimeinterval,thegrouplastinglessthana

    minute;

    (vi) ensurethat:

    (a) structuresandearthworks,existingor

    underconstruction,onandofftheSite,

    donotexperience,duringblasting

    operationsincludingtrialexplosions,avibrationalamplitudeexceeding0.2mm

    andaresultantpeakparticlevelocityexceeding50mmpersecond,orother

    limitsstatedinAppendix6/3,atthe

    sametimeorindividually;and

    (b) peakoverpressures,ofmagnitudesuch

    astoendangerwindowsandglazed

    areasofstructures,donotoccur.

    (vii) whereinstrumentationandmonitoringis

    appropriate:

    (a) rigidlyfixtostructuresandinsertinearthworksdescribedin(vi)(a)above,

    suitableinstrumentstomeasurethe

    vibrationalamplitudeandresultantvibrationalpeakparticlevelocity,and

    peakoverpressures,experiencedduring

    blastingoperationsincludingtrialexplosions;

    (b) makeavailabledetailsoftheproposed

    instrumentationwithintheSite;

    (c) unlessotherwisestipulatedin

    Appendix6/3,makehisown

    arrangementsforinstallinginstrumentsonpropertyofftheSiteincluding

    negotiatingwithlandownersandother

    interestedparties;

    (d) readsuchinstrumentsandtake

    measurementsthroughouttheperiodof

    blastingoperations,includingtrialexplosions;

    (e) forinstrumentsonstructuresor

    earthworksontheSiteand,whererequiredinAppendix6/3,onproperty

    offtheSite,makeavailabletheresults

    totheOverseeingOrganisationattheendofeachdaysblasting.

    (viii) takemeasurementsofvibrationalamplitude

    andpeakparticlevelocityineachofthreemutuallyperpendicularplanesanddetermine

    thepeakvalue,takenasthemaximum

    resultantcalculatedbyvectorsummationof

    thethreecomponentsofamplitudeandvelocityrespectively,measuredas

    instantaneouslyastheresolutionoftherecordinginstrumentpermits;

    Amendment-November2009 8

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    9/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    (ix) ensurethatnoisefromblastingoperationsis

    controlledinaccordancewithClause109;

    (x) useexplosivesinthequantitiesandinthemannerrecommendedbythemanufacturer;

    (xi) storeexplosivesinregisteredpremisesina

    licensedstoreormagazineprovidedwithaseparatecompartmentfordetonatorsoruse

    themunderanImmediateUseCertificate

    issuedbythepolice;

    (xii) onlypermitexplosivestobeusedorhandled

    byorundertheimmediatecontrolofa

    competentpersoninaccordancewiththeConstruction(GeneralProvisions)

    Regulations1961(Regulation19)and

    subsequentamendingRegulations;

    (xiii) ensurethereisnounauthorisedissueor

    improperuseofexplosivesbroughtonthe

    Siteandmaintainastrictcheckonquantitiesissuedandconsumed;

    (xiv) complywiththerequirementsofBS6657in

    respectoftheuseofelectricaldetonatorsinthevicinityofstaticandmobileradio

    transmitters,includingnormalradioand

    televisionbroadcastingstationsandradarunitsassociatedwithaircraftmovements,

    electricitygeneratingplantandtransmission

    lines.

    608 Construction of Fills

    1 Allfills,includingembankments,shallbeconstructed:

    (i) inthelocationsdescribedinAppendix6/3to

    thelinesandlevelsstatedtherein;

    (ii) ofClassesofmaterialsrequiredorpermittedinAppendix6/1,complyingwithTable6/1

    with,unlessotherwisedescribedintheContract,onlyClass6Amaterialdepositedintoopenwater;

    (iii) bydepositing,assoonaspracticableafter

    excavation,inlayerstomeetthecompactionrequirementsofClause612asrequiredfor

    eachClassofmaterialinTable6/1,except

    that:

    (a) materialrequiringendproduct

    compactionshallbedepositedinlayers

    notexceeding250mmuncompacted

    thickness;(b) materialplacedintoopenwatershallbe

    depositedbyendtippingwithoutcompaction;

    (c) materialdepositedinareastoreceive

    dynamiccompactioncomplyingwithClause630shallbedepositedand

    compactedtotherequirementstherein.

    (iv) totherequirementsofthisClauseandanyotherrequirementsforfillinthisSeries.

    2 StarterlayersofClasses6B,6Cor6Dmaterialsas

    describedinAppendix6/3shallbedepositedasthefirstlayerorlayersoffillaboveexistinggroundlevelor,if

    appropriate,aboveanygroundimprovementrequiredby

    Appendix6/13.StarterlayersbelowClass2Epulverised-fuelashgeneralfillshallbeClass6D

    material.Plantmovementacrossstarterlayermaterial

    shallberestrictedtothatplantwhichisnecessaryforitsdeposition,spreadingandcompactionincompliance

    withthisClauseandClause612andanyplantrequiredtocarryoutanygroundimprovementbeneathitifrequiredbyClause630.TheContractorshalltakeall

    reasonablemeasurestopreventdamagetothe

    underlyingstrata,whichmayincludeuseoflighterspreadingplantorareductionofthenumberofpasses

    ofcompactionplant.

    3 CoarsegranularmaterialClasses1Cand6Bshall,beforecompaction,bespreadinlayersbyacrawler

    tractorofnotlessthan15tonnestotalmass.After

    compactioneachlayershall,ifvoidsremain,beblinded

    withanapprovedClassofgranularmaterialcomplying

    withTable6/1sothatallsurfacevoidsarefilledbeforethenextlayerandbeforeanycappingorsub-baseis

    constructed.

    4 Embankmentsandotherareasoffillshall,unless

    otherwiserequiredintheContract,beconstructed

    evenlyovertheirfullwidthandtheirfullestpossibleextentandtheContractorshallcontrolanddirect

    constructionalplantandothervehiculartraffic

    uniformlyoverthem.Damagebyconstructionalplantandothervehiculartrafficshallbemadegoodbythe

    Contractorwithmaterialhavingthesamecharacteristics

    andstrengthasthematerialhadbeforeitwasdamaged.5 Embankmentsandotherareasofunsupportedfills

    shallnotbeconstructedwithsteepersideslopes,orto

    greaterwidthsthanthosedescribedinAppendix6/3,excepttopermitadequatecompactionattheedges

    beforetrimmingback,ortoobtainthefinalprofile

    followinganysettlementofthefillandtheunderlyingmaterial.Howeveranyoversteepeningorincreasein

    widthshallnotexceedanylimitsdescribedin

    Appendix6/3andshallremainonlyfortheminimumperiodsnecessaryconsistentwiththesafetyofthe

    PermanentWorks.

    6 Stagedconstructionoffillsandanycontrolledratesoffilling,shallbecarriedout,inaccordancewithany

    requirementsdescribedinAppendix6/3including

    Amendment-November2009 9

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    10/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    installationofinstrumentationanditsmonitoring,in

    compliancewithClause629.

    7 WhererequiredinAppendix6/3theContractorshallsurchargeembankmentsorotherareasoffill,as

    describedthereinfortheperiodsstated.Ifsettlementofsurchargedfillresultsinanysurchargingmaterial,whichisunacceptableforuseinthefillbeing

    surcharged,lyingbelowtheformationor,wherethereis

    acapping,thesub-formation,theContractorshallremovethisunacceptablematerialanddisposeofitin

    accordancewithClause602.Heshallthenbringthe

    resultantleveluptoformationorsub-formation,asappropriate,withacceptablematerial.

    8 Wherepipesinembankmentsorinotherareasof

    fillarepermittedinAppendix5/1tobeconstructed

    otherthaninatrench,thefillshallbebroughtuptoandoverthemequallyonbothsides.Thefillshallbe

    depositedinevenlayersandshallnotbeheapedabovethepipe.Spreadingandcompactionshallbecarriedout

    evenlywithoutdislodging,distortingordamagingthe

    pipe.Powerrammersarenottobeusedwithin300mmofanypartofthepipeorjoint.

    9 Thelast600mmdepthoffilluptosub-formation

    level,orformationlevelasappropriate,shall,unlessotherwiserequiredintheContract,becarriedoutforthe

    fullwidthofembankments,orbetweentheouter

    extremitiesofthevergesinotherareasoffill,ina

    continuousoperation.TheContractorshallthencontinuewithoutdelaytocarryouteither(i)or(ii)

    below:

    (i) formthesub-formationorformation,allinaccordancewithClauses613and616,

    followingimmediatelyeitherby:

    (a) theconstructionofthefullthicknessofcappingorsub-baseasappropriate;or

    (b) ifpermittedinAppendix6/3,the

    constructionofalesserthicknessof

    cappingorsub-baseasdescribedthereinlaidasaweatherprotectionlayer;

    (ii) placeanadditional300mmminimumcompactedthicknessofmaterialabove

    sub-formationlevelorformationlevelas

    appropriateforthefullwidthofthefillingtoformaweatherprotection.Thisweather

    protectionshallbecomposedofthesame

    materialasthesub-formationorformationandcompactedincompliancewithTable6/1.

    Thematerialshallbeprovidedfromthe

    Contractorsownresourcesandthe

    protectionlayershallbeconstructedinacontinuousoperation.Forstabilisedcapping,

    theprotectivelayershallconsistofunstabilisedmaterial.

    10 Duringconstructionofembankmentsandotherfills,exposedsidesofClasses2Eand7Bpulverised-

    fuelashmaterialshallbeprotectedagainstscourand

    erosionfromanysource.

    11 (05/01)CompletedslopesofClasses2Eand7BfillmaterialshallbecoveredimmediatelybyClass5topsoil

    asrequiredinAppendix6/8orturforothermaterial,as

    requiredinAppendix30/5.

    12 Wheneverfillistobedepositedagainstthefaceof

    anaturalslope,orslopingearthworksfaceincluding

    embankments,cuttings,otherfillsandexcavations,suchfacesshallbebenchedorotherwiseshapedasrequired

    inAppendix6/3immediatelybeforeplacingthe

    subsequentfill.

    13 Allpermanentfacesofsideslopesofembankments

    andotherareasoffillformedinClasses2or7cohesivematerialsotherthanpulverised-fuelash,shall,subsequenttoanytrimmingoperations,bere-worked

    andsealedbytrackingatrackedvehicle,suitableforthe

    purpose,ontheslope,orbyothersuitablemethods.

    609 Geotextiles Used to Separate EarthworksMaterials

    1 GeotextilesrequiredaspartofthePermanent

    Workstoseparateearthworksmaterialsatlocations

    describedinAppendix6/5shallbemanufacturedfromsyntheticorotherfibresasrequiredthereinandbeinthe

    formofthinpermeablemembranes.

    2 TheContractorshallprovideevidencetothe

    OverseeingOrganisation,beforethegeotextileis

    incorporatedinthePermanentWorks,thatthegeotextile

    willbesufficientlydurable,wheninstalledincontactwiththematerialstobeseparated,tomaintainits

    integrityforatleastthelifeperiodrequiredin

    Appendix6/5.

    3 Geotextilesshallbeprotectedatalltimesagainst

    mechanicalorchemicaldamage.ThosesusceptibletodamagebylightshallnotbeuncoveredbetweenmanufactureandincorporationinthePermanentWorks.

    Temporaryexposureshallnotexceed5hours.

    4 ThemethodofselectionandtherequirednumberofsamplesareasdescribedinAppendix6/5.Samplesshall

    betakenfromtheconsignmentofgeotextiletobeused

    inthePermanentWorks.Samplesandtestpiecescutfromthemshallcomplywithsub-Clause7ofthis

    Clauseandtestpiecesshallbetestedatalaboratoryto

    provethatthegeotextilemeetsthefollowingcriteriaorothercriteriadescribedinAppendix6/5:

    (i) Thegeotextileshallsustainatensileloadof

    notlessthanthatvaluegiveninAppendix6/5,determinedinawidestrip

    Amendment-November2009 10

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    11/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    tensiletestcarriedoutinaccordancewith

    BS6906:Part1.Thecharacteristicstrength

    shallbetakenasthevalueofthestrengthofthematerialbelowwhichnotmorethan5%

    ofthetestresultsmaybeexpectedtofall.Thisrepresentsthestrengthat1.64standarddeviationsbelowthemeanstrength.

    (ii) Thegeotextileshallallowwatertoflow

    throughit,atrightanglestoitsprincipalplane,ineitherdirection,atarateofnotless

    than10litres/m2/sunderaconstantheadof

    waterof100mm,determinedinaccordance

    withBS6906:Part3.Theflowratedeterminedinthetestshallbecorrectedto

    thatapplicabletoatemperatureof15C

    usingpublisheddataonvariationinviscosity

    ofwaterwithtemperature.

    (iii) Thegeotextileshallhaveasizedistribution

    ofporeopeningssuchthatthemean090,is

    between100micronsand300microns,determinedinaccordancewith

    BS6906:Part2.

    5 ThegeotextileshallbelaidandlappedasdescribedinthisClauseorasdescribedinAppendix6/5and

    wherelappingisemployedadjacentsheetsorstripsof

    geotextileshallbeoverlappedbyatleast300mm,orotherdimensiondescribedinAppendix6/5.

    6 Thelayerofmaterialonwhichthegeotextileisto

    beplacedshallnothaveprotrusionsorsharpprojectionswhicharelikelytodamagethegeotextileduring

    installationorinservice.Themethodofinstallation

    shallensurethatthegeotextileisincontinuouscontactwiththesurfaceonwhichitistobeplacedandthe

    geotextileshallnotbestretchedorbridgedoverhollows

    orhumps.Operationofconstructionplantdirectlyontheinstalledgeotextilewillnotbepermittedandits

    coveringwithfillmaterialshalltakeplaceimmediately

    afteritslaying.

    7 Allsamplesandtestpiecescutfromthemshallbemaintainedinacleananddrycondition,exceptfor

    normalcontaminationandwettingduringtesting,andshallberetainedbytheContractorinaccordancewith

    Appendix6/5.Priortodeterminationofporesizeand

    tensilestrength,testpiecesshallbeconditionedandbroughtintoequilibriumatatemperatureof202C,

    andarelativehumidityof655%.Thedryweightof

    thegeotextiletestedshallbequoteding/m.

    8 Thenumberoftestsonsamplesshallbeasrequired

    inAppendix6/5.

    610 Fill to Structures

    1 ThisClauseshallapplytofilltostructuresotherthan:

    (i) fillforreinforcedearthstructures,includingassociateddrainagelayers;

    (ii) fillforanchoredearthstructuresincluding

    associateddrainagelayers;

    (iii) fillforsurroundandbeddingofcorrugated

    steelburiedstructures;

    (iv) fillabovestructuralconcretefoundations

    unlessotherwiserequiredinAppendix6/6.

    2 Materials,asrequiredorpermittedinAppendix6/6ofClasses6N,6P,7Aor7Bandcomplyingwith

    Table6/1shallbeusedasfilltostructures,inthelocationsdescribedinAppendix6/6.

    3 TheContractorshallcompact,incompliancewith

    Clause612,end-productcompaction,Class6N,6P,7A

    and7BmaterialtosatisfythecompactionrequirementsforthoseClassesaslistedinTable6/1,butsubjecttothe

    restrictionsinsub-Clauses4and5ofthisClause.

    4 Wherefilltostructuresisrequiredtothesamelevelonmorethanonesideofastructuralelementorburied

    structure(exceptwhereClause623applies)itshallbe

    maintainedatheightsnotdifferingbymorethan250

    mmaftercompactiononopposingsidesofthestructuralelementasfillingproceeds.

    5 TheContractorshallrestrictcompactionplantusedonfilltostructures,within2mofastructure,tothe

    followingitemsasdescribedinsub-Clause612.10and

    listedinTable6/4:

    (i) vibratoryrollerhavingamasspermetre

    widthofroll,asdeterminedbysub-Clause

    612.10,notexceeding1,300kgwithatotalmassnotexceeding1,000kg;

    (ii) vibratingplatecompactorhavingamassnot

    exceeding1,000kg;

    (iii) vibro-tamperhavingamassnotexceeding

    75kg.

    Thecompactedlevelofthefillwithinthiszoneshallnotdifferduringconstructionfromthecompactedlevelof

    theremainderoftheadjoiningfilltostructuresbymore

    than250mm.

    6 WhererequiredinAppendix6/6,Class6N,6Pand

    7Bmaterialshallbeshown,bymeansofatrialutilising

    notlessthan20m3ofthematerial,depositedand

    compactedinaccordancewiththisClause,tobestable,whenitistrimmedtoaslopeof1verticalto1

    horizontal,orotherslopedescribedinAppendix6/6.

    Amendment-November2009 11

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    12/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    611 Fill Above Structural ConcreteFoundations

    1 Filldepositedabovestructuralconcretefoundations

    shallbe,asshownontheDrawings:

    (i) Class6N,6P,7Aor7BselectedfillmaterialcomplyingwithClause610including

    compactionrequirements;

    (ii) Class6Mselectedfillmaterial,depositedandcompactedinaccordancewithClause623,

    abovethefoundationofarchprofile

    corrugatedsteelburiedstructures;

    (iii) anotherclassofselectedfillorgeneralfill

    complyingwithTable6/1depositedand

    compactedincompliancewithClauses608

    and612andinadditionbesubjecttosub-Clauses610.4and5.

    612 Compaction of Fills

    General

    1 Exceptfordynamiccompaction,whichshall

    complywithClause630,andunlessotherwisedescribed

    inAppendix6/3,theContractorshallcarryoutcompactionincompliancewiththisClause,assoonas

    practicableafterdeposition,onallthoseClassesoffill

    inTable6/1whichrequiretobecompacted.

    2 Compactionshallbeeithermethodorend-product

    asrequiredfortheClassoffillinTable6/1,usingplant

    appropriatetotheClassoffillandthesiteconditions.

    3 TheContractorshallobtainpermissionfromthe

    OverseeingOrganisationbeforecarryingout

    compactionoutsidenormalworkinghours.

    Method Compaction

    4 Wheremethodcompactionisrequiredtobe

    adopteditshallcomplywithsub-Clauses5to10ofthisClause.

    5 Exceptasstatedinsub-Clause6ofthisClause,

    methodcompactionshallbeundertakenusingtheplantandmethodsinTable6/4appropriatetothecompaction

    requirementsaslistedinTable6/1fortheClassof

    materialbeingcompacted.

    6 PlantandmethodsnotincludedinTable6/4shall

    onlybeusedprovidingtheContractordemonstratesat

    sitetrialsthatastateofcompactionisachievedbythealternativemethodequivalenttothatobtainedusingthe

    specifiedmethod.7 Earthmovingplantshallnotbeacceptedascompactionequipmentnorshalltheuseofalighter

    categoryofplanttoprovideanypreliminarycompactiontoassisttheuseofheavierplantbetakenintoaccount

    whenassessingtheamountofcompactionrequiredfor

    anylayer.

    8 IfmorethanoneClassofmaterialisbeingusedinsuchawaythatitisnotpracticabletodefinetheareas

    inwhicheachClassoccurs,theContractorshallcompactwithplantoperatingasifonlythematerial

    whichrequiresthegreatercompactiveeffortisbeing

    compacted.

    9 TheContractororOverseeingOrganisationmay

    carryoutfielddrydensitytestsasdescribedinsub-

    Clause15ofthisClauseonmaterialcompactedtomethodrequirementsatafrequencydefinedin

    Appendix6/3.Iftheresultsoffieldtestsshowdensities

    whichindicatethestateofcompactiontobeinadequate,thenifthisisduetofailureoftheContractortocomply

    withtherequirementsoftheContract,theContractor

    shallcarryoutsuchfurtherworkasisrequiredto

    complywiththeContract.

    10 ForthepurposesofTable6/4thefollowingshall

    apply:

    (i) TheminimumnumberofpassesNistheminimumnumberoftimesthateachpointon

    thesurfaceofthelayerbeingcompacted

    shallbetraversedbytheitemofcompaction

    plantinitsoperatingmode,orstruckbypowerrammersorfallingweightcompactors.

    Disthemaximumdepthofthecompactedlayer.

    (ii) IncolumnheadedN#thenumberofpasses

    shownistobedoubledformaterialClasses1A,1B,2A,2B,2Cand2Dwhensuch

    materialsoccurwithin600mmofsub-

    formation(ifcappingisrequired)orformation.Suchextracompactionshall,

    unlessotherwisedescribedinAppendix6/3,

    eitherbecarriedoutforthefullwidthofthe

    embankmentor,inotherareasoffillwhicharetoreceiveapavement,betweentheouter

    extremitiesoftheverges.

    (iii) ThecompactionplantinTable6/4is

    categorisedintermsofstaticmass.Themass

    permetrewidthofrollisthetotalmassontherolldividedbythetotalrollwidth.Where

    asmoothwheeledrollerhasmorethanone

    axlethecategoryofthemachineshallbedeterminedonthebasisoftheaxlegivingthe

    highestvalueofmasspermetrewidth.

    (iv) Agridrollerisamachinewithacompactingrollorrollsconstructedofheavysteelmesh

    ofsquarepattern.

    Amendment-November2009 12

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    13/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    (v) Adeadweighttampingrollerisamachine

    witharollorrollsfromwhichfeetproject

    andwheretheprojectedendareaofeachfootexceeds0.01mandthesumofthe

    areasofthefeetexceeds15%oftheareaofthecylindersweptbytheendsofthefeet.Therequirementsfortampingrollersapplyto

    machinesthathave2rollsintandem.Ifonly

    onetampingrolltraverseseachpointonthesurfaceofthelayeronanyonepassofthe

    machine,theminimumnumberofpasses

    shallbetwicethenumbergiveninTable6/4plusanyfurtherdoublingrequiredtosatisfy

    (ii)above.

    (vi) Forpneumatic-tyredrollersthemassper

    wheelisthetotalmassoftherollerdivided

    bythenumberofwheels.Inassessingthenumberofpassesofpneumatic-tyredrollers

    theeffectivewidthshallbethesumofthewidthsoftheindividualwheeltracks

    togetherwiththesumofthespacings

    betweenthewheeltracksprovidedthateachspacingdoesnotexceed230mm.Wherethe

    spacingsexceed230mmtheeffectivewidth

    shallbethesumofthewidthsoftheindividualwheeltracksonly.

    (vii) Avibratorytampingroller,whichmaybe

    self-propelledortowed,isamachinehaving

    ameansofapplyingmechanicalvibrationtooneormorerolls.Therollorrollshave

    projectingfeetwheretheheightofeachfoot

    exceeds10%oftheradiusoftherolldrum,theprojectedendareaofeachfootexceeds

    0.1%oftherolldrumsurfacearea,andthe

    sumoftheareasofthefeetexceeds10%oftheareaofthecylindersweptbytheendsof

    thefeet.

    Therequirementsfortheoperationof

    vibratorytampingrollersshallbethesameas

    thosestatedforvibratoryrollersinsub-Clause(viii)exceptthatvibratorytamping

    rollersoperatingwithoutvibrationwillbeclassifiedasdeadweighttampingrollers.

    (viii) Vibratoryrollersareself-propelledortowed

    smooth-wheeledrollershavingmeansof

    applyingmechanicalvibrationtooneormorerollsexceptthatvibratoryrollersemployed

    forMethod5compactionshallbesingleroll

    types.

    Vibratoryrollersoperatingwithoutvibration

    willbeclassifiedassmooth-wheeledrollers. Therequirementsforvibratoryrollersare

    basedontheuseofthelowestgearonaself-propelledmachinewithmechanical

    transmissionandaspeedof1.5to2.5km/h

    foratowedmachine,oraself-propelledmachinewithhydrostatictransmission.If

    highergearsorspeedsareusedanincreased

    numberofpassesshallbeprovidedinproportiontotheincreaseinspeedoftravel.

    Wherethemechanicalvibrationisappliedto

    tworollsintandem,theminimumnumberofpassesshallbehalfthenumbergivenin

    Table6/4fortheappropriatemasspermetre

    widthofonevibratingrollbutifonerolldiffersinmasspermetrewidthfromthe

    otherthenumberofpassesshallbe

    calculatedasfortherollwiththesmallestvalue.Alternativelytheminimumnumberof

    passesmaybedeterminedbytreatingthe

    machineashavingasinglevibratingrollwithamasspermetrewidthequaltothatof

    therollwiththehighervalue.

    Vibratoryrollersshallbeoperatedwiththeirvibratorymechanismoperatingonlyatthe

    frequencyofvibrationrecommendedbythe

    manufacturers.Wheremorethanoneamplitudesettingisavailableand/orarange

    offrequenciesisrecommended,themachine

    shallbeoperatedatthemaximumamplitudesettingandatthemaximumrecommended

    frequencyforthatsetting. Vibratoryrollersshallbeequippedor

    providedwithdevicesindicatingthefrequencyatwhichthemechanismis

    operatingandthespeedoftravel.Both

    devicesshallbecapableofbeingreadbyaninspectoralongsidethemachine.

    (ix) Vibrating-platecompactorsaremachines

    havingabase-platetowhichisattachedasourceofvibrationconsistingofoneortwo

    eccentricallyweightedshaftsand:

    (a) themasspersquaremetreofthebase-plateofavibrating-plate

    compactoriscalculatedbydividingthe

    totalmassofthemachineinitsworkingconditionbyitsareaincontactwith

    compactedmaterial;

    (b) vibrating-platecompactorsshallbeoperatedatthefrequencyofvibration

    recommendedbythemanufacturers.

    Theyshallnormallybeoperatedattravellingspeedsoflessthan1km/hbut

    ifhigherspeedsarenecessarythenumberofpassesshallbeincreasedinproportiontotheincreaseinspeedof

    travel.

    Amendment-November2009 13

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    14/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    (x) Vibro-tampersaremachinesinwhichan

    engine-drivenreciprocatingmechanismacts

    onaspringsystemthroughwhichoscillationsaresetupinabase-plate.

    (xi) Powerrammersaremachineswhichareactuatedbyexplosionsinaninternalcombustioncylinder,eachexplosionbeing

    controlledmanuallybytheoperator.

    (xii) Droppingweightcompactorsaremachinesinwhichadeadweightisdroppedfroma

    controlledheightusingahoistmechanism

    andtheyincludeself-propelledmachineswithmechanicaltraversingmechanisms

    capableofcompactingsoilintrenchesand

    closetostructures.

    (xiii) Inthecaseofpowerrammersanddropping-weightcompactorsonepasswillbe

    consideredasmadewhenthecompactingshoehasmadeonestrikeontheareain

    question.

    (xiv) Foritemsmarked*intheMethod3columnofTable6/4therollershallbetowedby

    track-layingtractors.Self-propelledrollers

    areunsuitable.

    (xv) Wherecombinationsofdifferenttypesor

    categoriesofplantareused,thefollowing

    shallapply:

    (a) thedepthoflayershallbethatforthetypeofplantrequiringtheleastdepthof

    layer;and

    (b) thenumberofpassesshallbethatforthetypeofplantrequiringthegreatest

    numberofpasses.

    End-product Compaction

    11 Whereend-productcompactionisrequireditshall

    complywithsub-Clauses12to15ofthisClause.

    12 (05/01)TheContractorshallatleast7daysbefore

    commencementofend-productcompactionmakeavailablethefollowingtotheOverseeingOrganisation:

    (i) thevaluesofmaximumdrydensityandthe

    optimummoisturecontentobtainedinaccordancewithBS1377:Part4usingthe

    2.5kgrammermethodorvibratinghammer

    methodasappropriateforeachofthefillshe

    intendstousewhichmeettherequirementsofthepermittedClassorClasses(where

    withinanyClassofmaterialthefillcontains

    materialhavingdifferentmaximumdrydensitiesandoptimummoisturecontentsthe

    Classshallbefurthersub-divided,by

    extendingtheidentificationsystem,inorder

    tomonitorthecompacteddensity);

    (ii) agraphofdensityplottedagainstmoisture

    contentfromwhicheachofthevaluesin(i)

    aboveofmaximumdrydensityandoptimummoisturecontentweredeterminedand,for

    Class7Amaterial,aplotofthe5%airvoids

    curveforeachsub-division.

    13 Oncetheinformationcontainedinsub-Clause12of

    thisClausehasbeenmadeavailabletotheOverseeing

    Organisationitshallformthebasisforcompaction.

    14 Fillcompactedtoend-productrequirementsshall

    haveafielddrydensity,measuredinaccordancewith

    sub-Clause15ofthisClause,equaltoorgreaterthanthepercentagegiveninTable6/1ofthemaximumdry

    densityfortherelevantClassoffillpreviouslymadeavailabletotheOverseeingOrganisationinaccordancewithsub-Clause12ofthisClause.

    15 Thefielddrydensityreferredtoinsub-Clause14

    ofthisClauseshallbemeasuredinaccordancewithBS1377:Part9,exceptthatnuclearmethodsshallonly

    beusedwhererequiredorpermittedinAppendix6/3.

    Wherenuclearmethodsareused,thegaugeshallbecalibratedinaccordancewithBS1377:Part9.

    613 Sub-formation and Capping

    1 (05/01)Cappingshallbeprovidedonlyinthoselocations,andtotheextent,particularlystatedin

    Appendix6/7tobeconstructedwithcapping.Itshall

    complywiththisClauseandinaddition,forstabilisedcapping,withClauses614,615and643asappropriate.

    2 (05/04)CappingshallbeconstructedwithClass

    6F1,6F2,6F3,6F4,6F5,6S,9A,9B,9C,9D,9Eor9F

    materialasrequiredorpermittedinAppendix6/7andcomplyingwithTable6/1.

    3 (05/04)Unlessotherwisedescribedin

    Appendix6/7,cappingshalleitherconsistofoneClassofcappingmaterialthroughoutitsdepthlaidinoneor

    morelayersofcompactedthicknesscomplyingwith

    Clause612,orbeformedofnotmorethantwoelementsofdifferentcappingmaterials.Eachelementshallbe

    formedofoneormorelayersofthesamecapping

    material,eachofcompactedthicknesscomplyingwithClause612.Class9Dor9Estabilisedcappingmaterial

    shallnotbeplacedorconstructedaboveClass6F

    granularcappingmaterialorClass6Sgranularfilterlayermaterial.

    4 WhererequiredinAppendix6/7,beforecommencingtheconstructionofcappinginthePermanentWorks,theContractorshalldemonstratethe

    methods,equipmentandmaterialsheproposestouseby

    Amendment-November2009 14

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    15/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    constructinganarea,orareasasappropriate,ofcapping

    onatypicalpreparedsub-formationtothesame

    thicknessasrequiredinthePermanentWorks.Theareaofeachcappingconstructiondemonstrationshallbenot

    lessthan700m.5 (05/01)ThematerialsplacedduringthedemonstrationmayformpartofthePermanentWorks,

    providedtheymeettherequirementsoftheContract,or

    becarriedoutelsewhereontheSitewherethisisdetailedinAppendix6/7.Aftercompletionofeach

    demonstrationareatheContractorshallwithinaperiod

    ofnotgreaterthan5daysandbeforecommencingthemainconstructionoftheappropriatecappinginthe

    PermanentWorks,carryouttestsoneachdemonstration

    areaandprovidetheOverseeingOrganisationwith

    recordssubstantiatingcompliancewiththestipulated

    criteriaofAppendix6/7.WhererequiredbyAppendix6/7theContractorshallprovidesheeting,to

    protectthedemonstrationarea.

    6 Thedemonstrationareashall,ifitdoesnotmeetthe

    requirementsforthePermanentWorksorislocated

    elsewhereonsite,beremovedandtheareareinstatedinaccordancewithAppendix6/7.

    7 Themethodsandmaterialsusedintheaccepted

    demonstrationshallnotbechangedduringthecourseoftheWorkswithouttheconstructionofafurther

    demonstrationwheresuchdemonstrationsarerequired

    byAppendix6/7.

    8 UnlessotherwisestatedinAppendix6/7,the

    sub-formationshallhavethesamelongitudinalgradient,

    crossfallandsurfaceleveltolerancesastheformation.

    9 TheContractorshalllimitanyunprotectedareaof

    sub-formation,whichistoreceivecappingtosuitthe

    outputoftheplantinuseandtherateofdepositionofcapping.

    10 Nounprotectedsub-formationwhichistoreceive

    cappingshallremaincontinuouslyexposedtorain

    causingdegradation,norbeleftuncoveredovernight.11 (05/01)IncuttingstheContractorshall,aspermittedorrequiredinAppendix6/7carryoutoneofthe

    followingprocedures:

    (i) (05/04)forClass6FgranularcappingmaterialorClass6Sgranularfilterlayermaterial,

    excavatebelowformationleveltoadepthto

    acceptthecapping,trimthesurfacetoformthesub-formationandimmediatelycompact

    withonepassofasmooth-wheeledroller

    havingamasspermwidthofrollnotless

    than2,100kgoravibratoryrollerhavingamasspermwidthofrollnotlessthan700kg

    oravibratingplatecompactorhavingamass

    permofnotlessthan1,400kg,exceptthat

    onlysmoothwheeledrollersshallbeusedon

    Class3chalkmaterial,andimmediatelydepositandcompactaboveitacappingin

    Class6FgranularcappingmaterialorClass

    6Sgranularfilterlayermaterial;or(ii) forClass9A,9B,9C,9D,9Eor9Fcapping

    materialconstructthecappingbystabilising

    theintactmaterial,providingitcomplieswithClass6E,6R,7E,7F,7Gor7Imaterial

    requirements,immediatelybelowformation

    toformClass9A,9B,9C,9D,9Eor9Fmaterial,respectively;or

    (iii) (05/04)excavatebelowformationtosufficientdepthtoenablestabilisationofintactClass

    6E,6R,7E,7F,7Gor7Imaterialtobe

    carriedout,toproduceClass9A,9B,9C,9D,9Eor9Fmaterialformingthelowerelement

    ofthecapping(afterstabilisationofthis

    element,thecappingshallbecompletedbydepositingafurtherlayerorlayersofClass

    6E,6R7E,7F,7G,or7Imaterialand

    stabilisingittoformClass9A,9B,9C,9D,9Eor9Fcappingordepositingand

    compactingClass6Fgranularcapping

    materialtoformtheupperelementofthecapping);or

    (iv) (05/04)excavatetosub-formationleveland

    depositmaterialcomplyingwithClasses6E,6R,7E,7F,7G,or7ItobestabilisedtoformacappingofClass9A,9B,9C,9D,9Eor9F

    layers.

    Whereastabilisedlayerisdirectlyoverlain

    byClass6Fgranularcappingmaterialthestabilisedlayershallbecompactedasfora

    sub-formationin11(i)above.

    12 (05/01)OnembankmentsandotherareasoffilltheContractorshall,aspermittedorrequiredin

    Appendix6/7carryoutoneofthefollowingprocedures:

    (i) (05/04)completetheembankmenttoformthesub-formationorremoveanyprotectionlayer

    andtrimthesurfacetoformthesub-

    formation,andinbothcasescompactwithonepassofasmooth-wheeledrollerhavinga

    masspermwidthofnotlessthan2,100kgor

    avibratoryrollerofnotlessthan700kgpermwidthoravibratingplatecompactor

    havingamasspermofnotlessthan

    1,400kg,(exceptthatonlysmooth-wheeled

    rollersshallbeusedonClass3chalk

    material)andimmediatelyconstructaboveit,inoneormorelayers,Class6Fgranular

    cappingmaterialorClass6Sgranularfilterlayermaterial;or

    Amendment-November2009 15

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    16/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    (ii) constructtheembankmenttosufficient

    heightandcarryoutstabilisationtoforma

    cappingofClass9A,9B,9C,9D,9Eor9Fmaterialinoneormorelayersutilisingwhere

    appropriateanyprotectionlayerpreviouslyconstructed;or

    (iii) (05/04)formulti-elementcapping,

    incorporatingstabilisedmaterial,construct

    theembankmenttosufficientheighttocarryouttheworkdescribedin12(ii)aboveand

    immediatelyconstructaboveitoneormore

    layersofClass6Fgranularcappingmaterial.

    WhereastabilisedlayerisdirectlyoverlainbyClass6Fgranularcappingmaterialthe

    stabilisedlayershallbecompactedasfora

    sub-formationin12(i)above.13 ForClass6F3materialOptimumMoistureContent

    shallbedeterminedaccordingtoBS1377:Part4

    Method3.7(vibratinghammertest).Measurementsofmoisturecontentbothforcontrolpurposesandfor

    optimummoisturecontentdeterminationshallbe

    accordingtoBS1377:Part2Method3(ovendrymethod)butusinganovenonareducedtemperature

    settingof45to50C.

    14 (05/04)FilterlayersconstructedofClass6Sgranular

    filterlayermaterialshallbeprotectedfromdamageby

    trafficandconstructionplant.TheContractorshallsoorganiseworkthatonlythetrafficdirectlyengagedin

    depositing,spreadingandcompactingthefilterlayershallbepermittedaccesstothesurfaceofthislayer.At

    notimeshalltheContractorpermittheleadingedgeof

    thefilterlayertoextendmorethan100metresbeyondtheleadingedgeofthesucceedinglayerofsubbase.

    614 Cement Stabilisation to Form Capping

    1 Wherecappingistoconsistof,eitherwhollyorin

    part,cementstabilisedmaterialClass9A,9Bor9C,this

    Clauseshallapplytotheconstructionofthosepartswhicharestabilisedwithcement.

    2 MaterialtobestabilisedwithcementshallbeClass6E,Class7FandClass7Gmaterialsallcomplyingwith

    Clause601andTable6/1.Unlessotherwisedescribedin

    Appendix6/7cementshallbePortlandcementcomplyingwithClause1001.

    3 Class6E,7For7Gmaterialtobestabilisedshall

    haveaddedtoit,atanypoint,thatquantityofcementmeasuredasapercentageofitsdryweightas

    determinedonthedemonstrationarea,tomeetthe

    requiredbearingratioinAppendix6/1,subjecttoaminimumof2%cement.

    4 Theappropriatequantityofcementshallbe

    uniformlyspread,byasuitablespreadingmachine,ontopofthelayertobeprocessed.Usingacollectingtray

    andbalancetheContractorshallchecktherateofspread

    ofthemachineonceforevery500mofcementspread.5 UnlessindicatedotherwiseinAppendix6/7,Class

    6E,7For7Gmaterialshallbestabilisedinasingle

    layerifitscompactedthicknessis250mmorless.Ifitscompactedthicknessisgreater,thematerialshallbe

    stabilisedinlayersnotlessthan130mmandnotmore

    than250mmthick,includinganycutting-inrequiredbysub-Clause9ofthisClause.

    6 TheContractorshallnotcarryoutcement

    stabilisationwhentheshadetemperatureisbelow3Cunlessonarisingthermometerabove0C.Cement

    stabilisationshallnotbecarriedoutduringperiodsofrainorwhenrainisimminent.Whencementisspreadonmateriallikelytocauseprematurehydration,

    processinginaccordancewithsub-Clause7ofthis

    Clauseshallfollowimmediately.

    7 UnlessindicatedotherwisebyAppendix6/7,Class

    6E,7For7Gmaterialformingthelayertobestabilised

    shallbeprocessedbypulverisingandmixinginthecementbymeansofasufficientnumberofpassesofa

    suitablemobilestabilisingmachineuntil95%ofthesilt

    andclayfractionisreducedtoparticlesorlumpspassingaBS28mmsieveafterdrysievingandthe

    pulverisationcomplieswithTable6/1.

    8 (11/05)Duringprocessing,sufficientwatershallbeavailableinthematerialtohydratethecementand

    enablesatisfactorymixingandcompactiontobe

    achieved.Anyaddedwatershallbethroughanintegral

    spray-baronthestabilisingmachine.Anyaddedwatershallhaveasulfatecontentnotexceeding1400mg/las

    SO4,whentestedinaccordancewithTestNo.1of

    TRLReport447.

    9 Thestabilisingmachineshallbeequippedwitha

    deviceforcontrollingthedepthofprocessingwhich

    shallbemaintainedatthecorrectsettingatalltimes.Anoverlapof150mmshallbemadebetweenadjacent

    passesofthestabilisingmachine.Whereasubsequent

    layerofmaterialisplacedonalayerpreviouslystabilisedthetinesorbladesofthestabilisingmachine

    shallbesetsothattheycutintothepreviouslystabilised

    layerbelowbyatleast20mm.

    10 (11/05)EachlayerofClass9A,9Bor9Cprocessedmaterialshallbecompactedassoonaspossibleafter

    thefinalpassofthestabilisingmachine.Compaction

    shallbecompletedwithin2hoursfollowingthemixing

    ofthecementintothematerialtobestabilised.ImmediatelybeforecompactionClass9Bprocessed

    materialshallhaveaMoistureConditionValue(MCV)ofnotgreaterthan12norlessthanthefigurestatedin

    Amendment-November2009 16

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    17/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    Appendix6/1forClass9Bcementstabilisedmaterial,

    bothasdeterminedinaccordancewithClause632.

    WatershallbeaddedifnecessaryinauniformmannertoenablethisMCVrequirementtobemet.Anyadded

    watershallhaveasulfatecontentnotexceeding1400mg/lasSO4whentestedinaccordancewithTest

    No.1ofTRLReport447.

    11 ThecompactionofeachlayerofClass9Aor9B

    materialshallcomplywithClause612,Table6/4

    Method6orMethod7respectively,exceptthatiflayersofClass9Aor9Bgreaterthan250mmthicknessareto

    beconstructed,thenumberofpassesofthecompaction

    plantshallbedeterminedfromtheresultsofademonstrationareaasdetailedinAppendix6/7.

    12 ThecompactionofClass9Cmaterialshallcomply

    withClause612,endproductcompaction,tosatisfythecompactionrequirementsgiveninTable6/1ofthis

    Class.

    13 Class9A,9Band9CmaterialsshallbecuredinaccordancewithClause1035.Duringperiodswhenthe

    airtemperatureisforecasttodropbelow3Corwhen

    groundfrostisforecastClass9A,9Band9Cmaterialshallbeprotected,topreventfreezing,foraperiodof

    7daysfromthetimeofcompletionofcompaction.Such

    protectionshallbesealedtopreventtheingressofmoisture.

    14 Class9A,9Band9CmaterialsshallnothaveothermaterialdepositedorcompactedabovethemuntilsuchtimeastherequiredbearingratioinAppendix6/1has

    beenachieved.Therelaxationallowedinsub-Clause

    617.2shallnotapplybeforethistime.

    615 Lime Stabilisation to Form Capping

    1 ThisClauseshallapplyonlytothosecapping

    materialswhicharetobestabilisedwithlimetoform

    materialClass9D.

    2 MaterialtobestabilisedwithlimeshallbeClass7E

    materialcomplyingwithClause601andTable6/1.

    3 (11/03)Limeforlimestabilisationshall,asrequiredinAppendix6/7,beeitherquicklimeorhydratedlime

    complyingwithBSEN459-1.Quicklimeshallwhen

    sievedhave100%passingaBS10mmsieveandatleast95%bymasspassingaBS5mmsieve.

    4 TheContractorshallmakeavailabletothe

    OverseeingOrganisationforeachsourceoflimeareportofachemicalanalysisforavailablelimemade

    inaccordancewithsub-Clause641.2.Suchreportsshall

    bemadeavailabletotheOverseeingOrganisationprior

    totheincorporationoflimeinthePermanentWorksatweeklyorotherintervalsdefinedinAppendix6/7

    duringperiodswhenlimestabilisationiscarriedout.

    5 Class7Ematerialtobestabilisedshallhaveaddedtoit,atanypoint,thepercentageofitsdryweightof

    lime,asdeterminedonthedemonstrationarea,tomeet

    therequiredbearingratioinAppendix6/1,subjecttoaminimumof2%byweightofavailablelimeasa

    percentageofthedryweightoftheClass7Ematerial.

    6 Limeofquantitycomplyingwithsub-Clause5ofthisClauseshallbeuniformlyspreadbyasuitable

    spreadingmachineontopofthelayertobestabilised.

    UsingacollectingtrayandbalancetheContractorshallchecktherateofspreadbyweight,onceforevery

    500moflimespreadoradifferentrateoftestingfor

    therateofspreadasdescribedinAppendix6/7.AtthesametimetheContractorshallcollectsamplesoflime

    depositedonthetrayandtestthemforavailablelime

    contentinaccordancewithClause641.

    7 UnlessindicatedotherwiseinAppendix6/7,the

    materialshallbestabilisedinasinglelayerifits

    compactedthicknessis250mmorless.Ifitscompactedthicknessisgreater,thematerialshallbestabilisedin

    layersnotlessthan130mmandnotmorethan250mm

    thick,includinganycutting-inrequiredbysub-Clause12ofthisClause.

    8 UnlessindicatedotherwiseinAppendix6/7lime

    stabilisationshallbecarriedoutonlyduringthemonthsofMarchtoSeptemberinclusiveandwhentheshade

    temperatureisnotbelow7C.Onlywhenthespecified

    bearingratioisattainableatashadetemperaturelessthan7C,maylimestabilisationbecarriedoutatsuch

    lowertemperature.Limestabilisationshallbe

    suspendedifrainfallwillhaveanadverseeffectonthe

    materialbeingstabilised.Thespreadingoflimeshallnotbecarriedoutinamannerorunderconditionsthat

    willresultinlimebeingblownfromthesiteonto

    adjacentlandorproperty.

    9 UnlessindicatedotherwiseinAppendix6/7,the

    materialformingthelayerstobestabilisedshallbe

    processedbypulverisingandmixinginthelimeby

    meansofsufficientnumberofpassesofasuitablemobilestabilisingmachineuntil95%oftheClass9D

    processedmaterialpassesaBS28mmsieveafterdrysievingandthepulverisationcomplieswithTable6/1.

    10 (11/05)Duringprocessingsufficientwatershallbe

    availableinthematerialtoslakethequicklime(ifused)

    andtoenablesatisfactorymixingandcompactiontobeachieved.Anyaddedwatershallbethroughanintegral

    spray-baronthestabilisingmachine.Anyaddedwater

    shallhaveasulfatecontentnotexceeding1400mg/lasSO

    4whentestedinaccordancewithTestNo.1of

    TRLReport447.

    11 (11/05)Thelayershallreceiveatleasttwopassesof

    thestabilisingmachinetopulveriseandmixthelimeandsoil,afterwhichtheprocessingshallbeinterrupted

    Amendment-November2009 17

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    18/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    byaperiodofnotlessthan24hoursandnotgreater

    than72hours,toenablethelimetoreactwiththesoil.

    Beforethisperiodcommencesthesurfaceofthelayershallbesealedwithonepassofasmoothwheeledroller

    havingamasspermetrewidthofrollofnotlessthan2700kgorapneumatictyredrollerofnotlessthan1000kgperwheel.Attheendofthisperiodthelayer

    shallreceiveonefurtherpassofthestabilisingmachine

    ormoreifrequiredtoenablethematerialtocomplywithsub-Clauses9and13ofthisClause,addingwater

    uniformlyifnecessary.Anyaddedwatershallhavea

    sulfatecontentnotexceeding1400mg/lasSO4when

    testedinaccordancewithTestNo.1ofTRLReport447.

    12 Thestabilisingmachineshallbeequippedwitha

    deviceforcontrollingthedepthofprocessingwhich

    shallbemaintainedatthecorrectsettingatalltimes.An

    overlapof150mmshallbemadebetweenadjacentpassesofthestabilisingmachine.Whereasubsequent

    layerofmaterialisplacedonalayerpreviouslystabilisedthetinesorbladesofthestabilisingmachine

    shallbesetsothattheycutintothepreviouslystabilised

    layerbelowbyatleast20mm.

    13 EachlayerofClass9Dprocessedmaterialshallbe

    compactedassoonaspossibleafterthefinalpassofthe

    stabilisingmachine.ImmediatelybeforecompactiontheprocessedmaterialshallhaveaMoistureCondition

    Value(MCV)ofnotgreaterthannorlessthanthe

    figuresstatedinAppendix6/1,forClass9Dlimestabilisedmaterial,bothasdeterminedinaccordance

    withClause632.

    14 Ifthereisadelayfollowingthefinalpassand

    beforecommencementofcompactionthesurfaceshallbesealedbynotlessthan2passesofasmooth-wheeled

    rollerhavingamasspermetrewidthofnotlessthan

    2,700kgorofapneumatictyredrollerofnotlessthan1,000kgmassperwheel.Onrecommencementand

    beforecompactionthelayershallbere-processed

    withouttheadditionoflime,byasufficientnumberofpassesofthestabilisingmachinetomeettheMCV

    requirementsofsub-Clause13ofthisClauseaddingwateruniformlyifnecessary.

    15 Thecompactionofeachlayershallcomplywith

    Clause612,Table6/4Method7exceptthatiflayers

    morethan250mmthickareconstructedthenumberofpassesofthecompactionplantshallbethose

    determinedfromresultsobtainedonademonstration

    areaasdetailedinAppendix6/7.

    16 Class9Dmaterialshallnothaveothermaterial

    depositedorcompactedaboveituntilsuchtimeasthe

    requiredbearingratioinAppendix6/1hasbeen

    achieved.Therelaxationallowedinsub-Clause617.2shallnotapplybeforethistime.

    616 Preparation and Surface Treatment ofFormation

    1 Theformationshall,aftercompletionofany

    subgradedrainage,andimmediatelybeforelayingsub-

    baseonareasofcompletedformation,haveasurfaceleveltolerancewithin+20mmand-30mm,orother

    leveloftolerancedefinedinAppendix6/7relativetoits

    designedlevelaftercompletionofthefollowingoperationsasnecessary:

    (i) (11/04)Anyprotectionlayershallberemoved

    andanysoftordamagedareasshallbe

    rectifiedbyexcavatingthemandreplacingwithacceptablematerialhavingthesame

    characteristicsandstrengthasthe

    surroundingmaterial.Thesurfaceofthe

    formationshallbetrimmedandimmediatelycleanedfreefrommudandslurrywhichshall

    bedealtwithasunacceptablematerialinaccordancewithsub-Clause#601.2.

    (ii) Theformationshallimmediatelybe

    compacted,inadditiontothecompactionrequiredforthefill.Thisadditional

    compactionshallforthispurposebeassumed

    tobeasforalayerof250mmfinishedthicknesscompactedincompliancewith

    Clause612andTable6/4Method6except

    forClass3materialswhereMethod4shallbeused.Immediatelyaftertheadditional

    compactiontheformationshallbetrimmed

    toachievethetolerancesofthissub-Clause.

    2 Wherethetolerancesinsub-Clause1ofthisClause

    areexceeded,theContractorshalldeterminethefull

    extentoftheareawhichisoutoftoleranceandshallmakegoodtheformationasfollows:

    (i) ifthesurfaceistoohighitshallbe

    re-trimmedandre-compactedincompliancewithClause612andsub-Clause1ofthis

    Clause;

    (ii) ifthesurfaceistoolowitshallbecorrectedbytheadditionofacceptablematerial

    complyingwithTable6/1having

    characteristicsandstrengthmatchingtheoverlainmaterial,depositedandcompacted

    incompliancewithClause608and612and

    sub-Clause1ofthisClause.IncohesivematerialsClasses2and7,wherethislow

    surfaceislessthan150mmbelowformation,

    materialshallberemovedtoadepthofatleast150mmbelowformationbeforethe

    additionalmaterialisdepositedandcompacted.

    Amendment-November2009 18

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    19/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    3 Aftertrimming,orre-trimmingifnecessary,the

    formationshallberolledwithonepassofasmooth-wheeledrollerhavingamasspermetrewidth

    ofrollnotlessthan2100kgor,exceptforClass3

    material,avibratoryrollerhavingamasspermetrewidthofvibratingrollofnotlessthan700kgora

    vibratingplatecompactorhavingamasspermunder

    thebaseplateofnotlessthan1,400kg.

    4 WhererequiredinAppendix6/7orwherethe

    tolerancesinsub-Clause1ofthisClausecannotbe

    achievedinthepreparationofformationinrockthenoneofthefollowingshallbecarriedoutsoastoachieve

    theabovetolerances:

    (i) thematerialshallbeexcavatedbelowformationtothedepthdescribedin

    Appendix6/7.TheexcavatedmaterialshallbeprocessedasdescribedinAppendix6/7andre-depositedandcompactedin

    compliancewithClauses608and612and

    Table6/4Method6incompactedlayersnotgreaterthan250mmthick;or

    (ii) (11/03)wheretherocksurfaceistabularitshallberegulatedbydepositingand

    compactingcementboundmaterialas

    describedinAppendix6/7,complyingwiththe1000Series,orST1concreteto

    Clause2062.

    5 TheContractorshalllimitanyareasofcompletedformationtosuittheoutputofplantinuseandtherate

    ofdepositionofsub-base.Noformationofcohesive

    materialClasses2and7shallremaincontinuouslyexposedtoraincausingdegradationorbeleftuncovered

    overnight.

    6 Thepreparationofformationonexistingsub-basematerialshallbecompletedasdescribedin

    Appendix6/7.

    617 Use of Sub-formation or Formation byConstruction Plant

    1 Constructionplantandothervehiculartraffic

    (exceptthatrequiredfortheconstructionofcapping)shallnotbeoperatedonthesub-formation,unless

    adequateprotection,ifnecessaryinadditiontoany

    weatherprotection,isprovided.

    2 Constructionplantandothervehiculartraffic

    (exceptforthatrequiredforpreparationoftheformation

    incompliancewithClause616)shallnotbeoperatedontheformationunlessadequateprotection,ifnecessaryin

    additiontoanyweatherprotectionisprovided.3 Inadditiontotherequirementsofsub-Clauses1and2ofthisClause,theContractorshallmakeavailable

    totheOverseeingOrganisationhisproposalsforthe

    protectionofthesub-formationorformationinareas

    wheretheyarewithin300mmoftheexistinggroundlevel,aftertopsoilhasbeenstripped,beforeusing

    constructionplantorothervehiculartrafficatorabove

    sub-formationorformation.

    618 (05/01) Topsoiling

    1 TopsoilingshallbecarriedoutusingClass5

    materialcomplyingwithTable6/1.

    2 Importedtopsoil,Class5Bmaterial,shallonlybe

    importedwhenrequiredinAppendix6/8,or

    Appendix30/6.

    3 WhenrequiredinAppendix6/8topsoilshallnotbe

    excavatedfromstockpiles,whetheronsiteorimported:

    (i) whichhavebeenexposedtoacumulativerainfallexceeding100mm,orotherfigurestatedinAppendix6/8,overthepreceding28

    daysmeasuredatapointdetailedin

    Appendix6/8;or

    (ii) whenheavyrainisfalling;or

    (iii) withatrackedvehicle;or

    (iv) whichhavebeenstockpiledformorethan2years;or

    (v) whicharefrozen;or

    (vi) inthecaseoftopsoilwhichhasbeenstockpiledformorethan6months,unlessthe

    stockpilehasbeentreatedwithatotal,

    non-residualherbicideasrecentlyasisseasonallypossible(allowingtheperiodof

    timerecommendedbythemanufacturerto

    elapsepriortoexcavation).

    4 Topsoilshall:

    (i) bedepositedandspreadontheareas,tothe

    thicknessesdescribedinAppendix6/8,inlayersnotexceeding150mm.Eachlayer

    shallbefirmedbeforespreadingthenext.Thethicknessshallbereducedwherenecessarytoallowforanysubsequentturfing

    requiredinAppendix30/5(itshallnotbe

    spreadusingatrackedvehicle,whensostipulatedinAppendix6/8);

    (ii) havestonesandotherdebrisremovedand

    disposedoffSitewhichhave:

    (a) dimensionsgreaterthan100mm

    equivalentdiameter,unlessotherwise

    permittedinAppendix6/8;and

    (b) dimensionsgreaterthan50mm

    equivalentdiameterwhichliewithin

    50mmofthesurface;

    Amendment-November2009 19

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    20/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    (iii) begradedtosmoothcontours,eliminatingall

    moundsanddepressionswherewatermay

    collect;

    (iv) nothavestonesorotherdebrisprotruding

    abovethesurfacebymorethan30mm,andcomplywiththefurtherrequirementsofClauses3004and3005.

    619 Earthwork Environmental Bunds

    1 Earthworkenvironmentalbundsshallbe

    constructedinthelocationsdescribedinAppendix6/9withfillmaterialscomplyingwiththerequirements

    thereinandClause601andTable6/1.Depositionshall

    beinaccordancewithClause608andcompactionwith

    therequirementsofTable6/1unlessotherwisedescribedinAppendix6/9ortherequirementsof

    sub-Clauses2or3ofthisClauseapply.

    2 Earthworkenvironmentalbundsformedof

    reinforcedoranchoredearthshallbeconstructedin

    compliancewithClauses2502and622.

    3 Earthworkenvironmentalbundsformedof

    strengthenedembankmentsshallbeconstructedin

    accordancewithClause621.

    4 (05/01)WhererequiredinAppendix6/9earthworkenvironmentalbundsshallbetopsoiledinaccordance

    withClause618andseeded,orturfed,allinaccordancewithClause3005.

    620 Landscape Areas

    1 Landscapeareasshallbeconstructedinthe

    locationsshowninAppendix6/9withClass4material

    asdescribedthereinandcomplyingwithTable6/1.

    2 UnlessmethodcompactiontoClause612is

    requiredinAppendix6/9thedegreeofcompactionof

    Class4materialshallbesufficienttoremovelarge

    voidsandtoproduceacoherentmasswhilstpreventingover-compactionandanybuildupofexcesspore

    pressures.

    3 Followingcompletionoffillingoflandscapeareas,

    Class4materialshallwhererequiredinAppendix6/9,

    beshapedasdescribedtherein.

    4 Class4materialshallbedepositedinlandscape

    areasafteranyadjoiningembankmentorotherareaof

    fillhasbeencompleted.WherepermittedinAppendix6/9andprovidedtheadjoiningembankment

    orotherareaoffillisalwayskeptatleast1mhigher

    thanthelandscapeareafill,constructionofsuchlandscapeareamayproceeduntilcompletion.

    5 (05/01)Landscapeareasshallbetopsoiledin

    accordancewithClause618andseededorturfedinaccordancewithClause3005totherequirementsof

    Appendix30/5.

    621 Strengthened Embankments

    1 Strengthenedembankmentsshallbeconstructedin

    thelocationsandtothedetailsdescribedin

    Appendix6/9withfillmaterialsandstrengthening

    materialsdescribedtherein.

    622 Earthworks for Reinforced Soil andAnchored Earth Structures

    1 Theconstructionofearthworksforreinforcedsoil

    andanchoredearthstructurestogetherwithassemblyanderectionofreinforcingandanchorelementsand

    associatedcomponentsshallbeincompliancewiththisClauseandClause2502.

    2 Excavationshallbecarriedoutincompliancewith

    Clause604.

    3 Fillforreinforcedsoilstructuresshall,exceptfor

    theirassociateddrainagelayers,beofClass6I,6J,7B,

    7Cor7DselectedmaterialcomplyingwithTable6/1aspermittedinAppendix6/1togetherwithanyother

    additionalrequirementstherein.WhereClass7B

    conditionedpulverised-fuelashisusedforfill,onlynon-metallicreinforcingelementsshallbeusedand

    metallicfastenersshallbeofstainlesssteel.

    4 Fillforanchoredearthstructuresshall,exceptfortheirassociateddrainagelayers,beof6Ior6Jselected

    materialcomplyingwithTable6/1aspermittedin

    Appendix6/1togetherwithanyotheradditionalrequirementstherein.

    5 Drainagelayerstoreinforcedsoilandanchored

    earthstructuresshallbeoneofthefollowingasappropriate:

    (i) Class6HmaterialcomplyingwithTable6/1

    andAppendix6/1.

    (ii) (05/04)forusewithClass7Bmaterial,

    uncrushed,partiallycrushedorcrushedgravelsandcomplyingwithBSEN12620,

    finescontentcategoryf3andsizes0/4(CP),

    0/4(MP)or0/2(MP)and,whenincontactwithmetalliccomponents,withthe

    propertieslistedinTable6/3.

    (iii) TypeBfilterdrainmaterialcomplyingwith

    Clause505foruseonlyinhorizontaldrainagelayers.

    Amendment-November2009 20

  • 7/28/2019 Specification for Highway Works series 600: earthworks

    21/75

    Volume1 Series600SpecificationforHighwayWorks Earthworks

    Verticallayersofdrainagelayermaterial

    shallbebroughtupatthesamerateasthe

    adjoiningfillmaterialwithoutmixingorcontamination.

    6 Inadditiontotherequirementsofsub-Clauses7and8ofthisClause,fillforreinforcedsoilandanchoredearthstructuresshallbedepositedand

    compactedincompliancewithClauses608and612and

    Table6/1,withmethodcompactionforClasses6H,6I,6J,7Cand7Dmaterialsandend-productcompaction

    forClass7Bmaterial.Drainagelayermaterialother

    thanClass6HshallbedepositedinaccordancewithClause608andcompactedasdescribedin

    Appendix6/3.

    7 Reinforcedsoilandanchoredearthstructuresshall

    have:(i) thedepositionandcompactioncarriedoutso

    thatalllayersofreinforcingandanchorelementsarefixedattherequiredlevelson

    topofcompactedfill;

    (ii) thedeposition,spreading,levellingandcompactionofthefillcarriedoutgenerallyin

    adirectionparalleltothefacingandexecuted

    instagestoalternatewiththeplacingandfixingofthereinforcingandanchorelements

    andthefacingelements;

    (iii) thereinforcingandanchorelementskeptasfreeaspossiblefromdamageor

    displacementduringdeposition,spreading,

    levellingandcompactionofthefill(alsothe

    programmeoffillingshallbearrangedsothatnomachinesorvehiclesrunonthe

    reinforcingoranchorelements);

    (iv) allconstructionplant,andallothervehicles,havingamassexceeding1,000kg,keptat

    least2mawayfromthebackofthefacing;

    (v) within2mofthebackofthefacing,the

    plantusedforcompactingthefillrestrictedtothefollowingitemsasdescribedin

    sub-Clause612.10andlistedinTable6/4:

    (a) vibratoryrollerhavingamasspermetre

    widthofrollnotexceeding1,300kg

    withatotalmassnotexceeding1,000kg;

    (b) vibratingplatecompactorhavingamass

    notexceeding1,000kg;

    (c) vibrotamperhavingamassnot

    exceeding75kg;

    (vi) attheContractorsoption,thereinforcedsoilandanchoredearthfillbeyondthe2mzone

    referredtoin(v)above,raisedinthicker

    layersthanwithinthe2mzone,providing

    thisiscompatiblewiththearrangementof

    thereinforcingandanchorelementsandthedifferenceincompactedleveldoesnot

    exceed300mm;

    (vii) duringconstructionofthereinforcedsoiloranchoredearthstructuretheretainedfillat

    therearofthestructure,asdefinedinsub-

    Clause8ofthisClause,maintainedatthesamelevelastheadjoiningreinforcedsoilor

    anchoredearthfill;

    (viii) iftheretainedmaterialattherearofthereinforcedsoiloranchoredearthstructure,as

    definedinsub-Clause8ofthisClause,isan

    existingearthworkornaturalslopewhich

    requiressupportingbytemporaryshoring,thisshoringshallberemovedprogressively

    astheworkproceedstopreventthe

    formationofvoids.

    8 Therearofthereinforcedsoiloranchoredearth

    structureisthepositioncoin