SPAN IFMIS Project in Indonesia December 5 - 7, 2011 Washington, DC Ministry of Finance Republic of Indonesia ICGFM Winter 2011 Conference PFM in the 21 st Century THE WORLD BANK
Nov 29, 2014
SPANIFMIS Project in Indonesia
December 5 - 7, 2011Washington, DC
Ministry of FinanceRepublic of Indonesia
ICGFMWinter 2011 Conference
PFM in the 21st Century
THE WORLD BANK
Agenda
Indonesia Roadmap of PFM Reform and SPAN Governance and Implementation Design of SPAN Plans for SPAN and IT Integration
Page │02
SPAN
Indonesia
Page │03
SPAN
Area 1.9 m sq kmPopulation 240m
GDP / Growth 2010 $700b / 6.1%Annual Budget $112bTotal civil servants 4.7mTreasury offices 200 Spending units 29,000Treasury employees 11,000Spending unit employees 96,000
Roadmap of PFM Reform
1999-2004 2005-2009 2009-2011 and beyond
New Laws: •1999: Decentralization law•2003: State Finance Law•2004: State Treasury Law •2004: Audit of the management and accountability of the state finance
Creation of new Directorate Generals :•DG Budget (budget formulation and preparation)•DG Treasury (budget execution and treasury mgt - 2005)•DG Fiscal Balance (management of transfer funds to the local governments - 2006)•DG Debt Management (management of foreign and domestic loans)•DGSAM (management of state assets and receivables - 2006)
World Bank Supports PFM in Indonesia:•22 Dec 2004 to 2014: Government Financial Management and Revenue Administration Program (GFMRAP), $60 million investment loan for implementing IFMIS (SPAN); •12 Oct 2006 to 2017: PFM MDTF Part I ($24 m) and Part II ($10 m) grants to complement the WB GFMRAP and also to to support a broad range of PFM reform initiatives.
Procedural improvements to support PFM reforms: •Unified budget system: combined recurrent and development budget• Introduction of performance based budgeting and Medium Term Expenditure Framework (MTEF)• Issuing Budget execution documents (DIPA) on time•Reforming business processes in the Treasury payment offices (KPPN) through the establishment of pilot showcase offices that reduce payment processing time from 2 days to sometimes 1 hour.•Establishing Government accounting standard and reorienting the chart of accounts•Reforming the government procurement process (Keppres 80/2003)•MOF as one of the selected ministry to implement bureaucratic reform (BR) program
Continuous improvements to support PFM reforms: •New program structure aligns Government programs with organization structures and establishes clearer lines of accountability of the line ministries (budget users)•The new simplified budget document which focus on performance rather than detailed line item.•Performance information (including its formulated target and indicators)•Definition of the baseline and new initiatives•Calculating output based standard cost (SBU/ SBK)• Integration database between budget appropriation data (DG Budget) and allotment data (DG Treasury)•Full implementation and expanded coverage of the Treasury Single Account•Deepening and stabilizing cash plan and forecasting •Faster and evenly spread budget disbursement
Contracts for implementing SPAN • IVV (Independent Validation and Verification) consultant to assist project preparation and procurement•COTS and Systems Integrator (Turnkey) to deliver COTS Solution; Infrastructure, DC & DRC; Telecom links; Cabling•BPI (Business Process Improvement) consultant (2007-2011)•CMC (Change Management and Communication)•PMQA (Project Management and Quality Assurance)•SAKTI (Spending Unit Application developer)
Page │04
SPAN
Roadmap of SPAN
Standalone and disparate systems
with no integration but
centrally developed and
managed
SPANImplementing
Core Accounting as part of IFMIS integrating the processes of Budget and
Treasury and taking feeds from
others
Enhanced systems for performance
based budgeting, medium term expenditure framework
Page │05
SPAN
• 27 systems• 14 belong to DG Budget
and DG Treasury• 13 belong to Spending
units, Revenue, Debt, etc
Current• 14 replaced by SPAN• Many additional
processes automated• 7 integrated to SPAN
SPAN• More integration• More automation
Post SPAN
Governance & Implementation
Project Organization
OV
ER
ALL P
RO
GR
AM
G
OV
ER
NA
NC
E
STR
UC
TU
RE
QU
ALIT
Y M
AN
AG
EM
EN
T
CH
AN
GE M
AN
AG
EM
EN
T
TR
AIN
ING
MA
NA
GEM
EN
T
Ensuring a greater chance of success in implementing SPAN• Project governance• Augmenting resources through consultants (IVV, PMQA, CMC) and help from
World Bank Page │06
SPAN
Design of SPAN - Requirements
Page │07
SPAN
SPAN Scope
COTS Solutio
n
Collaboration
Environment
Hardware
Systems Software
LAN & Cabling WAN
Data Centre
COTS Functionality
Budget Preparation
Commitment
Management
Management of
Spending Authority
Payments Manageme
nt
Processing of
Government Receipts
GL & Chart of Accounts
Cash Planning Reporting
Maintenance of
Reference Information
DATA CHARACTERISTICS
•Data Model•Common Definitions•Single Collection Point
•Universal Application
•Consistent Naming Conventions for Data Elements
•Common Data Dictionary
APPLICATION CHARACTERISTICS
•Derived Values Transfer Between Modules
•Minimum Reconciliation Required to Ensure Data Integrity
•Consistent Customisation Tools and Techniques
•Code Shared Among Modules
•Shared Business Rules
PRESENTATION CHARACTERISTICS
•Consistent Headings on Screens and Reports
•Consistent Navigation
•Consistent Look and Feel for Screens and Reports
•Single Authentication
OPERATIONAL CHARACTERISTICS
•Single Security and Rights Administration
•Consistent Interface to External Environment
• Implementation of New Releases of Components Handled Consistently
•Common Job Scheduling
•Common Set of Hardware/Software/ Communications Platforms/Protocols
Design of SPAN – Big picture
Page │08
SPAN
Sample plans for SPANProject Organization
RO
LLO
UT P
LA
NTES
TIN
G P
LA
N
CO
MM
UN
ICATIO
NS
PLA
NTR
AIN
ING
PLA
N
Empowering and effectively using available resources• Detailed plans • Communicated well in time
Page │09
SPAN
Future plan for IT Integration at MOF
• Ministry of Finance is implementing IT Shared Services• Business process of individual departments would be retained at the
department level while common services would be managed by the MOF Shared Services
Objective1. Optimise investments in
infrastructure at MOF – both technological and operational
2. Achieve economies of scale by implementing among others, virtualization technologies
3. Consolidate scarce resources
4. Increase integration between departments
5. Focus towards IT Controls and Governance and Enterprise Risk Management
MOF Shared Services will manage SPAN infrastructure in the newly consolidated data centre
Page │010
SPAN
Take away
PFM Reform is a long drawn process comprising of multiple change initiatives affecting regulation, process, systems and people
IFMIS systems accelerate reform and must be chosen and designed well
IT and program governance coupled with proper planning ensures a greater chance of success
Resources need to be augmented IFMIS system creates an opportunity for further
integration
Page │011
SPAN
Robert [email protected] Robert [email protected] Suresh [email protected]