SOW / Open Workbench

By Wilmer Arellano

Fall 2009

Page 2: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Please download and install

http://www.openworkbench.org/ http://www.openworkbench.org/index.ph

p?option=com_docman&Itemid=55

Page 3: SOW / Open Workbench By Wilmer Arellano Fall 2009.

References Some Excerpts from the book:

• Karl T Ulrich and Steven D. Eppinger. (2004). Product Design and Development. Third Edition. Mc Graw Hill, Irwin. ISBN-13: 978-0-07-247146-5.

Some Excerpts from the book • “Engineering Design, a Project Based Introduction”, second edition

by Clive I. Dym and Patrick Little. John Wiley and Sons, Inc. ISBN 0-471-25687-0

http://en.wikipedia.org/wiki/Statement_of_workhttp://en.wikipedia.org/wiki/Work_breakdown_structurehttp://www.maxwideman.com/musings/wbswar.htmhttp://www.inforapid.com/ http://office.microsoft.com/en-us/assistance/

HA011361531033.aspx#Step%201http://www.openworkbench.org/

Page 4: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Project management Product development involves:

• many people

• many different tasks. Successful product development projects result in:

• high-quality;

• low-cost products

• efficient use of time,

• money,

• and other resources.

Page 5: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Project management

Project management is the activity of planning and coordinating resources and tasks to achieve the project goals.

Page 6: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Statement Of Work (SOW) A statement of work (SOW) is a document used in the

Project Development and organizes information about:• Scope of Work (WBS), Describes the work to be done in

detail and specifies the hardware and software involved and the exact nature of the work to be done.

• Location of Work, Describes where the work is to be performed. Specifies location of hardware and software and where people will meet to perform the work.

• Period of Performance, This specifies the allowable time for projects, such as start and finish times.

• Deliverables Schedule, This part list the specific deliverables, describing what and when it is due.

• Who is responsible for what. Similar to an estimate of somebody fixing your roof

Page 7: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Statement Of Work (SOW)

The information indicated in the previous slide is presented in that section of the proposal as needed

There is no need to summarize as presented in the slide

Page 8: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Work Breakdown Structure (WBS) The WBS is the hierarchical list of the project's phases, tasks

and milestones

• Phase: A group of related tasks that completes a major step in a project.

• Task: An activity that has a beginning and an end. Project plans are made up of tasks.

• Milestone: A reference point marking a major event in a project and used to monitor the project's progress.

Scope: The combination of all project goals and tasks, and the work required to accomplish them.

• The scope translates into the timeline and budget. Budget: The estimated cost of a project. http://office.microsoft.com/en-us/assistance/

HA011361531033.aspx#Step%201

Page 9: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Work Breakdown Structure (WBS) The WBS may describe:

• the activities of the project or • Activities speak to the work involved in the project,

• or its deliverables. • Deliverables speak to end results.

If activities, then the WBS is expressed by sentences commencing with verbs,

but if deliverables, then the entries are expresses as nouns.

http://www.maxwideman.com/musings/wbswar.htm We will base our WBS on deliverables. Please

make that clear in your WBS

Page 10: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Work Breakdown Structure (WBS) The WBS was initially developed by the U.S. defense

establishment, and it is described in Military Standard as follows:

• “A work breakdown structure is a product-oriented family tree composed of hardware, software, services, data and facilities”

• http://h2o.enr.state.nc.us/bims/WBS/Support_Project_WBS.html

Page 11: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Work Breakdown Structure (WBS)

• This is what we want Deliverables based WBS• http://en.wikipedia.org/wiki/

Work_breakdown_structure#Example_of_a_work_breakdown_structure

Page 12: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Work Breakdown Structure (WBS)

The 100% rule• The rule applies at all levels within the hierarchy:

the sum of the work at the “child” level must equal 100% of the work represented by the “parent” and the WBS should not include any work that falls outside the actual scope of the project, that is, it cannot include more than 100% of the work

• The best way to adhere to the 100% Rule is to define WBS elements in terms of deliverables.

Page 13: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Phase: A group of related tasks that completes a major step in a project.

Task: An activity that has a beginning and an end. The end is marked by a deliverable

Page 14: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Documenting (WBS) Phase 1.1-Antenna Design

• Objective: To produce a 50 Ohm input impedance antenna with a power handling capability of 100 Watts with minimum cost and a minimum power gain of 3 dB

• Approach: Two method will be used and compared to select the more economical design. Method 1 will consist of the recently acquired Antenna Design Software and method 2 will be based on newly published formulas by A. Jones [4]

• Expected Results: A fully functional transmit antenna with accompanying literature and mounting hardware.

This phase will consist of the following tasks:• Antenna Design• Antenna Construction• Antenna Testing

Remember this is a deliverable based description

Page 15: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Project Timeline/ Sequential Tasks Tasks are sequential when they are dependent on the output

of another task. These because the dependencies impose a sequential order in which the tasks must be completed.

We do not necessarily mean that the later task cannot be started before the earlier one has been completed

Page 16: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Project Timeline/ Parallel task

Two tasks are parallel when they are both dependent on the same task but are independent of each other.

Page 17: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Project Timeline/ Coupled tasks Coupled tasks are mutually

dependent; each task requires the result of the other tasks in order to be completed. Coupled tasks either must be executed

• simultaneously with continual exchanges of information or

• must he carried out in an iterative fashion.

Page 18: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Milestones

Examples: • Prototype Implementation.

• Testing.

• Documentation.

• Demonstration.

Each Milestone should be explained with a sentence or two

Page 19: SOW / Open Workbench By Wilmer Arellano Fall 2009.

PERT Charts (program evaluation and review technique)

• PERT (program evaluation and review technique) charts explicitly represent both dependencies and timing, in effect combining some of the information contained

in the DSM and Gantt chart.

Page 20: SOW / Open Workbench By Wilmer Arellano Fall 2009.

The Critical Path• The dependencies among the tasks in a PERT chart, some of which may be

arranged sequentially and some of which may be arranged in parallel, lead to the concept of a critical path. The critical path is the longest chain of dependent events.

Page 21: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Example

1. TransmiterAntenna Design 25%

1. Transmiter Modulator Design 25%

Power Amplifier Design 50%

Page 22: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Example

1.1 Antenna DesignTheorical Design 5%Antenna Construction 10%Antenna testing 5%

1. Transmiter Antenna Packaging 3%Antenna Design 25% Monitoring 2%

1. Transmiter Modulator Design 25%

Power Amplifier Design 50%

Page 23: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Example

1.1 Antenna DesignTheorical Design 5%Antenna Construction 10%Antenna testing 5%

1. Transmiter Antenna Packaging 3%Antenna Design 25% Monitoring 2%

1. Transmiter Modulator Design 25% 1.2 Modulator DesignAudio interface Module 10%

Power Amplifier Design 50% Mixer Module 10%Output Stage Module 5%

1.3 Power Amplifier Design

Page 24: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Example

1.1 Antenna DesignTheorical Design 5%Antenna Construction 10%Antenna testing 5%

1. Transmiter Antenna Packaging 3%Antenna Design 25% Monitoring 2%

1. Transmiter Modulator Design 25% 1.2 Modulator DesignAudio interface Module 10%

Power Amplifier Design 50% Mixer Module 10%Output Stage Module 5%

1.3 Power Amplifier Design

Continue with next Phase

Page 25: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Possible Research (Missing Percentages)

Find Area of InterestFind ArticlesRead Articles

Finalize

DetailsWritten Report

Determine topics to coverWrite Topics

ResearchCreate Content

Research Project Power Point Obtain Graphics

Page 26: SOW / Open Workbench By Wilmer Arellano Fall 2009.

http://en.wikipedia.org/wiki/Work_breakdown_structure

Alternate Style (not what we want to use)

Page 27: SOW / Open Workbench By Wilmer Arellano Fall 2009.
Page 28: SOW / Open Workbench By Wilmer Arellano Fall 2009.

This is just an example, you can customize as you like.

Page 29: SOW / Open Workbench By Wilmer Arellano Fall 2009.

In Favorites Gantt Charts, double-click the little square and enter:

• A new Phases with:

•Name

•Category

•And ID

Make sure to select phase

Page 30: SOW / Open Workbench By Wilmer Arellano Fall 2009.

The first phase has been created

Page 31: SOW / Open Workbench By Wilmer Arellano Fall 2009.

In Favorites Gantt Charts, double-click the little square and enter:

•The Tasks with:

•Names

•Category

•And ID

•Duration

•Could leave blank

•Probably Better

Make sure to select task

Page 32: SOW / Open Workbench By Wilmer Arellano Fall 2009.

The first task has been entered

Page 33: SOW / Open Workbench By Wilmer Arellano Fall 2009.

This is how it would look after all tasks for the first phase have been entered

Page 34: SOW / Open Workbench By Wilmer Arellano Fall 2009.

To indicate task’s dependencies drag from the end of one task to the beginning of the next one

Page 35: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Click here to auto-schedule

Page 36: SOW / Open Workbench By Wilmer Arellano Fall 2009.

This is how it would look like

Red Color indicates the Critical Path

Page 37: SOW / Open Workbench By Wilmer Arellano Fall 2009.

1.1 Antenna DesignTheorical Design 5%Antenna Construction 10%Antenna testing 5%

1. Transmiter Antenna Packaging 3%Antenna Design 25% Monitoring 2%

1. Transmiter Modulator Design 25% 1.2 Modulator DesignAudio interface Module 10%

Power Amplifier Design 50% Mixer Module 10%Output Stage Module 5%

1.3 Power Amplifier Design

Page 38: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Project with two phases included

It is a coincidence that the two phases have same duration

Page 39: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Click to see the PERT

The zoom commands were used to fit the chart in the window

Page 40: SOW / Open Workbench By Wilmer Arellano Fall 2009.

On planning, Resource assignment, double click the little square to enter the resources and their costs

Page 41: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Do the same for non labor resources

Use Equipment for Space

Page 42: SOW / Open Workbench By Wilmer Arellano Fall 2009.

You can add the cost of components as “material”

Page 43: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Right click on the tasks and select assignment to assign resources to the tasks

Page 44: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Select Resource and click on Assign

Enter estimated hours in Estimate

Page 45: SOW / Open Workbench By Wilmer Arellano Fall 2009.

As components were entered with a rate of $100, 1.5 will represent $150

Page 46: SOW / Open Workbench By Wilmer Arellano Fall 2009.

The yellow color indicates that the task is low in resources, more hours or space or equipment, etc are needed

If you need to add a new task or phase in between tasks or phases, right click the square and select insert task

Page 47: SOW / Open Workbench By Wilmer Arellano Fall 2009.

There will be a problem if you click schedule again

Page 48: SOW / Open Workbench By Wilmer Arellano Fall 2009.

As the Audio Interface Module and the Mixer Module were using the same resources, they were converted to sequential.

You would need to add more resources to keep the tasks in parallel

The zoom commands were used to fit the chart in the window

Page 49: SOW / Open Workbench By Wilmer Arellano Fall 2009.

•Another Low Frequency Engineer was included

•Two more Lab Spaces were included

•It was not necessary increase the project duration

Page 50: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Click on controlling and then Revise Schedule to see the budget

Page 51: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Set The base Line

Updating The Project Status

Page 52: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Updating The Project Status

Page 53: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Updating The Project Status

Double Click on the affected tasks and change the changes in estimated and actual time per Resource

Page 54: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Updating The Project Status

The task bar changes colour to reflect status (Red / Blue – Not Started)(Purple – Started)(Grey – Progress completed)The task name changes colour to reflect status (Red – Not Started)(Purple – Started)(Green – Completed)

Page 55: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Updating The Project Status

If the task is completed enter 0 in Estimate

Page 56: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Updating The Project Status

We reduced 20 hours but because of the weekend it appears to be a longer time

Page 57: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Milestones

Page 58: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Milestones

Drag the milestone to the desired location

Page 59: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Milestones

Page 60: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Copy and Paste

Table cells can be copied and pasted into excel

By the way, this is a representation of the WBS

Page 61: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Phase 1.1 Antenna Design HardwareTask 1.1.1 Theoretical Design HardwareTask 1.1.2 Antenna Construction HardwareTask 1.1.3 Antenna Testing HardwareTask 1.1.4 Antenna Packaging HardwareTask 1.1.5 Monitoring HardwarePhase 1.2 Modulator Design HardareTask 1.2.1 Audio Interface ModuleTask 1.2.2 Mixer Module HardwareTask 1.2.3 Output Stage ModuleMilestone Prototype Prototype Ready Hardware

Task 1.1.1 Theoretical Design HardwareTask 1.1.2 Antenna Construction Hardware

Phase 1.1 Antenna Design Hardware Task 1.1.3 Antenna Testing HardwareTask 1.1.4 Antenna Packaging HardwareTask 1.1.5 Monitoring Hardware

Task 1.2.1 Audio Interface ModuleTask 1.2.2 Mixer Module Hardware

Phase 1.2 Modulator Design Hardare Task 1.2.3 Output Stage ModuleMilestone Prototype Prototype Ready Hardware

You can use the information from Openworkbench to build your WBS

Page 62: SOW / Open Workbench By Wilmer Arellano Fall 2009.
Page 63: SOW / Open Workbench By Wilmer Arellano Fall 2009.

The Budget

JohnSmith 15 $225.00

Circuits Lab 10 $70.00JohnSmith 10 $150.00

Circuits Lab 2 24 $24.00Mary Morrison 20 $300.00Circuits Lab 32 $224.00John Martinez 32 $480.00Comp Mod $150.00John Martinez 40 $600.00Lab Circuits 3 40 $280.00

$2,503.00

Even the Components are included here

Page 64: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Class Assignment Elaborate SOW of your Senior II Project Elaborate Budget

• Summarize resources, do not list them more than once

Make sure that you:• Include Senior Design I and II activities and set a Baseline

• Follow Style Guidelines

• Include Contents in the Right Section #s

• Include TITLE PAGE AND CONTENTS

• WBS (using 100% Rule)

• Gant Chart

• Pert

• Critical Path

• Print only what is required, do not waste paper

• Include your Mentor time and any consultant time in the resources

Page 65: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Class Assignment

Grading:Report Deduction Reason Heading Style, Single Occurrence 4 Heading Style, Multiple Occurrences 7 Starting with picture, table or graph Single Occurrence 4 Starting with picture, table or graph Multiple Occurrence 7 Not presenting required information Case by Case Not Presenting Title Page 4 Not Presenting Table of contents, List of Figures, List of Tables 4 Maximum grade 40 Presentation 40

Page 66: SOW / Open Workbench By Wilmer Arellano Fall 2009.

Class Assignment

Deliverables• Printed Report

• Oral Presentation with visuals

• Demonstration of full proposal body according to Word Tutorial

• Need Analysis

Make sure you use a version system for archiving your proposal

Page 67: SOW / Open Workbench By Wilmer Arellano Fall 2009.

&&QuestionsQuestions

AnswersAnswers