McGillivray Blvd. Pembina Hwy. Markham Rd. Investors Group Field University of Manitoba Bishop Grandin Blvd. SOUTHWEST RAPID TRANSITWAY (STAGE 2) AND PEMBINA HIGHWAY UNDERPASS PROJECT U OF M/ STADIUM STATION • Frequent, high-speed transit right to IGF • Fast, reliable service to U of M • Major upgrades to main campus transit station Temporary lane closures/pedestrian restrictions in local area SOUTHPARK RECONSTRUCTION • Reconstruction of Southpark from Pembina to the Transitway • Active transportation paths and sidewalks • Intersection improvements at Pembina PEMBINA UNDERPASS • Underpass widened and enhanced to benefit all users • Pembina widened to three lanes from Stafford to Point Road to improve traffic flow • New active transportation pathways on both sides Temporary lane closures on Pembina MARKHAM, CHANCELLOR & PLAZA STATIONS Temporary pedestrian restrictions and traffic diversions in local area (no lane closures) during active construction CHEVRIER, CLARENCE & SEEL STATIONS Temporary traffic, transit and pedestrian restrictions in local area LETELLIER OVERPASS • New Letellier rail overpass Temporary, localized parking restrictions; temporary changes to Transit service on Chevrier BISHOP GRANDIN OVERPASS • New transit and active transportation structures Temporary lane closures on Bishop Grandin (see info sheet) CHEVRIER RECONSTRUCTION • Chevrier Boulevard street renewal between the Transitway to Pembina Highway • Chevrier active transportation pathway Temporary traffic, transit and pedestrian restrictions in local area MCGILLIVRAY OVERPASS • Construction of new McGillivray overpass • Realignment of AT pathway on south side of McGillivray Temporary lane closures in local area; temporary closure of existing active transportation pathway BRENDA LEIPSEC DOG PARK • New, upgraded Brenda Leipsic Dog Park • Temporary relocation of dog park during construction LEGEND NEW STAGE 2 RAPID TRANSITWAY EXISTING (STAGE 1) RAPID TRANSITWAY NEW ACTIVE TRANSPORTATION PATHWAY ROADWAY NEW RAPID TRANSIT STATIONS PARK & RIDE KISS & RIDE QUICKER COMMUTES • Reliable: Buses on the Transitway not affected by traffic congestion and delays • Fast: Buses on the Transitway travel safely at high speeds • Convenient: Easy connections with existing Transit routes; ample parking at new Park & Rides BEAUMONT STATION Temporary traffic, transit and pedestrian restrictions in local area NEW, MODERN STATIONS • Comfortable heated, landscaped, accessible stations • Prominent, real-time next-bus displays • Secure bike lockers at every station • New Park & Ride/Kiss & Ride options ROADWAY IMPROVEMENTS & ENHANCED LIVEABILITY • Traffic improvements that benefit everyone • Significant new investment in local roads • Enhanced landscaping and area beautification NEW ACTIVE TRANSPORTATION OPTIONS • New cycling/pedestrian path along full length of Transitway • Modern, protected and accessible • Will connect with all intersecting active transportation routes • Pathway will be lluminated at night for enhanced visibility and safety • All rapid transit stations will include bike racks and lockers COMPLETE