Southwest LRT Project Craig Lamothe, AICP Senior Project Manager 2011 MN State Planning Conference September 29, 2011
25

Southwest LRT Project

Jan 11, 2016

Download

Documents

nevin

Southwest LRT Project. Craig Lamothe, AICP Senior Project Manager 2011 MN State Planning Conference September 29, 2011. Today’s Topics. Twin Cities Transit System Profile Previous Regional New Starts Projects Hiawatha LRT Northstar Commuter Rail Central Corridor LRT - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Southwest LRT Project

Southwest LRT Project

Craig Lamothe, AICPSenior Project Manager

2011 MN State Planning ConferenceSeptember 29, 2011

Page 2: Southwest LRT Project

1) Twin Cities Transit System Profile

2) Previous Regional New Starts Projects

a) Hiawatha LRT

b) Northstar Commuter Rail

c) Central Corridor LRT

3) Federal New Starts Program Primer

4) Southwest LRT Project

a) Alternative Analysis Phase Recap

b) Preliminary Engineering Phase Preview

2

Today’s Topics

Page 3: Southwest LRT Project

3

Twin Cities Ridership

2006 2007 2008 2009 201080

82

84

86

88

90

92

94

96M

illi

on

s

Page 4: Southwest LRT Project

4

Metro Transit Ridership (2010)

Express9,243,906

Subur-ban

Local1,570,4

46

Local56,068,009

LRT10,455,

860

Commuter Rail710,426

Page 5: Southwest LRT Project

5

Peer Comparison: 2009 System Ridership

Page 6: Southwest LRT Project

6

Peer Comparison: Ridership per Capita

Seattl

e, W

A

Atlant

a, G

A

Miam

i, FL

Baltim

ore,

MD

Portla

nd, O

R

San D

iego,

CA

Denve

r, CO

Twin Citie

s

Houst

on, T

X

Honolu

lu, H

I

Phoen

ix, A

Z

Dallas

, TX

San J

uan,

PR

Pittsb

urgh

, PA

Las

Vegas

, NV

0

20

40

60

80

100

120

Rid

es

pe

r C

ap

ita

Page 7: Southwest LRT Project

• Buses– Artic Buses: 163– Standard 40’ Buses: 735– Hybrid Buses: 97

• Light Rail– 27 cars

• Commuter Rail– 18 Passenger Cars– 6 Locomotives

7

Metro Transit Fleet

Page 8: Southwest LRT Project

8

2030 Transitway System

Page 9: Southwest LRT Project

• 12 miles• 19 Stations• Project Cost: $715.3 million• 2011 Annual Operating Budget:

$26.7 million• Avg. Weekday Ridership (Aug ‘11):

35,069• 2010 Total Annual Ridership:

10,500,000

9

Hiawatha LRT (Blue Line)

Page 10: Southwest LRT Project

• 40 miles• 6 stations• Project Cost: $320 million• 2011 Annual Operating Budget:

$17.0 million• Avg. Weekday Ridership (Aug. ‘11)

2,696• 2010 Total Annual Ridership:

710,400

10

Northstar Commuter Rail

Page 11: Southwest LRT Project

• 11 miles• 18 new stations• $957 million

• 2015 Est. Operating budget: $25.4 million

• Projected weekday ridership: Over 40,000 by 2030

11

Central Corridor LRT (Green Line)

Page 12: Southwest LRT Project

12

New Starts Overview

Full Funding Grant Agreement

Alternatives Analysis

Final DesignCommitment of Non-Federal Funding, Construction Plans, ROW Acquisition,

Before-After Data Collection Plan, FTA Evaluation for FFGA,

Begin Negotiations

Pro

j Mgm

t Ove

r-si

ght

Construction

Preliminary EngineeringComplete NEPA Process

Refinement of Financial Plan

Select LPA,MPO Action

PMP

FTA Decision on entry into PE

FTA Decision on entry into FD

Systems Planning

Page 13: Southwest LRT Project

• Evaluate the mode and alignment options for a particular corridor

• Benefits, costs and impacts of transportation options

• Complete with the selection of the locally preferred alternative (LPA) and adoption of the LPA into the region’s long range transportation plan

13

Alternatives Analysis (AA) Phase

Page 14: Southwest LRT Project

• Consider design options to refine LPA and complete the NEPA process

• Hone the estimates of project cost, benefits, impacts and schedule

• Finalize management plans• Demonstrate technical capabilities to

develop the project• Commit local funding sources

14

Preliminary Engineering (PE) Phase

Page 15: Southwest LRT Project

• Prepare final construction plans, contract packages, detailed specifications and bid documents

15

Final Design (FD) Phase

Page 16: Southwest LRT Project

16

New Starts Evaluation Process

Page 17: Southwest LRT Project

17

Peer “New Starts” Projects

Orlando, FLHonolulu, HI

New York, NY

St. Paul- MinneapolisP

N

Pending FFGA

New FFGA

E Existing FFGAJuly 2011 Status

San Francisco

Houston, TX

Denver, CO

Salt Lake City, UT

Dallas, TX

Seattle, WA

E

EEN. Virginia-Dulles, VA

E

E

N

P

Hartford, CT

E

E

P

Sacramento, CA

P

P

San Jose, CA

N

N Portland, OR

P

P

E

E

E

Page 18: Southwest LRT Project

18

Peer “New Starts” PE Projects

Vancouver, WA

Portland, OR

Sacramento, CA

Los Angeles, CA

Los Angeles, CA

Honolulu, HIHouston, TX

Charlotte, NC

Pawtucket, RI

San Jose, CA

Salt Lake City, UT

Minneapolis,- St. Paul, MN

September 2011 Status

Page 19: Southwest LRT Project

Alternatives Analysis

LPA Selected

LPA Amended into TPP

MC requests to Enter PE

FTA approves Entry into PE

19

SWLRT: Historical Timeline

2005 - 2009

Nov. 4, 2009

May 26, 2010

Aug. 31, 2010

Sept. 2, 2011

Page 20: Southwest LRT Project

• Transit Technology Review• Identification of Alignments and Stations• Initial Set of Alternatives

– No Build– Enhanced Bus– Build Alternatives (BRT & LRT)

20

SWLRT: AA Phase

Page 21: Southwest LRT Project

• 15 miles• 17 new stations• Est. Project Cost:

$1.25 billion

21

SWLRT: Locally Preferred Alternative (LPA)

Page 22: Southwest LRT Project

22

SWLRT: Project Budget

30%

10%10%

50%

CTIBHCRRAStateFTA

$30.6M in Local Funds Committed to Date

$625 million

$375 million

$125 million

$125 million

Page 23: Southwest LRT Project

23

SWLRT: Anticipated Schedule

Preliminary Engineering

Final Design

Construction

Revenue Operations

2011 - 2013

2013 - 2014

2014 - 2017

2018

Page 24: Southwest LRT Project

• Procurement of Engineering Services• Complete 30% Design• Procurement of Environmental Services• Complete Final Environmental Impact Statement• Establishment of a Project Office• Secure Municipal Consent from 5 Cities

24

SWLRT: PE Phase

Page 25: Southwest LRT Project

http://www.metrocouncil.org/transportation/SW/SouthwestLRT.htm

• Mark Fuhrmann, Program Director – New Starts Rail [email protected]

• Chris Weyer, Project Director - Southwest [email protected]

For Further Information and Updates

25