Southwest LRT Project Craig Lamothe, AICP Senior Project Manager 2011 MN State Planning Conference September 29, 2011
Jan 11, 2016
Southwest LRT Project
Craig Lamothe, AICPSenior Project Manager
2011 MN State Planning ConferenceSeptember 29, 2011
1) Twin Cities Transit System Profile
2) Previous Regional New Starts Projects
a) Hiawatha LRT
b) Northstar Commuter Rail
c) Central Corridor LRT
3) Federal New Starts Program Primer
4) Southwest LRT Project
a) Alternative Analysis Phase Recap
b) Preliminary Engineering Phase Preview
2
Today’s Topics
3
Twin Cities Ridership
2006 2007 2008 2009 201080
82
84
86
88
90
92
94
96M
illi
on
s
4
Metro Transit Ridership (2010)
Express9,243,906
Subur-ban
Local1,570,4
46
Local56,068,009
LRT10,455,
860
Commuter Rail710,426
5
Peer Comparison: 2009 System Ridership
6
Peer Comparison: Ridership per Capita
Seattl
e, W
A
Atlant
a, G
A
Miam
i, FL
Baltim
ore,
MD
Portla
nd, O
R
San D
iego,
CA
Denve
r, CO
Twin Citie
s
Houst
on, T
X
Honolu
lu, H
I
Phoen
ix, A
Z
Dallas
, TX
San J
uan,
PR
Pittsb
urgh
, PA
Las
Vegas
, NV
0
20
40
60
80
100
120
Rid
es
pe
r C
ap
ita
• Buses– Artic Buses: 163– Standard 40’ Buses: 735– Hybrid Buses: 97
• Light Rail– 27 cars
• Commuter Rail– 18 Passenger Cars– 6 Locomotives
7
Metro Transit Fleet
8
2030 Transitway System
• 12 miles• 19 Stations• Project Cost: $715.3 million• 2011 Annual Operating Budget:
$26.7 million• Avg. Weekday Ridership (Aug ‘11):
35,069• 2010 Total Annual Ridership:
10,500,000
9
Hiawatha LRT (Blue Line)
• 40 miles• 6 stations• Project Cost: $320 million• 2011 Annual Operating Budget:
$17.0 million• Avg. Weekday Ridership (Aug. ‘11)
2,696• 2010 Total Annual Ridership:
710,400
10
Northstar Commuter Rail
• 11 miles• 18 new stations• $957 million
• 2015 Est. Operating budget: $25.4 million
• Projected weekday ridership: Over 40,000 by 2030
11
Central Corridor LRT (Green Line)
12
New Starts Overview
Full Funding Grant Agreement
Alternatives Analysis
Final DesignCommitment of Non-Federal Funding, Construction Plans, ROW Acquisition,
Before-After Data Collection Plan, FTA Evaluation for FFGA,
Begin Negotiations
Pro
j Mgm
t Ove
r-si
ght
Construction
Preliminary EngineeringComplete NEPA Process
Refinement of Financial Plan
Select LPA,MPO Action
PMP
FTA Decision on entry into PE
FTA Decision on entry into FD
Systems Planning
• Evaluate the mode and alignment options for a particular corridor
• Benefits, costs and impacts of transportation options
• Complete with the selection of the locally preferred alternative (LPA) and adoption of the LPA into the region’s long range transportation plan
13
Alternatives Analysis (AA) Phase
• Consider design options to refine LPA and complete the NEPA process
• Hone the estimates of project cost, benefits, impacts and schedule
• Finalize management plans• Demonstrate technical capabilities to
develop the project• Commit local funding sources
14
Preliminary Engineering (PE) Phase
• Prepare final construction plans, contract packages, detailed specifications and bid documents
15
Final Design (FD) Phase
16
New Starts Evaluation Process
17
Peer “New Starts” Projects
Orlando, FLHonolulu, HI
New York, NY
St. Paul- MinneapolisP
N
Pending FFGA
New FFGA
E Existing FFGAJuly 2011 Status
San Francisco
Houston, TX
Denver, CO
Salt Lake City, UT
Dallas, TX
Seattle, WA
E
EEN. Virginia-Dulles, VA
E
E
N
P
Hartford, CT
E
E
P
Sacramento, CA
P
P
San Jose, CA
N
N Portland, OR
P
P
E
E
E
18
Peer “New Starts” PE Projects
Vancouver, WA
Portland, OR
Sacramento, CA
Los Angeles, CA
Los Angeles, CA
Honolulu, HIHouston, TX
Charlotte, NC
Pawtucket, RI
San Jose, CA
Salt Lake City, UT
Minneapolis,- St. Paul, MN
September 2011 Status
Alternatives Analysis
LPA Selected
LPA Amended into TPP
MC requests to Enter PE
FTA approves Entry into PE
19
SWLRT: Historical Timeline
2005 - 2009
Nov. 4, 2009
May 26, 2010
Aug. 31, 2010
Sept. 2, 2011
• Transit Technology Review• Identification of Alignments and Stations• Initial Set of Alternatives
– No Build– Enhanced Bus– Build Alternatives (BRT & LRT)
20
SWLRT: AA Phase
• 15 miles• 17 new stations• Est. Project Cost:
$1.25 billion
21
SWLRT: Locally Preferred Alternative (LPA)
22
SWLRT: Project Budget
30%
10%10%
50%
CTIBHCRRAStateFTA
$30.6M in Local Funds Committed to Date
$625 million
$375 million
$125 million
$125 million
23
SWLRT: Anticipated Schedule
Preliminary Engineering
Final Design
Construction
Revenue Operations
2011 - 2013
2013 - 2014
2014 - 2017
2018
• Procurement of Engineering Services• Complete 30% Design• Procurement of Environmental Services• Complete Final Environmental Impact Statement• Establishment of a Project Office• Secure Municipal Consent from 5 Cities
24
SWLRT: PE Phase
http://www.metrocouncil.org/transportation/SW/SouthwestLRT.htm
• Mark Fuhrmann, Program Director – New Starts Rail [email protected]
• Chris Weyer, Project Director - Southwest [email protected]
For Further Information and Updates
25