1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL
Jan 04, 2016
1SOUTHERN REGIONAL LOAD DESPATCH CENTRE
POWER GRID CORPORATION OF INDIA LIMITED
WELCOME TO
V MADHU, MD, KPTCL
2
PRESENTATION OVERVIEW
SR GRID - QUICK FACTS
KPTCL METERING LOCATIONS
AVAILABILITY BASED TARIFF
OPEN ACCESS REGULATIONS – RECENT CHANGES
IMPACT OF CHANGES – CASE STUDIES
STATE SECTOR – CHALLENGES & TASKS AHEAD
3
MORE LINKS
SCHEDULING PROCEEDURE
DRAFT IEGC JUNE 2005
4
THANK YOU
5
SOUTHERN REGIONAL GRID
QUICK FACTS
6
SOUTHERN REGION
WESTERNREGION
EASTERN REGION
NORTHERN REGION
NORTH-EASTERN REGION
INSTALLED CAPACITY
NORTHERN :- 31,230 MW
EASTERN :- 17,697 MW
SOUTHERN :- 32,704 MW
WESTERN :- 32,354 MW
NORTH-EASTERN :- 2,357 MW
TOTAL 116,342 MW
REGIONAL GRIDS
7
SOUTHERN REGION – GEOGRAPHY
ANDHRA PRADESH
TAMIL NADU
KARNATAKA
KE
RA
LA
POPULATION :- 22.5 CRORES ( 22% OF INDIA)
AREA :- 651 (‘000 SQ KM)(19% OF INDIA)
INSTALLED CAPACITY:- 32,734 MW(28.1%)
PER CAPITA CONSUM. – 700 unit (A. I. – 567)
WEATHER :- South-west monsoon
North-east monsoon
SEA COAST :- AROUND 4000 KM
8
INSTALLED CAPACITY IN SR
The above capacity does not includes
--- About 1342 MW of Wind Mill Capacity in Tamil Nadu.
--- Micro and Captive plants in different states.
AGENCY HYDRO THERMALGAS/
DIESELWIND/
OTHERS NUCLEAR TOTAL
AP 3586 2963 272 2 --- 6823
KAR 3277 1470 128 5 --- 4879
KER 1811 --- 235 2 --- 2047
TN 1987 2970 423 19 --- 5400
PONDI --- --- 33 --- --- 33
C. S. --- 8090 360 --- 830 9280
IPP 278 387 2506 1071 --- 4243
TOTAL 10939 (33%) 15880 (49%) 3956 (12%) 1099 (3%) 830 (3%) 32704
9
SOURCE-WISE EFFECTIVE GENERATING CAPACITY OF SOUTHERN REGION
AS ON 31-MAR-05
HY DRO
33%
THERMAL
49%
GAS/NAPTHA/DIESEL
12%
NUCLEAR
3%
WIND
3%
SOURCE IN MW IN %HYDRO 10939 33
THERMAL 15910 49GAS/NAPTHA/DIESEL 3956 12
NUCLEAR 830 3WIND 1099 3TOTAL 32734 100
GENERATING UNITS IN SOUTHERN GENERATING UNITS IN SOUTHERN REGIONREGION
A.PKAR
TNKERGENERATORS ABOVE 1000 MW
GENERATORS 500 – 1000 MW
GENERATORS BELOW 500 MW
TYPICAL
GENERATOR
SPREAD
IN SR- HYDRO
- THERMAL
- GAS / NAPTHA
- NUCLEAR
UNIT CAPACITYUNIT CAPACITY APAP KARKAR KEKERR
TNTN CGSCGS TOTATOTALL
THERMAL (500 THERMAL (500 MW)MW)
22 88 1010
THERMAL THERMAL
(200-250 MW)(200-250 MW)1100
77 1313 1515 4545
GAS/THERMAL GAS/THERMAL
(100-150 MW)(100-150 MW)99 22 33 1010 2424
HYDRO HYDRO
(>50 MW)(>50 MW)2277
2727 1616 1515 8585
TOTALTOTAL 4488
3636 1919 3838 163163
11
LOAD 500-1500 MW
LOAD 200-500 MW
TYPICAL
LOAD
SPREAD
IN SR
KHAMMAM
VIJAYAWADANAGARJUNASAGAR
VISAKHAPATNAM
(POWERGRID)HYDERABAD
RAICHUR
GOOTY
HOODY
SALEM
UDUMALPET
TRICHUR
MADURAI
TRICHY
MADRAS
NEYVELI
CUDDAPAHDAVANAGERE
KAIGA
115
317
RSTPP
BHADRAVATI
130x216
4x2
182
151
181
173
302
308172
277
279
155
178x
2
PONDICHERY
BANGALORE
SIRSI
MUNIRABAD
PP
P
P
P
P
P
P
P
P
P
PP
P
P
N
KOLAR
PALLOM
KAYANKULAMEDAMON
TALCHER
JEYPORE
63
187
2x78
2x221
54
HOSUR
KADRA
KODASAALY
Nagjhari
1
120
60
MAPS
P
SSLMM
MMDP
THIRUVANATHAPURAM
ALMATHI
NELLORE
400 KV LINE PRESENTLY
OPERATED AT 220 KV
NELAMANGALA
KURNOOL
GAZUWAKA(AP)
SIMHADRI NTPC
HIRIYUR
189
195
267x
2
258
242
175
179
127
130x
2
221x2
146x252x2
197x2
301x2
8x4
15x2
300
28
330
ABOUT 12000 CKM 400KV TRANSMISSION
TALGUPPA
GRID MAP
GRID FOCAL POINT SHIFTED TO KOLAR AFTER COMMISSIONING OF HVDC
KOODANKULAM
THIRNELVALI
TYPICAL FLOWS ARE FROM NORTH TO SOUTH
QUANTUM CHANGES IN FLOW PATTERN LIKELY AFTER COMMISSIONING OF KOODANKULAM 2000 MW
13
13000
14000
15000
16000
17000
18000
19000
20000
21000
22000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
TIME IN HRS --->
DE
MA
ND
IN
MW
---
>
MONSOON SUMMER WINTER
TYPICAL LOAD CURVE OF SR
WINTER
MONSOON
SUMMER
EVENING PEAK
14
GRID OPERATION
TYPICAL ISSUES IN THE PAST
15
GRID OPERATION – TYPICAL ISSUES IN PAST
• LOW / HIGH FREQUENCY PROBLEMS
– FREQUENCY EXCURSES TO LOW/HIGH VALUES
• LOW / HIGH VOLTAGE OPERATION
– CRITICALLY LOW VOLTAGES AT LOAD CENTRES
– SUBSTANTIALLY HIGH VOLTAGES AT FAR ENDS
• SYSTEM BROWNOUTS / BLACK OUTS
– SEPERATION OF SYSTEMS / LOSS OF LOAD
• ECONOMIC IN-STABILITY / INCREASED ELECTRICAL LOSSES– UNRELIABLE / INEFFICIENT OPERATION OF EQUIPMENT
16
GRID PRESENT STATUS
17
47.00
47.50
48.00
48.50
49.00
49.50
50.00
50.50
51.00
5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95
% OF TIME --->
FR
EQ
IN H
Z -
-->
2004-05
2003-04
<49.049.0 & <49.5
49.5 & <50.5
50.5 & Above
Max Min Avg FVI
2004-05 0.13 8.49 91.21 0.17 50.90 48.62 49.85 0.83
2003-04 2.30 22.03 75.23 0.44 51.17 48.18 49.69 1.95
2002-03 49.48 14.48 34.03 2.01 51.37 47.69 48.95 18.86
2002-03
FREQUENCY DURATION CURVE 2002-03, 2003-04 & 2004-05
18
47.50
48.00
48.50
49.00
49.50
50.00
50.50
51.00
25 26 27 28 29 30 31
DAYS ----->
FR
EQ
UE
NC
Y IN
HZ
---
->FREQUENCY PROFILE
2002, 2003 & 2004
19
FREQUENCY CURVE FOR 9th SEPTEMBER 2004FVI = 0.04
Avg Freq = 49.99Hz
48.5
49.0
49.5
50.0
50.5
51.0
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23
10 * ∑ (F – 50) 2
FVI = -------------------------------
24 * 60
20
320
330
340
350
360
370
380
390
400
410
42000
:05
01:0
5
02:0
5
03:0
5
04:0
5
05:0
5
06:0
5
07:0
5
08:0
5
09:0
5
10:0
5
11:0
5
12:0
5
13:0
5
14:0
5
15:0
5
16:0
5
17:0
5
18:0
5
19:0
5
20:0
5
21:0
5
22:0
5
23:0
5
TIME IN HRS --->
VO
LT
AG
E IN
KV
---
>
REALITY BITE:
FARMERS IN KARNATAKA ARE HAPPY WITH FEWER HOURS OF QUALITY POWER!!.
EFFICIENCY OF PUMPS AT TG HALLI WATER WORKS IMPROVED!
COMPARISION OF BANGALORE VOLTAGE-TYPICAL DAY
BETTER VOLTAGE PROFILE MEANS LESS ELECTRICAL LOSSES
Jan 02
Jan 03
21
Voltage at Bangalore Jan 02 & 03
22
SOUTHERN REGION LOSS*
2002 2003 2004** 2005**
LOAD (MW)
LOSS (MW)
LOSS %
LOAD (MW)
LOSS (MW)
LOSS %
LOAD (MW)
LOSS (MW)
LOSS %
LOAD (MW)
LOSS (MW)
LOSS %
AP 6510 408 6.27 5983 264 4.41 7234 311 4.30 7557 279 3.69
KARNATAKA 4078 265 6.50 4609 237 5.14 5158 228 4.42 5285 183 3.46
KERALA 1928 82 4.25 2227 101 4.54 2479 86 3.47 2453 66 2.69
TAMILNADU 6135 224 3.65 6888 240 3.48 7421 198 2.67 7522 216 2.87
PONDICHERRY 215 0 0.00
CENTRAL GENERATING STATION 472 0 0.00 684 0 0.00 538 0.00 121 0 0.00
SOUTHERN REGION 19123 979 5.12 20391 842 4.1 22830 823 3.6 23153 744 3.2
•*Source : Report of System Studies conducted for Accessing Shunt Compensation requirement in Southern Region – March 2004 and March 2005 - SREB ,CEA
•** Projected figures 0.5% REDUCTION MEANS 100 CR ANNUAL SAVINGS0.5% REDUCTION MEANS 100 CR ANNUAL SAVINGS
23
AVAILABILITY BASED TARIFF
OPERATIONAL EXCELLANCE
24
DEEP VALLEY
DEEP VALLEY
SHARP
PEAK
25
KADAMPARAI PUMP OPERATION
-300
-200
-100
0
100
200
300
400
5000:
001:
002:
003:
004:
005:
006:
007:
008:
009:
0010
:00
11:0
012
:00
13:0
014
:00
15:0
016
:00
17:0
018
:00
19:0
020
:00
21:0
022
:00
23:0
00:
00
TIME ---->
IN M
W --
-->
48.50
49.00
49.50
50.00
50.50
51.00
FREQ
UENC
Y IN
HZ
---->
GENERATOR MODE
PUMP PUMP
SAVINGS OF RS 40 LAKHS EVERY DAY
INVESTMENT OF 1600 CRORES SAVED
26
OPPORTUNISTIC UI TRADEEXPORT TO WR ON 13/05/03-14/05/03
-300
-200
-100
0
100
200
300
400
500
600
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 00 01 02 03 04 05 06 07 08
49
49.2
49.4
49.6
49.8
50
50.2
50.4
50.6
50.8
51POWER EXPORT TO WR ON
UI BASIS DURING LOAD CRASH
FREQ
27
SCHEDULE VS ACTUAL INJECTION GRAPH OF ER (AT ER PERIPHERY) FOR DATE : 31.08.03
0
100
200
300
400
500
600
700
800
900
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92
TIME AS BLOCK OF 15 MINUTE --->
MW
-->
49.0
49.5
50.0
50.5
51.0
51.5
52.0
52.5
53.0
53.5
54.0
54.5
55.0
FREQ
UEN
CY
(Hz)
-->
SCHEDULE ACTUAL INJECTION ENTITLEMENT
SR FREQ ER FREQ
Entitlement
Schedule
Actual Injection
OPERATION ON 31/08/03 (Ganesh Chathurthi)
AMOUNT SAVED FOR SR CONSTITUENTS = 107 LAKHS
50 NOS HVDC SETPOINT CHANGES DONE TO ACHIEVE THIS!!!!!
28
GENERATION vs FREQUENCY FOR
10
30
50
70
90
08
:21
09
:21
10
:21
11
:21
TIME IN HH:MM ----->
MW
---
-->
49.00
49.20
49.40
49.60
49.80
50.00
50.20
50.40
FR
EQ
IN
HZ
---
-->
FREE GOVERNOR MODE OF OPERATION ON 12-DEC-04
SHARAVATHI -1
FREQ DROP FROM 49.72 HZ TO 49.27 HZ
i.e. ~ 0.45HZ
29
GENERATION vs FREQUENCY FOR
10
30
50
70
90
08
:21
09
:21
10
:21
11
:21
TIME IN HH:MM ----->
MW
---
-->
49.00
49.20
49.40
49.60
49.80
50.00
50.20
50.40
FR
EQ
IN
HZ
---
-->
FREE GOVERNOR MODE OF OPERATION ON 12-DEC-04
SHARAVATHI -4
FREQ DROP FROM 49.72 HZ TO 49.27 HZ
i.e. ~ 0.45HZ
30
0
100
200
300
400
500
600
700
800
900
1000
0 2 4 6 8 10 12 14 16 18 20 22 0
HOURS ---->
GE
NE
RA
TIO
N IN
MW
---
>
48.80
49.00
49.20
49.40
49.60
49.80
50.00
50.20
50.40
FR
EQ
IN H
Z--
->
SHARAVATHI GENERATION – TYPICAL DAY
FREQ
MW
31
OPTIMAL RESERVOIR UTILISATIONSHARAVATHY / IDDUKI
PLANT OPERATORS AT THESE STATIONS THINK OF THE
RESERVOIR LEVEL IN RUPEES RATHER THAN IN FEET!!!
Rs. Rs.
Rs.
Rs.
Rs.
Rs.Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.Rs.
32
49.72 HZ
33
MERIT ORDER : UNITS BOXED UP
POWER STATION STATE CAPACITY(MW) FUELVARIABLE
COST
TATA DIESELKARNATAK
A 79 DIESEL 308
RAYALSEEMA DGPP
KARNATAKA 27 DIESEL 360
YELEHANKA DIESEL
KARNATAKA 128 DIESEL 314
THANRBHAVIKARNATAK
A 220 NAPTHA 325
SUB-TOTAL 454
BRAHAMPURAM DPP KERALA 107 DIESEL 275
BSES KERALA 157 NAPTHA 308
KASARGODE PCL KERALA 22 NAPTHA 298
KAYAMKULAM KERALA 360 NAPTHA 322
SUB-TOTAL 646
BASIN BRIDGETAMIL NADU 120 NAPTHA 584
P.P.NALLURTAMIL NADU 330 NAPTHA 415
SUB-TOTAL 450
TOTAL 1550
34
UI IN SR (FROM 01/01/03 TO 07/08/05)
OVERVIEW
• TOTAL UI TURNOVER :- 8893 MU
• TOTAL UI AMOUNT DISBURSED:- 1817 CR
• AVG WEEKLY TRANSACTION:- 67 MU
• AVG WEEKLY UI AMOUNT DISBURSED:- 13.4 CR
35
UI SUMMARY – 136 WKS
FROM 01/JAN/03 TO 07/AUG/05)STATE ---> AP KAR KER TN PON
Total Net UI in MUs exported(-) / Imported(+)
-4507 4376 1027 1494 -148
Total Net amount in Rs. Crores
Receivable(-) / Payable(+)
-877 831 153 417 -31
Average rate of UI in paise/unit
195 190 149 279 207
36
INTER-REGIONAL EXCHANGES DETAILS UPTO 136 WKS (Till 07-AUG-05)
WR ER
Net Energy Transaction
231 MU
IMPORT BY SR
703 MU
IMPORT BY SR
Amount Due to
SR Constituents
Rs. 60.38 Cr. Rs. 12.49 Cr.
Amount Credited TO SR Constituents
Rs. 60.38 Cr. Rs. 12.49 Cr.
37
GRID OPERATION:GRID OPERATION: A TIGHT ROPE WALK A TIGHT ROPE WALK
BLACK-OUTVOLTAGE
COLLAPSE IN-ECONOMIC
OPERATION
INSTABILITYPOWER
SWINGSINCREASED
LOSSES
38
UI TRANSACTION ON 31/08/03
HIGHLIGHTS OF UI TRANSACTION ON 31.08.03 (SUNDAY, GANESH CHATURTHI)
• UI imported from ER : 6.07 MU• UI imported from WR : 2.81 MU• Total UI imported from C. Grid by SR : 8.88 MU• Average UI rate of C.Grid : 93 Ps/Unit • Average UI rate in SR for C.Grid : 213 Ps/Unit • Max. Power transfer in UI from ER : 510 MW• Max. Power transfer in UI from WR : 350 MW• Total Max. Power transfer in UI from C.Grid : 860 MW• Amount saved for the SR constituents : 107 Lacs• Total Number of HVDC Operations : 50 no.s
39
METERING LOCATIONS IN SR
• Total No Of SEMS in SR USED FOR REA 350
No.s• Total No Of SEMS in KPTCL USED FOR REA
50 No.s
SR METERING DIAGRAM
40
KAKINADA
PO 05
REA METERING LOCATION OF STATE OWNED INTER STATE LINES IN SOUTHERN REGION
HOSUR
HOSUR
YERANDAHALLY
2
20 KV .
YERANDAHALLY
2
20 KV .
MANJESWAR
UPPATI
KADAKOLA
KNYMPTTAKONEJA
ARAKU
BALIMELA
OS
AP
TN
KERKAR
GOA
LOW
ER
SIL
ER
U
BA
RS
UR
HVDC
KO
LLA
PU R
K'T
HA
RA
I
UD
UM
ALP
ET
KA
YA
TH
AR
TH
EN
I
BELLARY
TANDUR GOOTY
SEDAM
CH
IKK
OD
I
MO
OZ
HIY
AR
ED
MO
N
IDU
KK
I
PA
RA
SA
LA
MH
MP
220
KV
220
KV
220
KV
220
KV
220
KV
220
KV
110
KV
220
KV
132
KV
66 K
V
110
KV
220 KV
110 KV
AP57
AP55
AP56
OS 58
P0 06
TN 56
AP 54 TN 57
TN 54
TN51
TN52
TN53
TN58
KL52
KL53
KL51
TN 55
CK 54
CK 51
CK 52
KL 55
KL 56CK56
CK59
CK58
GO01
GO02
GO03
CK57
AP 58AP 52
CK 60
CK 61
CK 55
CK 53KL58
PONDY(Yanam)
132
KV 21
XELDEM
21
GO04
UPPERSILERU
PONDA
PONDA
AMBEWADI SUPA
MACHKHUNBALIMELA
AP 53CHITOOR TIRUVALEM
SULURPET
G'P
UN
DI
KOOTHAMUNDA
220 KV
220 KV
220 KV
220 KV
220 KV
132 KV
220
KV
110
KV
INTER STATE LINES METERING LOCATIONS
41
METERING LOCATIONS IN KPTCL'S INTERCONNECTED SYSTEM
AP-51CK-53
TANDUR
GOOTY
A PAP-52CK-55
BELLARY
SEDAM
TN-55CK-54HOSURYERANDAHALLI
T N
CK-22CK-21
CK-05CK-06
CK-03CK-04
BANGALORE
RAICHUR N'SAGAR
MBD
N'SAGAR
MBD
CENTRAL TR. SYSTEM
CK-51KL-55
KL-56 CK-52
KONAJE
KADAKOLA
MANJESWAR
KANIAMPETTA
KSEB
GO-03
GO-04
GO-01
GO-02AMBEWADI
XELDEMXELDEM
PONDA
PONDA
PONDA SUPA
GOA(SR)
KG-24
KG-23
KG-22
KG-21
KODASALLI
KADRA
SIRSI-2
SIRSI-1
KGS
CK-60
CK-61CHIKKODI
KolhapurWR/MSEB
CK-01CK-02
HOODY
SR-63
SR-64
BANGALORE
BANGALORE
CK-57CK-57
CK-58
CK-56
CK-57
KOLAR
220kV
220kV
220kV
110kV
110kV
220kV
220kV
220kV
220kV
220kV
220kV
220kV
220kV
400kV
220/400kV
220/400kV
220/400kV
CK-11CK-12
KOLARKOLAR
220/400kV
110kV
400kV
42
GOOTY
CK-21RAICHUR
4 5 6 7
CK-23
CK-05
CK-06
CK-24
CK-27
CK-25
SR-81
DAVANAGERE
CK-26
NELAMANGALA
CK-28
CK-09
CK-10
CK-30
CK-31
HOODY
CK-07
CK-08
CK-15
CK-16
HIRIYUR
CK-29
CK-32 CK-33
CK-13
CK-14
BANGALORE
SR-11
N'Sagar
Kolar
Munirabad
CK-35
CK-34
CK-36
CK-37
Temporary Configuration :Karnataka's drawl in Raichur-Hoody section:Raichur = -(CK-21) -(CK-23) -(CK-25); Muniarabd=(CK-05) ; Davanagere=(CK-07); Hiriyur=(CK-15); Nelamangala= -(CK-29)-(CK-30)-(CK-35) -(CK-36) -(CK-38);Hoody = (CK-09)+(CK-13)
CK-30
CK-31
CK-38
Karnataka's drawl in Raichur-Hoody section:
Raichur = -(CK-21) -(CK-23) -(CK-25);
Muniarabd=(CK-05) ;
Davanagere=(CK-07); Hiriyur=(CK-15);
Nelamangala= -(CK-29)-(CK-30)-(CK-35)
-(CK-36) -(CK-38);
Hoody = (CK-09)+(CK-13)
RAICHUR SECTION
43
KPTCL'S DRAWL ON 400kV RAICHUR-DAVANAGERE SECTION
(CK-RC)=-(CK-21)-(CK-23)-(CK-25) -(CK-29)-(CK-30)+ (CK-35)+ (CK-36) (CK-38) + (CK-05)+ (CK-07) +(CK-09) + (CK-13) + (CK-15)
KPTCL'S DRAWL ON 400kV
(CK-91)= (CK-01)+(CK-03)+(CK-RC) +(CK-11)
CK'S DRAWL ON 220kV
(CK-92)= -(CK-51)-(CK-53)-(CK-54)-(CK-55)-(CK-58)-(CK-59)+(KG-21)
+(KG-22)+(KG-23)+(KG-24)
CK'S DRAWL ON 132kV
(CK-93)=-(CK-52)-(CK-56)
TOTAL DRAWL (CK-94)=(CK-91)+(CK-92)+(CK-93)NOTE: SEMS ON FEEDERS NOT CARRYING ISGS POWER NOT TO BE CONSIDERED