PRESENTATION OVERVIEW
SOUTHERN REGIONAL GRID – OVERVIEW
SPECIFIC IMPROVEMENTS IN RECENT PAST
OPERATIONAL EXCELLANCE
ABT – UI POOL IN SR GRID
MANPOWER AND BUDGET
4
THANK YOU
5
SOUTHERN REGIONAL GRID
OVERVIEW
6
SOUTHERN REGION – GEOGRAPHY
ANDHRA PRADESH
TAMIL NADU
KARNATAKA
KE
RA
LA
POPULATION :- 22.5 CRORES ( 22% OF INDIA)
AREA :- 651 (‘000 SQ KM)(19% OF INDIA)
INSTALLED CAPACITY:- 36,921 MW(29.0%)
WEATHER :- South-west monsoon
North-east monsoon
SEA COAST :- AROUND 4000 KM
7
SR STATES – POWER SYSTEM STATISTICSANDHRA PRADESH
INSTALLED CAPACITY – 8944 MW
MAX DEMAND MET – 8241 MW
DAILY CONSUMPTION MAX – 171 MU
DAILY CONSUMPTION AVG – 142 MU
CONSUMER PROFILE –
INDS -27%, DOM-22%, COMM-5%, IRRI-39% & OTHERS-7%
KARNATAKA
INSTALLED CAPACITY – 6180 MW
MAX DEMAND MET – 5612 MW
DAILY CONSUMPTION MAX – 125 MU
DAILY CONSUMPTION AVG – 95 MU
CONSUMER PROFILE –
INDS -26%, DOM-19%, COMM-7%, IRRI-39% & OTHERS-9%
KERALA
INSTALLED CAPACITY – 2284 MW
MAX DEMAND MET – 2602 MW
DAILY CONSUMPTION MAX – 41 MU
DAILY CONSUMPTION AVG – 34 MU
CONSUMER PROFILE –
INDS -34%, DOM-44%, COMM-13%, IRRI-2%& OTHERS-7%
TAMIL NADU
INSTALLED CAPACITY – 10015 MW
MAX DEMAND MET – 8371 MW
DAILY CONSUMPTION MAX – 166 MU
DAILY CONSUMPTION AVG – 135 MU
CONSUMER PROFILE –
INDS -39%, DOM-25%, COMM-7%, IRRI-24% & OTHERS-5%
8
ANDHRA PRADESH
POPULATION :- 7.6 CRORES
AREA :- 275 (‘000 SQ KM)
NO OF CONSUMERS :- 162 LAKHS
PER CAPITA CONS. :- 719 UNITS
MAIN AGRICULTURE CROP :- RICE
CLIMATIC CONDITION :- HOT AND HOT & HUMID
SR STATES – GEOGRAPHYKARNATAKA
POPULATION :- 5.3 CRORES
AREA :- 192 (‘000 SQ KM)
NO OF CONSUMERS :- 105 LAKHS
PER CAPITA CONS. :- 642 UNITS
MAIN AGRICULTURE CROP :- COFFEE & RAGI
CLIMATIC CONDITION :- HOT AND HOT & HUMID
KERALA
POPULATION :- 3.2 CRORES
AREA :- 39 (‘000 SQ KM)
NO OF CONSUMERS :- 61 LAKHS
PER CAPITA CONS. :- 386 UNITS
MAIN AGRICULTURE CROP :- COCONUT & SPICES
CLIMATIC CONDITION :- HUMID
TAMIL NADU
POPULATION :- 6.2 CRORES
AREA :- 130 (‘000 SQ KM)
NO OF CONSUMERS :- 152 LAKHS
PER CAPITA CONS. :- 866 UNITS
MAIN AGRICULTURE CROP :- SUGAR CANE & OIL SEEDS
CLIMATIC CONDITION :- HOT AND HOT & HUMID
9
INSTALLED CAPACITY IN SRSUMMARY OF INSTALLED CAPACITY(MW)
AS ON 31.07.2006
AGENCY HYDRO THERMAL GAS/DIESEL WIND/OTHERS NUCLEAR TOTAL
ANDHRA PRADESH 3587 2963 272 2 --- 6824
KARNATAKA 3389 1470 128 4 --- 4991
KERALA 1835 --- 235 2 --- 2072
TAMILNADU 2137 2970 423 19 --- 5549
PONDICHERRY --- --- 32 --- --- 32
CENTRAL SECTOR --- 8090 360 --- 880 9330
IPP 278 387 3149 4309 --- 8123
TOTAL
11226 (30%)
15880 (43%)
4599 (13%)
4336 (12%)
880 (2%)
36921 (100%)
10
GROWTH OF INSTALLED CAPACITY OF SR
1947
5
1983
0
2030
4
2129
8
2213
3
2298
3
2417
3
2616
3 2850
1
2952
6 3273
3 3603
1
10000
15000
20000
25000
30000
35000
40000
1994-95 1995-96 1996-97 1997-98 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06
YEARS - - ->
IN MW
11
11226(30%)
15880(43%)
4337(12%)
880(2%)
4599(13%)
SOURCE-WISE INSTALLED CAPACITY OF SR
All Figures In MW
TOTAL 36,921 MW
HYDRO
THERMAL
WIND/OTHERS
NUCLEAR
GAS
GENERATING UNITS IN SOUTHERN REGION
A.PKAR
TNKERGENERATORS ABOVE 1000 MW
GENERATORS 500 – 1000 MW
GENERATORS BELOW 500 MW
TYPICAL
GENERATOR
SPREAD
IN SR
UNIT CAPACITY AP KAR KER TN CGS TOTAL
THERMAL (500 MW) 2 8 10
THERMAL
(200-250 MW)10 7 13 15 45
GAS/THERMAL
(100-150 MW)9 2 3 10 24
HYDRO
(>50 MW)27 29 16 15 87
TOTAL 48 38 19 38 165
- HYDRO
- THERMAL
- GAS / NAPTHA
- NUCLEAR
CPP/IPP PLANTS IN SOUTHERN REGION
A.P
KAR
TNKER
Station Name I/C in MW
Variable Cost (Ps)
TATA ELECTRIC 79.1 390
JINDAL 260 280
THANNEERBAVI 220 500
Station Name I/C in MW
Variable Cost (Ps)
KASARGOD PCL 22 470
BSES 157 560
KUTHUNGAL 21 ---
MANIYAR 12 ---
KAYAMKULAM 360 580
Station Name I/C in MW
Variable Cost (Ps)
HITEC 15
TCPL 63.5
GMR VASAVI 196 444
SAMALPATTY 105 474
ST-CMS 250 161
P P NALLUR 330.5 550
ABAN 113 88
MADURAI POWER 106 456
ARKAY 38
Station Name I/C MW
Variable Cost (Ps)
SIMHADRI 1000 104
BSES 220 168
VEMAGIRI PGL 233
SPECTRUM 208 104
JEGURUPADU EXT.
220
JEGURUPADU 216 102
LANCO 355 125
14
LOAD 500-1500 MW
LOAD 200-500 MW
TYPICAL
LOAD
SPREAD
IN SR
KHAMMAM
VIJAYAWADANAGARJUNASAGAR
GAZUWAKA
HYDERABAD
RAICHUR
GOOTY
HOODY
SALEM
UDUMALPET
TRICHUR
MADURAI
TRICHY
MADRAS
NEYVELI
CUDDAPAH
DAVANAGERE
RAMAGUNDAM
BANGALORE
MUNIRABAD
PP
P
P
P
P
P
P
P
P
P
PP
P
KOLAR
63
HOSUR
1
60
P
NELLORE
NELAMANGALA
KURNOOL
KALPAKKA
SIMHADRI
HIRIYUR
TALAGUPPA
MAMIDIPALLY
SRI SAILAM
-- OF NTPC
-- OF ANDHRA PRADESH
-- OF TAMIL NADU
-- OF NLC
-- OF POWERGRID
400KV SUB-STATIONS IN SR
NEYVELI TPS I (EXP)
POWERGRID STATE OTHERS TOTAL
AP 8 9 2 19
KAR 6 5 1 12
KER 2 2
TN 6 1 2 9
TOTAL 22 15 5 42
TRIVENDRUM
NARENDRA
VEMAGIRIGMR
JEGRUPADU EXTN
MEHA BOOB NAGAR
CHITTOOR
-- OF NPC
KAIGA
MYSORE
-- OF KARNATAKA
ALMATHI
16
TRANSMISSION IN SOUTHERN INDIA
ABOUT 3000 CKM OF 400 KV LINES ADDED IN THE PAST 2 YEARS
VOLTAGE LEVEL AP KAR KER TN CGS TOTAL
400 KV 2680 1616 10905 15201
220/230 KV 10274 7839 2692 6538 366 27709
132/110 KV 12360 6060 3720 10220 32360
TOTAL 25314 15515 6412 16758 11271 75270
17
11000
13000
15000
17000
19000
21000
23000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
HOUR ---->
DE
MA
ND
IN
MW
--->
TYPICAL LOAD CURVE OF SR
WINTER
MONSOON
SUMMER
EVENING PEAK
WEATHERCONSUMPTION
18
DEEP VALLEY
DEEP VALLEY
SHARP
PEAK
19
MONSOONS
SOUTH WEST MONSOON NORTH EAST
MONSOON
20
KADAMPARAI PUMP OPERATION
-300
-200
-100
0
100
200
300
400
5000:
001:
002:
003:
004:
005:
006:
007:
008:
009:
0010
:00
11:0
012
:00
13:0
014
:00
15:0
016
:00
17:0
018
:00
19:0
020
:00
21:0
022
:00
23:0
00:
00
TIME ---->
IN M
W --
-->
48.50
49.00
49.50
50.00
50.50
51.00
FREQ
UENC
Y IN
HZ
---->
GENERATOR MODE
PUMP PUMP
SAVINGS OF RS 40 LAKHS EVERY DAY
INVESTMENT OF 1600 CRORES SAVED
21
OPPORTUNISTIC UI TRADEEXPORT TO WR ON 13/05/03-14/05/03
-300
-200
-100
0
100
200
300
400
500
600
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 00 01 02 03 04 05 06 07 08
49
49.2
49.4
49.6
49.8
50
50.2
50.4
50.6
50.8
51POWER EXPORT TO WR ON
UI BASIS DURING LOAD CRASH
FREQ
22
SCHEDULE VS ACTUAL INJECTION GRAPH OF ER (AT ER PERIPHERY) FOR DATE : 31.08.03
0
100
200
300
400
500
600
700
800
900
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92
TIME AS BLOCK OF 15 MINUTE --->
MW
-->
49.0
49.5
50.0
50.5
51.0
51.5
52.0
52.5
53.0
53.5
54.0
54.5
55.0
FREQ
UEN
CY
(Hz)
-->
SCHEDULE ACTUAL INJECTION ENTITLEMENT
SR FREQ ER FREQ
Entitlement
Schedule
Actual Injection
OPERATION ON 31/08/03 (Ganesh Chathurthi)
AMOUNT SAVED FOR SR CONSTITUENTS = 107 LAKHS
50 NOS HVDC SETPOINT CHANGES DONE TO ACHIEVE THIS!!!!!
23
DETAILS OF INTER-REGIONAL UI IMPORTS BY SR FROM WR AND ER DURING 20 th - 26th J UNE 05
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
20-J
un
21-J
un
22-J
un
23-J
un
24-J
un
25-J
un
26-J
un
UI ENERGY IMPORTED BY SR FROM WR & ER
-2.00
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.0020
-Jun
21-J
un
22-J
un
23-J
un
24-J
un
25-J
un
26-J
un
DAYS -->
EN
ER
GY
IN M
Us
--->
WR UI ER UI
TOTAL UI IMPORT AMOUNT @ SR RATE
0
100
200
300
400
500
600
20-J
un
21-J
un
22-J
un
23-J
un
24-J
un
25-J
un
26-J
un
DAYS --->
IN L
AK
HS
--->
0
10
20
30
40
50
60
70
80
90
100
20-J
un
21-J
un
22-J
un
23-J
un
24-J
un
25-J
un
26-J
un
AVERAGE UI TRANSACTION RATES IN RESPECTIVE REGIONS
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
20-J
un
21-J
un
22-J
un
23-J
un
24-J
un
25-J
un
26-J
un
DAYS --->
Rs
PE
R U
NIT
--->
SR RATE WR/ER RATE
NET GAIN BY SR CONSTITUENTS DUE TO RATE DIFFERENTIAL
0
10
20
30
40
50
60
70
80
90
100
20-J
un
21-J
un
22-J
un
23-J
un
24-J
un
25-J
un
26-J
un
DAYS --->
IN L
AK
HS
--->
24
GENERATION vs FREQUENCY FOR
10
30
50
70
90
08
:21
09
:21
10
:21
11
:21
TIME IN HH:MM ----->
MW
---
-->
49.00
49.20
49.40
49.60
49.80
50.00
50.20
50.40
FR
EQ
IN
HZ
---
-->
FREE GOVERNOR MODE OF OPERATION ON 12-DEC-04
SHARAVATHI -1
FREQ DROP FROM 49.72 HZ TO 49.27 HZ
i.e. ~ 0.45HZ
25
GENERATION vs FREQUENCY FOR
10
30
50
70
90
08
:21
09
:21
10
:21
11
:21
TIME IN HH:MM ----->
MW
---
-->
49.00
49.20
49.40
49.60
49.80
50.00
50.20
50.40
FR
EQ
IN
HZ
---
-->
FREE GOVERNOR MODE OF OPERATION ON 12-DEC-04
SHARAVATHI -4
FREQ DROP FROM 49.72 HZ TO 49.27 HZ
i.e. ~ 0.45HZ
26
0
100
200
300
400
500
600
700
800
900
1000
0 2 4 6 8 10 12 14 16 18 20 22 0
HOURS ---->
GE
NE
RA
TIO
N IN
MW
---
>
48.80
49.00
49.20
49.40
49.60
49.80
50.00
50.20
50.40
FR
EQ
IN H
Z--
->
SHARAVATHI GENERATION – TYPICAL DAY
FREQ
MW
27
OPTIMAL RESERVOIR UTILISATIONSHARAVATHY IN KARNATAKA
THE COST OF GENERATION AT SHARAVATHY IS LESS THAN 20 Ps /UNIT
AVERAGE SELLING UI RATE OF KARNATAKA IS 372 Ps/UNIT
PLANT OPERATORS AT SHARAVATHY THINK OF THE RESERVOIR LEVEL IN RUPEES
RATHER THAN IN FEET!!!
Rs. Rs.
Rs.
Rs.
Rs.
Rs.Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.Rs.
28
VOLTAGE PROFILE IN SR GRID TYPICAL DAY IN OCTOBER 2004
360
370
380
390
400
410
420
430
440
RA
MA
GU
ND
AM
HY
DE
RA
BA
D
GA
ZU
WA
KA
NU
NN
A
N'S
AG
AR
KU
RN
OO
L
GO
OT
Y
NE
LLO
RE
CU
DD
AP
AH
BA
NG
ALO
RE
CH
EN
NA
I
NE
YV
ELI
VO
LT
AG
E L
EV
EL
02:00HRS
19:00HRS
29
01-01-03 TO 20-08-06
INTER REGIONAL EXCHANGES
274
234
152170
0
50
100
150
200
250
300
350
SR RATE WR RATE SR RATE ER RATE
RA
TE
(P
AIS
A/K
WH
) -
>
IMPORT BY SR FROM WR (804 MU)
IMPORT BY SR FROM ER (903 MU)
30
01-01-03 TO 20-08-06
INTER REGIONAL EXCHANGES
141 134
272260
0
50
100
150
200
250
300
SR RATE WR RATE SR RATE ER RATE
RA
TE
(P
AIS
A/K
WH
) -
>
EXPORT BY SR TO WR (710 MU)EXPORT BY SR TO ER (362 MU)
31
IR EXCHANGES OF SR IN THE FORM OF UI TILL 20.08.2006 (190 WEEK)
TRANSACTION WITH WR
TRANSACTION WITH ER
Energy Imported
804 MU (IMPORT BY SR)
903 MU(IMPORT BY SR)
Net Saving to each SR and WR/ER Constituents
due to differential tariff
Rs. 53.50 Cr. Rs. 45.50 Cr.
Energy Exported 710 MU (EXPORT BY SR)
362 MU(EXPORT BY SR)
Net Saving to each SR and WR/ER Constituents
due to differential tariff
Rs. 42.54 Cr. Rs. 16.13 Cr.
32
AP KAR KER TN PONDY
Total UI exported(-) /
Imported(+) in MUs
-4228 5053 389 2001 -272
Total amount paid in Crores
Rs.-734 932 -16 534 -54
Average rate of UI in paise/unit 174 184 40 267 197
SUMMARY OF UI – 190 WKS(FROM 01/JAN/03 TO 20/AUGUST/06)
33
UI IN SR (FROM 01/01/03 TO 20/08/06)
• TOTAL UI TURNOVER :- 11632 MU
• TOTAL UI AMOUNT DISBURSED:- 2370 CR
• AVG WEEKLY TRANSACTION:- 61 MU
• AVG WEEKLY UI AMOUNT DISBURSED:- 13 CR
34
UI EXCHANGES AND AVG. RATES IN RESPECT OF DIFFERENT CONSTITUENTS IN SR
333
186 178
240
-199
-260 -267
-160
-400
-300
-200
-100
0
100
200
300
400
RA
TE
(PA
ISE
/UN
IT)
OVER DRAWAL (PURCHASE) UNDER DRAWAL (SOLD)
5164MU
1337MU
2659MU
5046MU
111MU
949MU
658MU
AP KAR KER TN
817MU
Back