Southeast Nexus (SENEX) Studying the Interactions Between Natural and Anthropogenic Emissions at the Nexus of Air Quality and Climate Change NOAA Field Study in the Southeast U.S. in Summer 20 • Southeast U.S. has high anthropogenic and biogenic emissions, humidity, and photochemistry • How do the emissions react to form aerosol and oxidants? • What are the climate-relevant properties of the aerosol? Modeled aerosol forcing peaks in the SE U.S. [Leibensperger, ACP 2011]
Southeast Nexus (SENEX) Studying the Interactions Between Natural and Anthropogenic Emissions at the Nexus of Air Quality and Climate Change. Southeast U.S. has high anthropogenic and biogenic emissions, humidity, and photochemistry How do the emissions react to form aerosol and oxidants? - PowerPoint PPT Presentation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Southeast Nexus (SENEX) Studying the Interactions Between Natural and Anthropogenic
Emissions at the Nexus of Air Quality and Climate Change
A NOAA Field Study in the Southeast U.S. in Summer 2013
• Southeast U.S. has high anthropogenic and biogenic emissions, humidity, and photochemistry
• How do the emissions react to form aerosol and oxidants?
• What are the climate-relevant properties of the aerosol?
Modeled aerosol forcingpeaks in the SE U.S.[Leibensperger, ACP 2011]
Modeled aerosol forcingpeaks in the SE U.S.[Leibensperger, ACP 2011]
Scientific Motivation
Southeast U.S.:•Many secondary pollutants and radiative forcings are higher than elsewhere in the Nation
How do anthropogenic and biogenic emissions interact and affect air quality and climate?
How do anthropogenic and biogenic emissions interact and affect air quality and climate?
OMI HCHO column peaks in summer SE U.S. [Millet, 2008]
OMI HCHO column peaks in summer SE U.S. [Millet, 2008]
April 12: windows and feet to TampaApril 19: truck to TampaApril 22-26: Sta C3X, Sta 8, LTI, WLOPC, FliSciApril 29–May 2: Sta 2, Sta 6a, LIPF, AAMPS pod
Shipping: April 19, 2013
Integration Schedule
May 6-10: Sta 3, Sta 5, CO pod, CCN, j-headsMay 13-17: Sta 4, Sta 6b, Dual PassMay 20-24: AOC prepMay 27-30: Power checks and test flightMay 31: Transit to Nashville
Shipping: April 19, 2013
Integration Schedule
Shipping: April 19, 2013
Integration Schedule
July 15: transit to TampaJuly 16-17: de-integrationJuly 18: truck to BoulderJuly 19: unload truck go to the Rio