Top Banner
SOUTH WALES INDUSTRIAL CLUSTER DEVELOPMENT CHRIS WILLIAMS
11

SOUTH WALES INDUSTRIAL CLUSTER …7 SOUTH WALES CLUSTER “To develop a world leading truly sustainable Industrial Cluster befitting the societal needs of 2050 and beyond’. Through

Aug 06, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SOUTH WALES INDUSTRIAL CLUSTER …7 SOUTH WALES CLUSTER “To develop a world leading truly sustainable Industrial Cluster befitting the societal needs of 2050 and beyond’. Through

SOUTH WALES INDUSTRIAL CLUSTER DEVELOPMENT

CHRIS WILLIAMS

Page 2: SOUTH WALES INDUSTRIAL CLUSTER …7 SOUTH WALES CLUSTER “To develop a world leading truly sustainable Industrial Cluster befitting the societal needs of 2050 and beyond’. Through

Graphic slide

2

https://vimeo.com/269820048

Page 3: SOUTH WALES INDUSTRIAL CLUSTER …7 SOUTH WALES CLUSTER “To develop a world leading truly sustainable Industrial Cluster befitting the societal needs of 2050 and beyond’. Through
Page 4: SOUTH WALES INDUSTRIAL CLUSTER …7 SOUTH WALES CLUSTER “To develop a world leading truly sustainable Industrial Cluster befitting the societal needs of 2050 and beyond’. Through

Graphic slide

4

4

• Flexible Energy solutions• ‘SMART’ low carbon cluster• Reduce the Red and make the Green a reality• Exciting new steelworks of the future

Page 5: SOUTH WALES INDUSTRIAL CLUSTER …7 SOUTH WALES CLUSTER “To develop a world leading truly sustainable Industrial Cluster befitting the societal needs of 2050 and beyond’. Through

5

UK CLUSTERS

• Proposal is Natural Gas to Hydrogen with CO2

storage in Morecambe Bay.

• Hydrogen used for power, trains, industrial and domestic.

• Cost £0.9bn Operational 2026

The NW Cluster

Page 6: SOUTH WALES INDUSTRIAL CLUSTER …7 SOUTH WALES CLUSTER “To develop a world leading truly sustainable Industrial Cluster befitting the societal needs of 2050 and beyond’. Through

6

Thanks to Google Maps

Page 7: SOUTH WALES INDUSTRIAL CLUSTER …7 SOUTH WALES CLUSTER “To develop a world leading truly sustainable Industrial Cluster befitting the societal needs of 2050 and beyond’. Through

7

SOUTH WALES CLUSTER

“To develop a world leading truly sustainable Industrial

Cluster befitting the societal needs of 2050 and beyond’.

Through working together, and the support of Governments and NRW, we will explore:-

• the mechanisms for Decarbonisation• How to become a wholly circular economy, • the Hydrogen economy, • Energy and Resource efficiency

Thus developing a ‘Clean Growth’ vision for South Wales industry.

Objective

Page 8: SOUTH WALES INDUSTRIAL CLUSTER …7 SOUTH WALES CLUSTER “To develop a world leading truly sustainable Industrial Cluster befitting the societal needs of 2050 and beyond’. Through

8

Way Forward

Developing a Plan

Page 9: SOUTH WALES INDUSTRIAL CLUSTER …7 SOUTH WALES CLUSTER “To develop a world leading truly sustainable Industrial Cluster befitting the societal needs of 2050 and beyond’. Through

9

What do we need to be the ‘Leanest and Greenest’ in the world??

Clusterorganisation

UK Gov

Welsh Gov

Industry

UniversitiesColleges Schools

Institute

Technology providers

Consultants

Consultants

Contractors

Benchmarking –Best in

World/Global view

Page 10: SOUTH WALES INDUSTRIAL CLUSTER …7 SOUTH WALES CLUSTER “To develop a world leading truly sustainable Industrial Cluster befitting the societal needs of 2050 and beyond’. Through

10

Working with the Liverpool Manchester Cluster

‘South Wales’ + ‘HyNet’ form “West Coast cluster” with 15Mt CO2/yr injection capacity 1.5bt CO2 storage - sufficient for 100 years

5Mt CO2/yr from South Wales

Competitive cost of carbon abatement

Page 11: SOUTH WALES INDUSTRIAL CLUSTER …7 SOUTH WALES CLUSTER “To develop a world leading truly sustainable Industrial Cluster befitting the societal needs of 2050 and beyond’. Through

11

SUMMARY

• The Cluster is just starting but with some momentum

• The Progressive Energy initial overview will help pull us together and will show that by working together with the NW Cluster we can offer UK Government an attractive and relatively quick option for reducing CO2 emissions

• We are starting to work together with UK Government through their programs for Decarbonisation

• Look forward to working further with Welsh Government to create options and a vision for 2050

• We can then develop roadmaps for the required R&D, technology demonstration, skills, incentives and the policies we need to make that vision a reality