~ 1 ~ Work Study Cell, SECR.
SOUTH EAST CENTRAL RAILWAY
WORK STUDY CELL
Work study report on
Review of Work Load Vis-à-vis cadre strength of
Diesel Loco Shed/Raipur in Mechanical Deptt. of Raipur Division
OVER S.E.C. RAILWAY
WORK STUDY CELL S. E C. RAILWAY
BILASPUR
STUDY NO.
SEC/01/2017-18
~ 2 ~ Work Study Cell, SECR.
SOUTH EAST CENTRAL RAILWAY
WORK STUDY REPORT
ON
Review of Work Load Vis-à-vis cadre strength of Diesel Loco Shed/Raipur in Mechanical Deptt.
of Raipur Division
OVER S.E.C. RAILWAY
GUIDED BY SRI S.K. GUPTA
SR.DY. GENERAL MANAGER
LED BY SRI S. N. PATNAIK
WORK STUDY OFFICER
CONDUCTED BY
SRI V. K. SINHA
SRI A. C. BEHERA CH. WORK STUDY INSPECTOR
SRI S. K. MISHRA
WORK STUDY INSPECTOR
WORK STUDY CELL
S. E. C. RAILWAY, BILASPUR
STUDY No.
SEC/01/2017-18
~ 3 ~ Work Study Cell, SECR.
CONTENTS
Chapter Description Page No.
- Summary of Recommendations & Suggestions 4
I Introduction 5-7
II Observations 8-38
III Critical Analysis and Recommendations 39-45
IV Financial Evaluation 46
~ 4 ~ Work Study Cell, SECR.
SUMMARY OF RECOMMENDATIONS & SUGGESTIONS
S# Description Para
ref.
RECOMMENDATIONS:-
1
It is recommended that 42 vacant posts of Technicians are identified as surplus and should be surrendered from present sanctioned of 799 posts of DLS/Raipur. The 42 posts have been identified as surplus in reference to All India Best Benchmarking of Man Power Productivity Ratio of DLS/PTRU (3.82), East Central Railway with the Man Power Productivity Ratio of DLS/Raipur (4.12) and considering various outsourcing activities existing & proposed at DLS/Raipur.
3.5.1
2. The none-core activities of DLS/Raipur like painting & carpentry work of Locos and maintenance of Road vehicles may be outsourced so that attention on Core-activities can be concentrated more and thereof it would be monetary beneficial
by reducing staff.
3.5.2
SUGGESTIONS:
1
A Safety Cell may be set up in Shed for monitoring of safety related matters, organizing safety seminar in shed for counseling of staff, checking of safety rules during working, checking of major machines for schedule of testing, checking of safety equipments etc.
3.5.3
2. Artisan staff should follow safety rules during working and proper counseling should be provided to Artisan/Helper time to time in this connection.
3.5.4
~ 5 ~ Work Study Cell, SECR.
CHAPTER-I
1.0 INTRODUCTION:
The study of Diesel Loco Shed, Raipur has been undertaken to review the existing workload,
requirement of staff and optimum utilization of manpower in pursuance with the policy of
Railway Board to achieve Benchmarking figure of Manpower Productivity Ratio first at par
with Indian Railway Average and subsequently the all India Best Benchmarking and
outsourcing of some activities executed by the DLS/Raipur.
The following methodology has been adopted for conducting the study:
(i) Collection of relevant data,
(ii) Examination of records,
(iii) Direct observations regarding working of staff,
(iv) Interaction with officers and staff and
(v) Critical Analysis.
1.1 Diesel Loco Shed (MECHANICAL DEPARTMENT)/Raipur :
Diesel loco shed Raipur is situated near RSD(Raipur Stores Depot) station in Raipur division of SEC Railway under the control of Sr.DME/D/Raipur. It was commissioned in 1993. The staff of Diesel loco shed Raipur normally attend the light schedule, heavy schedule and maintenance of WDM-2, WDM-3A, WDM 3A, WDS-6, WDG4, WDG4D, WDP4, WDG-3A & ZDM4A Diesel locos.
1.2 Layout of DLS/Raipur: The complete Lay-out of DLS/R is as below:
~ 6 ~ Work Study Cell, SECR.
1.3 Sections/shops in DLS/R:
Diesel Loco Shed/Raipur comprises of various Sections/Shops which are as under:
S# Shop/Section Name S# Shop/Section Name
1. Mechanical Bench 16. Heavy Schedule (Elect.)
2. Air Compressor/Air Brake 17. Tool Room
3. Wheel Change Section 18. CMS Lab.
4. Machine Shop 19. Store (Elect.) 5. Light Schedule (Mech.) 20. NG-DLS 6. Heavy Schedule (Mech.) 21. Trouble Shooting Points
7. Half Yearly & Temporary Repair 22. Fuelling Section
8. Carpentry, Body Repair & Painting Section 23. SSE (D) Office
9. EMD/HHP Section 24. Planning Cell 10. Meter Bench 25. Establishment Section 11. Battery Bench 26. Computer Section 12. Small Motor Bench 27. Tender Cell 13. Traction Motor Bench 28. Control Room 14. EMD Electrical 29. Canteen 15. Light Schedule (Elect.)
1.4 Main Activities of DLS/R:
Diesel Loco Shed/ Raipur constitutes of three sections: (a) Mechanical (b) Electrical & (C) Ancillary. The main activity of Diesel loco shed, Raipur is to perform the maintenance of Diesel Locomotives as per the schedules –
i. Light Schedule (Trip Schedule, Monthly Sch. & Quarterly Sch.) ii. Heavy Schedule (Half Yearly, Yearly & Third Yearly)
iii. Temporary Repairs of Loco. Maintenance of Machinery & Plants in Shed. iv. Supply of materials from stores to shops. v. Loading & Unloading of material.
1.5 ORGANIZATIONAL SET UP:
A. Organisation set up of DLS/Raipur:
DLS
Raipur
Mechanical
Section
Electrical
Section
Ancillary
Section
Schedule Work, Out of
Course, under gear &
Wheel Change Sec.
Mechanical Bench,
Others
Schedule Work, Out of
Course, Electrical Bench
& Others
Sr. DME Office, SSE
Office, Welding,,
Machine Shop,
M&P,T/P etc.
~ 7 ~ Work Study Cell, SECR.
B. Organisation Chart of Officers & Staff pertaining to DLS/Raipur:
1.6 Diesel loco shed/Raipur mainly constitutes of three sections shown as under :-
Mechanical Electrical Ancillary
1. Light Schedule
Trip Schedule.
Monthly Schedule.
Quarterly Schedule. 2. 2. Out of course repair gang 3. 3. Heavy Schedule
Half yearly
Yearly Section,
Third Yearly 4. 4. Under gear and wheel change section
5. 5. Mechanical Bench
Head Bench,
Compressor Bench,
Nozzle Bench,
Bracket Bench,
TSC Bench,
Heat Exchange Bench,
FIP Bench,
Radiator Bench,
Gasket Bench.
Air Brake Bench
6. 6. Others
Tool room,
SMI (Shed Material In charge)
computer cell Office,
SSE’s store,
Trouble shooting point.
Fueling Point
Laboratory
1. Light Schedule
Trip Sch.,
Monthly Sch.
Quarterly Sch. 2. 2. Out of course repair gang 3. 3. Heavy Schedule
Half Yearly Section,
Yearly Section,
Third Yearly 4. 4. Electrical Bench
Meter Bench,
Governor Bench,
Small Motor Bench,
Traction Motor Bench
Battery Bench
5. 5. Others
SMI,
SSE’s store,
Trouble shooting point
Computer Section
Welders,
Fork lifters,
Jumbo drivers,
Loco body repair,
Fire extinguishers,
M&P maintenance,
Machine shop
Wheel lathe,
Painters
Tool Room
Token Board
Sr.DME Office
SSE Office
~ 8 ~ Work Study Cell, SECR.
CHAPTER-II
2.0 OBSERVATIONS :
2.1
Staff Position: The Consolidated cadre strength of Diesel Loco Shed/Raipur as per data provided by Sr.DME(D)/R office (As on 28.02.2017) is as under:
S# Designation P. B. G.P. Sanc. Actual Vac
Ministerial:
1 Ch. OS 9300-34800 4600 03 03 00
2. OS 9300-34800 4200 09 06 03
3. Sr. Clerk 5200-20200 2800 04 03 01
4. Jr. Clerk 5200-20,200 1900 00 04 -04
5. Jr. Steno 2400 01 00 01
Sub-Total 17 16 01
Supervisor:
SSE (M) 9300-34800 4600 34 32 02
SSE (E) 9300-34800 4600 22 22 00
SSE (A) 9300-34800 4600 04 03 01
JE (M) 9300-34800 4200 14 15 -01
JE (E) 9300-34800 4200 09 06 03
JE (A) 9300-34800 4200 02 02 00
Sub-Total 85 80 05
Artisan:
MCM (M) 9300-34800 4200 46 41 05
MCM (E) 9300-34800 4200 30 29 01
MCM (A) 9300-34800 4200 09 08 01
Tech Gr-I (M) 5200-20200 2800 117 119 -02
Tech.Gr- I (E) 5200-20200 2800 82 82 00
Tech.Gr-I (A) 5200-20200 2800 24 23 01
Tech Gr-II (M) 5200-20200 2400 53 42 11
Tech.Gr-II (E) 5200-20200 2400 38 32 06
Tech.Gr-II (A) 5200-20200 2400 11 13 -02
Tech.Gr-III (M) 5200-20200 1900 122 86 36
Tech.Gr-III (E) 5200-20200 1900 78 35 43
Tech.Gr-III (A) 5200-20200 1900 10 11 -01
Sub-Total 620 521 99
Lab:
18. CMS 9300-34800 4600 06 04 02
19. CMA 9300-34800 4200 03 05 -02
20. LAB ASST.I 5200-20200 2800 00 01 -01
21 LAB ASST.II 5200-20200 2400 00 01 -01
22. LAB ASST.III 5200-20200 1900 07 00 07
Sub-Total 16 11 05
Group’D’:
DCH 5200-20200 1800 45 73 -28
DC 5200-20200 1800 00 00 00
Sr. Peon 5200-20200 1800 02 01 01
Peon 5200-20200 1800 01 02 -01
TADK 5200-20200 1800 01 01 00
Sub-Total 49 77 -28
Others:
24. MV driver Gr. I 5200-20200 2800 02 03 -01
25. MV driver Gr. II 5200-20200 2400 00 01 -01
26. MV driver Gr. III 5200-20200 1900 01 01 00
Work Charge Post:
MCM(A) 9300-34800 4200 05 05 00
Tech. –I(A) 5200-20200 2800 03 03 00
Helper 5200-20200 1800 01 00 01
Sub-Total 09 08 01
GRAND TOTAL 799 718 81
Note: This sanctioned cadre includes 09 Work charge posts
~ 9 ~ Work Study Cell, SECR.
2.2 Maintenance System: The system of preventive maintenance envisages a schedule for maintenance attention at regular specified intervals including replacement of components. It aims to replace the components before they actually fail in service due to ageing, wear and tear, while also endeavouring to obtain maximum life possible for the components. The system also aims at synchronization of attention to all related components so that the manpower and engine-days lost on account of the examination is minimized. However, it is the need of the hour to introduce the concept of predictive maintenance to bring down both cost and as well as down time for maintenance. To achieve this, it is necessary to lay down a list of parameters which are required to be monitored remotely and also during the last shed attention paid to arrive at the decision about next schedule to be given to the loco. Remote monitoring is an essential requirement in achieving this objective. It is recommended that, few locos should be put on trial on the system of predictive maintenance.
Schedule periodicity of Alco locos is as under:
S. No. Name of Schedules Original Periodicity Current Schedules for Alco Locos
Periodicity
1 Trip or Weekly Max. 7 days T1 15, 20, 30 & 40 days
2 Fortnightly 15 days T2 15, 20, 30 & 40 days
3 Monthly 30 days M-2 60 days
4 Quarterly 90 days M-4 120 days
5 Half Yearly 180 days M-12 12 Months
6 Yearly 1 year M-24 24 Months
7 2 yearly 2 years - -
8 3 Yearly 3 years M-48 48 Months
9 POH 6 years M-96 96 Months
2.3 Details of activities under Maintenance Schedule: Diesel Loco Shed/ Raipur constitutes of three sections: (a) Mechanical (b) Electrical & (C) Ancillary. The main activity of Diesel loco shed, Raipur is to perform the maintenance of Diesel Locomotives as per the schedules - (1) Light Schedule (Trip Schedule, Monthly Sch. & Quarterly Sch.) (2) Heavy Schedule (Half Yearly, Yearly & Third Yearly) (3) Temporary Repairs of Loco.
~ 10 ~ Work Study Cell, SECR.
2.4
2.4.1
Section wise activities: The Section wise works are carried out by the Diesel Loco staff at Diesel loco shed
Mechanical Section :
Description of maintenance work being carried out under Mechanical Section are as given below:
A. Light Schedule
Trip Schedule: -
Engine Room:-In trip schedule, radiator blow out is done, Lubricating oil strainer is changed, all engine room, expresser Room, radiator room and nose compartment are checked. Checking of leakages in lube oil system fuel oil system & cooling water system lube oil pressure, fuel oil pressure, TSC run down, compressor oil, water level, vacuum oil, bath filter panel, after cooler, crank case, RTTM blower motor belts, cylinder head, exhaust manifold sending bath air impact filter, Universal shaft, Operation of Radiator fan, right angle Gear Box checking for unusual sound & over heating of all engine room items. Checks on cooling water, lube oil, fuel oil, suspension bearing oil and brake power pressure. All Operation in start condition of loco is seen. Under gear: - All safety bracket, equalizing beams, buffers, CBC, center pivot & side pivot cattle guard, roller bearing axle box, all wheels springs & safety chains bogie crank , all vacuum & air hose pipes, rail guard, changing of carbolic filters Brake blocks, gear case, suspension bearing oil, load pad oil, all Nut & bolts tightness, hanger pins, checking done.
Monthly Schedule :-
Engine Room :- In monthly schedule radiator blow out is done, lube oil filter, strainer filter change, compressor valve change, fuel oil filter change, all engine room, expresser room, radiator room and nose compartment checking done Checking of leakages in lube oil system fuel oil system & cooling water system lube oil pressure, fuel oil pressure, TSC run down, compressor oil, water level, vacuum oil, bath filter panel, after cooler, crank case, RTTM blower motor belts, cylinder head, exhaust manifold sending bath air impact filter , Universal shaft ,Operation of Radiator fan, Right Angle Gear Box, checking of unusual sound & over eating of all engine room items testing of cooling water, lube oil, fuel oil, suspension bearing oil and brake power pressure check. All Operation in start condition of loco.
Under gear: - All safety bracket, equalizing beams, buffers, CBC, center pivot & side pivot cattle guard, roller bearing axle box, all wheels springs & safety chains bogie crank , all vacuum & air hose pipes, rail guard, changing of carbolic filter Brake blocks, gear case, suspension bearing oil, load pad oil, all Nut & bolts tightness, hanger pins, checking done.
Quarterly Schedule :-
Engine Room :- In quarterly schedule radiator blow out done, lube oil filter, strainer filter change, compressor valve change, fuel oil filter change, all engine room, expresser room, radiator room and nose compartment checking done Checking of leakages in lube oil system fuel oil system & cooling water system lube oil pressure, fuel oil pressure, TSC run down, compressor oil, water level, vacuum oil, bath filter panel, after cooler, crank case, RTTM blower motor belts, cylinder head, exhaust manifold sending bath air impact filter , Universal shaft ,Operation of Radiator fan, Checking of Dry run, Right Angle Gear Box checking of unusual sound & over eating of all engine room items testing of cooling water, lube oil, fuel oil, suspension bearing oil and brake power pressure check, tappet timing check, hot engine done. All Operation in start condition of loco.
~ 11 ~ Work Study Cell, SECR.
Under gear: - All safety bracket, equalizing beams, buffers, CBC ,center pivot & side pivot cattle guard, roller bearing axle box, all wheels springs & safety chains bogie crank , all vacuum & air hose pipes, rail guard, changing of carbolic filters ,Felt Wicks, Brake blocks, gear case, suspension bearing oil, load pad oil, all Nut & bolts tightness, hanger pins, checking done.
Under gear & wheel gear section :-Attending the Half yearly, Yearly & Third Yearly scheduled loco, out of course repairs, fuel tank cleaning, felt wicks cleaning & other miscellaneous work .
Heavy Schedule:
Half Yearly Schedule :- Crank Case checking, radiator blow out done, checking of unusual sound & over heating of all engine room items, testing of cooling water, lube oil, fuel oil, suspension bearing oil and brake power pressure check, hot engine done. Cranks of split gear, Nut bolt checking Crank Case gasket checking, D - scaling, Chemical Testing of water at the level of P.H./Nitrate,
minute inspection of oil/water leakage ,Refilling of water as per requirement, checking of Engine cylinder head, air inlet exhorts elbow , checking of clearance of Toped, changing of fuel injector, Right angle gear box oil changing, lubrication of universal shaft & fast coupling, changing of lube oil filter, strainer , fuel oil filter, Relief valve, Regulating valve, Bi-pass valve. After cooler, Water circulating pump, Lube oil pump, lube oil cooler, panel valve, TSC Removed & sent to bench for Overhauling & after overhauling same is fitted, changing of RTTM Blower motor belt & nuts, changing of compressor valve, checking of all safety clamps & brackets, Flexible pipes, Cam shaft, Main bearing, All nut bolts of engine, Engine Blocks. Load box test is done & output noted down. All operation in running condition is checked.
Yearly Schedule :- Crank Case checking, radiator blow out done checking of unusual sound & over heating of all engine room items testing of cooling water, lube oil, fuel oil, suspension bearing oil and brake power pressure check, tappet timing check, hot engine done. Cranks of split gear, Nut bolt checking Crank Case gasket checking, D - scaling, Chemical Testing of water at the level of P.H./Nitrate, minutely inspection of oil/water leakage, Refilling of water as per requirement, changing of fuel injector, Right angle gear box oil changing, lubrication of universal shaft & fast coupling, changing of lube oil filter, strainer , fuel oil filter, Relief valve, Regulating valve, Bi pass valve. After cooler, radiator Water circulating pump, RTTM Blower motor, Lube oil pump, lube oil cooler, panel valve, All cylinder head pistons liners, Inter cooler OST assembly, Cam shaft, Fuel injection pumps, All brackets, TSC, Removed & sent to bench for Overhauling & after overhauling same fitted. Changing of compressor valve, checking of all safety clamps & brackets, Flexible pipes, Cam shaft, Main bearing, All nut bolts of engine, Engine Blocks. Blow by test of all heads done, all main bearing, cylinder head, & exhaust gas temperature taken. Load box test done & output noted down. All
operation checking in running condition done.
3rd Yearly Schedule :- Crank Case checking, radiator blow out done checking of unusual sound & over heating of all engine room items testing of cooling water, lube oil, fuel oil, suspension bearing oil and brake power pressure check, tappet timing check, hot engine done. Cranks of split gear, Nut bolt checking Crank Case gasket checking, D - scaling, Chemical Testing of water at the level of P.H./Nitrate, minutely inspection of oil/water leakage ,Refilling of water as per requirement , Lubrication of universal shaft & fast coupling, changing of lube oil filter,
~ 12 ~ Work Study Cell, SECR.
strainer , fuel oil filter, Relief valve, Regulating valve, Bi-pass valve. After cooler, Water circulating pump, RTTM Blower motor, radiator Lube oil pump, lube oil cooler, panel valve, All cylinder head pistons liners, Inter cooler OST assembly, compressor Cam shaft, Main bearing Fuel injection pumps, All brackets, TSC, Right angle gear box Removed & sent to bench for Overhauling & after overhauling same fitted. checking of all safety clamps & brackets, Flexible pipes, All nut bolts of engine, Engine Blocks. Blow by test of all heads done, all main bearing, cylinder head, & exhaust gas temperature taken. Load box test done & out put noted down. All operation checking in running condition done.
Mechanical Bench:
Mechanical Bench comprises of various Sections to compliance the Maintenance
work properly & effectively described as under:
Head Bench:- uncoupling work of head then dipping in chemical and cleaned, nozzle sleeve changing, hydraulic test, bore cleaning & checking, valve set checking,
assembling work, lapping test blow by test testing done. Piston inspection, clearance measurements, uncoupling work of piston then dipping in chemical, cleaning, Zyglow test, checking of connecting rod , hydraulic test & assembling work done.
Compressor Bench:- The Compressor Bench staff attended monthly, Quarterly, Half yearly, yearly & third yearly work .Repairing & overhauling of valves & spare compressor.
Nozzle Bench: - Repairing & overhauling of Nozzle.
Bracket Bench: - Repairing & overhauling of Brackets & power assembly.
TSC Bench: - Repairing & overhauling of Turbo Super Charger.
Heat Exchange Bench,:- Repairing & overhauling of water circulating pumps, Lube oil pumps, Rear Truck Traction Motor blower, after cooler, radiator fan, Lube oil filter tank, Lube oil cooler, Lube oil valve set, fuel Oil valve set & universal shaft .
FIP Bench: - Repairing & overhauling of Fuel Injection Pumps.
Radiator Bench: - Repairing & overhauling of Radiators.
Gasket Bench: - As per requirements, all types of Gasket Cutting & preparing for use in different parts of loco.
Air Brake Bench:- Repairing & overhauling of all types of valves, schedule work of loco in Air brake system & repairing work in monthly, Quarterly, Half yearly, yearly & Third yearly .
~ 13 ~ Work Study Cell, SECR.
2.4.2 Electrical Section:
A. Light Schedule :
Trip Schedule:-
In trip schedule Traction Generator, Traction motor, Control Compartment blow out done, Traction Generator, Traction motor, Control Compartment, Braking Blower Motor, Axle Generator , Rectifier Unit for Alternator, Crank Case Exhauster Motor, Fuel Pump Motor, Auxiliary Generator, Traction Motor Blowers, Eddy Current Clutch Coil , CCyycclloonniicc ffiilltteerr
mmoottoorr ,, Exciter generator, Braking Switches, Reverser, Cranking Contactors, Power contactors, Field Shunting Contactors, Excitation panel, Engine Control Panel, Voltage Control Panel’ all resistance which fitted in Locos, Master controller, MMoottoorr CCuutt OOuutt SSwwiittcchh,,
LLooww WWaatteerr SSwwiittcchheess,, OOiill PPrreessssuurree SSwwiittcchheess,, EEnnggiinnee TTeemmppeerraattuurree SSwwiittcchheess,, MG8 Governor, Woodward Governor, Microprocessor Governor, Governor pilot valve, Governor head, stabilizing Rheostat , Load Rheostat, Batteries of Locos power side and Control side insulation checking & inspection done. Running checking of loco in start condition & checking of all voltages of loco.
Monthly Schedule :-
In monthly schedule Traction Generator, Traction motor, Control Compartment blow out done, Traction Generator, Traction motor, Control Compartment, Braking Blower Motor,Axle Generator , Rectifier Unit for Alternator, Crank Case Exhauster Motor, Fuel Pump Motor, Auxiliary Generator, Traction Motor Blowers, Eddy Current Clutch Coil , CCyycclloonniicc
ffiilltteerr mmoottoorr ,, Exiter generator, Braking Switches, Reverser, Cranking Contactors, Power contactors, Field Shunting Contactors, Excitation panel, Engine Control Panel, Voltage Control Panel’ all resistance which fitted in Locos, Master controller, MMoottoorr CCuutt OOuutt SSwwiittcchh
,,LLooww WWaatteerr SSwwiittcchheess,, OOiill PPrreessssuurree SSwwiittcchheess,, EEnnggiinnee TTeemmppeerraattuurree SSwwiittcchheess,, MG8 Governor, Woodward Governor, Microprocessor Governor, Governor pilot valve, Governor head, stabilizing Rheostat , Load Rheostat, Batteries of Locos power side and Control side insulation checking & inspection done. Running checking of loco in start condition & checking of all voltages of loco.
Quarterly Schedule :-
In quarterly schedule Traction Generator, Traction motor, Control Compartment blow out done, Traction Generator, Traction motor, Control Compartment, Braking Blower Motor,Axle Generator , Rectifier Unit for Alternator, Crank Case Exhauster Motor, Fuel Pump Motor, Auxiliary Generator, Traction Motor Blowers, Eddy Current Clutch Coil , CCyycclloonniicc
ffiilltteerr mmoottoorr,, Exiter generator, Braking Switches, Reverser, Cranking Contactors, Power contactors, Field Shunting Contactors, Excitation panel, Engine Control Panel, Voltage Control Panel’ all resistance which fitted in Locos, Master controller, MMoottoorr CCuutt OOuutt SSwwiittcchh
,,LLooww WWaatteerr SSwwiittcchheess,, OOiill PPrreessssuurree SSwwiittcchheess,, EEnnggiinnee TTeemmppeerraattuurree SSwwiittcchheess,, MG8 Governor, Woodward Governor, Microprocessor Governor, Governor pilot valve, Governor head, stabilizing Rheostate , Load Rheostate, Specific Gravity & Cell voltage of Batteries of Locos,
power side and Cotrol side insulation, ‘D’ form , Traction motor Cable Joint tightness, Multiple Unit Junction Box, Dynamic Grid checking & inspection done. Running checking of loco in start condition & checking of all voltages of loco.
B. Heavy Schedule
Half Yearly Schedule: In Half Yearly schedule Traction Generator, Traction motor, Control Compartment blow out done, traction generator mica cutting chamfering holder alignment inspection done, traction motor in side, out side cleaning inspection done. Crank Case Exhauster Motor, Fuel Pump Motor ,, ,,LLooww WWaatteerr SSwwiittcchheess,, OOiill PPrreessssuurree SSwwiittcchheess,, EEnnggiinnee TTeemmppeerraattuurree SSwwiittcchheess,,
CCyycclloonniicc ffiilltteerr mmoottoorr Axle Generator changing done, Control Compartment, Braking Blower Motor,Rectifier Unit for Alternator, Auxiliary Generator, Traction Motor Blowers, Eddy Current Clutch Coil ,Exciter generator, Braking Switches, Reverser,
~ 14 ~ Work Study Cell, SECR.
Cranking Contactors, Power contactors, Field Shunting Contactors, Excitation panel, Engine Control Panel, Voltage Control Panel ’all resistance which fitted in Locos, Master controller, MMoottoorr CCuutt OOuutt SSwwiittcchh ,, MG8 Governor, Woodward Governor, Microprocessor Governor, Governor pilot valve, Governor head, stabilizing Rheostat , Load Rheostat, Specific Gravity & Cell voltage of Batteries of Locos, power side and Control side insulation, ‘D’ fprm , Traction motor Cable Joint tightness, Multiple Unit Junction Box, Dynamic Grid checking & inspection done after all parts fittings all circuits, dry run testing done in started condition of engine all equipments over heating , leakages & operation checking done. Checking of all voltages of loco. Load box testing done. Loco on run checking done.
Out of course repair: Attending all section failure loco, all trouble shooting of loco in shed, all major type of component changing, all modification & all special drives.
Yearly Schedule :- In yearly schedule Traction Generator, Traction motor, Control Compartment blow out done, traction generator mica cutting chambering holder alignment , carbon brush
changing & inspection done, traction motor in side, out side cleaning inspection done. Crank Case Exhauster Motor Fuel Pump Motor ,, ,,LLooww WWaatteerr SSwwiittcchheess,, OOiill PPrreessssuurree
SSwwiittcchheess,, EEnnggiinnee TTeemmppeerraattuurree SSwwiittcchheess,, CCyycclloonniicc ffiilltteerr mmoottoorr Axle Generator, all switches , relays breakers, resistance , panels of Control Compartment, Braking Blower Motor,Rectifier Unit for Alternator , Cranking Contactors, Power contactors, Field Shunting Contactors, Excitation panel, Engine Control Panel, Voltage changing done, Auxiliary Generator, Traction Motor Blowers, Eddy Current Clutch Coil ,Exciter generator, Master controller, MMoottoorr CCuutt OOuutt SSwwiittcchh ,, MG8 Governor, Woodward Governor, Microprocessor Governor, Governor pilot valve, Governor head, stabilizing Rheostats , Load Rheostats, Specific Gravity & Cell voltage of Batteries of Locos, power side and Control side insulation, ‘D’ form , Traction motor Cable Joint tightness, Multiple Unit Junction Box, Dynamic Grid checking & inspection done. after all parts fittings all circuits, dry run testing done in started condition of engine all equipments overheating , leakages & operation checking done. Checking of all voltages of loco. Load box testing done. Loco on run checking done.
3rd Yearly Schedule :- In 3rd Yearly schedule Traction Generator, Traction motor, Control Compartment blow out done, traction generator mica cutting hampering holder alignment, carbon brush changing & inspection done, traction motor in side, outside cleaning inspection done. Crank Case Exhauster Motor, Fuel Pump Motor ,, ,,LLooww WWaatteerr SSwwiittcchheess,, OOiill PPrreessssuurree SSwwiittcchheess,, EEnnggiinnee
TTeemmppeerraattuurree SSwwiittcchheess,, CCyycclloonniicc ffiilltteerr mmoottoorr Axle Generator, all switches , relays breakers, resistance , panels of Control Compartment, Braking Blower Motor,Rectifier Unit for Alternator , Cranking Contactors, Power contactors, Field Shunting Contactors, Excitation panel, head light assembly, flasher light assembly, gauge light assembly, Engine Control Panel, Voltage Auxiliary Generator, Traction Motor Blowers, Eddy Current Clutch Coil
,Exciter generator, Master controller, MMoottoorr CCuutt OOuutt SSwwiittcchh ,, MG8 Governor or Woodward Governor or Microprocessor Governor, Governor pilot valve, Governor head, stabilizing Rheostat , Load Rheostat removed & send to benches and after overhauling all above parts fitting done, Batteries of Locos, changing done, Auxiliary Generator, Traction Motor Blowers, Eddy Current Clutch Coil ,Exciter generator, Master controller, MMoottoorr CCuutt OOuutt
SSwwiittcchh removed & send to benches and after overhauling all above parts fitting done,, power side and Control side insulation, ‘D’ form , Traction motor Cable Joint tightness, Multiple Unit Junction Box, Dynamic Grid checking & inspection done. After all parts fittings all circuits, dry run testing done in started condition of engine all equipments overheating, leakages & operation checking done. Checking of all voltages of loco. Load box testing done. Loco on run checking done.
Electrical Benches
Small Motor Bench :-Dynamic Braking Grids, Dynamic Braking Blower Motor, Axle Generator , Rectifier Unit for Alternator, Crank Case Exhauster Motor, Fuel Pump Motor, Auxiliary Generator, Traction Motor Blowers, Eddy Current Clutch Coil , CCyycclloonniicc
~ 15 ~ Work Study Cell, SECR.
Electrical Benches
Small Motor Bench :-Dynamic Braking Grids, Dynamic Braking Blower Motor, Axle Generator , Rectifier Unit for Alternator, Crank Case Exhauster Motor, Fuel Pump Motor, Auxiliary Generator, Traction Motor Blowers, Eddy Current Clutch Coil , CCyycclloonniicc
ffiilltteerr mmoottoorr ,,Exciter generator repairs overhauling & testing done.
Traction Motor Bench:-Tacho-Generator, Traction motor (TM),yearly schedule, pinion fitting , repairs overhauling & testing done.
Meter Bench: - Braking Switches, Reverser, Cranking Contactors, Power contactors, Field Shunting Contactors, Excitation panel, Engine Control Panel, Voltage Control Panel’ all resistance which fitted in Locos, Master controller, MMoottoorr CCuutt OOuutt SSwwiittcchh ,,LLooww
WWaatteerr SSwwiittcchheess,, OOiill PPrreessssuurree SSwwiittcchheess,, EEnnggiinnee TTeemmppeerraattuurree SSwwiittcchheess repairs overhauling & testing done.
Governor Bench: - MG8 Governor, Woodward Governor, Microprocessor Governor, Governor pilot valve, Governor Head, stabilizing Rheostat, Load Rheostat repairs overhauling & testing done.
Battery Bench: - Batteries of Locos are repairs overhauling & testing done & new batteries testing done.
2.5 Working Hour:
A. Office & Stores :- {9.00 hours to 17.00 hours} 6 days in a week
B. Light Schedule: - In three shifts C. Heavy Schedule: - In two shifts 6 days in a week,
D. Repair benches: - 8.00 hours to 12.00 hours & 13.00 hours to 17.00 hours 6 days a week
Working Shift:-
a. General Sift- 08:00 to 17:00 Hrs. b. P-1 Shift- 00:00 to 08:00 Hrs. c. P-2 Shift- 08:00 to 16:00 Hrs. d. P-3 Shift -16:00 to 08:00 Hrs.
2.6 Details of Plant Machinery & Equipements Diesel Loco Shed Raipur Division
S.
No. Description of Machine
Capaci
ty
COFMOW PO no. &
date Name of Supplier
1 CRANE EOT , Crane
No.1/50/94 ( Make Avon)
50/10
T
COFMOW/IR/s-
2823/94/op-665-A dt-
23-12-94
Avon Crane Pvt. LTD. 305,
Udyog Vihar, Dundahera,
GURGAON (Har.)
2 CRANE EOT , Crane
No.6/15/94 (Make Reva) 15/5 T
COFMOW/IR/s-
2824/94/op/641 dt-28-
12-94
Reva Engineering
Industries Ltd. Phase -II
New Delhi - 20
3 CRANEReva 15/5 Ton 15/5 T
P.O. No COFMOW/IR/S-
4453/09/P-1/OP-8144
(REVA) Dt. 16.06.10
Reva Industries Ltd.
Faridabad
4 Crane (Tram Beam), Crane
No.3/4/93 (Make Reva) 03 T
COFMOW/IR/s-2807/93/op-617 dt-03-
10-94
Reva Engineering Industries Ltd. Phase -II
New Delhi - 20
5 Crane (Tram Beam), Crane
No,4/4/93 (Make Reva) 03 T
COFMOW/IR/s-
2807/93/op-617 dt-03-
10-94
Reva Engineering
Industries Ltd. Phase -II
New Delhi - 20
~ 16 ~ Work Study Cell, SECR.
6 Crane (Tram Beam), Crane
No.5/4/93 (Make Reva 03 T
COFMOW/IR/s-2807/93/op-617 dt-03-
10-94
Reva Engineering Industries Ltd. Phase -II
New Delhi - 20
7 Crane (Tram Beam), Crane No.
6/4/93, (Make Reva) 03 T
COFMOW/IR/s-
2807/93/op-617 dt-03-
10-94
Reva Engineering
Industries Ltd. Phase -II
New Delhi - 20
8 CRANE EOT Machine no. 3/3/01
3 T COFMOW/IR /S-
3799/P1/OP-1180
M/s, Krane Component
(India) Pvt. Ltd. B - 10 Anand nagar MIDC.
ADDL- Ambernath Dist-
Thane - 421506
9 CRANE EOT Machine no.
4/3/01 3 T
COFMOW / IR /COT /
3T/01
M/s, Krane Component
(India) Pvt. Ltd. B - 10
Anand nagar MIDC.
ADDL- Ambernath Dist- Thane - 421506
10
CRANE Electric Hoist Jib
Crane (Pillar Crane)
/JC / 01/95
1.5 T
MIB Challan
No.412/LF(D) dt.
29.12.1994
Rockwell Hoist Crane (P)
Ltd. Recd from Loco
Foreman (D)/S.E. Rly.
MIB/NGP.
11
CRANE Electric Hoist Jib
Crane (Pillar Crane) /JC/02/ 95
1.5 T
MIB Challan
No.412/LF(D) dt. 29.12.1994
Rockwell Hoist Crane (P)
Ltd. Recd from Loco Foreman (D)/S.E. Rly.
MIB/NGP.
12
CRANE Electric Hoist Jib
Crane (Pillar
Crane)/JC/03/04
1.5 T
P.O. No.-
s/con/bbs/0203/MECH
/01/0410/20246 DT.
16.06.03
Robin engg. Enter.
KOLKATA
13 CRANE Electric Hoist Jib Crane (Pillar Crane) JC /
04 / 04
1.5 T
P.O. No.-s/con/bbs/0203/MECH
/01/0410/20246 DT.
16.06.03
Robin engg. Enter.
KOLKATA
14
CRANE Electric Hoist Jib
Crane (Pillar Crane) JC
/ 05 / 04
1.5 T
P.O. No.-
s/con/bbs/0203/MECH
/01/0410/20246 DT.
16.06.03
Robin engg. Enter.
KOLKATA
15
JACK WHITING
(Synchronized Operation)
Make - MAMCO Reced. on
03.07.2001+G20
25 T
P.O. No. -s/con/bbs/00-
01/mech/01/0319/ dt-
27.02.2001
M/s. MARWAHA manufaturing Co.
B/3,street no 2 Anand
Prabat Industrial Area,
Guru Govind Singh Marg,
New RohtakRd. New Delhi - 110005
16 JACK JAMALPUR 25 T Ch. No.-31/jj/mctr/30
dt02.01.12 CWM/E RLY JAMALPUR
17 FORK LIFT TRUCK GODREJ
D.Model-GX 300D / 32544 3 T
P.O. No.
06.06.5185.2.50100 dt.
21.12.06
M/s.Godrej & Boyce mfg co ltd material handling
equipment division
Mumbai
18
FORK LIFT TRUCK
GODREJ
D.Model-GX 300D / 33770
3T
P.O. No.
06.08.5253.2.46355
dt.14.08.08
M/s.Godrej & Boyce mfg
co ltd material handling
equipment division
Mumbai
19 FORK LIFT TRUCK GODREJ F.Model-GX-200E / 74087
Battery Operated
2 Tonnes
P.O. No.06.08.5252.2.46354
dt.14.08.08
M/s.Godrej & Boyce mfg
co ltd material handling equipment division
Mumbai
20 FORK LIFT TRUCK GODREJ
No - 76316 Battery Operated 2 T
P.O.
No.06.11.5057.2.46048
dt.24.06.13
M/s.Godrej & Boyce mfg
co ltd material handling
equipment division
~ 17 ~ Work Study Cell, SECR.
Mumbai
21 Plat Form Truck / FOUR
wheel (jumbo) Sr. No. - 2 T
P.O. No. 06.08.7269.2.46438 Dt
06.02.08
Make-JALDOOT PUNE
22
Plat Form
Truck / FOURwheel (Jumbo)
Sr. No.-
2 T
P.O. No.
06.08.7269.2.46438 Dt
06.02.08
Make-JALDOOT PUNE
23
LATHE , Under Floor Pit type
Semiautomatic wheel lathe
(BG)
COFMOW /IR / S-
2806/93/OP-604
DATED 29.11.94
HYT Engineering Co. Pvt.
Ltd, 29/10, D-2, Block
MIDC, Chinchwad, Pune
411019
24 Hack saw machine "Punam"
make model No. PHYD-10
22.5
mm.
Dy.CME( c ) /R/97/10
dt.06.06.97
Steel man & Co. 13, B.B.
Ganguly street 4th floor Room No. 410 Calcutta-12
25
Drilling Machine Radial Type
BVR- 5 Recd. old from G.P./
Raipur
50 mm SS/MW/Ch/94/05
dt.30.06.1994 Make:Batliboi, Surat
26 LATHE Harihar Lathe
Machine 6 1/2" MB type. 6 -1/2"
Dy.CME( c ) /R/97/18
dt. 01.07.97 Recd. from LF/BIA
27 LATHE All Geared Head
SS&SC Lathes 1500 -600 6"
06.08.5315.2.46554 Dt.
13.07.09
HMT MachineTools
Limited Kolkata
28 Shaper- GP 24, makers No. GP/24/1187, Mrker's name
cooper Engg. Co. Ltd. Bombay.
10 HP Dy.CME( c ) /R/97/17
dt. 18.06.97
Old machine, recd from LF/BIA. (Cooper Engg.Co.
Ltd. BOMBAY)
29 LATHE MACHINE (Centre
Lathe M/c) 6"
P.O. No.
S/CON/BBS/0102/Mec
h/01/0355/20107
Dt.23.09.2003
Make- SOUND
30 LATHE MACHINE (Centre
Lathe M/cKRS-25C/100) 6"
06.10.5055.7.46823 Dt.
08.09.10 Make-RP Engg. Batala
31 Grinding M/c Sr. DME (D) / R /3 /98
dated 01.04.98 Make-Ambernath
32 LATHE MACHINE (8 "
Kirloskar Lathe) 8" NA NA
33
BORING MACHINE (Super
vertical Cyl block boring
machine model C-65 to 125 mm, bore length 275 mm)
65 to
125
mm
Dy.CME( c ) /R/97/108
dt. 13.02.97
Kavery Enterprises
Gondal Road Near Baraj
Traders, Rajkot-4
34 COMPRESSOR (Screw Air
Compressor Godrej)
500
CFM
Cofmow/R/S-
4228/06/P-1/OP 1608
Dt. 06.12.07
M/S GODREJ & BOYCEE
Mfg.Co. MUMBAI
35
COMPRESSOR (Chicago
pneumatic A/C. Model No.
SEAS-30 Sl. No.MO.549051007 )
110
CFM
S/CON/BBS 00-
01/MECH/01/O321/04
254 DATED 05.01.2001
M/s. Chicago pneumatics
India Ltd. Plot No.
1201/1202 GIDC Ind.
Estate, HALOL 389350 Dist._ Panchmahal (Guj.)
36 COMPRESSOR (HOLMAN Air
Compressor)
525
CFM
P.O.
No.06.08.5063.1.42218
dt. 31.07.08
HOLMAN
37
COMPRESSOR KG Khosla Air
compressor two stage Model-
AE-20,
20 CFM Dy CME(C)/R/97/12 Dt-
07-06-1997
Supplied by M/s. Laxmi
Pneumatics Pvt. Ltd., Civil
Station Road/ Raipur.
38
COMPRESSOR KG Khosla Air
Compressor KG-2 -60
reciprocating Air cooler, two
stage heavy duty stationary air
compressor. Set nos. 8316,
60 CFM Sr. DME(D)/ R /3/98/6
dt. 20.03.98
K. G. Khosla Comp. Ltd.
'Manjusha' 57 Nehru place
New Delhi-19
~ 18 ~ Work Study Cell, SECR.
39
COMPRESSOR KG Khosla Air Compressor KG-2 -60
reciprocating Air cooler, two
stage heavy duty stationary air
compressor. Set nos. 8317
60 CFM Sr. DME(D)/ R /3/98/6
dt. 20.03.98
K. G. Khosla Comp. Ltd.
'Manjusha' 57 Nehru place
New Delhi-19
40
COMPRESSOR KG Khosla Air
Compressor KG-2 -60
reciprocating Air cooler, two stage heavy duty stationary air
compressor. Set nos.,8318,
60 CFM Sr. DME(D)/ R /3/98/6
dt. 20.03.98
K. G. Khosla Comp. Ltd.
'Manjusha' 57 Nehru place New Delhi-19
41
COMPRESSOR KG Khosla
Air Compressor KG-2 -60
reciprocating Air cooler, two stage heavy duty stationary air
compressor. Set nos. 8319
60 CFM Sr. DME(D)/ R /3/98/6
dt. 20.03.98
K. G. Khosla Comp. Ltd.
'Manjusha' 57 Nehru place New Delhi-19
42 Air Dryer Model No-MP-1900
P. O. No.
06.06.5.03.1.41210 Dt.
04-06-04
Make-MTA (ITALY)
43
WELDING MACHINE( Diesel
welding set DWG-400 with air
cooler diesel engine with
Kirloskar HA-394 Sl No. 94011)
450
AMP
Dy.CME( c ) /R/97/24
dt. 03.07.97 Sur Arc & Steel Co. Ltd.
44
WELDING MACHINE Motor Generator Welding set. Make -
Advani Orlinken Ltd. Model
No. Super Gen.320 Sl. No.
12/03052973
P.O. No.
S/CON/BBS/02-
03/Mech/01/0427/202
42 dt. 08.04.03
M/s. Ashish & Co. 147,
M.G. Road, KOLKATA
700007
45
WELDING MACHINE Thyristorised Hexaphase
Welding Rectifier TD-600
techno -01
P.O. No.
06.06.5110.1.50115 dt.
29.01.07
Technocrats Plasma
System Pvt Ltd
46
WELDING MACHINE
Thyristorised Hexaphase
Welding Rectifier TD-600 techno - 02
P.O. No.
06.06.5110.1.50115 dt.
29.01.07
Technocrats Plasma
System Pvt Ltd
47
WELDING MACHINE
Thyristorised Hexaphase
Welding Rectifier TD-600
techno - 03
P.O. No.
06.06.5110.1.50115 dt.
29.01.07
Technocrats Plasma
System Pvt Ltd
48
WELDING MACHINE
Thyristorised Hexaphase
Welding Rectifier TD-600 techno -04
P.O. No.
06.06.5110.1.50115 dt. 29.01.07
Technocrats Plasma
System Pvt Ltd
49
WELDING MACHINE
Thyristorised Hexaphase
Welding Rectifier TD-600
techno -05
P.O. No.
06.06.5110.1.50115 dt.
29.01.07
Technocrats Plasma
System Pvt Ltd
50
WELDING MACHINE
Thyristorised Hexaphase Welding Rectifier TD-600
techno -06
P.O. No.
06.06.5110.1.50115 dt.
29.01.07
Technocrats Plasma System Pvt Ltd
51
WELDING MACHINE Motor Generator Welding set. Make -
Ador. Model No. Super
Gen.320 Sl. No. 12/09107126,
P.O.
No.06.08.5344.1.42975
dt.27.08.08
SUN GOLD Interprises,
Bilaspur
~ 19 ~ Work Study Cell, SECR.
52
WELDING MACHINE Motor
Generator Welding set. Make - Ador. Model No. Super
Gen.320 Sl. No.
12/09107127,
P.O.
No.06.08.5344.1.42975
dt.27.08.08
SUN GOLD Interprises, Bilaspur
53
Motor Generator Welding set.
Make - Ador. Model No. Super
Gen.320 Sl. No. 12/09107128
P.O.
No.06.08.5344.1.42975
dt.27.08.08
SUN GOLD Interprises,
Bilaspur
54 ET Plant
40000
ltrs/day
Work contract No. -
21/ETP/CEC/SER/2002 Dated 04.06.2002
Make-P.K.Murthy & Sons
55 Incinerator. 30Kg/h
r
Work contract
Agreement No.
110/06/Incinerator -3 /
603 dated 12.06.2009
Maharastra Engineering
Bilaspur
56 Boiler Sr.No.914, RS-02 Non-
IBR
200
kg/hr.
S/CON/BBS/02-03-
Mech/01/0429 /20281 Dt.15.07.2003
Make-MAXIMA
57
JET MACHINE (High
pressure jet cleaning plant(
Steam type). Mounted on
wheel trolly. Make- INVENTA,
15/150 Sl. No. 17025/41)
P.O. No.
S/CON/BBS/02-
03/Mech/01/0392/200
85 dt 18.04.01
M/s. Inventa Ind. spares
India Pvt. Ltd. D-188,
Flated Factories Complex,
OKHALA New Delhi-
110020
58
JET MACHINE High pressure
jet cleaning plant( Steam type). Mounted on wheel trolly.
Make- INVENTA, 15/150 Sl.
No. 17025/42
P.O. No. S/CON/BBS/02-
03/Mech/01/0392/200
85 dt 18.04.01
M/s. Inventa Ind. spares
India Pvt. Ltd. D-188, Flated Factories Complex,
OKHALA New Delhi-
110020
59 JET MACHINE
P.O.
No.06/05/5036/01/500
59 dt. 11.11.05
Sona Enterprises,33
Mahima Vihar,Ring BSP
60
JET MACHINE High
Pressure Hot Water/System
Jet Cleaning M/c ……………
P.O.No.06/06/5012/150
028 dt,.14.07.06 UT Pumps Ltd
61 JET MACHINE High Pressure Hot Water/System
Jet Cleaning M/c……………..
P.O.
No.06/06/5012/150028
dt,.14.07.06
UT Pumps Ltd
62
JET MACHINE High
Pressure Hot Water Jet
Cleaning M/c
P.O.
No.06.06.5108.1.41106
dt. 03.04.07
Inventa Cleane Tech Pvt
Ltd, OKHLA
63 SCRUBBER WITH DRYER
A-Model No-E-530
P.O. No. 06.06.5109.1.41058 dt.
02.03.07
Make-HAKO INDUSTRIAL
MARKETING NAGPUR
64 SCRUBBER B-Roots Multi
Scrubber-525 No - 1
P.O.
No.06.05.7119.1.50094
dt. 18.12.06
Make-ROOTS
65
SCRUBBER
B-Roots Multi Scrubber-525 No - 2
P.O.
No.06.05.7119.1.50094 dt. 18.12.06
Make-ROOTS
66
SCRUBBER
B-Roots Multi Scrubber-525
No - 3
P.O.
No.06.05.7119.1.50094
dt. 18.12.06
Make-ROOTS
67 SCRUBBER B-Roots Multi
Scrubber-525 No- 4
P.O. No.06.05.7119.1.50094
dt. 18.12.06
Make-ROOTS
68 DM Plant 2000
ltrs/hr
P.O. No.
06.06.5015.1.50098 Dt.
M/s Super Techniian ,
Water treatment People ,
~ 20 ~ Work Study Cell, SECR.
19.12.2006 Kol.13
69
ZyGLO-check fluoreceent
penetrant tank type crack/
model No. FP- 18 (Perhob) Sl
No. 236/94-95
Dy.CME( C )/R/97/21
dt. 01.07.97
M/s. East Coast
Enterprises Ltd. 33,
Braborne road, Calcutta-1
70
ZyGLO-Testing Machine with
Acce. ( Florocent Penetrent Inspection Test Bench)
P.O.
No.06.14.5003.1.41.222 Amrut Enterprises. Pune
71 Compression set Apparatus for
rubber testing
P.O.
No.25/08/5458/1/6800
1/170 dt.18.06.09
S C Day & kolkata
72 Hardness Testing M/c set
P.O. No.
06.06.5134.1.41342
dt.08.08.07
Make-A.S.I. sales pvt ltd
73 MPI Testing Machine
P.O.
No.06.06.5016.1.50050 dt.19.09.06
Make-The Oriental Chemical works KOLKATA
74 Metallurgical Sample Cut-Off
& Polishing M/c
P.O. No.
06.07.5097.1.41664
dt.04.01.08
Apollo Instrument
Equipment KOLKATA
75 Spectrometer
P.O. No.
COFMOW/IR/S-3715/P-
II/G-354 Dt 15.06.06
UNISPEC MARKETING
MUMBAI
76 Digital Ultrasonic Flaw
Detector
P.O.No-06.05.5038.1.50105 dt-
06.02.06
Modsonic Instruments
Ahmedabad
77 Digital Ultrasonic Flow
Detector
P.O. No.
06/06/5111/1/41281
dt. 05.07.07
Modsonic Instruments
Ahmedabad
78 Fume Hood
P.O. No.
06.09.5009.01.43357 Dt. 07.05.2010
M K Associates RAIPUR
79 Excitation Cards test panel S/1293/6011/1/10022
dt. 27.01.94
V.K. Industries Ganesh
Colony Pilani. 333031
(Raj.)
80 MICROSCOPE ( INVERTED
METALLURGICAL)
P.O. No.
06.06.5135.1.41502.dt.
09.10.07
IR TECHNOLOGIES,
MUMBAI
81 Lapping machine GT make 610
mm
Dy.CME ( C )/R/97/35
dt. 04.08.97
Recd. from loco foreman
DLS, S.E. Rly. KGP
82 Woodward Governor Test stand Part No. 890951
Dy. CME ( C ) R/97/03
Dt. 18-02-1997 Recd. from J.E. (DL-
1)/KGP
83
Balancing Machine model HS-
10 with microprocessor based
electronics type DTMP with
printer(ABRO.)
P.O. No.-
COFMOW/IR/S2934/OP
.684 dt-11.09.95
Ashok brothers Impex P.
Ltd, 12 Scindia house
cannaught circuses New
Delhi.
84 Load test bench of traction motor make sarola model -C-
80SE-200
Ch. No. Dy. CME ( C )
R/97/38 Dt. 09-08-1997
Sarola Electronics. 36/1,
Bangachia Rd. Panchanantola Liluah,
Howrah.
85 Test bench Model E -1-10 part
no.15513221
DMS/DLS/RS/R/21 dt-
07.11.2006 DLW
86 Pump Receprocating Bulldoger
High pressure
Dy CME /R /97/ LP/
2150 dated 18.01.97 Make-WASH
87 Pallet Hydrolic 2500
kgs
P.O. No.
25/06/7235/v66/563/6
38 dt. 12.01.07
Make-GODREJ UNITED
SALES KORBA
88 SHOT Blasting Machine
(ABRASIVE)
P.O. No.
06.08.5154.1.42443 dt.21.10.08
Ma Kali Kripa Korba
~ 21 ~ Work Study Cell, SECR.
89 Torque Wrench (Hydrolic)
P. O. No.
06.08.5155.1.42498 Dt.
11-11-2008
Hytorc Mumbai
90 Torque Wrench for Main
Bearing (Hydrolic )
P.O. No.
06.05.5186.1.42506 dt. 14.11.08
Hytorc Mumbai
91 Press Hydraulic
P.O. No.
06.08.5162.1.42472 dt.
31.10.08
Vankos & Co.13/2, Ind.
state Patna-13
92 Torque Wrench Pneumetic
P.O. No.
06.08.5150.1.42729
dt.07.04.09
Hytorc Mumbai
93 Coil Spring Testing Machine P.O.
No.06.06.5217.1.41853
dt.05.03.08
Enkey Indus. Delhi
94 Torque Wrench Hydrolic EMD
P.O. No.
06.11.5133.1.41030 dt-
28.01.2013
Advance bolting solution
pvt. Ltd Mumbai
95 Torque Wrench Power Pack
Hydraulic
P.O.
No.06.08.5158.1.42835 dt.17.06.09
Hytorc Mumbai Make-
USA
96 Surface roughness Tester
Portabble
P.O. No.
25/09/5661/1/68143/0
40 dt. 06.05.09
MITUTOYO M.P.
Hardware RAIPUR
97 Thermal Imaging Infrared
Camera
20 C to
900
P.O. No.
06.08.5342.1.43056
dt.20.01.09
Model:E-45 PCI LTD
Pusha Road New Delhi
98 Compressor/Expressor Test Bench
P.O. No.
06.08.5341.1.42982
dt.31.08.09
SUBLIME TECHNOLOGIES Kolkata
99 Pressure Gauge calibration
test stand
P. O. No.
06.08.5345.1.43097 Dt.
24.11.09
SUBLIME
TECHNOLOGIES Kolkata
100 Easy Laser D 480
P.O. No.
06.10.5075.01.43728
dt.24.11.10
Tribotech Vikroli West
MUMBAI
101 Sand Blasting Machine
Portable
P.O. No. 06.10..5090.1.41078 Dt.
09.02.11
Shree Mahamaya Udyog
Bilaspur
102 Torque Tester Wrench 5000
NM
P.O. No.
06.09.5231.1.41038 Dt.
25.01.11
Hytech Micro
Measurement Delhi
103 Fire Extinguisher (Water Mix)
P.O. No.
07.11.5035.2.46151 Dt.15.09.11
Aska Equipment Ltd. Pitampura
104 Nozzle Reconditioning Machine
P.O. No.
06.10.5091.1.41524 Dt.
20.12.11
Sahyadri Designers PUNE
105 Boroscope with Acessories P.O. No.
06.10.5167.1.41245 Dt.
25.05.12
Karz Storz Endoscopy
Delhi
106 Nozzle test stand S/6593/7068/1/00165 Standard Engineers and
Traders calcutta
107 FLAT LAPPING MACHINE Sr. No.
1800mm
S/CON/BBS/00-01/MECH/01/0320/04
351 DATED 02.03.2001
ICON EQUIPMENTS PVT
Ltd. 60/A MANCHESWAR INDISTRIAL STATE PO -
RASULGARH
BHUBNESHWAR
108 LAPPING MACHINE MACHINE P.O. No.- SHIV TRADING
~ 22 ~ Work Study Cell, SECR.
SPEED FAME 06/05/5040/1/50056
DATED 25.09.2006
CARPORATION KOLKATA
109 Torque Wrench for Crab Nut
& Main Bearing Hydraulic
P.O. No.
06.06.5105.1.41286 dt.
05.07.07
HYTORC MUMBAI
110 C3W Distubutor Valve test
Stand
P.O. No.
01.13.5026.1.41154 Dt.
27.05.14
Stone India Ltd., Kolkata
111
Battery charging eqp. (Silicon
rectifier type) Sl No. AO-789 &
AO-790 (02 nos)
15 KVA S/4793/5158/1/10021
Dt.09.08.94
United Transformers &
Elect. 18, Charamtala
Road *(North), Bally/ Howrah
112 Axle Bearing Mounting
Dismounting Equipment
P.O.No.
06.06.5106.1.41350 dt.
10.08.07
Make: BRAHM Model:
BHP-999
113 Milli Volt Drop Test Kit S/4395/5060/1/10009
dt26.07.1996 Make-NTPL
114 Semi automatic capacitance
TAN delta test set
AT No.COFMOW/IR/S-
3770/06/P-II/OP-1550
Dt:10.07.06
SIVANANDA Electronics
NASIK
115
Traction Motor Pinion
Mounting Dismounting Equipment.
P.O.No.06.06.5107.1.41
011 dt. 12.02.07
Make-LARZEP MAA Kali
Kripa KORBA
116 Welding Machine Make ADOR-
1 Portable
150
Amp
Single
phase
P.O. No. NS/CP/114 Dt.
04-08-2009
M/s. M P Hardware
Corporation, Raipur
117 Welding Machine Make
ADOR-2 Portable
150
Amp
Single phase
NS/CP/171DT.24-09-
20013
M/S Best Supply Agency,
Sadar Bazar, Raipur
118 Welding Machine Make
ADOR-3 Portable
150
Amp
Single
phase
NS/CP/347DT.21-03-
20014
M/s Raipur Sales Agency,
Raipur
119 Welding Machine Make ESSAB Portable
150
Amp Single
phase
NS/CP/222DT.08-12-2014
M/s Bhagirathi Udhyog, Raipur
120
Comprassion set test
apparatus with accessories for
rubber testing
P.O. No.
25/08/5458/1/68001/1
70 Dt. 18-06-2009
M/s. S.C. Day & Co.
121 Torque Wrench J-Gun Sl No.
J500444 Pneumetic
4200
NM
P.O. No.
06.10.5038.1.41330 Dt.
18-07-2012
M/s. Advance Bolting
Solutions Pvt. Ltd.
122
Torque Wrench for traction motor/ Auxilary machine
Model No. HY7MXJ Sl No. EA-
1301-027 Hydraulic
P.O. No.
06.10.5040.1.41279 Dt.
07-08-2013
M/s. Advance Bolting
Solutions Pvt. Ltd.
123
Torque wrench for FIP
Foundation & FIP bolts of Alco
loco Hydraulic
P.O. No.
06.10.5043.1.41280 Dt.
07-08-2013
M/s. Advance Bolting
Solutions Pvt. Ltd.
124 Cam Gear Extractor set
P.O. No.
06.10.5165.1.41032 dt.30-01-2013
Industrial Need Pune
~ 23 ~ Work Study Cell, SECR.
125
Torque wrench for Generator
foundation bolt and engine foundation bolt Avanti-3
Hydraulic
P. O. No.
06.13.5130.1.41229 Dt.
11-09-2014
M/s. Advance Bolting Solutions Pvt. Ltd.
126 Visco meter bath
(Temparature)
P.O. No.
96.14.5335.1.00325 Dt.
24-09-2014
M/s-Power & Electrical
Co., Kolkata
127 Cleaning plant Piston Dy. CME (C/R/97/26 Dt
12-07-1997)
Loco Foreman(D) S.E. Rly
Motibagh Nagpur
128
Ultra sonic flaw detector
Digital model EINSIEIN Sl No. E 670-0206
P.O.No-
06.05.5038.1.50105 dt-06.02.06
M/s. MODSONIC
Instruments Mfg. Co. Pvt. Ltd. Ahemdabad
129
Ultra sonic flaw detector
Digital model no. EINSTAIN-
II® Sl. No. E1310-1107
P.O.
No.06/06/5111/1/4128
1 dt.5-07-2007
M/s. MODSONIC
Instruments Mfg. Co. Pvt.
Ltd. Ahemdabad
130
Spectrometer Computer
control bench top rotating disc
electrode
P.O. No-Cofmow/IR/S-
7000/G-690 dt.12-10-
2012
M/S-NB Instrument Pvt.
Ltd New Delhi
131
Strohlein Apparatus (Applo
carbon determinaiton Apparatus)
P.O.No.
25/06/7072/1/66409/149 Dt 24/09/2007
M/s. Appolo instrument & Equiment , Kolkata
132
MPI Machine (Bench type
heavy duty magnetic particle inspection equipment) Model
No. OCW/EMCD.05D Sl No.
170207
P.O. No.
06.06.5016.1.50050 Dt.
19-09-2006
ORIENTAL CAPITAL WORKS KOLKATA
133 Welding Plant with Accessories
EMD/Sr.No-12/12077859
P.O. No.
06.11.5129.1.41348
Dt03.08.2012
S.D.Assosiate
134 Welding Plant with Accessories
EMD/Sr.No-12/12077860
P.O. No.
06.11.5129.1.41348
Dt03.08.2012
S.D.Assosiate
135 Welding Plant with Accessories
EMD/Sr.No-12/12077862
P.O. No.
06.11.5129.1.41348
Dt03.08.2012
S.D.Assosiate
136
Jack Synchronised Lifting
JackSr/No-
1076,1077,1078,1079,1080 (4
Sets)
45 ton
P.O.No.-cofmo/I/S-
6036/P-11/O.P.-2091
Dt.-24.02.2012
Marwaha Manufacturing
company New Delhi
137 Battery charger with
Accessories
P.O. No.
04.12.5011.1.41360
dt.09.08.12
M/s Naveen electronics
company, banglore
138 Platform truck Battery
operated
2
tonnes
P.o.No. 06.11.5134.2.46097 dt.
05.10.12
M/s Jaldoot, pune
139 F.I. Injector test stand ( Fuel
Injector)
P.O.No.
06.11.5131..1.41359
dt.08.08.12
M/s S.L.V.M.R,Hariyana
140 Universal Multipurpose
Armature Machine
P.O. No.-Cofmow/IR/S-
4758/P-1/op-2218 dt-
06.09.13
M/s-HYT Engineering
company Pvt. Ltd. New
Delhi
141 Drill Machine Make-Bosch
(2No) NS/CP/52 dt-20.06.09 M/S-Best supply raipur
142 Drill Machine Make-Bosch
(2No) NS/CP/351 dt.-22.03.14 M/S-Best supply raipur
~ 24 ~ Work Study Cell, SECR.
143 Balancing Machine Electronic
singal pan analytical bal.
P.O.-
25/09/5535/1/68057/5
90 dt-12.02.09
M/S-Unique Sales
Agency,Raipur
144 Gasket Cutting Machine NS/CP/26 dt.-07.05.08 M/s-Hindustan Electric,
House Visakhapatnam
145 Grinder (stright/pencile) Hand
Hitachi (2No) NS/CP/04 dt21.04.05
M/S-Modern Trading
Agencies Raipur
146 Grinder (stright/pencile) Hand NS/CP/31 dt.-12.05.08 M/s-Mahaveera
Enterprises Raipur
147 Grinder (stright/pencile) Hand
(2No) NS/CP/334 dt-10.03.14 Best Supply Raipur
148 Grinder (Flexible Shaft) (2No) Sr.DME(D)/R/90 dt-
18.03.98 Samrat Electronics Raipur
149 Grinder (Flexible Shaft) NS/CP/65 dt-10.06.08 M/s-Mahaveera
Enterprises Raipur
150 Grinder Angle 100mm Disc
Dia (2No) NS/CP/53 dt-22.05.08
M/s-Mahaveera
Enterprises Raipur
151 Grinder Angle 100mm Disc Dia (5No)
NS/CP/179 dt26.03.12 M/S-Best supply raipur
152 Grinder Commutator P.L-
12660530
DSK/DSL/RS/242 dt-
25.07.98 DLW
153 Grinder Commutator P.L-
12660530
DSK/DSL/RS/279 dt-
16.12.2000 DLW
154 Grinder Commutator P.L-12660530
DSK/DSL/RS/79 dt-
18.08.01 DLW
155 Grinder Commutator P.L-
12660530 (2No)
DMS/RS/DLW/R/08 dt-
14.07.08 DLW
156 Grinder (Angle)-Disc-Portable 125mm Dia (2No)
NS/CP/60 dt-04.07.12 M/S-A.D.Technocon
Raipur
157 Valve Seat Grinder Nag-
15510062
DMS/RS/R/17 dt-
14.02.06 DLW
158 Valve Seat Grinder Nag-
15510062-(2No)
DMS/RS/DLW/R/26 dt-
05.03.07 DLW
159 Valve Seat Grinder Nag-
15510062
DMS/RS/DLS/R/27 dt-
30.11.07 DLW
160 Valve Seat Grinder Nag-
15510062
DMS/RS/DLS/R/33 dt-
23.10.09 DLW
161 Valve Seat Grinder Nag-
15510062
Sale/01/06/0035 dt-
07.03.11 DMW
162 Valve Seat Grinder Nag-
15510062 (2No.) Sale/d2/52/0409 DMW
163 Hand Blower 6" 6" Sr.DME(D)/R/8/99/87
dt-15.5.99
164 Disc Grinder 9" Dia Heavy
duty 9" NS/CP/270 dt-16.02.09 Best Supply Raipur
165 Disc Grinder 9" Dia (2No.)
Heavy duty 9" NS/CP/103 dt-22.07.09 Best Supply Raipur
166 Hot Air Gun (2No.) NS/CP/114 dt-07.08.08 M/s-Mahaveera
Enterprises Raipur
167 Hot Air Gun (2No.) NS/CP/225 dt-07.01.08 M/s-Mahaveera
Enterprises Raipur
168 Hydrolic Jack 15 Ton Sr.DME(D)/R/5/98/141
dt-20.08.98 M/S Jain Trading Kolkota
169 Hydrolic Jack (2No.) 30 Ton
p.o.-
06/04/0170/1/40453
dt-19.01.05
Maakalikripa korba
~ 25 ~ Work Study Cell, SECR.
170 Hydrolic Jack (4No.) 30 Ton
P.O-
06/05/5065/1/50040
dt04.10.05
Maakalikripa korba
171 Hydrolic Jack RC-504 50 Ton Sr.DME(D)/R/5/98/141
dt-20.08.98 M/S Jain Trading Kolkota
172 Hydrolic Jack CLL-5010 50 Ton Sr.DME(D)/R/5/98/142
dt-20.08.98 M/S Jain Trading Kolkota
173 Hydrolic Jack Set 50 Ton P.O-S/CON/BBS/02-
03/MECH/01/0393/20
086 dt-12.09.02
Venkas&Co. Patna
174 Hydrolic Jack Set (4No) 50 Ton 105/04-05 dt-06.12.04 M/S-Teamwork Hydraulic
Hyderabad
175 Hydrolic Valve Seat P.L.-
15518814
DMS/DSL/RS/32 dt-
24.07.2002 DLW
176 Hydrolic Valve Seat P.L.-
15518814 (2No)
DMS/DSL/RS/114 dt-
02.11.01 DLW
177 Hydrolic Valve Seat P.L.-15518814 (2No)
DSK/D/RS/324 dt-
17.03.2001 DLW
178 Nibbler AC/03-04/004dt-
02.08.2003
Ashish & Company
Kolkata
179 Straight Knife C/Machine
Orbito-8" 8" NS/CP/200 dt-06.03.07
M/S-E Life Sales
Corporation Raipur
180 Planner and Circular Saw NS/CP/153 dt-01.10.08 M/s-Mahaveera
Enterprises Raipur
181 Weighing Machine Scale
Braun Postal
Sr.DME(D)/R/8/99/06
dt-08.01.99
182 Pump Single phase mono set NS/CP/02 dt-08.04.09 M/S-S.S.hydrulics &
pneumatics
183 Transfarmar Single phase
step down NS/CP/06 dt-18.04.09
M/S-Electromech India
raipur
184 Torque Meter Static 5-92 LBFT
06.05.5086.1.50042 dt-29.09.05
Prabha Sales,Bilaspur
185 Torque Meter Static
80-
1500
LBFT
06.05.5086.1.50042 dt-
29.09.05 Prabha Sales,Bilaspur
186 Weight Machine 100Kgs NS/CP/143 dt-21.01.02 ACOS (DSL) Raipur
187 Zig-Saw NS/CP/210 dt-29.03.07 M/S-Best supply raipur
188 Blower Single Speed Ralli Wolf Sr.DME(D)/R/90 dt-
18.03.98
M/S Samrat Electronics
Raipur
189 Fuel Injection Pump
Calibration Test Stand
06.14.5102.1.41093dt.2
5.03.2015 M/S SLVMR
190 Power Assly Test Stand 06.14.5077.1.41067dt.2
7-02-15
M/s Sakshi Tools ,
Faridabad
191 Unit Injector Test Stand 06.14.5099.1.41204
dt.17-07-15
M/s Sahayadri Designer,
Pune
192 Valve Face Grinding Machine 06.14.5078.1.41079
dt.13-03-15 Perfect Engineering , New
Delhi
193 Cylinder Head Nut Tightning
Hydrolic
01.13.5034.1.41368
dt.30.10.2015
Advance bolting solution
pvt. Ltd Mumbai
194 CNC Under Floor Wheel Lathe
COFMOW/IR/S-7016/P-
II /G-709/12 dt.25-07-
2013
M/s HYT Engineering
Pune
~ 26 ~ Work Study Cell, SECR.
2.7 Details of Outsourcing activities :
S# Name of Work
Outsourcing Activities Remarks
Exiting Proposed
1 Overhauling of cast steel bogies (OT) Existing - -
2 Supply of 1600 Cu. M Dry & its filling in locos at
DLS/R for 02 year (OT)
Existing - -
3 Transportation of NG locos between Raipur and
Nagpur alongwith loading and unloading
Exiting - -
4 AMC of Godrej make Screw Compressor (ST) Existing - -
5 Multi Utility Vechicle Hiring-6 for 2 yrs (OT) Existing - -
6 Up keeping of NG Loco Shed for 02 years (OT) Exiting - -
7 Overhauling of Wood Ward Governor (ST) Existing - -
8 Consultancy & certification services for
integrated system management for ISO
9001:2008, ISO 14001:2004 & ISO 18001:2007 for DLS\R (OT)
Existing - -
9 AMC of Maser controller of WDG4 locos (ST) Exiting - -
10 Stripping activity in yearly sch locos (OT) Existing - -
11 Supply, Retro fitment, testing and commissioning
of 52 nos. distributed Power Control System
(DPCS) for HHP Locos at diesel loco shed Raipur
(OT)
Existing - -
12 AMC of MEP 660(RC) make Medha. Exiting - -
13 AMC for IGBT based TCC & LCC (RC) make
Medha
Existing - -
14 Comprehensive Annual maintenance contract for IGBT based Traction Control Converters(TCC)
and Locomotive Control Computers (LCC) system
of EMD make
Existing - -
15 AMC of control unit & OH actuator unit of MCBG
through OEM (RC)
Exiting - -
16 Cleaning of Locomotives at DLS/R (OT) Existing - -
17 Operator and Effluent Treatment Plant (OT) Existing - -
18 Transportation of Loco components to various
Railway unit (OT)
Exiting - -
19 Comprehensive Annual Maintenance Contract for FTRTIL make Air Dryer. (ST)
Existing - -
20 Outsourcing of welding repair activities (OT) Existing - -
21 Mechanized Cleaning at DLS/R (OT) Exiting - -
22 AMC of Spectrometer machine make M/s Spectro
Inc. (ST)
Existing - -
22 Overhauling of ABB make TSC Turbochargers.
(RC).
Exiting - -
23 Operation and maintenance of Incinerator (OT) Existing - -
24 AMC of AC Motors make Signotrron (ST) Existing - -
25 Overhauling of ABB make TSC Turbochargers.
(RC)
Exiting - -
26 Overhauling of CTRB Bearing make Brenco
through OEM.
- Proposed Tender opened on
14.02.2017
27 Overhauling of CTRB Bearing make Timken through OEM.
- Proposed Tender to be floated
28 Overhauling of valves of CCB 1.5 of HHP & ALCO
locos through OEM.
- Proposed Under process
29 Overhauling of Traction motors make Siemens
through OEM.
- Proposed Under process
30 AMC of CNC under floor wheel Lathe Mchine
through OEM.
- Proposed Under process
~ 27 ~ Work Study Cell, SECR.
2.8 Details of Performance regarding Reliability, Loco holding, Outage (Target), Schedule Out turn:
2.8.1 Reliability YEAR - 2015-16
Month
Statistical Non Statistical Total Holding
Actual
Cum.
Per 100 Locos Actual Cum. Per 100 Locos Actual Cum.
Month Cum Month Cum Month Cum
Jan'16 3 53 2.00 3.56 5 65 3.33 4.37 8 118 150 148.90
Feb'16 6 59 4.00 3.60 4 69 2.67 4.21 10 128 150 149.00
Mar'16 6 65 3.95 3.63 4 73 2.63 4.08 10 138 152 149.25
Apr'16 7 7 4.61 4.61 4 4 2.63 2.63 11 11 152 152.00
May'16 4 11 2.63 3.62 6 10 3.95 3.29 10 21 152 152.00
Jun'16 8 19 5.23 4.16 8 18 5.23 3.94 16 37 153 152.33
July'16 12 31 7.84 5.08 7 25 4.58 4.10 19 56 153 152.50
Aug'16 5 36 3.27 4.72 5 30 3.27 3.93 10 66 153 152.60
Sep'16 7 43 4.58 4.69 3 33 1.96 3.60 10 76 153 152.67
Oct'16 5 48 3.27 4.49 7 40 4.58 3.74 12 88 153 152.71
Nov'16 3 51 1.95 4.17 6 46 3.90 3.76 9 97 154 152.88
Dec'16 6 57 3.85 4.13 5 51 3.21 3.70 11 108 156 153.22
Average 6.33 4.13 5.67 3.70 12.00 153.20
2.8.2 Details of Loco holding
2014-15
Mon
th
WD
G4
WD
P4D
WD
M2
WD
M2
Infe
rier
WD
M3A
WD
G3A
WD
S6
TO
TA
L
ZD
M4A
G T
ota
l
Net
Apr-14 39 2 4 5 30 41 20 141 6 147 121
May-14 39 2 5 5 30 41 20 142 6 148 122
Jun-14 40 2 5 5 30 41 20 143 6 149 123
Jul-14 40 2 5 5 30 41 20 143 6 149 123
Aug-14 42 2 9 0 30 41 20 144 6 150 124
Sep-14 44 2 9 0 30 41 20 146 6 152 126
Oct-14 47 2 5 0 30 41 20 145 6 151 125
Nov-14 50 2 5 0 30 41 20 148 6 154 128
Dec-14 57 2 5 0 30 41 20 155 6 161 135
Jan-15 64 2 5 0 30 41 20 162 6 168 142
Feb-15 66 2 5 0 30 41 20 164 6 170 144
Mar-15 66 2 5 0 30 41 20 164 5 169 144
Average 49.50 2.00 5.58 1.67 30.00 41.00 20.00 149.7
5 5.92 155.67 129.8
~ 28 ~ Work Study Cell, SECR.
2.8.3 Details of Loco holding
2015-16
Mon
th
WD
G4
WD
P4D
WD
M2
WD
M2
Infe
rier
WD
M3A
WD
G3A
WD
S6
TO
TA
L
ZD
M4A
G T
ota
l
Net
Apr-15 66 2 5 0 30 41 20 164 5 169 144
May-15 66 2 5 0 30 41 20 164 5 169 144
Jun-15 66 4 5 0 30 41 20 166 5 171 146
Jul-15 69 4 5 0 30 41 20 169 5 174 149
Aug-15 72 4 5 0 30 41 20 172 5 177 152
Sep'15 72 4 5 0 30 41 20 172 6 178 152
Oct'15 72 4 5 0 30 41 20 172 6 178 152
Nov'15 72 4 3 0 30 41 20 170 6 176 150
Dec'15 72 4 3 0 30 41 20 170 6 176 150
Jan'16 72 4 3 0 30 41 20 170 6 176 150
Feb'16 72 4 3 0 30 41 20 170 6 176 150
Mar'16 72 6 3 0 30 41 20 172 6 178 152
Average 70.2
5 3.83 4.17 0.00 30.00 41.00 20.00
169.25
5.58 174.83 149.25
2.8.4 Details of Loco holding
2016-17
Mon
th
WD
G4
WD
G4D
WD
P4D
WD
M2
WD
M2
Infe
rier
WD
M3A
WD
G3A
WD
S6
TO
TA
L
ZD
M4A
G T
ota
l
Net Effectiv ML
Apr'16 63 9 6 3 0 30 41 20 172 5 177 152 151
May'16 63 9 6 3 0 30 41 20 172 5 177 152 150
Jun'16 63 9 7 3 0 30 41 20 173 5 178 153 151
July'16 63 9 7 3 0 30 41 21 174 5 179 153 150
Aug'16 63 9 7 3 0 30 41 21 174 5 179 153 149
Sep'16 63 9 7 3 0 30 41 21 174 5 179 153 150
Oct'16 63 9 7 3 0 30 41 21 174 5 179 153 150
Nov'16 63 10 7 3 0 30 41 21 175 5 180 154 152
Dec'16 63 12 7 3 0 30 41 21 177 5 182 156 153
Jan'17 63 12 7 3 0 30 41 21 177 5 182 156 154
Average 63.00 9.70 6.80 3.00 0.00 30.00 41.00 20.70 174.20 5.00 179.20 153.50 151
~ 29 ~ Work Study Cell, SECR.
2.8.5 OUTAGE
Year 2014-15 FOIS
Mon
th
WDM2+WDG3A+WDG4 WDS6
Freight Coaching Total Shunting
Target
Actual
%age Cum
u. Targ
et Actu
al %age
Cumu.
Target
Actual
%age Cum
u. Targ
et Actu
al %age
Cumu.
Apr'14 77.00
78.70
102.21
78.70
22.00
22.10
100.45
22.10
99.00 100.8
0 101.8
2 100.80
15.75
16.60
105.40
16.60
May'14 77.90
81.60
104.75
80.15
22.00
22.50
102.27
22.50
99.90 104.1
0 104.2
0 104.10
15.75
16.10
102.22
16.35
June'1
4 78.80
82.50
104.70
80.93
20.00
22.30
111.50
22.30
98.80 104.8
0 106.0
7 104.80
15.75
16.70
106.03
16.47
July'14 78.80
82.80
105.08
81.40
22.00
22.80
103.64
22.80
100.80
105.60
104.76
105.60
15.75
16.60
105.40
16.50
Aug'14 83.00
87.70
105.66
82.66
22.00
22.50
102.27
22.50
105.00
110.20
104.95
110.20
15.75
16.70
106.03
16.54
Sept'14 83.00
88.30
106.39
83.60
22.00
22.50
102.27
22.50
105.00
110.80
105.52
110.80
15.75
16.30
103.49
16.50
Oct'14 85.10
90.50
106.35
84.59
22.00
23.30
105.91
23.30
107.10
113.80
106.26
113.80
15.75
16.60
105.40
16.51
Nov'14 87.10
95.3
0
109.4
1
85.9
3
22.0
0
23.1
0
105.0
0
23.1
0
109.1
0
118.4
0
108.5
2
118.
40
15.7
5
16.0
5
101.9
0
16.4
6
Dec'14 93.30
102.00
109.32
87.71
22.00
23.20
105.45
23.20
115.30
125.20
108.59
125.20
15.75
17.40
110.48
16.56
Jan'15
99.60
102.50
102.91
89.19
22.00
22.60
102.73
22.60
121.60
125.10
102.88
125.10
15.75
17.30
109.84
16.64
Feb'15
101.4
0
104.92
103.47
90.62
22.00
23.78
108.09
23.78
123.40
128.70
104.29
128.70
15.75
17.80
113.02
16.74
Mar'15
101.40
104.
60
103.1
6
91.7
9
22.0
0
22.4
0
101.8
2
22.4
0
123.4
0
127.0
0
102.9
2
127.
00
15.7
5
19.5
0
123.8
1
16.9
7
Average
87.20 91.7
9 105.26
22.0
0 22.7
6 103.44
107.73
113.41
105.26
15.7
5 16.3
5 103.81
2.8.6 Details of Work load
S# Year Annual target Target Achieved No. of Locos holding
1 2014-15 87.2 91.79 129.8
2 2015-16 104.48 108.87 149.25
3 2016-17 Apr- jan 107.72 111.88 153.5
2.9 Section wise vis-à-vis activity wise deployment of Staff:
Section wise deployment to perform various activities are as under:
2.9.1 Heavy Schedule-HHP Mechanical Section: Basically, this Section carry out the activities related to Heavy Schedule with total deployment of 45 Staff and details of is given as under:
Working Shift Work description
General Shift Total 09 staff (01-SSE, 01-JE & 07 Technicians) have been
deployed to deal with various type of work.
01 SSE woks as overall in charge of the Section and 01 JE does the supervisory and monitoring work carried out by
Technicians.
07 Technicians are utilized in Special repairs, running
repairs, record maintenance and up-keeping of Tools & Spare
Parts.
Shit-A (P-2, 8:00-16:00 Hrs.) Total 18 Staff (01 SSE, 11- Tech. & 06-DC) are working to deal with Power assembly Changing, Initial Testing , Stripping
under 3rd Yearly work and miscellaneous work.
Shift-B (P-3, 16:00-00:00 Hrs.) Total 18 Staff (01 SSE, 12- Tech. & 05-DC) are working to
deal with Fastener, Torquing, accessories fitment work,
revolution checking , Inspection of Power assembly and Turbo
Stripping work.
~ 30 ~ Work Study Cell, SECR.
2.9.2 Air Brake & Compressor: Total 46 Staff (02-SSE, 03-JE, 32-Tech. & 09-DC) are engaged in this Section in 3-Shifts wherein 01 SSE works as overall all in charge and remaining 04 Supervisors carry out the Supervisory & monitoring work as per Shift requirement.
Working Shift Work descriptions
(P-1, 00:00-08:00Hrs.) Generally, a group 06 Staff (Tech+DC) are deployed in each of the shifts but to cope the work load in P2&P3 Shifts, the remaining Staff are being utilized in these shifts for attending all types of testing, checking & maintenance work.
(P-2, 8:00-16:00 Hrs.)
(P-3, 16:00-00:00 Hrs.)
2.9.3 Machine Shop: The deployment of Staff in this Section are as below:
Category No. of Staff Work Descriptions
Supervisor (SSE) 01 Staff of this Section deal with Wheel Tyre Turning ,
Tread cutting, Boring, Shaping, Drilling, removing of broken bolts, Traction motor, Armature turning & Mica cutting etc. work in P2 & P3 Shifts along with deployment of 6 to 7 staff in each Shifts as per requirement.
Technician 09
DC 03
2.9.4 Laboratory: Total 19 staff are working in DLS Laboratory in various Sections to carry out different type of jobs and detail of which are as under:
S# Name of Section Working Shift
1 Main Lab. General Shift
2 D.P. Lab & Zyglo Testing General Shift
3 M.P.I. Testing (Magnetic Particle Testing) General Shift
4 Spectrographic Analysis General Shift
5 Shift Lab for Lube Oil & Content Water analysis P1,P2 &P3 Shift
6 Demineralising Plant (DM) P1,P2 &P3 Shift
Deployment of Staff:
Section No. of Staff Work
Main Lab 02-CMS, 02-Tech./DC HSD analysis, Store items, Failure components analysis, record maintenance,
Roller testing, Sand testing, UST of Axle,
Store related work
D.P. Lab & Zyglo
Testing
02-CMS/CMA,
05- Tech/DC
Zyglo Testing of all small components of
Yearly & other Heavy Scheduled Locos,
D.P. testing & MIP Testing.
Spectrographic analysis
01-CMS, 01-Tech
Spectrographic analysis and lube oil, sample collection & Report making.
Shift Lab 01-Supervisor (01x3+01RG)
+01Helper/Tech in P2 and
01-Tech in P2&P3
Quality Control Analysis of Compressor
Oil, Clutch Oil, Coolant Water HSD Oil,
DM Water etc.
D.M .Plant 01-Supervisor (01x3+01RG)
+01Helper/Tech in P2 and
01-Tech in P2&P3
Cleaning of Filter Unit regularly and
regeneration of DM Plant, etc.
*01 Staff is sent to inspect D. P. Test of Bogie frame and the requisite staff are also
deployed as per requirement.
~ 31 ~ Work Study Cell, SECR.
2.9.6 Tool Room: This Section mainly deals with maintaining Special Tools & Plants and issuing and receiving of General Tools. The deployment of Staff is as under:
Category No. of Staff Work Descriptions
SSE (Mech.) 01-Overall in charge Supervisory & Monitoring work
SSE (Elect.) 01 Deals with Electrical TP & MNP items
SSE (Ancillaries) 01 Deals with demand & repair of TNP &MNP items.
OS 01 Deals with receiving & issuing , repair of Tools, condemnation of MNP&TP, P.O.s & Challan, Calibration of Machine
Technicians 02 (08:00-16:00 Hrs.) 02(16:00-00:00 Hrs.) 01(00:00-00:00 Hrs.)
Deployed to issue & receive of TNP &MNP items.
2.9.7 Tender Section:
This Section deals with Execution & compliance of Tender process and deployment of staff is as under:-
Category No. of Staff
Work descriptions
SSE/Mech. 01 All opened Tender, Single Tender & Quotation Contract work –From initiation of proposal to closure of Contract.
SSE/Elect. 01 All opened Tender, Single Tender & Quotation Contract work –From initiation of proposal to closure of Contract.
Sr. Tech. 01 Assists in movement of Files, Chasing of Files at Divisional Offices.
Technician-I 01 Assisting in making of proposal, DE, finance compliance, variation and variation statements etc.
Technician-III 01 Assisting in Funding, EMD, PG, Submission legal vetting of POA , PG, Submission, legal vetting of POA and EMD, PG, SD releases.
2.9.8
SSE (D) Office :
This office deals with Establishment matters and other related work and distribution of Staff deployment is as under:
Category No. of staff Work Descriptions
Jr. Clerk 01 Deals with Establishment like maintaining Muster Roll, T.A., IOD, leave Register of Staff and Letter Correspondence.
Tech.-I 01 Carry out the activities related to Leave Register computer Work and provide assistance. Tech.-III 01
DC 01
Tech-I 02 Deals with MB Book Letter Correspondence of Engineering work Elect(G), Stock item requisition
Sr. Peon 01 Work as TADK and other miscellaneous work.
~ 32 ~ Work Study Cell, SECR.
2.9.9 Carpenter Section
Category No. of Staff
Work description
Technician 05 All heavy schedule locos work like seat cover change or seat repair and fitting. Hand rest repairer and change Each loco have four numbers of look out glasses, six numbers of window glasses. If found necessary glasses are changed, cab room flooring uncouple and after schedule refitting has done. All light schedules locos are attend and if found any repairs, have to attend and repair. In shed all carpentry work like packing uncoupling and coupling. Doors of shed are repaired and keep intact. Making notice boards, all diagram boards. Assisting the carpentry works for every section for their modification. Loco cab ceiling uncoupling and after repairs and fitment by electrical staff re-ceiling is done. Attending other shed locomotives and if required all the above works are done. During summer drive, sun risers and sum films fitment. During winter drive, sealing of all the doors and windows are done. During rainy season, arresting of water leakages from window shutters. Attending outstation for trouble shooting like glass broken cases and other cases. All modification done by Medha & Air brake needs floor removal of Loco’s & other completion floor refitting is done. Making Battery wooden foundation for very loco’s after heavy schedule. Making Manometer. Making Lapping machine pharma. Making of wooden stand for working in loco for Air brake staff. Tables, chairs, Almirah’s, Aldrop repairing Door closer, and other Miscellaneous works are done. Due to staff deficiencies only P-II shift is done in this section. After 8 hours duty at least two staff attend Locos in P-III shift.
2.9.10 Heavy Schedule (Electrical): The activity in this section are performed in two shift Shift A(8.00 hrs-16.00 hrs) and
Shift B(16.00 hrs-24.00 hrs) . Following maintenance are carried out at Heavy schedule(Electrical) section:
1. Half Yearly Schedule 2. Yearly Schedule 3. Three-Yearly Schedule
Half Yearly Schedule: - Remove, overhaul and fit back of Electrical rotating equipment, Check with degreasing compound, check insulation resistance, check commutator, Brush holder and connecting cable, Alarm and protective devices, Checking of all cables for loose connections worm or damage, Insulation and connecting strip and Thermostats etc.
Yearly Schedule: - Remove the Engine Speed Controller, Techo generator if necessary. Remove, clean, inspect, Recondition and fit back of Warning Lights, Remove and recondition of Circuit breakers, Switches and Batteries. Remove, clean & check the Speedometer/Speed Recorder. Wiring and cables clean, merger with Insulation tester and record, insulation resistance etc.
~ 33 ~ Work Study Cell, SECR.
Three-Yearly Schedule: Remove, overhaul and fit back of Self starter, Alternator and Lube oil re-priming pump motor. Remove Shut down magnet valve, Idle magnet valve, Low water switch, Lube oil pressure switch and clean and overhaul in benches, check for proper operation & setting. Check insulation resistances & record, check for satisfactory operation and adjust if required of 95 Degree centigrade Temp. switch water, 93 Degree centigrade Temp. switch lube oil and Transmission oil temp. switches. Check condition of wires & cables in channels and cab compartment and renew if necessary.
Distribution of staffs in Heavy Schedule:-
Shift Supervisor Technician DC/DCH
A 01 16 00
B 01 15 00
01 SSE is the overall incharge of the Heavy Schedule (Electrical) section.
2.9.11 Light Schedule (Electrical): The activity in this section are performed in three shift Shift A(16.00 hrs-24.00 hrs)
and Shift B(00.00 hrs-08.00 hrs),Shift C(8.00 hrs-16.00 hrs) . Following maintenance are carried out at Light schedule(Electrical) section:
A. Trip-I Schedule (10 Days): The activities carried out during Trip-I schedule are checking of the Alternator, Lube oil pre-priming motor, Techo Generator for unusual sound and temperature. Check operation of Low water switch, Idling magnet valve, OPS, shut down magnet valve, Battery charging ,Half Engine R.P.M., Circuit Breakers & switches, Check condition of carbon brushes & commutator of lube oil pre-priming motor. Check Electrolyte level, intactness of terminal connections for loose or overheating of Batteries.
B.Trip-II Schedule (20 Days): The activities carried out during Trip-II schedule are cleaning and Checking specific gravity of Electrolyte of Batteries, Cleaning of reflectors of head lights and glass of both sides and adjust focus if needed, Checking of loose connection/broken sockets overheating of junction boxes, switches, circuit breakers. Battery knife switch condition to be checked for cable connection and proper closing of contacts. Checking temperature gauges and Techo generator for any loose connections etc.
C.Monthly Schedule (30 Days): In every 30 days following examinations (Including Trip-II) carried out at Diesel loco shed, Raipur. Batteries:- Checking of voltage, cleaning vent plug, applying petroleum jelly to terminals. Check engine speed controller for proper operation & proper Half Eng. RPM, Check condition of relays, pressure switches, tumbler switches, fuses and contacts. Check all electrical circuit for any ground. Check following for slackness of holding fixture (foundation):-Starter, Alternator, Lube oil priming motor. Drive less
Electronic speed Recorder:- Down load the memory, Erase the memory after down loading, check MF glass & operation of PS, DS, UP Bottoms etc., check & correct if required, time, date, loco no., wheel Dia. odometer, speed limit. Drive less Electronic Speedometer: - Set correct wheel dia in control unit. Removed overhauled due items and fitted back checked operation properly. Insulation Resistance checking:-Knife switch & table main key off, Knife switch off & table main key on.
D. Quarterly Schedule (90 Days): - In every 90 days following examinations (Including Monthly schedule) carried out at Diesel loco shed, Raipur:- Check for ground and insulation resistance of all electrical circuit and wiring, Relays check for proper condition. Check electrical rotating equipment, clean with degreasing component and air cure commutator if necessary. Check for proper operation of the
~ 34 ~ Work Study Cell, SECR.
Engine speed ,Idle speed ,equipment, Controller, Half engine speed, Shut down Lube oil pressure switch , Check & closing the lube oil pressure in kg/ Sq.cm , Compare engine speed counter with master tachometer and record if any differences. Remove and overhaul all magnet valves. Check for satisfactory, operation and fit back. Remove, overhaul & fit back the Self starter, alternator etc
Distribution of staffs in Light Schedule(Elect.):-
Shift Supervisor Technician DC/DCH
A 01 09 03
B 01 12 01
C 01 12 01
RG Gang 01 19 01
Incharge -01 SSE
Shift A: 8.00-16.00hrs, Shift B: 16.00-24.00hrs, Shift C: 00.00-08.00hrs RG gang: 8.00-16.00hrs(Mon-Sat.)
2.9.12 Small Motor Bench: In small motor bench, Schedule and unschedule maintenance and overhauling of
FPM(OC type, TLPM(DC type), Axle Generator, Tacho generator, GBC Motor, BKBL(both vertical and horizontal type), Governor pump and fuel pump, Starting motor and GBC motor, Auxiliary Generator, cab fan, ECC etc are carried out.
Distribution of staffs in Small motor Bench:-
Shift Supervisor Technician DC/DCH
General Shift 01 10 01
General Shift: 8.00-17.00hrs(Mon-Sat.)
2.9.13 Traction Motor Bench: In Traction motor bench, Schedule and unshedule maintenance and overhauling of
Traction Motor, Cable replacement and slip ring replacement work etc are carried out.
Distribution of staffs in Traction motor Bench:-
Shift Supervisor Technician DC/DCH
General Shift 01 17 03
02 DC out of 03 are long absent from June/October 2016 02 Tech. are booked in first night shift. General Shift: 8.00-17.00hrs(Mon-Sat.)
2.9.14 Meter Bench: In Meter bench, Schedule maintenance and overhauling of microprocessor based
Speedometer, data downloading and time setting, mega electronic governor, speedometer module data module data downloading and time setting, auxiliary power data module data downloading and report sent, speed sensor etc are carried out.
Distribution of staffs in Meter Bench:-
Shift Supervisor Technician DC/DCH
General Shift 01 19 02
General Shift: 8.00-17.00hrs(Mon-Sat.)
2.9.15 Canteen: In Canteen, 01 Technician is utilized as care taker and the Cooks/Masalchies etc are
outsourced. The tender fir Canteen is revised in every six months.
2.9.16 Control Room: Line clear transaction from RSD, Placement of locos, co-ordinate with DPC of
divisional Control to take incoming loco position and dispatching of ready locos and record maintenance.
~ 35 ~ Work Study Cell, SECR.
Shift Technician DC/DCH
A 01 00
B 01 00
C 01 00
RG 01 00
2.9.17 Trouble Shooting Point: There are 02 Trouble Shooting Points at Bilaspur and Dallirajahara under DLS/R.
They attend the loco failure as per message received from controlor.
Station Technician(E) Technician(M)
Bilaspur 01 01
Dallirajahara 01 00
2.9.18 Srore(Electrical): There are 03 staffs(01-Jr. Clerk and 02-Technicians) are deployed in the section of
Electrical Store of DLS/Raipur. They dealt with issuing of materials by LM-32, posting in DMTR, preparing challan for material issued to other offices,posting in Ledger,
arranging scrap materials for DS-8 and sent to GSD/R, unloading materials from Truck come from Varanasi, Patiala and other firms and maintaining all registers.
Shift Ministerial Technician
General Shift 01 02
General Shift: 8.00-17.00hrs(Mon-Sat.)
2.9.19 Wheel Change: In Wheel change section, total 41 staffs(04 SSE ,36 Tech. and 01 DC) are deployed in
two shift. The activities they dealt are all schedule work of undergear like bogie frame overhauling, bogie frame liver repair, bogie frame manual repair, attention of Axle Box and its linear repair, bogie and wheel formation, greasing of suspension tube, brake block changing, ultrasonic testing of axles, bogie run out and truck in during heavy schedules, temporary repairs during light schedule etc.
Distribution of staffs in Wheel Change Section:-
Shift Supervisor Technician DC/DCH
I 03 23 01
II 01 13 00
Shift I: 8.00-16.00hrs,Shift II: 16.00-24.00hrs. Month wise workload: Average 03 Alco Loco and 03 End Loco attended per month.
2.9.20 NG Section: There are 05 NG Locos (04 Running and 01 Standby at Shed) are operated in Raipur
Division between Kendri-Abhanpur-Dhamtari and Dhamtari-Rajim. Activities dealt in NG section is as follows:-
Type of Maintenance Interval Staff deputed
Trip-I After every 10 days 03(M)+02(E)
Trip-II After every 20 days 03(M)+02(E)
Monthly Schedule After every 30 days 05(M) for Engine Room+ 02(E) for Elect. fittings+ 03 for Undergear equipt.
In NG section, total 19 staffs(01 SSE ,16 Tech. and 02 DC) are deployed in this section. 02 Technicians per shift are deployed in 03 shifts(P1,P2 & P3), 08 Tech./DC are deployed in General shift, 02 Tech. for RR at TBD, 02 are deployed at Rajim and Dhamtari for Loco securing and 01 Technician is deployed at Office for Registers work.
~ 36 ~ Work Study Cell, SECR.
Distribution of staffs in NG Section:-
Shift Supervisor Technician DC/DCH
P-1
01
02 00 P-2 02 00 P-3 02 00
General shift 05 02
RR at TBD 02 00 Loco securing at RJM and DTR 02 00
Office work 01 00 Shift P-1: 8.00-16.00hrs, P-2: 16.00-24.00hrs, P-3: 00.00-08.00 hrs.
2.9.21 Light Schedule (Mechanical): The activity in this section are performed in three shift Shift A(16.00 hrs-24.00 hrs)
and Shift B(00.00 hrs-08.00 hrs),Shift C(8.00 hrs-16.00 hrs) . Following maintenance are carried out at Light schedule(Electrical) section:
Running Repair:- All incoming locos in shed Running Repair examination carried out at Diesel loco Shed Raipur are : Open crank case cover & check screen for any
material, Check the condition of caps, tappet rollers, big end bearing and main bearings, Check oil level of Diesel Engine crank case, Air-compressor, Vacuum exhauster, Behr drum-Transmission and add if required. Check air compressor operation, check working of M.R. safety valve, Check operation of vacuum brake valve at all positions, Check vacuum with test plate having 5/16”(8m) hole, Check operation of both front and rear horns, Check operation of reservoir for forward and reverse, visual inspection for any deficiency of parts of Under gear, Check axle box for over heating, Clean Engine rooms, all auxiliary units & interior of cab etc.
Trip-I Schedule (10 Days): In every 10 days Trip-I schedule is carried out at Diesel loco Shed, Raipur. It consist of : Open crank case cover & check screen for any foreign material, Check the condition of caps, tappet rollers, big end bearing and main bearings, Check oil level of Diesel Engine crank case, Air-compressor, Vacuum exhauster, Behr drum-Transmission and add if required. Check air compressor operation, check working of M.R. safety valve, Check operation of vacuum brake valve at all positions, Check vacuum with test plate having 5/16”(8m) hole, Check operation of both front and rear horns, Check operation of reservoir for forward and reverse and locomotive Air Brake, visual inspection for any deficiency of parts of Under gear, Check axle box for over heating, Check condition of reactionary arm pin and cardon shaft, Check air compressor visually for any over heating and smooth operation etc.
Trip-II Schedule (20 Days): In every 20 days following examinations are (Including Trip-I) carried out at Diesel loco shed, Raipur. (a)Diesel Engine- Checking & adjusting of the valve clearance of inlet & exhaust valve, cleaning of Fuel oil secondary filter, Lubricate all the fuel pump racks,
Checking the fuel pump rate delivery per minute and fuel oil pressure. (b) Under Gear – Greasing the perifex coupling & vacuum exhauster pulley & shaft, checking & filling up oil in centre pivot, Lubricating slack adjusters, cleaning car body filters & fit back. (c) Transmission – Remove reservoir slide blocks for inspection & replace, if necessary. Condition of couples to be checked, checking for any unusual sound. (d) Air Brake – Checking the operation & adjusting the pressure in Independent brake valves, Throttle valve, safety valve, no load governor, reducing valve. Overhaul & fit the valves. Clean & fit the filters. Checking the operation of speedometer.
Monthly Schedule:- In every 30 days (Monthly) the examinations are (Including Trip-II) carried out at Diesel loco shed, Raipur are- Change all the injector and record ignition pressure of all cylinders by penny indicator, Fuel oil secondary filters to be renewed and sludge to be drained out, Lube oil filter to be renewed and removed the sludge deposited in the filter housing, Check
~ 37 ~ Work Study Cell, SECR.
that the sealing of leather below connecting air intake filter to air inlet pipe to TSC are tight in order, Check the sliding sleeve of the supercharger between the turbo supercharger and after tightening the cooler, Clean air maze oil bath filter, Blow out radiators with compressed air from opposite direction of normal air flow, Inspect for leaks from all joints and pipes of exhaust manifold, Checking of axle in position visually for cracks. Check the condition of wheels for hollow type, fracture and flat spots, measure wheel dia and record. Grease the cardon shaft and frame gearing. Check the condition of hand brake and adjust if necessary and grease. Remove, clean and fit back transmission oil filter, Filling pump pressure to be checked, adjust if necessary. Overhauled the valves i.e. Horn valve, Horn, Sanding Valve, check valve. Change governor diaphragm. Air Compressor inter cooler fins to be cleaned. Attend repairs booked by the drivers and record
Quarterly Schedule: In every 90 days (Quarterly) the examinations (Including Monthly schedule) carried out at Diesel loco shed, Raipur are: (a)Diesel Engine:- Cleaning Air intake manifold in position. Changing the vacuum exhauster oil, clean
the oil tank and filter. Changing oil of the Turbo super Charger. Checking the condition of the Behr pump coupler. Air compressor oil to be changed. Fuel tank to be checked in position and cleaned after draining oil. Behr drum magnet filter check; clean and fit back. Checking the vent pipe of cooling water circuit. Checking the fuel injection pump timings of all the pumps, if required adjust the same.
(b) Under Gear Drain the oil from centre pivot and check the condition of pivot. Drain oil from Gear boxes and check for foreign material. Dismantle, check and grease or renew the leather bucket of brake cylinder assembly.
(c ) Transmission Checking the condition of Transmission control valve ‘O” ring & spring and fit back. Checking the condition of Behr pump drive shaft.
(d) Air Brake Check the efficiency of Air Compressor. Check the efficiency of vacuum exhauster. Record time required to create vacuum from ‘O’ to 48 cm. Overhaul the double check valves and fit back. Attend repairs booked by the drives and record.
Half –Yearly Schedule: In every 180 days (Half-Yearly) the examinations are (Including Quarterly schedule) carried out at Diesel loco shed, Raipur are as under: (a) Diesel Engine Replace the following with overhauled/New one:- Cylinder Head, After cooler, turbo super charger, fuel injection pump, lube oil heat exchanger, lube oil circulating pump, cooling water circulating pump, vacuum exhauster, Air compressor. Check visually and record the following: - main bearing, Big end bearing, jumper pipe, cam profile. Check visually the condition of the following:- Vulcan coupling, Regiflex coupling, Periflex coupling. Wash the exhaust and air intake way. Decarbonizes piston crown
and liner in position. Clean cylinder liner water jackets. Remove roller tappets for Zyglo testing. Remove rocker arm assemblies, clean, inspect and fit back. Check crank shaft alignment adjust if required. Inspect and check the operation of hand brake.
(b) Under gear Drain out axle gear box oil sample and check for metal particles. Renew the axle gear box oil, grease. Conduct ultrasonic tests on axles. Overhaul brake cylinders and fit back. Check wheels dia, wheel profile, flange thickness and record. Check the tightness of all screws, bolts and nuts. Check cardon shaft knuckle joints for tightness. Examine the bogies for loose fittings, overheating and loss of grease. Check and adjust the clearance of cattle guard from Rail level.
(c ) Transmission Overhaul and fit the Transmission control valve, filling pump, transmission heat
~ 38 ~ Work Study Cell, SECR.
exchanger. Augment of transmission to be checked, adjust if required. Check converter pressure and adjust if required. Check transmission oil system for any defects or leakages. Over haul the components and fit back Rotary valve ,Throttle valve, feed valve, sanding valve, horn valve, shut down valve, Relay valve, shut down check valve, independent brake valve, timing valve, safety valve, no load governor, pressure reducing valve, drain cock and oil separator cocks, air compressor and vacuum exhauster.
Distribution of staffs in Light Schedule(Mech.):-
Shift Supervisor Technician DC/DCH
A 02 13 01
B 02 14 00
C 02 12 02
RG Gang 03 29 00
For Record maintenance=04 Tech. Incharge -01 SSE Assistance to Incharge-02 SSE. Remlote recording- 01 JE
Shift A: 8.00-16.00hrs, Shift B: 16.00-24.00hrs, Shift C: 00.00-08.00hrs RG gang: 8.00-16.00hrs(Mon-Sat.)
2.9.22 Material Section: In Material section, total 08 staffs(03 SSE , 04 Tech. and 01 DC) are deployed. The
activities they dealt with stock items of ALCO locos and HHP locos, procurement of AAC, Indent items, BIM items, non-stock items, material inspection for stock/non-stock items, MCDO preparation.
Distribution of staffs in Wheel Change Section:-
Shift Supervisor Technician DC/DCH
General shift 03 (02 Mech. & 01 Elect.)
04 01
General Shift : 8.30-18.00hrs,
2.9.23 Ancillary Section: In Ancillary section, total 20 staffs(02 SSE and 18 Tech.) are deployed. The activities
they dealt with maintenance and operation of all Machines and Plants. Supervision of Welding Plant, ET Plant, Incinirator plant, Shed cleaning work, loco cleaning and washing work which are outsourced. Maintenance of operation of RO Plant.
Distribution of staffs in Wheel Change Section:-
Activity Supervisor Technician DC/DCH
Road vehicle
02
14 00
Fork Lifter 02 00
Outsourcing work supervision 02 00
Shift I: 8.00-15.00hrs:( 02 SSE & 16 Tech.) Shift II :16.00 hrs- 24.00hrs : (02 Tech) Rest Day: Sunday
~ 39 ~ Work Study Cell, SECR.
CHPTER-III
3.0 CRITICAL ANALYSIS & RECOMMENDATIONS:
3.1 The actual staff strength of Diesel Loco Shed/Raipur is 718 against the sanctioned
strength of 799 as on 01.02.2017. The requirement of staff has been assessed based on the present workload, Benchmarking, outsourcing activities, direct observations and discussion held with Supervisors/staff.
Now-a-days it has become very costly to hire manpower, cost of procuring the spares & inventory carryover has become quite high and technological complexities in locos have been increased. Further, with increase in production of locos, holding of locos in existing sheds is likely to go up substantially in the near future. Increased holding of sheds will further widen the gap between available sanction and manpower requirement as per benchmark/yardsticks. Therefore, outsourcing of identified activities in the Diesel Loco Shed as per Maintenance Manual of Diesel Locomotives will be imperative to bridge the
gap and maintain increased holding of the locos. However, many activities have already been outsourced but some other non-core activities can also be outsourced and its impact on manpower saving and financial benefit.
3.2 Assessment of Requirement of staff Section/Activity-wise at DLS/Raipur :-
3.2.1 Assessment of staff requirement for maintenance of Diesel Locos at DLS/R: Applying Benchmarking norms:
In order to achieve uniform sanction strength over IR Railway Board is constantly
pursuing the matter and instructing to achieve the current Indian Railway Average in
connection with the Man power productivity Ratio first and subsequently to achieve the
all India Best Benchmarking. As per Benchmarking Report of June’2016 issued by
Railway Board, All India average man power productivity ratio on deployed staff for
DLS/Raipur is 4.12 & DLS/Patratu where as East Central Railway’s MPROD is 3.82.
DLS/Patratu MPROD has been recognized as All India Best Benchmarking figure.
For achieving the MPROD of DLS/Raipur at par with DLS/Patratu, (East Central
Railway),
Thus, in view of above, the requirement of staff is assessed as under :
Total holding of Loco = 180 (80 HHP Loco + 74 ALCO loco + 21 Shunting loco + 05 NG loco) Requirement of staff as per AIBM = 3.82 men per loco.
Total Staff including Supervisor required for maintenance of 180 locos as per AIBM =
180 x 3.82 = 687
Therefore, the requirement of staff for maintenance of locos at DLS/R as per
AIBM comes to 687.
However, many activities at DLS/R like Mechanized cleaning in Shed, operation & maintenance of ETP are/Incinerator, cleaning of locomotives, overhauling of wood ward governor, overhauling of ABB make TSC Turbochargers, AMC of AC Motor/Spectrometer/Control unit/TCC/LCC/ Screw compressor, supply & filling up sand in locos, welding repair activities, Bogie stripping of locos during heavy schedule, overhauling of Bogie frame of Alco locos have been outsourced and some other activities like overhauling of Traction Motors, overhauling of valves of CCB 1.5 of locos, overhauling of CTRB Bearing, AMC of CNC under floor wheel Lathe Machine under process of outsourcing. During course of work study, it is revealed that some activities like Bogie stripping of locos during heavy schedule, welding repair activities, overhauling of Bogie frame of Alco locos are outsourced in this year and some activities like
~ 40 ~ Work Study Cell, SECR.
overhauling of Traction Motors, overhauling of valves of CCB 1.5 of locos, overhauling of CTRB Bearing, AMC of CNC under floor wheel Lathe Machine are under process of outsourcing. Considering the core & non-core activities of DLS/R, Work study team proposed that some other non-core activities like painting & carpentry work of Locos and maintenance & operation of Road vehicles may be outsourced and staff should be reduced accordingly.
It is a fact that workload of DLS/R has been reduced in view of recently outsourced activities being carried out at DLS/R. In addition, some more activities are in under progress (details given in 2.7) of Outsourcing and some of the non-core activities have also been proposed to outsource, which results in manpower savings. Hence, considering need based requirement, it is recommended that 30 staff should be reduced considerably from the sanctioned strength of DLS/R. Thus, keeping the above facts in view, the requirement of staff for maintenance of Diesel Locos comes to 657 (687 - 30).
3.2.2
Assessment of staff requirement for other activities carried out at DLS/Raipur: (i) Laboratory: At present 19 staff (04 CMS, 05 CMA, 02 Lab Assistant, 07 Tech, 01 DC) are working in Lab. Staff of this section deals with Ultrasonic testing of Axles, failure investigation of Loco components, Magnetic particle testing of Spring, Zyglow testing of all small components of Heavy scheduled locos, Spectrographic analysis of lube oil samples, Quality check of HSD oil, cooling water testing of loco, DM plant operation, Dye-penetrant testing of all big components of locos, testing of Roller Bearing, Backwash of filter unit, sample collection & Report making, laboratory testing works, cleaning of lab apparatus, Record maintenance etc. Artisan staff assist to CMS/CMA in testing process. Out of 19 staff, 01 CMS working as overall in-charge of Lab, 04 staff are deployed in Main Lab, 07 staff deployed for DP lab & Zyglo testing, 02 staff for spectrographic analysis, , 03 staff deployed in Shift Lab and 02 staff in DM plant. During discussion held with CMS(I/c), it is revealed that more CMS/CMA than present no. of CMS/CMA are required for smooth functioning of the Lab. Presently there is 05 vacant post of Lab Assistant. Hence, it is suggested that 05 vacant posts of Lab Assistant may be filled up or surrendered and money value generated from surrendering may be utilised for creation of CMS/CMA. Considering the existing workload, the present deployment of 19 staff in
Lab is justified. (ii) Fueling Point (RCD): At present 16 staff (01 CLI, 01 OS, 04 Clerk, 08 Tech, 02 DC) are working in RCD. Staff
of this section deals with receipt & issue of HSD oil, loco fueling, lorry decanting, accountal of Lube oil & fuel, Fuel transfer, Fuel Trip card entry, cleaning etc. Out of 16 staff, 01 CLI is working as In-charge of RCD, 01 OS deployed for accountal of Lube oil, 01 Clerk for accountal of fuel, 01 Clerk for accountal of SFC & Trip card entry, 01 Clerk taking learning of accountal of fuel, 01 Technician for fuel transfer & decanting of Tank, 01 Tech. for Fuel Trip Card entry and 08 Tech./DC (02 staff x 03 shift =06 + 02 RG/LR = 08) for fuel oil fueling in locos. It is found that 01 OS from Fueling Point will be transferred to Tool Room. Considering the existing workload, the present deployment of 15 staff are
justified to carry out the work of RCD.
(iii) Ancillary section (Millwright):
~ 41 ~ Work Study Cell, SECR.
At present 20 staff are working in Ancillary section. Staff of this section deals with maintenance & operation of Machine & Plants in shed, maintenance & operation of Road vehicles i.e. Truck, Pick-up, Fork Lifters, Crane, and Platform Truck in shed, maintenance & operation of RO plant, supervision of welding work/shed cleaning work/loco cleaning work in shed. It is found that some activities welding work, shed cleaning work, loco cleaning work have been outsourced. Out of 20 staff, 01 SSE is working as In-charge of Ancillary section, 17 staff are deployed in Shift-I and 02 staff in shift-II. Work study team proposed that some non-core activities like maintenance & operation of Road vehicles may be outsourced and staff should be reduced accordingly. Considering the existing workload and outsourcing activities, it is assessed that 15 staff are sufficient to carry out the work of Ancillary section. Hence, 05 staff are found surplus.
(iv) Tool Room: At present 08 staff (01 OS, 06 Tech, 01 DC) are working in Tools Room. Staff of this section deals with receipt & issue of tools & M&P items to sections in the shed and accountal of tools in all shifts. It is found that there are Spl. Tool Room and Sub. Tool Room. Out of 08 staff, 01 OS is working as In-charge of Tool Room, 06 staff are deployed in 3 shifts in Sub. Tool Room and 01 staff deployed in Spl. Tool Room. Considering the existing workload, present 08 staff are justified to carry out the work of Tools Room. (v) Control Room: At present 04 staff (01 staff x 03 shift =03 + 01 RG/LR = 04) are working in Control
Room at DLS/R. Staff of this section deals with coordinating with Diesel Power Controller of concerned Divisions for receipt and dispatch of locos, communicating
with HQ Power Controller, carrying out shunting of locos inside the shed, joint checking of locos with shunter during handing over and taking over of locos,
removal and placement of loco, noting down repairs logged in by LPs, preparing record of incoming and outgoing locos, schedule planning and forecasting, line clear
transaction with RSD, Record maintenance etc.
Considering the existing workload, present 04 staff are justified to carry out the
work of Control Room. (vi) SSE(D) office: At present 09 staff (02 SSE, 04 Technician, 01 Clerk, 01 DC, 01 Peon) are working in SSE(D) office. Staff of this section deals with all shed related work in DLS/R. Out of
05 staff, 01 SSE works as over all In-charge of the Mechanical wing in shed, 01 SSE is deployed as over all In-charge of the Electrical wing in shed, 03 staff for maintaining staff Muster Roll/Leave Register, TA, IOD, all correspondence work, 01 staff for maintaining MV Book, Engineering & Electrical General related work, 01 staff for making & verification of stock item requisitions, work and 02 staff for Dak distribution work, movement of files, photocopy work and other Group D related work. Considering the existing workload, it is assessed that 08 staff are sufficient to carry out the work of SSE (D) office. Hence, 01 staff is found surplus.
~ 42 ~ Work Study Cell, SECR.
(vii) Sr. DME office/DLS (Establishment/General/Pass/Tender Bill/Train /Confidential section): At present 08 staff (03 Ch. OS, 01 OS, 02 Sr. Clerk, 02 Peon) are working in Sr. DME office/DLS (Establishment/General/Pass/Tender Bill/Train /Confidential section). Out of 08 staff, 01 Ch. OS deals with cadre, PNM, posting/transfer, Muster Roll of Supervisors etc., 01 Clerk deals with issuing of Pass/PTO to shed staff & maintenance of records, 01 Ch. OS deals with D&A cases, RTI cases, Imprest cash & Quarter related matter, 01 Clerk deals with all types of Bill related work, 01 OS deals with training of staff & condemnation of locos related matter, 01 Ch. OS deals with confidential section related matter, 01 Peon attached with Establishment section and 01 Peon attached with officers. Considering the existing workload, present 08 staff are justified to carry out the work of Sr. DME office section. (viii) Technical & Planning section:
At present 07 staff (03 SSE, 02 Technician, 02 DC) are working in Technical & Planning section. Out of 07 staff, 03 staff are deployed for Technical work viz. loco failure analysis, preparation of morning power position, preparation of locomotives forecast, MCDO, Handouts, entry of punctuality & reliability reports in RDSO portal, monitoring of loco ineffectiveness, monitoring of shed performance, correspondence work and 04 staff deployed for Planning work viz. preparation of Abstract Estimate, Detail Estimate & Revised Estimate of M&P items, Rolling stock items, works programme, Budget preparation, MCDO preparation, correspondence work etc. Considering the existing workload, it is assessed that existing staff are sufficient to carry out the work of Technical & Planning section. Work study team recommends that 05 Artisan staff should be kept under the administrative control of SSE (I/Charge)/Planning section and they should be utilized for multi-task job within DLS as per requirement. (ix) Material section: At present 08 staff (03 SSE, 01 MCM, 03 Technician, 01 DC) are working in Material Section. Staff of this section deals with procurement of stock/Non-stock items, Indent preparation, material inspection, collection of material from other shed, supply of material to different sections at DLS as per requirement, Imprest items, performance of material, Record maintenance, correspondence work etc. Considering the existing workload, it is assessed that existing staff are sufficient to carry out the work of Material section.
During discussions held with SSEs of different sections, it is revealed that required materials are not supplied timely to the shops which hamper the schedule maintenance work and wastage of manpower. Hence, it is suggested that A Material Cell with staff strength of 01 Supervisor & 02 Artisan staff from staff strength of Material section may be set up in DLS/R for proper material management, chasing & supply of material to concerned shops timely. (x) Tender section: At present 05 staff (02 SSE, 03 Technician) are working in Tender section. Staff of this section deals with Tender related work. Out of 05 staff, 01 SSE works as In-charge of the section, 01 SSE is deployed for Open Tender, Single tender Quotation contract work, 01 Tech. for preparing of proposal, DE, finance compliance, variation & vitiation statements, 01 Tech. for assisting in movement of files, chasing of files at Divisional
~ 43 ~ Work Study Cell, SECR.
offices, 01 Tech. assisting in funding, EMD, PG, submission, legal vetting of POA & EMD, SD release process etc. Considering the existing workload, present 05 staff are justified to carry out the
work of Tender section.
(xi) Trouble Shooting Point: At present average 03 staff (Technician) are deployed at BSP & DRZ for line duty to attend trouble shooting work of Diesel Locos as per requirement.
Considering the existing workload, present 03 staff are justified to carry out the
work of Trouble shooting point.
(xii) Canteen: At present 01 departmental staff and some outsourcing staff are working in Canteen. Staff of this section deals with preparation & serving of breakfast/meal/tea and management of canteen. Activities of cook & Helper are outsourced. Considering the
existing workload, the present deployment of 01 departmental staff in Canteen is justified.
3.3 Summary of calculation of requirement of staff at DLS/Raipur (As per Par No. 3.2.1
& 3.2.2) :
Sanctioned strength = 799 On Roll strength = 718 Staff requirement for maintenance of Locos (As per Para No. 3.2.1) = 657. Staff requirement for other activities carried out in shed (As per Para No. 3.2.2)= 100. Total staff requirement = 657 + 100 = 757.
Thus, Identified Surplus Post = 799 – 757 = 42.
~ 44 ~ Work Study Cell, SECR.
3.4 Summary of Sanction, Present & Proposed staff strength at DLS/Raipur:
S# Designation Sanction
strength
Present
on Roll strength
Proposed
Strength
No. of identified Surplus
post to be surrendered
Ministerial:
1 Ch. OS 03 03 03 00
2. OS 09 06 09 00
3. Sr. Clerk 04 03 04 00
4. Jr. Clerk 00 04 00 00
5. Jr. Steno 01 00 01 00
Sub-Total 17 16 17 00
Supervisor:
9. SSE(M) 34 32 34 00
SSE(E) 22 22 22 00
SSE(A) 04 03 04 00
JE(M) 14 15 14 00
10. JE(E) 09 06 09 00
11. JE(A) 02 02 02 00
Sub-Total 85 80 85 00
Artisan:
12. MCM(M) 46 41 46 00
MCM(E) 30 29 30 00
MCM(A) 09 08 09 00
13. Tech.-I(M) 117 119 117 00
Tech.-I(E) 82 82 82 00
Tech.-I(E) 24 23 24 00
14. Tech.-II(M) 53 42 53 00
Tech.-II(E) 38 32 38 00
Tech.-II(A) 11 13 11 00
15. Tech.-III(M) 122 86 97 25
Tech.-III(E) 78 35 61 17
Tech.-III(A) 10 11 10 00
Sub-Total 620 521 578 42
Lab:
17. CMS 06 04 06 00
18. CMA 03 05 03 00
19. Lab Astt.-I 00 01 00 00
20. Lab Astt.-II 00 01 00 00
21. Lab Astt.-III 07 00 07 00
Sub-Total 16 11 16 00
Group’D:
23. DCH 45 73 45 00
24. DC 00 00 00 00
25. Sr. Peon 02 01 02 00
26. Peon 01 02 01 00
TADK 01 01 01 00
Sub-Total 49 77 49 00
Others:
27. MV Driver 03 05 03 00
Work Charge post:
MCM(A) 05 05 05 00
Tech.-I(A) 03 03 03 00
Helper 01 00 01 00
Sub-Total 09 08 09 00
GRAND TOTAL 799 718 757 42
~ 45 ~ Work Study Cell, SECR.
3.5 RECOMMENDATIONS & SUGGESTIONS: On the basis of above observations and critical analysis, the following recommendations and suggestions are made:
3.5.1 It is recommended that 42 vacant posts of Technicians are identified as surplus and should be surrendered from present sanctioned of 799 posts of DLS/Raipur. The 42 posts have been identified as surplus in reference to All India Best Benchmarking of Man Power Productivity Ratio of DLS/PTRU (3.82), East Central Railway with the Man Power Productivity Ratio of DLS/Raipur (4.12) and considering various outsourcing activities proposed and existing at DLS/Raipur.
3.5.2 The none-core activities of DLS/Raipur like painting & carpentry work of Locos and maintenance of Road vehicles may be outsourced so that attention on Core-Activities can be concentrated more and thereof it would be monetary beneficial by reducing staff.
Suggestions:
3.5.3
A Safety Cell may be set up in Shed for monitoring of safety related matters, organizing safety seminar in shed for counselling of staff, checking of safety rules during working, checking of major machines for schedule of testing, checking of safety equipments etc.
3.5.4 Artisan staff should follow safety rules during working and proper counseling should be provided to Artisan/Helper time to time in this connection.
~ 46 ~ Work Study Cell, SECR.
CHAPTER-IV 4.0 FINANCIAL EVALUATION & RESULTS:- Savings due to surrender of 42 identified surplus posts:-
Thus, recurring savings to the tune of Rs. 217, 82880 say Rs. 217 lakh Per annum can be achieved due to surrender of 42 posts of Technician from DLS/Raipur of Raipur Div. and surrender memorandum to be issued by Sr.DPO/R/SECR
-x-x-
Design.
Level
(7th
CPC)
G.P. (6th
CPC)
Pay
Structure
(7th CPC)
No. of Post to
be
surren
dered
Mean
pay of
the level
Cost per Month per
staff (Mean
Basic pay+
D.A. @ 4%)
Total cost
per month
(in Rs.)
Total cost
per year
(in Rs.)
Technician-
III(M) Level-2 1900
19900-
63200 25 41550 43220 1080500 129,66000
Technician-
III(E) Level-2 1900
19900-
63200 17 41550 43220 734740 88,16880