South Dakota Large Scale (Automated) Engineering & Base Level Engineering AMFM March 2017
31

South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

Aug 25, 2018

Download

Documents

duongphuc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

South Dakota Large Scale (Automated) Engineering

& Base Level Engineering

AMFM March 2017

Page 2: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

1

Consider these areas…

Why are we here?

Page 3: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

2

Agenda

▸ What is Large Scale Automated Engineering (LSAE) and Base Level Engineering

▸ Methodology

▸ Mapping

▸ Options for Community

▸ Outreach and Meetings

Page 4: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

3

New Risk Assessment Methodology

▸ Large Scale Automated Engineering (LSAE) with regulatory upgrades to achieve Base Level Engineering (BLE)

▸ 2 Dimensional modeling (HEC-RAS 5.0.1) ▸ Rain on Grid ▸ Base Flood Elevations (BFEs) are available for multiple return periods

as water surface elevations grids ▸ Resulting floodplains meet FEMA G&S for Approximate-level studies

(Zone A – ready) ▸ Enhanced products to facilitate better decisions at the community

level.

Page 5: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

4

South Dakota Project Area

Page 6: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

5

South Dakota project area and sequencing

Page 7: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

6

Base Level Engineering Base Level Engineering Methodology

Non-model backed Zone A’s on 10m DEM 2D HEC-RAS 5.0.1 on high-res LiDAR

Page 8: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

7

Base Level Engineering Base Level Engineering Methodology

Non-model backed Zone A’s on 10m DEM 2D HEC-RAS 5.0.1 on high-res LiDAR

Page 9: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

8

Identify Study Area

Base Level Engineering Methodology

Page 10: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

9

Model Inputs (Hydrology)

Base Level Engineering Methodology

Page 11: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

10

Model Inputs (Hydrology)

Base Level Engineering Methodology

Page 12: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

11

Model Inputs (H&H)

Base Level Engineering Methodology

Page 13: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

12

Model Inputs (Hydraulics)

Base Level Engineering Methodology

Page 14: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

13

Model Inputs (Hydraulics)

Base Level Engineering Methodology

Page 15: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

14

Model Verification

Base Level Engineering Methodology

Page 16: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

15

Model Outputs

Base Level Engineering Methodology

Page 17: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

16

Regulatory Upgrades – County-based Deliverables

Base Level Engineering Methodology

Page 18: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

17

Base Level Engineering Mapping

Page 19: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

18

BLE & On-Going Existing Study Areas

Page 20: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

19

There are three main options for communities to consider

Kickoff Meeting

Develop New Risk

Assessment Discovery Meeting New Detailed

Study

Option #1: NEW assessments of the existing floodplains

Option #2: Which areas need to be upgraded to detailed study?

Option #3: Utilize this information as best available data to base decisions off of for development and planning.

Page 21: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

20

Mapping Process (Option #1)

Discovery Meeting Refine the Results

Create Flood Insurance Products

Follow the Quality Review Process

Provide the Products to

Communities

Page 22: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

21

Base Level Engineering Deliverables

Hydrologic Calculations for multiple events • 10%, 4%, 2%, 1% and 0.2% water surface elevations

HEC-RAS Hydraulic modeling for these events • Modeling for multiple return periods including the 10%, 4%,

2%, 1% and 0.2% profiles!

Page 23: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

22

Mapping Process (Option #2)

Discovery Meeting

Gather Additional

Data Review Results

with Communities Create Flood

Insurance Products

Follow the Quality Review

Process

Provide the Products to

Communities

New Detailed Study

Page 24: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

23

Detailed Study?

Floodplains with annotated cross-sections • 10%, 1% and 0.2% floodplains prepared and

available in GIS format

Page 25: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

24

Create Flood

Insurance Products

Follow the Quality Review Process

Provide Products to

Communities

Project Phases

Timeline: 3-7 years depending on option chosen

Page 26: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

25

Mapping Process (Option #3)

Discovery Meeting

Review Results with Communities

Follow the Quality Review Process

Provide the Products to Communities

Page 27: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

26

Outreach and Meetings April 8th, 2016: Pre-Kick off meetings emails went out to each community. April 12th, 2016: Follow up phone calls to each community May 2th, 2016: Kick Off meeting invitations were sent out June 1st, 2016: Congressional Notifications June 13th – 24th, 2016: Three teams simultaneously conducted a Kick Off

Meeting (KOM) in every county (26 total meetings)

July 8th, 2016: KOM Thank You emails were sent out

Week 1 Team #1 Team #2 Team #3

Location County Meeting Time Location County Meeting Time Location County Meeting Time

14-Jun Sioux Falls Minnehaha &

Lincoln 10:00 AM Sioux Falls Minnehaha & Lincoln 10:00 AM Sioux Falls Minnehaha &

Lincoln 10:00 AM

Vermillion Clay 2:00 PM Parker Turner 2:00 PM Flandreau Moody 1:30 PM

15-Jun Yankton Yankton 10:00 AM Salem McCook 10:00 AM Brookings Brookings 9:00 AM

Parkston Hutchinson 2:00 PM Alexandria Hanson 2:00 PM Estelline Hamlin 2:00 PM

16-Jun Mitchell Davison 10:00 AM Howard Miner 10:00 AM Clear Lake Deuel 9:00 AM

Woonsocket Sanborn 2:00 PM De Smet Kingsbury 2:00 PM Watertown Codington 2:00 PM

17-Jun Huron Beadle 9:00 AM Madison Lake 9:00 AM Milibank Grant 9:00 AM

Week 2 Team #4

Location County Meeting Time

21-Jun Redfield Spink 1:00 PM

22-Jun Aberdeen Brown 9:00 AM

Britton Marshall 2:00 PM

23-Jun Sisseton Roberts 9:00 AM

Webster Day 2:00 PM

24-Jun Clark Clark 9:00 AM

Page 28: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

Questions?

Comments?

Page 29: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

28

Regulatory Upgrades – 2D Model Enhancements

Base Level Engineering Methodology

Page 30: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

29

Regulatory Upgrades – 2D Model Enhancements

Base Level Engineering Methodology

Page 31: South Dakota Large Scale (Automated) Engineering …dnrc.mt.gov/divisions/water/operations/floodplain-management/... · Large Scale (Automated) Engineering & Base Level Engineering

30

Regulatory Upgrades – Floodplain Mapping

Base Level Engineering Methodology