SOULTZ E.G.S. Pilot Plant Current status of the project
11

SOULTZ E.G.S. Pilot Plant Current status of the project January 2006

Jan 05, 2016

Download

Documents

Adriel

SOULTZ E.G.S. Pilot Plant Current status of the project January 2006. INTRODUCTION. The Soultz “Enhanced Geothermal System” (EGS) Pilot Plant : an European Project (EC) with the support of France (ADEME) and Germany (BMU), co-financed by Industrial Partners (ES, PW, EDF) - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SOULTZ E.G.S. Pilot Plant Current status of the project January 2006

SOULTZ E.G.S. Pilot PlantCurrent status of the project

January 2006

Page 2: SOULTZ E.G.S. Pilot Plant Current status of the project January 2006

INTRODUCTION

• The Soultz “Enhanced Geothermal System” (EGS) Pilot Plant : an European Project (EC) with the support of France (ADEME) and Germany (BMU), co-financed by Industrial Partners (ES, PW, EDF)

• Starting of the investigation on the Soultz-sous-Forêts site : 1987

• First circulation test between GPK2 and GPK1 : 1997

• Current EGS Pilot Plant in 2 phases :– Phase I (2001-2005) : Drilling of the deep wells and reservoir

stimulation– Phase II (2004-2008) : Circulation tests and production of electrical

energy

Page 3: SOULTZ E.G.S. Pilot Plant Current status of the project January 2006

PARTNERS AND SCIENTIFIC COOPERATION

• Funding Partners (Policy Group)

European Commission (EC)

ADEME (France)

BMU (Germany)

EEIG (contributing members)

• EEIG Partners (Consortium Agreement)

BRGM (France)

CNRS (France)

IFE (Norway)

DHM (Switzerland)

BGR (Germany)

GGA (Germany)

MeSy (Germany)

GTC (Germany)

• EEIG Members

Electricité de Strasbourg (ÉS)

Pfalzwerke (PW)

Electricité de France (EDF)

BESTEC (non contributing member)

• Other Partners

ARMINES (France)

GEOWATT (Switzerland)

EDF R&D (France & Germany)

Page 4: SOULTZ E.G.S. Pilot Plant Current status of the project January 2006

5000m >200°C

#4250m

35 à 50 Kg/s

Sédiments

Granite

35 à 50 Kg/s

70 à 100Kg/s

1500m

GPK3

GPK2 GPK4

25MWth 25MWth

#600m

SCHEMATIC PRESENTATION OF THE EGS PILOT PLANT

Primary Loop (Underground) :2 production wells, 1 re-injection well“Closed” brine circulationExpected Flowrate : 70-100 l/sDepth : 4500-5000 mBottom temperature : 200 °CPumping system (EGS)

Principle : Extract geothermal heat from hot rocks

Secondary Loop (Surface) :Expected surface temperature : 185 °CHeat exchanging systemAvailable thermal energy : 50 MWthSurface power plant facilitiesProduced electrical energy : 5 MWe

Principle : Convert geothermal heat in useful energy (electricity)

Page 5: SOULTZ E.G.S. Pilot Plant Current status of the project January 2006
Page 6: SOULTZ E.G.S. Pilot Plant Current status of the project January 2006

FIRST HYDRAULIC CIRCULATION TEST (2005)

• Circulation test between the 3 wells without production pumps (buoyancy effect), with a cooling system (heat exchanger, lagoon), and re-injection of the cooled geothermal brine in the central well

• Closed loop under full automation• Duration of the test : 5 months (mid July – mid Dec.)• Tracing test by fluorescein spot in the injection well• Seismic monitoring

RESULTS OF THE TEST

Page 7: SOULTZ E.G.S. Pilot Plant Current status of the project January 2006

• Closed loop circulation test

• Duration: > 5 Months• GPK2:

– F2 # 12 l/s Temp. #160°C– Productivity Index # 10 l/s/MPa

• GPK4:– F4 # 3l/s Temp. #120°C– Productivity Index # 3.5 l/s/MPa

• GPK3:– F3=F2+F4 = 15 l/s – Temp. #60°C (After cooling # 6MWth)– Injectivity index # 2.5 l/s/MPa

F4 = F4 = f4+ + f3,4F3=F2 + F4

f2 f3,2f4f3,4

F2F2 = = f2 + + f3,2

∆P2 ∆P3 ∆P4

Infinite natural geothermal reservoir

GPK2 GPK4GPK3

Main results December 2005:Hydraulics

No Production pumps: Only buoyancy effect

Production Well head pressure kept between 0.5 and 1.2 MPa

165 000 m3 of brine produced from GPK2

40 000 m3 of brine produced from GPK4

Page 8: SOULTZ E.G.S. Pilot Plant Current status of the project January 2006

0

100

200

300

400

500

600

700

800

900

1000

07/07/05 27/07/05 16/08/05 05/09/05 25/09/05 15/10/05 04/11/05 24/11/05 14/12/05

Time (days)

SN

flu

ore

scein

co

ncen

trati

on

g/l

)

Fluorescein concentrations analyzed in the

fluid discharged from the well GPK-2 Main results December 2005:

Closed loop circulation test: Tracing ,Fluid chemistry,Scaling

Production GPK2: 85% BrineProduction GPK4: 78% Brine

GPK4

GPK4GPK4

0

10

20

30

40

50

07/07/05 27/07/05 16/08/05 05/09/05 25/09/05 15/10/05 04/11/05 24/11/05 14/12/05

Time (days)

SN

flu

ore

scei

n c

on

cen

trat

ion

g/l

)

injection of 150 kg of SN fluorescein dissolved in 950 l

of fresh water

Fluorescein concentrations analyzed in the fluid discharged from the well GPK-4

Gaz composition:CO2: 56% (GPK2) to 61% (GPK4)N2 : 35% (GPK2) to 31% (GPK4)CH4: 6,3% (GPK2) to 5,8% (GPK4)He: 2% (GPK2) to 1,7% (GPK4)H2 : 1,9% (GPK2) to 2,8% (GPK4)

Scaling composition:67% Fe3O4(Magnetite)12 % FeCO3(Siderite) 10% CaCO3 (Calcite)3.5% PbS (Galena)2% BaSO4 + SrSO42% SiO2 (Silica)1% ZnS(Sphalerite

Inflow of Inflow of geothermal brine geothermal brine

GPK3 GPK4GPK2

12

3(?) Interpreted origins of the productions

All results from B. Sanjuan et al.

Page 9: SOULTZ E.G.S. Pilot Plant Current status of the project January 2006

Main results December 2005:Closed loop circulation test:

Microseismicity: July to November 2005

Dep

th

Dep

th

Page 10: SOULTZ E.G.S. Pilot Plant Current status of the project January 2006

CONCLUSIONS / CHALLENGES (2006 – 2007)

• Main current challenge : to improve the productivity of GPK4 well (new stimulation) and also solve the issue of GPK3 poor injectivity

• To order and install the production pumps (ESP and LSP technologies) in GPK2 and GPK4 in a remote and very aggressive medium (depth issue, HT, corrosion)

• To consolidate the new closed loop system with the production pumps and an adapted cooling system

• To design an install in parallel a first demonstrative power unit of 1.5 MWe

Page 11: SOULTZ E.G.S. Pilot Plant Current status of the project January 2006

MERCI / THANK YOU / DANKESCHÖN !