AZ APA Conference September 29, 2011 Solving a Solar Land Use Issue Bruce Plenk, City of Tucson Solar Energy Coordinator
19

Solving a Solar Land Use Issue

Jan 02, 2016

Download

Documents

lila-martin

Solving a Solar Land Use Issue. Bruce Plenk , City of Tucson Solar Energy Coordinator. 2011 Tucson Solar Summary. Tucson’s first 10 Years of Solar- 1999-2009- mostly small projects 5% solar in new city buildings; solar ready ordinance. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

Solving a Solar Land Use Issue

Bruce Plenk, City of Tucson Solar Energy Coordinator

Page 2: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

2011 Tucson Solar Summary• Tucson’s first 10 Years of Solar- 1999-2009- mostly small projects• 5% solar in new city buildings; solar ready ordinance.• 2009 Clean Renewable Energy Bonds (CREBs) projects- 1 MW. • 2011 CREBs/CDP projects: 2MW+• CAVSARP PPA-1MW• City leases for FRV and NRG Solar Farms-50 MW total

Page 3: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

Older solar projects on city buildings

Fire Station #22 –LEED Gold

Pennington Street Garage Shaded Parking - 64 kW

Solar lights at dog park

Adaptive Recreation Center - Adaptive Recreation Center - Solar pool heatingSolar pool heating

Page 4: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

2009 CREBs Project Sites

Page 5: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

2009 CREBS Project Details

• 7 sites (4 roof and 3 ground) - 23 kW to 475 kW; total 1 MW (200 home systems)

• 4614 traditional photovoltaic (PV) panels plus 260 Solyndra panels• Single axis trackers for ground mounted systems• Matched system size with roof space & electrical load

El Pueblo

Page 6: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

Roger Road Reclaimed Water Reservoir110 kW

El Pueblo 97 kW ballasted system

2009 CREBS Projects

Page 7: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

Solyndra panel close-up- a new kind of solar panel & in the news!!

Page 8: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

2011 CREBs/CDP plans

Page 9: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

So far so good, but…

• All of the early solar projects and the CREBs projects were accessory uses to existing buildings, so no zoning issues

• Zoning official had ruled that commercial solar facilities were generating plants

Page 10: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

The Problem-Good land, bad zoning

• Large plots of unused city land

• Closed City landfillsZoning of closed landfills: R-1, R-2, SR, RX-1

Page 11: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

Why it mattered

• TEP 2009 RFP for wholesale power looking for sites for large solar farms near distribution lines and close to customers

• Solar developers looking for land close to transmission lines too

• City of Tucson Land Use Code only allowed a generating system for the production of energy in Industrial Zones

• Closed landfills in various other zones, thus not available for solar!!

Page 12: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

2010 Land Use Code changes

• New definition of Renewable Energy Generation (LUC 6.3.12.3) which includes solar, wind, landfill gas, etc

• Established process for application for solar farms in most zones, with increasing levels of notice and hearing as move from Industrial to Commercial to Residential

Page 13: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

2010 Land Use Code changes

• Basic premise: more public involvement in zones with more potential conflict

• Industrial zones: Permitted use subject to performance criteria

• Commercial zones: Limited Notice Procedure (staff review + opportunity for hearing upon request)

• Residential zones: Full notice and hearing

Page 14: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

First case under new code-Plaza del Sol PV Project

• Ordinance adopted June, 2010

• Special Exception Use Zoning sought per revised City Ordinances

• Zoning Examiner hearing Dec 9, 2010

• Zoning Examiner decision Dec 16, 2010 recommending approval

• Construction started late Dec 2010

Page 15: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

A large mobile home community with master meter and unused land

Page 16: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

Plaza del Sol PV project

Page 17: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

Plaza Del Sol PV Project

• Project details: 630 kW; single axis trackers

• Meets 20% of mobile home community’s electrical load

• On-line May 2011• Financed with help of

TEP REC purchase and §1603 grant

• Next??

Page 18: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

Contact Information

• Bruce Plenk, Solar Energy Coordinator– (520) 837-6322, [email protected]

Soaring Heights Project at Davis-Monthan AFB

Page 19: Solving a Solar Land Use Issue

AZ APA Conference September 29, 2011

Questions &Comments ?