Solar PV Installation

What’s Involved

Page 2: Solar PV Installation, Whats Involved

First we erect the scaffolding for safe and convenient access to the roof

Page 3: Solar PV Installation, Whats Involved

We push back the tiles to locate the rafters and check the layout of the roof hooks

Page 4: Solar PV Installation, Whats Involved

Having finalised the layout we have fitted noggins in this roof to give the rafters additional width for fixing the roof hooks

Page 5: Solar PV Installation, Whats Involved

With the layout finalised and the noggins in place we can attach the roof hooks

Page 6: Solar PV Installation, Whats Involved

Meanwhile our electrician is installing the Inverter, isolators and generation meter

Page 7: Solar PV Installation, Whats Involved

With the roof hooks fixed the tiles are put back in position. We grind down the nib of the tile so that it will still lie flat with the hook in place

Page 8: Solar PV Installation, Whats Involved

Now we position and fit the rails

Page 9: Solar PV Installation, Whats Involved

The electrics are ready for the DC cabling from the Solar PV array

Page 10: Solar PV Installation, Whats Involved

With the frame in place it’s time to line up and attach the first panel

Page 11: Solar PV Installation, Whats Involved

Carefully checking to make sure it all lines up

Page 12: Solar PV Installation, Whats Involved

As each panel is installed the cables are connected up to create the circuit...

Page 13: Solar PV Installation, Whats Involved

...and carefully attached to the frame to prevent them rubbing on the tiles

Page 14: Solar PV Installation, Whats Involved

A lead sheath is fabricated to guide the cables into the loft. The nib of the tile has been ground away to ensure it lies flat and the roof stays weatherproof

Page 15: Solar PV Installation, Whats Involved

Inside the loft the cable from the Solar PV Array is fed into conduit for safety...

Page 16: Solar PV Installation, Whats Involved

...into a DC isolator so the system can be shut down from the loft space if necessary.......

Page 17: Solar PV Installation, Whats Involved

....then run in conduit to the inverter which in this case is in the garage.

Page 18: Solar PV Installation, Whats Involved

The last panel is lifted into position.......

Page 19: Solar PV Installation, Whats Involved

And connected to the rest of the array.

Page 20: Solar PV Installation, Whats Involved

With the frame trimmed to fit, the PV array is complete and looking good.

Page 21: Solar PV Installation, Whats Involved

The PV array is connected up, tested, commissioned and is now generating electricity

Page 22: Solar PV Installation, Whats Involved

It’s all working and the site is cleared ready for the scaffolding to come down.

Page 23: Solar PV Installation, Whats Involved

JOB DONE