Solar Enablement Initiative Distribution State Estimation – for real! Olav Krause SEI Project Leader ARENA Insights Forum 25 th June 2019
Solar Enablement Initiative Distribution State Estimation – for real!
Olav Krause
SEI Project Leader
ARENA Insights Forum 25th June 2019
Increasing Visibility of Distribution Networks to Maximise PV Penetration Levels – Project Partners
Solar Enablement Initiative
2
• This project aims to support electricity distribution companies to take a less conservative approach in assessing and approving additional customer photovoltaic (PV) systems to be connected to their networks.
• This is achieved by providing them with a better understanding of the operational conditions of their networks through the application of a proven state estimation technique (SEA) that generates an estimate of the networks’ operational conditions.
• These estimated results will form part of a network analysis tool through which the likely impact of the additional PV systems can be assessed.
Project Objective
3
Solar Enablement Initiative
Solar Enablement Initiative
• In a sense we’re going through what Transmission Systems went through in the 1970’s.
• Transmission Systems used to be monitored by manned substations equipped with telephones.
• Advances in ICT and digitisation of measurement equipment led to measurement data being telemetered to Transmission control centres.
• This has enabled automated secondary assessment and analysis processes driving up efficiency and reliability, such as:
• Topology optimisation• Reactive power optimisation• Contingency generation re-dispatch• (N-x) calculations• Short circuit studies• Network constrained dispatch and trading
The key: State Estimation
Why State Estimation?
4
DSSE - a ‘Hardware Abstraction Layer’Energex:~40% DTX*
measurements
United Energy:>90% Smart Meter coverage
TasNetworks:Re-closer and Regulator measurements
Solar Enablement Initiative
Voltage profile
Current profile
~20 DTX ~100 DTX ~350 DTX*DTX: Distribution Transformer
5
Solar Enablement Initiative
DSSE result precision (current MV trial)
6
• A largely residential feeder
• 36 distribution transformers 315 kVA to 750 kVA
• 25% monitor coverage (9 of 36 have transformer monitors).
• Feeder for real time deployment.
• Hosts PV system for dynamic export limit trial.
Estimation vs. SCADA
Measurement vs. estimated uncertainty
DSSE - on MV and LV levelStand-alone systemWith current integration:- OSIsoft PI- ARCgis ESRI- Siemens PSS®Sincal
Solar Enablement Initiative
7
own dashboard
Siemens PSS®Sincal with exported results
ESRI with result visualisation
PI Vision with result visualisation
Solar Enablement Initiative
DSSE – unprecedented knowledge of system performance
8
Node graphs& Maps
Heat Maps
Time series Histograms
• DSSE provides a basis for better decision making, off-line and in real-time
• Off-line value stems from detailed network performance assessment• E.g. assessing asset utilisation
• Regulatory compliance and reporting
• Planning, including investment, operational and connection assessment (project objective)
• Real-time value stems from situational awareness for improved operational decision making (manual and automated)• E.g. dynamic export/import limits (project objective, two demonstration sites)
• Use of controllable network devices (e.g. OLTC, regulators, capacitor banks,…)
• Possibly provision of Operational Envelops and Dispatch Constraints
DSSE - where is the value?
Solar Enablement Initiative
9
Solar Enablement Initiative
Distribution State Estimation – for real!