Top Banner
©2013 Software AG. All rights reserved. Migration from ARIS 7 to ARIS 9 Ben Øverland, Director Business Development Consulting March 5, 2014 - Oslo
23

Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

Jan 26, 2015

Download

Technology

Software AG

Presentation at ARIS 9 Seminar in Oslo on March 5, 2014 by Ben Øverland, Director Business Development Consulting & Peter Björklund, Solution Architect at Software AG.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved.

Migration from ARIS 7

to ARIS 9

Ben Øverland,

Director Business Development Consulting

March 5, 2014 - Oslo

Page 2: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only2 |

What does the ARIS 9 migration include?

ARIS 9 includes a lot of exciting new features and a new product architecture. Therefore

the upgrade will be planned and done in a very controlled process

• ARIS 9 installation: readiness assessment, upgrade installation, migration of existing

content and configuration

• ARIS 9 enablement: delta training for existing users, new ARIS trainings for new

customers, mentoring & certifications

• ARIS 9 customized solutions: existing solution analysis, ARIS 9 custom solution

upgrade/development

ARIS 9-specific

enablement to create

productivity fast

Client-specific upgrade

roadmap and

installation

Analysis and migration

of existing custom

solutions

Page 3: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only3 |

ARIS 9 readiness assessment

The underlying technical architecture of ARIS 9 has

changed significantly compared to older versions.

Therefore it will be rolled out in multiple releases to

make sure that all potential scenarios are

covered and existing content and customized solutions

can be migrated at the right time.

• Assessment of existing ARIS installation (ARIS 7.x

products, technology, ARIS DB setup,

customizations, content, scripts, reports..)

• Development of a high-level upgrade /

installation roadmap

• Determination of system requirements (hard-ware,

software, physical databases, network connectivity,

etc.)

Page 4: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only4 |

ARIS 9 training

The new ARIS version brings a new user interface that

simplifies the tool usage for end users significantly. To

get your project members up-to-speed quickly, we offer

two sets of training:

• ARIS 9 Delta Training

• 1,5 days of training for experienced ARIS users (ARIS as

we know it)

• 0,5 day for ARIS Connect

• Highlights the new developments in ARIS 9 and the

changes compared to version 7.x

• Standard ARIS 9 Training

• For new users without previous ARIS experience

• Curriculum contains multiple training offerings for

different user types (end user, admin, …)

Page 5: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only5 |

Existing custom solution analysis

Migration is an important topic for a BPM / EAM program

that wants to upgrade to ARIS 9. This includes not only the

basic configuration, users and databases, but also all

custom reports, semantic checks and macros that were

developed for the program.

The existing custom solution analysis covers:

• Analysis of existing scripts and automated views

• Upgrade path (or replacement if functionality is

standard in version 9)

• Specification document & effort estimate

• Development and deployment plan

Page 6: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only6 |

ARIS 9 custom solution upgrade / development

After authorization by the client, the development work

begins. It includes:

• Update / development of custom scripts (reports,

macros, semantic checks) and automated views

• Migration of ARIS 7 scripts to version 9

• Testing of custom scripts and automated views in client

ARIS 9 test environment

• Deployment of updated / developed custom scripts to

client ARIS 9 production environment

• ARIS 9 Custom Solution documentation

Page 7: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only7 |

ARIS 9 high-level upgrade approachReadiness

Enablement

ARIS Customized Solutions

ARIS 9upgradereadiness

check

Installation

ARIS 9mentoring

ARIS 9certification

ARIS 9 deltatraining

existing users

ARIS 9scripting

specification& estimates

ARIS 9customsolution

development

HW/SW/DB/cloud

provisioning

done by customer

ARIS 9Connect

Configuration

ARIS 9 fulltraining

new users

Existing configbackup &migration(ARIS & MZ

On premiseinstallation

(Design & MZSrv)

Cloudinstallation

(Connect Srv)

includes Design and MZ Srvs

Installationtest & doc.

Page 8: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved.

Migration from ARIS 7

to ARIS 9

Peter Björklund

Solution Architect

March 5, 2014 - Oslo

Page 9: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved.

ARIS Release 9ARIS 9 Deployment

Scenarios

Page 10: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only10 |

ARIS 9 Deployment Scenarios

Version 7

ARIS Business Server

ARIS

B. Architect

B. Designer

P. Govern.

B. Publisher

Version 9

ARIS

Architect

Designer

ARIS Design Server

B. Publisher

P. Govern.

ARIS Design Server

Version 9

ARIS

Architect

Designer

ARIS Design Server

Private cloud

ARIS Connect

Collaborate

Design

Dashboarding

Consume

B. Publisher

P. Govern.

ARIS Connect Server

Page 11: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only11 |

ARIS 9 Deployment Scenarios

Process Live

processlive.com

Collaborate

Design

Dashboarding

Consume

Based on ARIS Connect Server

Process Live

Version 9

ARIS

Architect

Designer

ARIS Design Server

B. Publisher

P. Govern.

ARIS Design Server

Version 9

ARIS

Architect

Designer

ARIS Design Server

Private cloud

ARIS Connect

Collaborate

Design

Dashboarding

Consume

B. Publisher

P. Govern.

ARIS Connect Server

Page 12: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only12 |

ARIS 9 Technical Architecture – Design Server

ARIS Client

can be installedfrom the server oras a separateinstallation

ARIS DesignServer

ARIS PublisherServer

Ext. DB Server(cust.)

ARIS Express

import only

Customer LDAP

ARIS Mashzone

User MgmtComponent

SAP® SolutionManager (cust.)

Page 13: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only13 |

ARIS 9 Technical Architecture – Connect Server

ARIS Connect Server

ARIS Client

can be installedfrom the server oras a separateinstallation

Ext. DB Server(cust.)

ARIS Express

Customer LDAP

ARIS DesignServer

ARIS Mashzone

import only

Governance"light"

Process PortalCollaboration

User MgmtComponent

Optional for existingcustomers/licenses

ARIS PublisherServer

SAP® SolutionManager (cust.)

Page 14: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved.

ARIS Release 9ARIS 9 Product

structure & architecture

Page 15: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only15 |

ARIS 9 – New harmonized product structure

CollaborationAd-hoc analysis

Open Metamodel

Management

User Management

Component

ARIS Design Server

ARIS Connect Server

Spreadsheet analysis Publishing

Design

Governance

Business Server

+

+

+

+

+

+

+

+

Ext. Pack: SAP Ext. Pack: EAM Ext. Pack: APG Ext. Pack: ...

Page 16: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only16 |

ARIS 9 – New harmonized product structureProduct families

ARIS Client

ARIS

Design/ConnectServer

ARIS ProcessPerform. Mgr

ARIS Mashzone

Page 17: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only17 |

ARIS 9 – New harmonized product structureAll ARIS Products

• … for all products and their related product add-ons

Product Family

Main ProductMain Product

Extension Pack

Main ProductExtension Pack

Main ProductExtension Pack

Page 18: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only18 |

ARIS Server products

ARIS Design Server

Design Srv Ext P.Process Gov.

Design Srv ExtPack TOGAF

Design Srv ExtPack SharePoint

Design Srv ExtPack ArchiMate

Design Srv Ext P.Documentum

ARIS Publisher Server

Publisher Ext.Pack IT Inventory

Publisher Ext P.Documentum

Publisher Ext P.SharePoint

ARIS Connect Server

Connect Srv ExtP. Process Gov.

Page 19: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only19 |

ARIS Design Server

Design Srv ExtPack SharePoint

Design Srv Ext P.Documentum

Design Srv Ext P.Process Gov.

Design Srv ExtPack TOGAF

Design Srv ExtPack ArchiMate

ARIS Connect Server

ARIS DesignServer

Functionality Scope of ARIS Connect Server

vs. ARIS Design Server

Collaborate

Dashboarding

Consume

Governance

Page 20: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only20 |

ARIS Client

ARIS Architect ARIS Designer

ARIS UMLDesigner

Arch. Ext. PackBusiness Strategy

Arch. Ext. PackEAM

Arch. Ext. PackProcess Gov.

Arch. Ext. PackSAP

Arch. Ext. PackSimulation

Designer Ext.Pack Bus. Stra...

Designer Ext.Pack EAM...

Designer Ext.Pack SAP...

Arch. Ext. PackModel-to-Exec.

Arch. Ext. PackAccess

UML DesignerExt. Pack Access

ARIS Viewer

- view models in Publisher- view ITI information- view Process Board (APG)

ARIS ConnectDesigner

ARIS ConnectViewer

ARIS Client products

Page 21: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only21 |

ARIS 7.x

• ARIS Business Architect

• ARIS Business Designer

• ARIS IT Architect

• ARIS IT Designer

• ARIS Business Architect for SAP

• ARIS BI Modeler Architect version

ARIS 9.0

• ARIS Architect

• ARIS Designer

• ARIS Architect + ARIS Architect

extension pack: EAM

• ARIS Designer + ARIS Designer

extension pack: EAM

• ARIS Architect + ARIS Architect

extension pack: SAP

• ARIS Architect + ARIS Architect

extension pack: SAP

From ARIS 7.x to ARIS 9.0

Page 22: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo

©2013 Software AG. All rights reserved. For internal use only22 |

Page 23: Software AG Nordic - Migration ARIS 7.x to ARIS 9 - ARIS 9 Seminar, March.5, 2014 - Oslo