Page 1 Ome sai ram Ome namo venkatesaya Srinivasaya Govindaya Naarayanayaaaaaah Soft Ware Testing: ⇒ Why did you choose this Course? * 1. Scope of getting job is very high. 2. No need to depend up on any technologies. 3. Testing remains forever 4. I want to be consistent through out my life ⇒Why explicitly the s/w companies are recruited the test engineers? 1. One person cannot efficiently perform two tasks at a time 2. Sentimental attachment. ⇒Who can do the course? Any graduate can do this course at this point of time ⇒ What exactly we require to get a job? 1. Stuff 2. Communication skills 3. Confidence 4. Dynamism ⇒ Project: Project is some thing that is developed based on the particular customers requirements and used by that customer only ( E.g.: Marriage laddu) ⇒Product: It is some thing that is developed based on the companies specification and used by the multiple customers (e.g.: Thirupathi laddu) ⇒Quality: Classical definition for quality: - Quality is defined as justification of all the requirements of customer in a product. NOTE: Quality is not defined in the product; it is defined in the customers mind Defect: - Defect is defined as deviation from the requirements [email protected]1
41
Embed
Soft Ware Testingapi.ning.com/files/BsWjeq0d1vb9sP3uI5PDYMP7v4ow2UFAxFjF9m... · Soft Ware Testing: ⇒ Why did you ... appointed day, gathers the requirements with the help of template
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1Ome sai ram
Ome namo venkatesayaSrinivasayaGovindaya
Naarayanayaaaaaah
Soft Ware Testing:⇒ Why did you choose this Course?* 1. Scope of getting job is very high. 2. No need to depend up on any technologies.
3. Testing remains forever4. I want to be consistent through out my life
⇒Why explicitly the s/w companies are recruited the test engineers?
1. One person cannot efficiently perform two tasks at a time 2. Sentimental attachment.
⇒Who can do the course? Any graduate can do this course at this point of time
⇒ What exactly we require to get a job?1. Stuff2. Communication skills3. Confidence4. Dynamism
⇒ Project: Project is some thing that is developed based on the particular customers requirements and used by that customer only ( E.g.: Marriage laddu)
⇒Product:It is some thing that is developed based on the companies specification and
used by the multiple customers (e.g.: Thirupathi laddu)⇒Quality:
Classical definition for quality: - Quality is defined as justification of all the requirements of customer in a product.NOTE: Quality is not defined in the product; it is defined in the customers mind
Defect: - Defect is defined as deviation from the requirements
Page 2Latest definition for quality: - quality is defined as not only the justification of requirements but also the presence of value (User friendliness)⇒ Testing:
Testing is processes, in which the defects are identified, isolated, subjected for rectification & ensure that the product is defect free. In order to produce the quality product in the end and hence customer satisfaction.
⇒ Bidding The Project:Bidding the project is defined as request for proposal, estimation and signing
off (Official agreement).
⇒ Kick Off Meeting:It is an initial meeting conducted in the soft ware company soon after the
project is signed off. In order to discuss the overview of the project and to select a project manager for the project.
Usually high level management, Project managers, team managers, quality managers, team leads and quality leads will be involved in this meeting.
⇒PIN (Project Initiation Note):- It is a mail prepared by the project manager and sent to the CEO of the soft
ware company in order to get the permission to start the project developments.
⇒ Software Development Life Cycle (SDLC):-
SDLC contains six phases they are
1. Initial phase or requirements phase.
2. Analysis phase
3. Design phase
4. Coding Phase
5. Testing Phase
6. Delivery & Maintenance Phase.
I. Initial Phase or Requirements Phase :
(a) Tasks: Interaction with the customer and gathering the requirements.
(b) Roles: Business Analyst (B.A), Engagement Manager (E.M)
⇒Process: First of all the business analyst will take an appointment from the customer, collects the templates from the company, meets the customer on appointed day, gathers the requirements with the help of template and comes back to the company with the requirements documents.
Once the requirement document has come to the company the engagement manager will check whether the customer gives any extra requirements
Page 3or confused requirements. In case of extra requirements he deals the excess cost of the project. In case of confused requirements he is the responsible for prototype demonstration and gathering the clear requirements.
⇒Proof: The proof document of this phase is Requirements Document. This is called with different names in different companies.
1. FRS (Functional Requirements Specification)
2. CRS (Customer Requirement Specification)
3. URS (User Requirement Specification)
4. BDD (Business Design Document)
5. BD (Business Document)
6. BRS (Business Requirement Specification)
Some companies may maintain the over all business flow information in one document and the detailed functional requirement information in the other document
⇒Templates: It is a pre defined format, which contains the predefined fields, and used for preparing a document in an easy, comfort and perfect manner.
⇒Prototype: -Defined as a roughly & Rapidly developed model which is used for demonstrating to the client, In order to gather the clear requirements and to win the confidence of a customer.
II. Analysis Phase:
(a) Tasks:
1.Feasibilty Study
2.Tentative planning
3. Technology Selection
4. Requirement Analysis(b) Roles: System Analyst, Project Manager, and Team Manager.
Process
1. Feasibility Study: - It is detailed study of the requirements in order to check weather the requirements are possible or not.
2. Tentative Planning: In this section the resource planning and the time planning (scheduling) is done temporarily.
Page 43. Technology Selection: - The list of all the technologies that are required
to accomplish this project. Successfully will be analyzed and listed out in this section.
4. Requirement Analysis: - The list of all the requirements that are required to accomplish this project. Successfully will be analyzed and listed out here in this section.
SRC- System requirement specification
Proof: - The proof of this phase is system Requirement specification.
III. Design Phase: -
Tasks:
1. High level designing
2. Low level designing
Roles: High-level designing is done by the chief Architect & Low level designing is done by the Technical Lead
Process: The Chief architect will be drawing some diagrams using unified modeling language in order to divide the whole project in to modules.
The Technical lead will also draw some diagrams in order to divide the modules in to sub modules.
The technical lead will also develop the PSEUDO code in order to make developers comfortable while de3veloping the actual code.
Proof: The proof document of this phase is Technical design document.
IV. Coding phase:
(a) Task: Developing or Programming
(b) Roles: Developers or Programmers
Process: Developers will develop the actual code by using the technical design document as well as following the coding standards like Proper indentation, color coding, proper commenting and etc..,
Proof: The proof document of this phase is source code Document.
E.g.: The programmer will develop some programs every one will develop his program in different colors but the soft ware companies will ask the developers to develop the program according to the company standards using proper color, coding, commenting. So as to understand it easily.
1. First of all the test engineers will collect the requirements document and try to understand all the requirements
2. While understanding it at all they get any doubts they will list out all of them in a review report.
3. They will send the review report to the author of the requirements document for clarifications.
4. Once the clarifications are given and after understanding all the requirements clearly, they will take the test case template and writes the test cases.
5. Once the first build is released then they will execute the test cases
6. If at all any defects are found. They will list out all of them in a defect profile template then
7. They will sent the defect profile document to the development department and then will be waiting for the next build to be released.
8. Once the next build is released then they re-execute the test cases.
9. If at all any defects are found they will update the profile document and sent it to the development department and will be waiting fro the next build to be released .
10. This process continuous till the product is defect free.
Proof: The proof of the testing phase is Quality Product.
⇒Test Case: (def) Test case is an idea of a test engineer based on the customer’s requirements in order to test a particular feature or a function.
(a) Task: - Installing the application in the client’s environment
(b) Rolls: -Deployment engineer or Senior test engineers.
Process: - The senior test engineer or deployment engineer will be going to the clients place and install the application in their environment with the help of the guidelines provide in the deployment document.
Maintenance:
After delivering the soft wate while using if at all any problem occurs then that problem becomes a task, based on that problem corresponding rolws will be appointed, the roles will defined the process and solve that problem.
Some clients may request for the continuous maintenance in such situations a group of people from the software company will be continuously working on the clients place and taking care of the soft ware.
1.Un-conventional Testing: -Unconventional testing is a sort of testing done by the quality assurance people, in which they test each and every out come document right from initial phase of the SDLC (Soft ware development life cycle)
2.Conventional Testing: It is sort of testing done by the test engineers on the application in the testing phase of SDLC.
Page 7⇒Testing Methodology or Testing techniques: There are three methods of testing
(a) Black-Box Testing
(b) White-Box Testing
(a) Grey-Box Testing
(a) Black-Box Testing: If one performs testing only on the functional part of an application with out having any structural knowledge then tat method of testing is known as Black-Box testing, usually the test engineers perform it.
(b) White-Box Testing: If one performs testing on the structural part of an application then that method of testing is known as white box testing, usually the developers or white box testers perform it.
(c) Grey-Box Testing: If one performs testing on both the functional part as well as the structural part of an application then that method of testing as known as gray box testing using the test engineers who have structural knowledge will perform gray- box testing.
⇒Levels of Testing:There are five levels of testing
1. Unit Level Testing
2. Module Level Testing
3. Integration Level Testing
4. System Level Testing
5. User Acceptance Testing (U.A.B)
1.Unit Level Testing: -
It is a level of testing in which one will perform testing on the units. It is a white box testing and usually developers or white box testers will perform.
2.Module Level Testing: -
Module: Module is defined as a group of related functionalities to perform a major task
It is a level of tasting in which one will perform testing on the modules. It is a black box testing and usually test engineers perform it.
It is a level of testing in which the developers will develop some interfaces to integrate the modules and test whether the interfaces are working fine or not. It is a white box testing usually developers or white box tasters perform.
The developers may follow one of the following approaches while integrating the modules.
1.Top-down approach
2.Bottom –up approach
3.Hybrid or Sandwich approach
4.Bigbang approach
1.Top-down approach: - In this approach one will develop the parent modules first and then integrate them with the related child modules
2.Bottom-up approach: - In this approach one will develop the child modules first and integrate them to the parent modules
3.Hybrid approach Or Sandwich approach:- This is a mixed approach of both the top down and bottom up approaches
4.Big bang approach:-In this approach one will wait till all the modules are ready and finally they will integrate all the modules at a time
⇒STUB: - While integrating the modules in top down approach if at all any mandatory module is missing then that module is replace with a temporary program known as STUB
⇒DRIVER: -While integrating the modules in bottom up approach. If at all any mandatory module is missing then that module is replaced with a temporary program known as DRIVER
4.System Level Testing:
It is a level of testing in which one will install the complete application in to the environment and then perform testing on it. At this level different types of testing will be done one among those is system integration testing.
5.System integration Testing: -
It is a type of testing in which once the complete application is developed one will perform an action at one module and checks for the reflections at the corresponding modules. It is a black box testing and usually test engineers perform.
It is the level of testing in which one will perform the same system testing in the presence of the user in order to make him accept the application. It is a black box testing and usually Test engineer performs it.
Environment: - Environment is a combination of three layers (e.g.: Yahoo)
a. Presentation layer
b. Business layer
c. Data base Layer
System: The application installed in to an environment combinable called as system.
a. Presentation Logic: The logic that is used for viewing application is known as presentation logic
b. Business Logic: - The logic that is used for performing the operations on the application is known as business logic.
c. Data Base Logic: - The logic that is used for sharing and retrieving the data is known as database logic.
Types of Environment: - There are Four types of environments
a. Stand alone environment or One-tier environment
b. Client –server environment or Two-tier Architecture
c. Web environment or Three-tier Architecture
d. Distributed environment or N-tier Architecture
a. Stand Alone environment: - In this type of environment all the three layers that is presentation layer, Business layer& Database layer will be present in al single tier. This type of environment is suitable for single user application.
In this type of environments there will be two tiers, one tier is for clients and other tier is for database servers. The presentation layer and the business layer will be present in each and every client . The database layer will be present in the database server. This type of environment is suitable for multi user application in a single or a limited area.
Two tier Architecture
PL+BL DBL
PL+BL
PL+BL
Clients Server
c. Web environment: - In his type of environment three tiers will be there. One is for client’s the middle one is for application server and the other one is for database servers. Presentation layer will be present at clients, Business layer will be present in the application server, and database layer will be present at the database servers. This type of environment is suitable for the applications that are used all over the world by limited number users
Three-tier Architecture:
PLDBL
BLPL
DBLPL
Web server: - It is software, which provides web services to the clients.
Page 11E.g.: - Internet Information service (IIS).
Example for Application servers: Tom pact, Web logic, web sphere etc..,
d. Distributed environment: -It is similar to the web environment but the number of application servers are increased and represented in individual tiers in order to distribute the business logic so that the logic will be distributed.
Page 13Drawbacks: - ⇒ It is not a complete model ⇒ Prototype has to be built on companies cost ⇒ User may limit his requirements by sticking to the prototype.
(B) Evolutionary Model: -
Advantages: - Whenever the customer is evolving the requirements this is the best Suitable model.
Drawbacks: -• Cannot define the dead lines• Project monitoring & maintenance is very difficult• No Transparency (No clear)
Spiral Model: -
Advantages: -This is the best suitable for developing the highly risk based project
Risk analysis and estimation is not an easy task It is a costly model It is a time consuming model
(C) Fish Model: -
• • • •
•
•
• • • •
Advantages: -
This is the best suitable for developing the highly risk based project(scientific projects)
Drawbacks: -o Time consuming Modelo Costly model
Verification: -It is a process of checking conducted on each and every role of the
organization in order to check whether they are working according to the guidelines or not right from the starting of the process till the ending of the process
Validation: -It is a process of checking conducted on the developed product in order to
check whether it is working according to the requirements or not.
Page 161.Build Acceptance Testing Or Build Verification Testing Or Sanity Testing: -
It is a types of testing in which one will conduct over all testing on the released build in order to check whether it is proper for further detailed testing or not. Even some companies call it as smoke testing, but some companies says that just before releasing the build the developers will conduct the overall testing on the build that is known as smoke testing and once the build is released what ever the test engineers do in order to accept the build is known as B.A.T or B.V.T or Sanity Testing.
2.Regression Testing: -
It is a type of testing in which one will perform testing on the already tested functionalities again and again.It is usually done in two scenarios.
1. Whenever the testers has raised the defects, rectified by the developers and next build is released to the testing department then the test engineer’s will test the defect functionality as well as the related functionality once again.
2. When ever some new features are incorporated by the developers, next build is released to the testing department then the test engineers will once again test the related functionalities of the new features in order to confirm that they are working same as previous.
Note: - Testing the new functionalities for the first time is known as new testing but not Regression Testing.
3.Re-Testing: -
It is a type of testing in which one will test the same functionality again and again with different sets of values in order to come to a conclusion whether it is working or not.
4.α - Testing (Alpha Testing): - It is a type of user acceptance testing in which the test engineers will test the
application in our company, in the presence of the customer.
Advantage: - If at all any defects are found then there is a chance of rectifying them immediately.
5. β -Testing (Beta): -
It is a type of user acceptance testing done in the clients place either by the end-users or by the third party testing experts before actual implementation.
Page 17Drawback: If at all any defects are found then there is no chance of rectifying them immediately.
6. Static Testing: -
It is a type of testing in which one will perform testing on the application or application related factors with out performing any action.Eg:- Documentary testing, GUI testing, Code reviews and etc.,
7. Dynamic Testing: -
It is a type of testing in which one will perform in the application or its related factors by doing some actionsEg: - Functionality testing.
8.Installation Testing: -
It is a type of testing in which one will install the application in to the environment by following the guide lines provided in the installation document and if the installation is successful then he will come a conclusion that the given guide lines are correct other wise he will come to a conclusion that the given guidelines are not correct.
9.Compatibility Testing: -
It is a type of testing in which one may have to deploy the application in to the multiple number of environments prepared with different combinations of environmental components in order to check whether the application is compatible with all that environments. This type of testing is usually done to products.
10. Monkey Testing: -
It is a type of testing in which one will perform abnormal action on the application intentionally in order to check the stability of the application.
11.Usability Testing: -
It is a type of testing in which one will check whether the application is user friendly or not and it can be comfortably used by the end user or not.
12. Exploratory Testing: -
It is a type of testing in which one will (Domain Experts) will perform testing on the application with out having the knowledge of requirements but by exploring the functionality.
13.End-To- End Testing: -
It is a type of testing in which one will perform testing on all the end- to-end scenarios of the application.
It is a type of testing in which one will deploy the application in to the clients environment and check whether it is compatible with that environment or not.
15.Reliability Testing: -It is a type of testing I which one will perform testing on the application
continuously for long period of time in order to check the stability of the application
16.Security Testing: -Its is a type of testing in which one will concentrate on the following areas of the
application
a. Authentication Testingb. Direct URL Testing (Uniform Resource Location)c. Fire Wall Leakage Testing.
(a) Authentication Testing: -
It is a type of testing in which one will enter different combinations of usernames and passwords and try to access the home page in order to check whether only the authorized persons are accessing the application or not.
(b) Direct URL Testing: -
It is a type of testing in which one will enter the URL of an unauthorized page directly in the browser and try to access that page in order to check whether it is been accessed or not.
(c) Firewall Leakage Testing: -
It is a type of testing in which one will enter as one level of user and try to access the other level of unauthorized pages in order to check whether the firewalls are working properly or not.
17. Mutation Testing: -
It is a type of testing in which one will perform testing on some thing by doing some changes to it.
18. ADHOC Testing: -
It is a type of testing in which one will perform testing on the application in his own style after understanding the requirements clearly.
2.0 Coverage Of Testing2.1 Features To Be Testing2.2 Features Not To Be Testing
3.0 Test Strategy
3.1 Levels Of Testing3.2 Types of testing3.3 Test design techniques3.4 Configuration management3.5 Test metrics3.6 Terminology3.7 Automation Plan3.8 List of automated tools
4.0 Base criteria
4.1 Acceptance criteria4.2 Suspension criteria
5.0 Test Deliverable
6.0 Test Environment
7.0 Resource Planning
8.0 Scheduling
9.0 Staffing& Training
10.0 Risks & Contingencies
11.0 Assumptions
12.0 Approval Information
1.0 Introduction: -
1.1 Objective: - The Purpose of the document is clearly described here in this section
Page 21The list of all the documents that are refereed to prepare the test plan will be listed out her in the section.
2.0 Coverage Of Testing: -
2.1 Features to be tested: -The list of all the features that are to be tested in this phase will be clearly
mentioned here in this section.
2.2 Features not to be tested: -The list of all the features that are not planned for testing based on the
following criteria will be listed out here in this sectiona. Out of scope featuresb. Low risk featuresc. The functionalities that are planned to be incorporated in futured. The features that are to be skipped based on the time constraints.
3.0 Test Strategy: -
Test strategy is defined as an organizational level term, which is used for testing all the projects in the organization.
Test Plan: -It is defined as a project level term, which is used for testing a particular
project in the organization.
Note: - Test strategy is common for all the projects but the test plan is specific for a particular project
3.1 Levels of Testing: -The list of all the levels of testing that are followed by that company are listed
out here in this section
3.2 Types of Testing: -The list of all the types of testing that are followed in that company will be
listed out here in this section.
3.3 Test Design Techniques: -Technique: -
Technique is some thing i.e., used for accomplishing a complex task in an easy manner.
A list of all the techniques that are used by that company while developing the test cases will be listed out here in this section.
Eg: - BVA (Banded value analysis) ECP (Equivalence Class Partition)
3.4 Configuration Management:- To be discussed later……
The list of all the metrics that are maintained in that company will be listed out here in this section
3.6 Terminology: -The list of all the terms and the meaning that are used in that company will
be listed out here in this section
3.7 Automation Plan: -The list of all the areas that are plan for automation in that company will be
listed out here in this section.
3.8 List Of Automated Tools: -The list of all the automated tools that are used in that company will be listed
out here in this section.
4.0 Base Criteria: -4.1 Acceptance Criteria: -
When to stop testing feeling that enough testing has been done on the application is clearly described here in this section.
4.1 Suspension Criteria: -When to suspend testing suddenly (abruptly) will be clearly mentioned here
in this section.
5.0 Test Deliverable: -
The list of all the documents that are to be prepared during the testing phase will be listed out here in this section.Eg: Test case, defects profile document.
6.0 Test Environment: -
The customer specified environment would be clearly described here in this section. The same environment will be simulated in the company and will be used for testing purpose.
7.0 Resource Planning: -
Who has to do what is clearly described here in this section.
8.0 Scheduling: -
The starting dates and the ending data of the each and every tasks is clearly planned here in this section.
Use Cases:Use case is a description of functionality of certain features of an application
in terms of actors, actions& responses
Input information required for preparing the use case Document: -
i. Screen shotii. Functional requirements
iii. Special requirement/Business rules/Validationiv. Template
i. Screen Shot: -User name
Password
Connect to
ii. Functional Requirements: -a. Login screen should contain username, password, Connects To fields and login, clear, cancel buttons.b. Connect to is not a mandatory field but when ever user requires it
should allow him to select a data base option.c. Up on entering valid username, valid password and clicking on login
button corresponding page must be displayed.d. Up on clicking on the clear button the information present in all the
fields must be cleared and the cursor must be available in the user name field
e. Up on clicking on the cancel button login screen must be closed.
iii. Special requirement/Business ruled/Validation: -
a. Initially whenever the login screen is Invoked Login, clear buttons must be disabled.
b. Cancels Button must be always enable.c. Up on entering user name and password the login button must be
enabled.d. Up on entering some information in to any of the fields the clear button
Page 25e. The Tabbing order must be user name, Password, Connect to, Login,
clear, cancel.iv. Use Case Template:Name Of The Use Case :Brief Description of Use Case :Actor’s Involved :Special Requirements :Pre Condition :Post-Conditions :Flow of Events :
v. Use Case Document:
Name of the use case: Login use case.
Brief Description of use case: It Describes the functionalities of all the features present in the login screen.
Actors Involved: Normal user, Admin User.
Special Requirements: There are two types of special requirements1.Explicit requirements2.Implicit requirements
1.Explicit Requirements: -The Requirements that are directly given by the customer are known
as explicit requirement.
2.Implicit Requirement: -The requirements that are analyzed by the business analyst feeling
that they will add the value (user friendliness) to the application are known as implicit requirements.
List of Explicit requirements: -
• Initially whenever the login screen is Invoked Login, clear buttons must be disabled.
• Cancels Button must be always enable.• Up on entering user name and password the login button must be
enabled.• Up on entering some information in to any of the fields the clear
button must be enabled• The Tabbing order must be user name, Password, Connect to, Login,
• Initially whenever the login screen is invoked the cursor must be available in the user name field
• Upon entering in valid username, valid password and clicking on log in button an error message should be displayed “Invalid username Please try again”
• Upon entering valid username, In valid password and clicking on login button an error message should be displayed “Invalid Password Please Try again”
• Upon entering Invalid username, Invalid password and clicking on login button an error message should be displayed “Invalid user name and password Please try again”
Pre-Conditions: Login screen must be available
Post-Conditions: Either home page or admin page for the valid user and error message for the invalid users
Flow of Events: There are three flows for the application
Action ResponseActor Clicks on the cancel button. Login screen is close
• Identify the module to which the use case belongs.Security module.
• Identify the functionality of the use case with respect to the total functionalityAuthentication
• Identify the functional points and prepare the functional point document.
• Identify the input required to perform testingValid & invalid Inputs
• Identify the actors involved in the used caseNormal user & Admin user.
• Identify whether the use case is linked with any other use case.Home page and Admin page use cases
• Identify the pre conditionsLogin Screen mist be available
• Identify the post conditionsEither home page or admin page for valid users and error message for invalid users
• Understand the main flow of the application• Understand the alternative flow of the application• Understand the special requirements• Document the test cases for the main flow • Document the test cases for the alternative flow• Document the test cases for the special requirements• Prepare the cross-reference matrix.
Functional Point: -The point where an user can perform some action is known as
FRS- Functional Requirement SpecificationFPD-Functional port DocumentMTCD-Master Test Case DocumentDTCD-Detailed Test Case DocumentDPD-Defect Profile Document
Cross Reference Document: -(Traceably Document)
It is a document, which contains a table of linking information used for tracing back for the reference in any kind of ambiguous (confusion) or questionable situation.
There are Two types of test cases if we see broadly they are:1. GUI Test Cases2. Functional Test Cases
The Functional cases are further divided in to Two types
(a) Positive Test Cases,(b) Negative Test Cases.
Guide Lines fro developing the GUI Test Cases:
• Check for the availability of all the objects• Check for the alignments of all the objects up on customer requirements• Check for the consistency of all the objects• Check for the spellings and grammar• Apart from the above guide lines any thing else that can be tested just by
looking with out doing any actions will fall under GUI test cases
Guide Lines for Positive Test Cases:
• A test engineer should have positive mind set up• He should consider the positive flow of the application• He should use only the valid Input
Guidelines for developing Negative Test Cases:
• A test engineer should have negative mind set up• He should consider the negative flow of the application• He should use at least one invalid input per a set of data
A test Engineer will do the following during the test execution
1. He will perform the action that is described in the description column2. He will observe the actual behavior under the actual value column.3. He will document the observed value under the actual value column.
Page 35In this phase the test engineer will compare the expected values with the actual values and if both are matched they will document the result as pass other wise they will document the result as fail.
Bug Tracking is a process in which the defects are identified, Isolated and managed
Defect –ID: -
The lists of defect numbers are mentioned here in this section.
Defect Description: -What exactly the defect is clearly described here in this section.
Steps for reproducibility: -The list of all the steps that are followed by the test engineer to identify the defect will be listed out here in this section.
Submitter: -The name of the test engineer who has submitted the defect will be mentioned here in this section.
Date Submission: -The date on which the defect is submitted is mentioned here in this section.
Version No: -Corresponding Version number is mentioned here in this section.
Build No: -Corresponding build number is mentioned here in this section.
Assigned To: -The development lead will fill the developers name for whom the defect is assigned.
Upon Clicking on clear button all the fields are cleared
but the cursor is not placed in the user
name field
1.Enter some information in to any of the fields 2.Click on clear button 3.Observe that the cursor is not placed in the username fields after clearing all the fields
Sri Balaji 11-Feb-08 1.0.0 1
3
Upon entering Suresh1 as
username and qtp as password and clicking on login
button admin page is displayed instead
of error message
1.Enter Suresh1 in to the user name field 2.Enter qtp in to the password field 3.Click on login button 4.Observe admin page is displayed instead of error message.
Sri Balaji 11-Feb-08 1.0.0 1
4
Up on entering the information only in to the user name
field login button is enabled instead of
being disabled
1.Enter some information in to username field 2.Check for the
enabled property of login button.
3.Observe that login button is enabled instead of being
disabled. Sri Balaji 14-Feb-08 1.0.0 1
5
Upon entering the information only in to the password
field login button is enabled instead being disabled
1.Enter some information in tho
password field 2.Check for the
enabled property of login button
3.Observe that login button to enable instead of being
Priority: -Priority defines the sequence in which the sequence in which defects has to be
rectified. It is classified in to four types
1.Critical (Pri1) or P1 or 12.High (Pri2) or P2 or 23.Medium (Pri3) or P3 or 34.Low (Pri4) or P4 or 4
Usually the Fatal defects are given critical priority, Major defects are given High priority, Minor defects are given Medium Priority and suggestions are given Low Priority, But depending up on the situations the priority will be changing.
I - Case: Low severity-High Priority Case: -
Up on customer visit to the company all the look and feel defects are given highest priority.
II - Case:High severity –Low Priority Case: -
When ever 80% of the application is released to testing department as 20% is missing the test engineers will treat them as Fatal defect but the development lead will give least priority for those defects as features are under development.
New: - When ever the defect is found for the first time the test engineer will set the status as New.
Open: -When ever the developer accepts the raised defect then he will set the status as open.
Fixed for verification Or Fixed for rectified: - When ever the developer rectifies the raised defect then he will change the status to fixed.
Re open and Closed: -When ever the defects are rectified, next build is released to the testing dept then the test engineers will check whether the defects are rectified properly or not. If the defect is rectified properly then the test engineer will set the status as “Closed”. If the defect is not rectified properly then the test engineer will set the status as “Re open”.
Hold: - When ever the developer is confused to accept or reject the defect then he will set the status of the defect as hold.
Testers Error or Testers Mistake Or Rejected: - When ever the developer is confirmed it is not at all a defect hen he will set the status of the defect as “ Rejected”.
As Per Design: - When ever the test engineer is not aware of new requirements and if he raises defects related to the new features then the developer will set the status “ As Per Design”.Note: This is a rare case not usually Occurs