Social Monitoring Report – Part 2 # Semiannual Report January-June 2018 June 2018 INO: West Kalimantan Power Grid Strengthening Project Prepared by Pusat Manajemen Konstruksi (Pusmankon) for the PT PLN and the Asian Development Bank.
Social Monitoring Report – Part 2
# Semiannual Report January-June 2018 June 2018
INO: West Kalimantan Power Grid Strengthening
Project
Prepared by Pusat Manajemen Konstruksi (Pusmankon) for the PT PLN and the Asian
Development Bank.
CURRENCY EQUIVALENTS (as of 30 June 2018)
Currency unit – Indonesian rupiah (Rp) Rp1.00 = $0.0000700869
$1.00 = Rp14,268
NOTE
(i) In this report, "$" refers to US dollars. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Social Semi Annual Report January - June 2018
Appendix 11 RoW Progress Monitoring of 150 kV Bengakayang - Ngabang –
Tayan TL
No Jalur SUTT/ SUTET KJPPJumlah
Tower/ Span
Panjang
ROWData Nominatif
Penetapan Besaran
kompensasiProgress Pelaksanaan
1
SUTT 150 kV
Bengkayang-
Ngabang
KJPP Dwi
Haryantono
Agustinus
Tamba
279 Tower/
278 Span 95,6 km - Tanah/ Sosialisasi (September 2016
Rp 10,608,316,800 69,124,002,971Rp Inventarisasi (Maret 2016)
- Bangunan/ Penilaian & penetapan besaran (September 2016)
Rp 330,990,001 Pembayaran:
- Tanaman/ - Tanah/ Rp 10,608,316,800
Rp 58,184,696,170 - Bangunan/ Rp 3330,990,001
- Tanaman/ Rp 58,184,696,170
- Progress Pembayaran (100%)
2
SUTT 150 kV
Tayan-Ngabang
KJPP Dwi
Haryantono
Agustinus
Tamba
128 Tower/
127 Span 46,8 km - Tanah/ Rp 40,972,230,363 Sosialisasi (November 2016)
Rp 5,442,465,000 Inventarisasi (Juni 2016)
- Bangunan/ Penilaian & penetapan besaran (November 2016)
Rp 3,315,000 Pembayaran:
- Tanaman/ - Tanah/ Rp 5.442.465.000
Rp 35,526,450,363 - Bangunan/ Rp 3.315.000
- Tanaman/ Rp 35.526.450.363
- Progress Pembayaran (100%)
FORMAT LAPORAN BERKALA
PELAKSANAAN KOMPENSASI ATAS TANAH, BANGUNAN DAN TANAMAN
DI BAWAH RUANG BEBAS SUTT/SUTET
NOLOKASI (DESA /
KELURAHAN)KECAMATAN JUMLAH TOWER
TANAH BEBAS
(TAPAK TOWER)ROW BEBAS (SPAN)
JADWAL SOSIALISASI
PHABA PEMBAYARAN Inventarisasi
1 Magmagan LUMAR T 1A - 4 7 7 7 13-Dec-16 21-Dec-16 September 2016
2 Sebalo T 5 - 21 17 17 17 8-Dec-16 20-Dec-16 Juni 2016
3 Bani Amas T 22 - 26 6 6 6 6-Dec-16 16-Dec-16 Mei 2016
4 Sebetung Menyala T 27 - 33 7 7 7 7-Dec-16 20-Dec-16 Maret 2016
5 Dharma Bakti T 34 - 38 5 5 5 21-Oct-16 17-Nov-16 Maret 2016
6 Sebente T 39 - 46 8 8 8 3-Nov-16 9-Dec-16 Maret 2016
7 Bangun Sari T 47 - 55 9 9 9 23-Sep-16 2-Nov-16 April 2016
8 Lulang T 56 - 57 2 2 2 22-Sep-16 25-Nov-16 April 2016
9 Setia Jaya T 58 - 67 10 10 10 22-Sep-16 14-Oct-16 April 2016
10 Untang T 68 - 78 11 11 11 19-Sep-16 13-Oct-16 Mei 2016
11 Kampet T 79 - 85 7 7 7 20-Sep-16 13-Oct-16 April 2016
12 Padang Pio T 86 - 95 10 10 10 16-Sep-16 7-Oct-16 April 2016
13 Ringo Lojok T 96 - 108 13 13 13 28-Sep-16 14-Dec-16 Mei 2016
14 Angkaras T 109 - 119 11 11 11 31-Oct-16 29-Dec-16 Mei 2016
15 Ansang T 120 - 123 4 4 4 2-Nov-16 24-Nov-16 Mei 2016
16 Darit T 124 - 129 6 6 6 14-Dec-16 27-Dec-16 Mei 2016
17 Mamek T 130 - 149 20 20 20 5-Oct-16 15-Dec-16 Mei 2016
18 Bagak T 150 - 156 7 7 7 6-Oct-16 9-Dec-16 Mei 2016
19 Anik Dinggir T 157 - 167 10 10 10 30-Sep-16 19-Oct-16 April 2016
20 Antan Raya T 168 - 190 23 23 23 6-Sep-16 27-Sep-16 April 2016
21 Penyaho Dangku T 191 - 207 17 17 17 7-Sep-16 28-Sep-16 April 2016
22 Amboyo Utara T 208 - 230 23 23 23 16-Dec-16 23-Dec-16 Mei 2016
23 Sungai Kelik T 231 - 235 5 5 5 24-Nov-16 7-Dec-16 Mei 2016
24 Munggu T 236 - 245 10 10 10 16-Nov-16 30-Nov-16 Agustus 2016
25 Raja T 246 - 254 9 9 9 17-Nov-16 2-Dec-16 Agustus 2016
26 Ambarang T 255 - 260 6 6 6 15-Nov-16 1-Dec-16 Agustus 2016
T 261 - 263 2 2 2
T 127 - 117 11 11 11
T 116 - 116 B 3 3 3
279 279 278
Agustus 2016
MENYUKE
NGABANG
27 Tebedak 11-Nov-16 7-Dec-16
BANYUKE HULU
ROW MONITORING PROGRESS
PACKAGE 3 SUTT 150 KV BENGKAYANG - NGABANG - TAYAN (SECTION 1 BENGKAYANG - NGABANG)
SPAN TOWER
BENGKAYANG
TERIAK
NOLOKASI (DESA /
KELURAHAN)KECAMATAN
JUMLAH
TOWER
TANAH BEBAS
(TAPAK TOWER)
ROW BEBAS
(SPAN)
JADWAL SOSIALISASI
PHABA PEMBAYARAN Inventarisasi
1 Kawat T 1d/0 * - 1 1 1 1 Maret 2017
2 Cempedak T 1 - 1G 9 9 9
3 Cempedak T 2 - 13 13 13 13
4 Tebang Benua T 14 - 25 12 12 12 6-Jun-17 15-Jun-17 Juni 2016
5 Mak Kawing T 26 - 31 6 6 6 26-Apr-17 17-May-17 Juni 2016
6 Temiang Mali T 32 - 42 10 10 10 20-Apr-17 10-May-17 September 2016
7 Tae T 43 - 46 5 5 5 21-Apr-17 19-May-17 Juni 2016
8 Padi Kaye T 47 - 60 14 14 14 19-Apr-17 18-May-17 September 2016
9 Angan T 61 - 79 19 19 19 6-Apr-17 28-Apr-17 Juni 2016
10 Kayu Ara T 80 - 87 9 9 9 5-Apr-17 21-Apr-17 Juni 2016
11 Jelimpo T 88 - 99 12 12 12 31-Mar-17 28-Apr-17 Juni 2016
12 Tubang Raeng T 100 - 110 11 11 11 30-Mar-17 20-Apr-17 Juni 2016
13 Tebedak T 111 - 114 4 4 4
14 Tebedak T 114A - 114C 3 3 3
128 128 127
September 2016
BALAI
JELIMPO
NGABANG 11-Nov-16 7-Dec-16 Agustus 2016
ROW MONITORING PROGRESS
PACKAGE 3 SUTT 150 KV BENGKAYANG - NGABANG - TAYAN (SECTION 2 NGABANG - TAYAN)
SPAN TOWER
TAYAN HILIR 7/28/2017 11-Aug-17
NO DESA/KELURAHAN LUAS TANAH
(M2) KOMPENSASI TANAH (RP)
LUAS
BANGUNAN (M2)
KOMPENSASI BANGUNAN
(RP)
KOMPENSASI
TANAMAN (RP)
SUB TOTAL
KOMPENSASI (RP)
1 MAGMAGAN KARYA 39,884 269,700,000Rp 214 39,600,000Rp 1,338,071,300Rp 1,647,371,300Rp
2 SEBALO 90,346 531,400,000Rp - -Rp 3,150,798,110Rp 3,682,198,110Rp
3 BANI AMAS 43,578 260,475,000Rp - -Rp 1,147,948,750Rp 1,408,423,750Rp
4 SEBETUNG MENYALA 41,332 243,480,000Rp 174 22,125,000Rp 746,712,270Rp 1,012,317,270Rp
5 DHARMA BAKTI 32,047 205,245,000Rp - -Rp 985,016,800Rp 1,190,261,800Rp
6 SEBENTE 52,415 337,020,000Rp 6 105,000Rp 2,310,247,445Rp 2,647,372,445Rp
7 BANGUNSARI 62,849 379,815,000Rp - -Rp 3,700,744,285Rp 4,080,559,285Rp
8 LULANG 11,943 99,495,000Rp 18 480,000Rp 1,033,883,555Rp 1,133,858,555Rp
9 SETIA JAYA 68,102 427,920,000Rp 15 975,000Rp 3,069,665,960Rp 3,498,560,960Rp
10 UNTANG 62,102 390,855,000Rp - -Rp 2,816,650,720Rp 3,207,505,720Rp
11 KAMPET 45,453 354,000,000Rp 390 51,390,000Rp 911,265,205Rp 1,316,655,205Rp
12 PADANGPIO 69,977 449,325,000Rp 187 19,920,000Rp 1,385,038,600Rp 1,854,283,600Rp
13 RINGOLOJOK 89,391 563,415,000Rp 822 150,885,001Rp 3,143,578,460Rp 3,857,878,461Rp
14 ANGKARAS 48,029 272,010,000Rp 16 270,000Rp 2,194,878,850Rp 2,467,158,850Rp
15 ANSANG 26,086 153,120,000Rp - -Rp 957,434,300Rp 1,110,554,300Rp
16 DARIT 32,315 190,215,000Rp - -Rp 1,538,061,865Rp 1,728,276,865Rp
17 MAMEK 135,038 843,840,000Rp - -Rp 3,370,541,000Rp 4,214,381,000Rp
18 BAGAK 51,182 317,220,000Rp 80 4,665,000Rp 922,629,020Rp 1,244,514,020Rp
19 ANIK DINGIR 70,460 439,350,000Rp - -Rp 2,764,915,710Rp 3,204,265,710Rp
20 ANTAN RAYAN 144,318 979,578,000Rp 101 11,850,000Rp 4,440,198,810Rp 5,431,626,810Rp
21 PENYAHO DANGKU 124,572 666,243,800Rp - -Rp 3,282,727,980Rp 3,948,971,780Rp
22 AMBOYO UTARA 161,545 752,195,000Rp 52 1,800,000Rp 5,116,358,900Rp 5,870,353,900Rp
23 SUNGAI KELIK 31,708 129,800,000Rp - -Rp 1,837,610,255Rp 1,967,410,255Rp
24 MUNGGUK 57,149 249,000,000Rp 30 1,815,000Rp 2,957,725,600Rp 3,208,540,600Rp
25 RAJA 53,574 237,400,000Rp - -Rp 1,215,081,800Rp 1,452,481,800Rp
26 AMBARANG 35,868 243,400,000Rp 8 1,095,000Rp 422,838,355Rp 667,333,355Rp
27 TEBEDAK SECTION 1 102,483 622,800,000Rp 83 24,015,000Rp 1,424,072,265Rp 2,070,887,265Rp
TOTAL 1,783,747 10,608,316,800 2,196 330,990,001 58,184,696,170 69,124,002,971
SECTION 1 SUTT 150 KV BENGKAYANG- NGABANG
NO DESA/KELURAHAN LUAS TANAH
(M2)
KOMPENSASI
TANAH (RP)
LUAS
BANGUNAN
(M2)
KOMPENSASI
BANGUNAN
(RP)
KOMPENSASI
TANAMAN (RP)
TOTAL
KOMPENSASI (RP)
1 TEBEDAK 21500.1 136,410,000Rp - -Rp 273,049,000Rp 409,459,000Rp
2 TUBANG RAENG 90081.17 508,770,000Rp - -Rp 3,120,757,100Rp 3,629,527,100Rp
3 JELIMPO 93214.66 544,455,000Rp - -Rp 2,926,411,700Rp 3,470,866,700Rp
4 KAYUARA 49503.49 298,800,000Rp 2.25 30,000Rp 1,210,871,000Rp 1,509,701,000Rp
5 ANGAN TEMBAWANG 126847.14 731,070,000Rp 28.29 1,065,000Rp 7,026,324,550Rp 7,758,459,550Rp
6 PADI KAYE 111740.91 552,180,000Rp - -Rp 3,227,835,705Rp 3,780,015,705Rp
7 TAE 39345.56 195,285,000Rp 12 75,000Rp 1,506,648,700Rp 1,702,008,700Rp
8 MAK KAWING 54414.76 389,355,000Rp - -Rp 2,911,549,365Rp 3,300,904,365Rp
9 TEMIANG MALI 71065.97 470,010,000Rp 10.85 1,545,000Rp 2,441,325,400Rp 2,912,880,400Rp
10 TEBANG BENUA 72730.74 511,185,000Rp 22.25 600,000Rp 3,613,185,803Rp 4,124,970,803Rp
11 CEMPEDAK 143845.61 1,067,100,000Rp - -Rp 7,116,639,640Rp 8,183,739,640Rp
12 KAWAT 4760.3 37,845,000Rp - -Rp 151,852,400Rp 189,697,400Rp
TOTAL 879050.41 5,442,465,000Rp 76 3,315,000Rp 35,526,450,363Rp 40,972,230,363Rp
SECTION 2 SUTT 150 KV NGABANG-TAYAN
Social Semi Annual Report January - June 2018
Appendix 12 Sample of payment and valuation result from independent
appraiser for RoW in Bengakayang – Ngabang – Tayan TL
BUKU V
LAPORAN PENILAIAN121202/LP-L/dha-2/999/XII-16
Jenis Properti
Tanah,Bangunan dan Tanam Tumbuh
PT. PLN (PERSERO) UIP Kalimantan Bagian Barat
Terletak di
Jalur SUTT 150 KV Bengkayang - Ngabang - Tayan
Desa Angkaras,Desa Ansang,Desa Darit,Desa Mamek,Desa Bagak dan Desa Anik Dingir
Kecamatan Menyoke Kabupaten Landak
Propinsi Kalimantan Barat
Kantor Jasa Penilai Publik
Dwi Haryantono Agustinus TambaProperty Appraisal, Asset Management, Asset Information System, Project Monitoring, Feasibility Studies.
No. Ijin KJPP : 2.11.0085 - Property Appraisal
Rukan Avenue Unit 8-152 Jakarta Garden City kel. Cakung Timur, Jakarta Timur 13910
Phone. +6221-22860332, Fac. +6221-22874838
e-mail : - [email protected]
KJPP Dwi Haryantono Agustinus Tamba
Satuan
- m2
- m2
-
- m2
- m2
-
- m2
- m2
-
- m2
- m2
-
- m2
- m2
-
- m2
- m2
-
- m2
- m2
-
- m2
- m2
-
- m2
- m2
-
Tanah 935
No. Lokasi / Objek Penilaian Luas Pasar Kompensasi
Rp. Rp.
Nilai Besaran
Tanam Tumbuh
3 Sanoni T.120 - T.121
Tanah
18,500,000 2,775,000
Tanam Tumbuh
2 Frans Adisius D. Aheng,SH.MH T.1
Desa Ansang,Kec. Menyoke,Kab. Landak
1 Sudarlan T.120 - T.121
Tanah 473
82,700,000 82,700,000
103,300,000
- -
Tanah 715 27,900,000 4,185,000
73,370,000
76,145,000
Bangunan - - -
73,370,000
101,900,000
91,870,000
Bangunan -
110,600,000 86,885,000
54,045,000
246,200,000 145,305,000
56,300,000 8,445,000 1,443
Bangunan - - -
Tanam Tumbuh 45,600,000 45,600,000
4 Tono T.120 - T.121
Tanah 3,044 118,700,000 17,805,000
Bangunan - - -
Tanam Tumbuh 127,500,000 127,500,000
5 Ames Supriadi T.120 - T.121
Tanah 1,699 66,300,000 9,945,000
Bangunan - - -
Tanam Tumbuh 37,000,000 37,000,000
6 Saleman T.120 - T.121
46,945,000
Tanah 815 31,800,000 4,770,000
Bangunan - - -
Tanam Tumbuh 34,319,500 34,319,500
66,119,500 39,089,500
7 Ames Supriadi T.120 - T.121
Tanah 865 33,700,000 5,055,000
Bangunan - - -
Tanam Tumbuh 60,800,000 60,800,000
94,500,000 65,855,000
8 Itus T.120 - T.121
Tanah 923 36,000,000 5,400,000
Bangunan - - -
Tanam Tumbuh 30,500,000 30,500,000
66,500,000 35,900,000
9 FX.Jampi T.121 - T.122
36,500,000 5,475,000
Bangunan - - -
Tanam Tumbuh 34,000,000 34,000,000
70,500,000 39,475,000
Professional Appraisal
Social Semi Annual Report January - June 2018
Appendix 13 Grievances received and handling in Package 3
Social Semi Annual Report January - June 2018
Appendix 14 Summary of Capacity Building, April 5th 2018
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI No. Dokumen :
CAPACITY BUILDING WEST KALIMANTAN POWER GRID
STRENGTHENING PROJECT
Tgl. Berlaku : 16 Juni 2017
Edisi /Revisi : 01/00
Halaman : 1 dari 7
DOKUMEN TERKENDALI Apabila Dokumen ini diunduh/didownload/dicetak akanmenjadi DOKUMEN TIDAK TERKENDALI
RISALAH RAPAT
CAPACITY BUILDING WEST KALIMANTAN POWER GRID STRENGTHENING PROJECT
Revision : 0 Meeting No. : No. Contract : Page 1 of 9
Date : 5 April 2018
Peserta : Sebagaimana Lampiran
Tempat : UIP KALBAGBAR
Jl. Letjen Suprapto No.50 G, Pontianak
Waktu : 09.00 WIB
Agenda :
1. Capacity Building West Kalimantan Power Grid Strengthening Project
- Environmental Safeguard
- Social Issues
Daftar Peserta Rapat: 1. PT PLN (Persero) UIP Kalbagbar
2. PT PLN (Persero) UPP Kalbagbar 1
3. PT PLN (Persero) UPP Kalbagbar 2
4. PT PLN (Persero) Pusmankon Kantor Induk
5. PT PLN (Persero) Pusmankon TSK KALBAGBAR 3
6. PT PLN (Persero) Pusmankon TMK ADB Project
7. Consortium KEC and Mistubishi Corporation
8. PT Siemens Indonesia
9. Consortium PT Krakatau Engineering and PT Citramas Heavy Industries
Lampiran :
1. Daftar Hadir
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI No. Dokumen :
CAPACITY BUILDING WEST KALIMANTAN POWER GRID
STRENGTHENING PROJECT
Tgl. Berlaku : 16 Juni 2017
Edisi /Revisi : 01/00
Halaman : 2 dari 7
DOKUMEN TERKENDALI Apabila Dokumen ini diunduh/didownload/dicetak akanmenjadi DOKUMEN TIDAK TERKENDALI
Revisi : 0 Meeting No. : No. Contract : Page 2 of 9
Date : April 5, 2018
No. Item Diskusi Keterangan
1.
2.
3.
4.
a.
b.
c.
d.
Pembukaan oleh Pak Anas selaku Spv K3L mewakili dari PLN UIP
KALBAGBAR
Safety Briefing
Pusmankon
Menyampaikan tentang dasar kontrak pelaksanaan dan
monitoring lingkungan kontraktor.
Pemateri Capacity Building oleh Bpk Edy Brotoisworo (ADB
consultant)
SECTION 1
ADB (Asian Development Bank) adalah bank yang negara
anggotanya merupakan develop member countries. ADB
mensyaratkan aturan lingkungan dalam kriteria pemberian loan
yang harus dipenuhi oleh pihak peminjam, safeguard adalah
aspek yang ditekankan.
ADB safeguard policy:
- Avoid adverse impact
- Minimize mitigate and or compensate
- Help borrower/client to strengthen their safeguard
Dampak harus diminimalkan, jika tidak bisa dihindari maka harus
ada kompensasi yang dilakukan.
ADB 3 key safeguard:
- Environemental safeguard
- Involuntary resettlement safeguard
- Indigenous people safeguard
Jika ketiga hal tersebut tidak dipenuhi maka, ADB tidak akan
mendanai proyek tersebut.
Kategorisasi proyek:
- Kategori A: dampak penting, signifikan, tidak dapat diperbaiki
(irreversible, diverse and unprecedented), EIA (Enviromental
UIP KALBAGBAR
UIP KALBAGBAR
PLN PUSMANKON
ADB Consultant
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI No. Dokumen :
CAPACITY BUILDING WEST KALIMANTAN POWER GRID
STRENGTHENING PROJECT
Tgl. Berlaku : 16 Juni 2017
Edisi /Revisi : 01/00
Halaman : 3 dari 7
DOKUMEN TERKENDALI Apabila Dokumen ini diunduh/didownload/dicetak akanmenjadi DOKUMEN TIDAK TERKENDALI
e.
f.
g.
Impact Assessment) diperlukan. Contoh: pembangunan PLTU,
PLTA, PLTG
- Kategori B: Ada dampak potensial dengan mitigasi yang lebih
mudah untuk proyek. IEE (Initial Environmental Examination)
setara UKL-UPL diperlukan. Contoh:Pembangunan transmisi
150 kV
- Kategori C : Dengan dampak lingkungan yang kecil dan tidak
dibutuhkan penilaian lingkungan. Contoh: pembangunan
laboratorium
- Kategori FI: melibatkan investasi dana ADB ke atau melalui FI.
Contoh: mikrokredit oleh Bank
Monitoring dan reporting
Monitoring dan reporting yang dilakukan sepadan dengan resiko
yang akan dihadapi proyek. Saat loan negotiation disebutkan
bahwa PLN melalui Pemerintah Indonesia (borrower) harus
mengimplementasikan dokumen IEE yang terdapat pada loan
agreement.
Permintaan ADB:
- Borrower harus punya prosedur pengelolaan lingkungan
- Menilai kepatuhan
- Disclosure dokumen di website, oleh karena itu dokumen harus
valid karena akan di baca oleh LSM yang dapat memberikan
feedback atau koreksi terkait pelaksanaan pengelolaan
lingkungan di proyek ADB.
- ADB akan melakukan review terhadap dokumen yang di submit
PLN sampai dokumen terdsebut acceptable dan di upload di
ADB website. Monitoring lingkungan dilakukan sampai setelah
2 tahun setelah PCR.
ADB safeguard Policy
- ADB akan melakukan site visit and review mission.
- Melakukan supervisi mission untuk proyek dengan signifikan
impact.
- Review monitoring report secara periodik
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI No. Dokumen :
CAPACITY BUILDING WEST KALIMANTAN POWER GRID
STRENGTHENING PROJECT
Tgl. Berlaku : 16 Juni 2017
Edisi /Revisi : 01/00
Halaman : 4 dari 7
DOKUMEN TERKENDALI Apabila Dokumen ini diunduh/didownload/dicetak akanmenjadi DOKUMEN TIDAK TERKENDALI
Pertanyaan dan Jawaban:
1. Apakah Amdal Indonesia bisa digunakan memenuhi ADB
requirement?
Terdapat perbedaan dokumen lingkungan ADB dengan
Amdal Indonesia, karena terdapat beberapa hal yg
missing di ADB Indonesia, sekarang dalam tahap
penyesuaian sehingga Amdal Indonesia bisa diterima di
ADB. Sampai di capai kesepakan tetap harus persyaratan
lingkungan dari pihak Lender (ADB) harus dipenuhi oleh
borrower.
2. Mengapa monitoring ADB harus dilakukan semua tidak hanya
gap saja?
Sesuai format yang ada pada ADB, harus menurut ADB,
saat ini SDB sedang membuat SIS, karena perbedaan
AMDAL pada masing2 negara
SECTION 2
Initial environmental examination (IEE)
IEE Fomat:
- IEE jika di silmiliarkan dengan aturan di Indonesia setara
dengan UKL-UPL jadi perlakukannya lebih sederhana daripada
AMDAL (EIA).
- 10 item IEE, paling penting 5 (Anticipated Enviromental
Impact), 9(EMP)
- Construction phase
1. Vegetation Clearing
- Dilakukan hanya pada width of the ROW untuk
mendapatkan jarak aman
- Untuk T/L, pemotonggan dilakukan dengan hand tool
termasuk chain saws
Pertanyaan:
(UIP) Dalam land clearing pada transmission line dalam
dokumen IEE tidak di perbolehkan menggunakan herbisida dan
alat berat (excavator atau bulldozer) , untuk kasus pohon sawit
jika tidak menggunakan herbiside atau bulldozer sawit akan
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI No. Dokumen :
CAPACITY BUILDING WEST KALIMANTAN POWER GRID
STRENGTHENING PROJECT
Tgl. Berlaku : 16 Juni 2017
Edisi /Revisi : 01/00
Halaman : 5 dari 7
DOKUMEN TERKENDALI Apabila Dokumen ini diunduh/didownload/dicetak akanmenjadi DOKUMEN TIDAK TERKENDALI
tumbuh kembali sehingga ada kemungkinan akan ada
kemungkinan pembayaran dua kali?
Jawab:
(ADB) menjadi catatan untuk di bicarakan dan untuk
didapatkan kesepakatan.
2. Soil Erosion
Incorporated into the engineering design
3. Drainage
Pada substation, ensuring location above flood level
4. Water Quality Impacts
Kualitas air termasuk air permukaan dan air tanah, lapisan
tanah harus diperhatikan terdapat tingkat permebilitas
tanah.
Pertanyaan:
- (Pusmankon) Untuk tumpahan minyak dengan volume
yang kecil bagaimana penanganannya, apakah harus
dikelola dan dengan cara apa?
Jawab:
(ADB) Tumpahan minyak sekecil apapun, akan dilakukan
review oleh mission dan di evaluasi, selanjutnya akan
diputuskan oleh ADB
Pertanyaan:
- (Pusmankon) Apakah dampak pada asscoicated project
harus dimonitor ?
Jawab:
(ADB) Dampak pada asociated project: harus dipastikan
bahwa proyek yang ada di sekitaran proyek juga harus
memenuhi policy dari ADB.
5. Air Quality Impacts
Pengukuran harus dilakukan, meskipun tidak dilakukan
mitigasi khusus karena tidak terdapat dampak yang terjadi.
Pertanyaan:
- (Kontraktor Paket 7, KE): Perbedaan monitoring antara
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI No. Dokumen :
CAPACITY BUILDING WEST KALIMANTAN POWER GRID
STRENGTHENING PROJECT
Tgl. Berlaku : 16 Juni 2017
Edisi /Revisi : 01/00
Halaman : 6 dari 7
DOKUMEN TERKENDALI Apabila Dokumen ini diunduh/didownload/dicetak akanmenjadi DOKUMEN TIDAK TERKENDALI
UKL/UPL dan IEE, mana yang harus diikuti kontraktor?
Jawab:
Dilakukan keduanya untuk karena untuk mematuhi aturan
lender dan aturan pemerintah Indonesia.
- (Kontraktor Paket 7, KE): Bagaimana Pengolahan Limbah
B3 pada proyek jaringan yang jumlahnya tidak terlalu
signifikan? Kontraktor sudah melakukan pengumpulan
namun belum dilakukan tindak lanjut.
Jawab:
Akan menjadi catatan, belum dipertimbangkan
6. Construction Waste Management
Material sisa konstruski harus dibersihkan termasuk sampah
bungkus makanan,. Kontraktor menyediakan trash bag untuk
masing-masing tower, mengumpulkan sampah pada masing-
masing tower dan dimasukkan pada TPS terdekat. Cement
Bag bisa digunakan untuk lansir material pondasi.
7. Domestic Waste Management
Temporary worker camp kontraktor dibuat oleh kontraktor
pada kondisi darurat, dimana lokasi tower tidak terdapat
pemukiman (remote area)
8. Roads and Infrastructure Impacts
Kemungkinan kerusakan jalan karena alat berat yang
digunakan, harus diperhatikan.
9. Encroachment into Production Forests, Hunting, Wood
Collection
Tidak boleh melewati hutan alam
10. Impacts on cultural heritage sites
Contoh pada Transmisi 150 kV Tayan – Sanggau – Sekadau
melewati pohon keramat, jalur tower dipindahan sekitar
30 m (T.36)
11. Occupational Health and Safety
Penggunaan PPE, Training untuk workers penggunaan PPE
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI No. Dokumen :
CAPACITY BUILDING WEST KALIMANTAN POWER GRID
STRENGTHENING PROJECT
Tgl. Berlaku : 16 Juni 2017
Edisi /Revisi : 01/00
Halaman : 7 dari 7
DOKUMEN TERKENDALI Apabila Dokumen ini diunduh/didownload/dicetak akanmenjadi DOKUMEN TIDAK TERKENDALI
5
12. Community Health and Safety
Parameter untuk penyusunan OSH monitoring
13. Employment Opportunities
Memberikan pekerjaan sebanyak2nya kepada banyak
orang, di lain pihak dituntut untuk melakukan efisiensi.
Terkait employment opportunity, tidak dipermasalahkan
tenaga kerja dari luar pulau, namun diprioritaskan adalah
affected people (local people)
14. Physical Cultural Resources
Apabila dalam suatu pekerjaan ditemukan suatu benda
yang dinilai memiliki nilai budaya, pekerjaan dihentikan,
benda temuan disampaikan kepada warga sekitar, jika
tidak ada kesimpulan maka disampaikan kepada expert.
Sejauh ini belum ditemukan.
Fasa Operational
Hazardous waste ex transformer pcb
Report subsmission
1. Konstruksi Laporan semi annual
2. Operasional dua tahun pertama untuk EMF yang dilakukan
setiap tahun. Sedangkan untuk parameter lainnya
menyesuaikan dengan dokumen IEE.
Environmental specialist (environmental consultant) di
pekerjakan dalam suatu proyek untuk melakukan monitoring
yang dilakukan oleh kontraktor.
Pertanyaan:
- Biaya untuk melakukan monitoring tidak ada dalam
BOQ?
Jawab:
Akan menjadi catatan dan masukan perbaikan di kontrak
selanjutnya.
Kontraktor sudah memahami dokumen IEE dan berusaha untuk
mengimplementasikannya dalam pekerjaan konstruksi.
Social Semi Annual Report January - June 2018
Appendix 15 Corporate Social Responsibility Implementation Report of the
150 kV Bengkayang – Ngabang - Tayan TL
LAPORAN PROGRAM CSR
PEMBERIAN BANTUAN BIBIT SAHANG DAN
PELATIHAN BUDIDAYA SAHANG (PAKET 3&4)
PT PLN (PERSERO) UIP KALIMANTAN BAGIAN BARAT 2017
Merupakan bentuk kepedulian PLN pada kemajuan perekonomian masyarakat yang berada
di sekitar pembangunan proyek ketenagalistrikan, Saluran Udara Tegangan Ekstra Tinggi
(SUTET) 275 kV Bengkayang-Jagoibabang, Provinsi Kalimantan Barat
Social Semi Annual Report January - June 2018
Appendix 16 List of vulnerable and severely AP living within the corridor of
150 kV Tayan – Sanggau – Sekadau TL
Poor/
Miskin
Women
headed HH/KK
Wanita
Elderly headed
HH/ KK Renta
1 2 3 4 5 6 7 8 9 10 11 12 13 14
KABUPATEN SANGGAU
Kecamatan Tayan Hilir
Desa Kawat
M. Yunus HH 71 M Retirement 3 1 - 2 jt 1 1
0 0 1 1 0
Desa Cempedak
H.M. Yusuf (wahdah-anak) HH 92 M Farmer 1 > 10 jt 1 1
Supiana Rosmiati HH 38 F Farmer 5 1-2 jt 1 1
Yeyen HH 50 M Farmer 7 1-2 jt 1 1
Jaher HH 60 M Farmer 2 1-2 jt 1 1
Jihon HH 72 M Farmer 4 100 rb - 1 jt 1 1 1
Bambang T.winarto HH 60 M Private 5 >10 jt 1 1
Gabe HH 69 M Farmer 7 1 - 2 jt 1 1
Alimin/ Lade (istri) HH 58 M Farmer 6 100 rb - 1 jt 1 1
Awi HH 40 M Farmer 6 100 rb - 1 jt 1 1
Ibrahim Sulaiman HH 65 M Farmer 2 100 rb - 1 jt 1 1 1
Songli HH 66 F Farmer 7 1-2 jt 1 1 1
Salpinus Sangkiat HH 56 M Farmer 3 100rb-1 jt 1
7 0 7 12 0
Desa Tebang Benoa
Namsun HH 71 M Farmer 6 1-2 jt 1 1 1
Deron HH 60 M Farmer 1 1 - 2 jt 1 1
Yosafat Sami HH 65 M Farmer 3 1 - 2 jt 1 1
Lusius Ong HH 61 M Farmer 4 1 - 2 jt 1 1
Silvanus Acom-Tini (istri) HH 60 M Farmer 3 1 - 2 jt 1 1
1 0 5 5 0
Kecamatan Balai
Desa Makkawing
Selipang HH 55 F Farmer 6 1-3 jt 1 1 1
Nitalisa/ Istri Roma HH 30 F Farmer 4 100-1jt 1 1
Antonius Andi HH 33 M Farmer 6 1-2 jt 1 1
3 1 0 3 0
Desa Temiang Mali
Matius Pauji HH 64 M Farmer 6 1-2 jt 1 1 1
Kuncit HH 50 M Farmer 6 1-2 jt 1 1
2 0 1 2 0
Desa Hilir
Lion (kecik- cucu) HH 82 F Farmer 5 1 - 2 jt 1 1 1
1 0 1 1 0
Desa Kebadu
Moses/ Agnes Iyam HH 45/ 57 M Farmer 3 100 rb - 1 jt 1 1
Kristina Serimi HH 43 F Farmer 6 100 rb - 1 jt 1 1 1
Maria Mina HH 58 F Farmer 4 100 rb - 1 jt 1 1 1
Antonius Jati HH 63 M Farmer 6 1-2 jt 1 1 1
Antonius Minar Tulai HH 40 F Farmer 4 100 rb - 1 jt 1 1
Yohanes James HH 54 M Farmer 3 100 rb - 1 jt 1 1
Rupinus Tului HH 41 M Farmer 5 100 rb - 1 jt 1 1
Leonardus Apoi HH 65 M Farmer 5 2 - 3 jt 1 1
Evardus Kuncang HH 58 M Farmer 6 100 rb - 1 jt 1 1
sabinus kancung HH 35 M Farmer 4 1 - 2 jt 1 1
Petrus Amak HH 45 M Farmer 7 100 rb - 1 jt 1 1
10 2 2 10 1
Desa Senyabang
Anton HH 68 M Farmer 5 1 - 2 jt 1 1 1
Herkulanus Luko HH 61 M Farmer 5 1 - 2 jt 1 1 1
Kanisius Jaher HH 58 M Farmer 6 100 rb - 1 jt 1 1
Stefanus Kenen -Ati (istri) HH 45 F Farmer 4 1 - 2 jt 1 1
Sukimin HH 46 M Farmer 7 1 - 2 jt 1 1
Aon HH 48 M Farmer 5 1 - 2 jt 1 1
Firmanus Siong HH 60 M
Occupied
some people
to cultivate
his oil palm
6 > 10 jt 1 1
Romanus Kusa HH 49 M Farmer 5 1 - 2 jt 1 1
Petrus Acan HH 67 M Farmer 2 1 - 2 jt 1 1
7 0 4 9 0
Desa Temiang Taba
Timotius Timas/ Darto S. HH 59 MRetirement
public servant5 100 rb - 1 jt 1 1
Gunik/ Adon (anak) HH 29 M Farmer 2 100 rb - 1 jt 1 1
Andrianus Yayuk HH 40 M Farmer 6 1 - 2 jt 1 1
Wisono-Rigu (anak) HH 58 M Farmer 5 1 - 2 jt 1 1
Sukardi B HH 50 M Farmer 7 1 - 2 jt 1 1
5 0 0 5 0
Kecamatan Tayan Hulu
Desa Menyabo
Kalistus Landong HH 52 M Farmer 6 1 - 2 jt 1 1
Laten HH 67 M Farmer 4 2 - 3 jt 1 1
Setia Budi HH 64 M Farmer 3 1 - 2 jt 1 1
1 0 2 3 0
Number of HH
member/
Jumlah
anggota KK
HH
income/month
(IDR/pendapatan
perbulan)
Vulnerability/Kerentanan
Vulnerable Severely
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
NotesNo. Name/Nama
Status in
the HH/
Status KK
Age/
Umur
Sex/
Jenis
Kelamin
(M/F)
Occupation/
Pekerjaan
SUBTOTAL
SUBTOTAL
Poor/
Miskin
Women
headed HH/KK
Wanita
Elderly headed
HH/ KK Renta
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Number of HH
member/
Jumlah
anggota KK
HH
income/month
(IDR/pendapatan
perbulan)
Vulnerability/Kerentanan
Vulnerable Severely NotesNo. Name/Nama
Status in
the HH/
Status KK
Age/
Umur
Sex/
Jenis
Kelamin
(M/F)
Occupation/
Pekerjaan
Desa Sosok
Dedy Candra Alengsius HH 34 M Farmer 7 100 rb - 1 jt 1 1
Ya'sabirin HH 61 M Farmer 7 2 - 3 jt 1 1
Tam Misbar HH 74 M Farmer 8sudah tidak
bekerja1 1 1
2 0 2 3 0
Desa Binjai
Adrianus Pekmeng HH 43 M Farmer 5 2 - 3 jt 1 1
Bambang Hermanto/ Putra
GiningHH 66 M Farmer 5 1 - 2 jt 1 1 1
Sulah- Juanang(anak) HH 46 MFarmer
(Rubber)6 1 - 2 jt 1 1
Rupinatul HH 35 F Farmer 6 1 - 2 jt 1 1
Suratno HH 65 M Farmer 8 2 - 3 jt 1 1 1
Martinus Sindeng HH 70 M Farmer 4 1 - 2 jt 1 1
Cahaya- Sanding (anak) HH 90 F Farmer 3 tidak bekerja 1 1 1
Vinsensius Sokin HH 58 M Farmer 5 100 rb - 1 jt 1 1
Yohanes Anes HH 65 M Farmer 6 3 - 10 jt 1 1
7 0 5 9 0
Kecamatan Parindu
Desa Suka Gerundi
Stanilaus Atui HH 60 M Farmer 5 2 - 3 jt 1 1
Kalista Nik HH 47 F Farmer 4 2 - 3 jt 1 1
Yulia Widyawati HH 32 F Housewife 4 100 rb - 1 jt 1 1 1
Elisabet Elis HH 38 F Farmer 7 2 - 3 jt 1 1
Rosa HH 45 F Farmer 5 2 - 3 jt 1 1
Lusia HH 56 F Farmer 4 1 - 2 jt 1 1
2 4 1 6 0
Desa Palem Jaya
0 0 0 0 0
Desa Pusat Damai
Veronika HH 37 F Housewife 7 (2KK) 1 - 2 jt 1 1
Seratima Simah/ Andreas
(suami)HH 63 F Housewife 6 1 - 2 jt 1 1 1
Theresia Arol HH 50 F Farmer 7 1-3 jt 1 1
Yulia Siat tju HH 64 F Farmer 6 1-3 jt 1 1 1
Yakobus HH 50 M Teacher/PNS 10 3 - 10 jt 1 1
Hiyasintus Injin HH 68 M farmer 5 1-2 jt 1 1
5 0 3 6 0
Desa Sebara
Petrus Sunar/ Elesius Acan
(mertua)HH 46 M Farmer 7 1 - 2 jt 1 1
Stephanus Atang HH 42 M Farmer 4 1 - 2 jt 1 1
Sabinus Bung HH 54 M Farmer 6 1 - 2 jt 1 1
Bambang-wakil ismael HH 38 M Farmer 6 1 - 2 jt 1 1
4 0 0 4 0
Kecamatan Kapuas
Desa Lape
Aten/ tanah adat
Aten / Tanah adat
Anastasia Saje HH 42 F Housewife 6 100 rb - 1 jt 1 1
Yohanes Lion HH 70 M Old Farmer 3 100 rb - 1 jt 1 1 1
Paula Dolen HH 58 F Farmer 4 1 - 2 jt 1 1
Sabradus Indus HH 43 M Farmer 4 1 - 2 jt 1 1
4 0 1 4 0
Desa Sei Mawang
Aki HH 73 M Farmer 2 100 rb - 1 jt 1 1 1
Eliana Maria/ Leo Kunun HH 47 F Farmer 3 1 - 2 jt 1 1
Ami HH 65 M Farmer 5 100 rb - 1 jt 1 1 1
3 0 2 2 1
Desa Bunut (P6)
Laudis Laus HH 56 M Retirement 6 1 - 2 jt 1 1
Alisius HH 72 M Farmer 5 1 - 2 jt 1 1 include in Substation
2 0 1 0 1
Desa Bunut (P7)
Solisman HH 32 M Farmer 3 100rb - 1 jt 1 include in Substation
Tonel HH 63 M Farmer 4 100rb - 1 jt 1 1 1
Rusandi Jang HH 60 M Farmer 5 1 - 2 jt 1 1 1
Dison HH 53 M Farmer 5 100rb - 1 jt 1 1
Antymus Nasir HH 75 M Farmer 4 100rb - 1 jt 1 1 1
5 0 3 4 0
Desa Beringin
Bong Khung Song HH 50 MFarmer;
Fishing6 1 - 2 jt 1 1
Kaderi HH 52 M Farmer 6 1 - 2 jt 1 1
Jubaidah HH 53 F
selling cakes
and
vegetables
4 100 rb - 1 jt 1 1
Ahmad Dapid HH 65 M Farmer 4 1 - 2 jt 1 1
Achyar HH 46 M Farmer 3 1 - 2 jt 1 1
4 0 1 5 0
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
Poor/
Miskin
Women
headed HH/KK
Wanita
Elderly headed
HH/ KK Renta
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Number of HH
member/
Jumlah
anggota KK
HH
income/month
(IDR/pendapatan
perbulan)
Vulnerability/Kerentanan
Vulnerable Severely NotesNo. Name/Nama
Status in
the HH/
Status KK
Age/
Umur
Sex/
Jenis
Kelamin
(M/F)
Occupation/
Pekerjaan
Desa Tanjung Kapuas
Misli HH 36 M Farmer 5 1 - 2 jt 1 1
1 0 0 1 0
Desa Penyeladi
Aliyas HH 55 M Farmer 9 1 - 2 jt 1 1
Budi (almarhum)/ sartika- istri HH 29 F Housewife 3 1 - 2 jt 1 1
Ratena HH 38 F Housewife 4 1 - 2 jt 1 1
Samsiah HH 45 F Housewife 5 100 rb - 1 jt 1 1 1
Cinta (almarhum)-abang Prima
(anak)HH 27 M
Private
company4 1 - 2 jt 1
Aminah- Jahri HH 71 F Farmer 100 rb - 1 jt 1 1 1
Rajeli HH 52 M Farmer 4 100 rb - 1 jt 1 1
Jaenudin HH 58 M Farmer 4 1 - 2 jt 1
5 2 1 5 3
Kecamatan Mukok
Desa Semuntai
Supriyadi HH 41 M
civil servant
(penjaga
sekolah)
3 1-2 jt 1 1
Ahong HH 57 M Farmer 4 1-2 jt 1 1
Lilis Suryani-Ramsi (menantu) HH 40 FFarmer &
Builder 5 1-2 jt 1 1
Jawi HH 80 M Farmer 4 1-2 jt 1 1
2 1 1 4 0
KABUPATEN SEKADAU
Kecamatan Sekadau Hilir
Desa Sungai Kunyit
Rupina NA HH 53 F Farmer 6 > 10 jt 1 1
Maro Lukas Simo HH 48 M Farmer 4 1 - 2 jt 1 1
Kristina Suyah HH 65 M Farmer 3 1-2 jt 1 1 1 1
Mikael Ahen HH 61 M Farmer 6 3 - 10 jt 1 1
Apui Y HH 60 M Farmer 6 3 - 10 jt 1 1
1 3 3 5 0
Desa Peniti
Abang Japar HH 62 M Farmer 9 1 - 2 jt 1 1 1
Rapeah HH 33 F Housewife 4 1 - 2 jt 1 1
AB. Ramsyah HH 32 M Farmer 4 100 rb - 1 jt 1 1
Apuk HH 61 MEntrepreneur/
Swasta5 3 - 10 jt 1 1
Jahra HH 60 FEntrepreneur/
Swasta6 2 - 3 jt 1 1 1
Petrus Ajiu HH 60 M Farmer 2 3 - 10 jt 1 1
2 2 4 6 0
Desa Ensalang
Agustinus Alak HH 36 M Farmer 4 100 rb - 1 jt 1 1
1 0 0 1 0
Desa Sei Ringin (reroute)
Kristina Kamelia HH 32 F Farmer 4 1 - 2 jt 1 1
Junaidi HH 63 M Farmer 4 2 - 3 jt 1 1
0 1 1 2 0
Desa Mungguk
Intan HH 32 F Farmer 5 1 - 2 jt 1 1
Ramli HH 55 M Farmer 7 2 - 3 jt 1 1
Sani HH 43 M Farmer 8 2 - 3 jt 1 1
Hermanto HH 40 M Farmer 6 1 - 2 jt 1 1
3 1 0 4 0
90 17 52 122 6 37
1 GI Sanggau
Alisius 1
Solisman 1
Yuliani 1
2 GI Sekadau
Abang Mokmen 1
Setiban 1
5
122 11
KETERANGAN
untuk data yang tercantum ke dalam vulnerable & severely, PLN memutuskan untuk memasukkan ke salah satu kategori saja, yaitu severely
133
TOTAL PER KATEGORI
TOTAL VULNERABLE & SEVERELY
SUBTOTAL
SUBTOTAL
SUBTOTAL
TOTAL SUTT
TOTAL GI
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
Social Semi Annual Report January - June 2018
Appendix 17 Acknowledgement of RoW socialization for Tayan - Sanggau -
Sekadau Transmission Line
BERITA ACARA KONSULTASI PUBLIK ATAU SOSIALISASI PEMBANGUNAN
SUTT 150 kV TAYAN - SANGGAU - SEKADAU
KECAMATAN TAYAN HULU KABUPATEN SANGGAU
Pada hari mi Rabu tanggal Dua Puluh Satu bulan Oktober tahun Dua Ribu Lima Belas ( 21 - 10 -
2015 ) kami masing - masing yang bertanda tangan dibawah mi
1. Daniel Thamrin Suen, S.Sos, M.Si
2. Ambari, S.I.P
3. Asep Trisman 4. Bambang S
5. Triyono
6. Rustiono 7. Zainab
8. Dekon Prisnadi
9. Ahyar 10.Eko Purwanto, ST. 11. Wawan Gunawan
12.Tatok Hermanto 13.Muhammad Hidayat
Camat Kapuas
Sekcam Kapuas Danramil Kapolsek Lurah Beringin Lurah Tanjung Kapus
Kades Penyeladi Perwakilan Masyarakat
Perwakilan Masyarakat Koord. P2T PT PLN (Persero) UPK RING KAL 1 Anggota P2T PT PLN (Persero) UPK RING KAL 1 Anggota P2T PT PLN (Persero) UPK RING KAL 1 Anggota P2T PT PLN (Persero) UPK RING KAL I
Bersama - sama telah melakukan Konsultasi Publik atau Sosialisasi pembangunan tapak tower SUTT
150 kV Tayan - Sanggau di Kantor Kecamatan Kapuas.
1. Sosialisasi dilakukan dengan berpedoman kepada
1. UU No.2 tahun 2012 tentang Pengadaan Tanah bagi Pelaksanaan Pembangunan untuk Kepentingan Umum.
Perpres No. 40 tahun 2014 tentang Perubahan atas Peraturan Presiden No. 71 tahun
2012 tentang Penyelenggaraan Pengadaan Tanah Bagi Pembangunan untuk Kepentingan Umum.
3. Peraturan Kepala Badan Pertanahan Nasional Republik Indonesia No. 05 tahun 2012
tentang Pengadaan Tanah bagi Pelaksanaan Pembangunan untuk Kepentingan Umum.
4. Keputusan Direksi PT PLN (Persero) No. 0289.KIDIRJ20I3 tentang Pengadaan Tanah
untuk Kepentingan Penyediaan Tenaga Listrik, Biaya Oprasional Pengadaan Tanah dan Biaya Oprasional Kompensasi di Lingkup PT PLN (Persero).
5. Rekomendasi Gubernur Kepala Daerah Tingkat I Kalimantan Barat No. 671.1 / 1167) DPE-C3 tanggal 29 April 2009 tentang Pembangunan Sarana Ketenagalistrikan di kalimantan Barat.
Keputusan Bupati Sanggau No. 250 Tahun 2014 tanggal 28 April 2014 Tentang
Penetapan Lokasi Tower Saluran Udara Tegangan Tinggi 150 kV di Wilayah Tayan Hilir, Balai, Tayan Hulu, Parindu, Kapuas dan Mukok.
BERITA ACARA KONSULTASI PUBLIK ATAU SOSIALISASI PEMBANGUNAN
SUTT 150 kV TAYAN - SANGGAU - SEKADAU
KECAMATAN PARINDU HULU KABUPATEN SANGGAU
Pada hari mi Jumat tanggal Enam Belas bulan Oktober tahun Dua Ribu Lima Belas (16 - 10 -
2015) kami masing - masing yang bertanda tangan dibawah mi:
1. Drs. Paulus Usrin, M.Si
2. Marina Rona, M.H
3. L.S Aritonang
4. R. Hutahaean
5. Sartono
U. i'KUUIIIIUS
7. Bartolomeus
8. Mardiyanto
9. Ahin 10. Yordanus
ii. Eko Purwanto, ST.
12. \Vawan Gunawan
13.Tatok Hermanto
14. Muhammad Hidayat
Camat Parindu
Sekcam Parindu
Koramil
Polsek
Kades Suka Gerundi
Kades Palem Jaya
Sekdes Pusat Damai
Kades Sebbara
Penvakilan Masyarakat
Perwakilan Masyarakat
Koord. P2T PT PLN (Persero) UPK RING KAL I
Anggota P2T PT PLN (Persero) UPK RING KAL I
Anggota P2T PT PLN (Persero) UPK RING KAL I
Anggota P2T PT PLN (Persero) UPK RING KAL I
Bersama - sama telah melakukan Konsultasi Publik atau Sosialisasi pembangunan tapak tower SUTT
150 k\' Tayan - Sanggau di Kantor Kecamatan Parindu.
1. Sosialisasi dilakukan dengan berpedoman kepada
I. UU No.2 tahun 2012 tentang Pengadaan Tanah bagi Pelaksanaan Pembangunan untuk
Kepentingan Umum.
2. Perpres No. 40 tahun 2014 tentang Perubahan atas Peraturan Presiden No. 71 tahun
2012 tentang Penyelenggaraan Pengadaan Tanah Bagi Pembangunan untuk
Kepentingan Umum.
3. Peraturan Kepala Badan Pertanahan Nasional Republik Indonesia No. 05 tahun 2012
tentang Pengadaan Tanah bagi Pelaksanaan Pembangunan untuk Kepentingan Umum.
4. Keputusan Direksi PT PLN (Persero) No. 0289.KJDIRI20I3 tentang Pengadaan Tanah
untuk Kepentingan Penyediaan Tenaga Listrik, Biaya Oprasional Pengadaan Tanah clan
Biaya Oprasional Kompensasi di Lingkup PT PLN (Persero).
5. Rekomendasi Gubernur Kepala Daerah Tingkat I Kalimantan Barat No. 671.1 / 1167 /
DPE-C3 tanggal 29 April 2009 tentang Pembangunan Sarana Ketenagalistrikan di kalimantan Barat.
6. Keputusan Bupati Sanggau No. 250 Tahun 2014 tanggal 28 April 2014 Tentang
Penetapan Lokasi Tower Saluran Udara Tegangan Tinggi 150 kV di Wilayah Tayan
Hilir, Balal, Tayan Hulu, Parindu, Kapuas clan Mukok.
BERITA ACARA KONSULTASI PUBLIK ATAU SOSIALISASI PEMBANGUNAN
SUTT 150 kV TAYAN - SANGGAU - SEKADAU
KECAMATAN T 4WH -IttfiUPATEN SANGGAU
Pada hari mi Selasa tanggal Dua Puluh bulan Oktober tahun Dua Ribu Lima Belas ( 20— 10-2015
) kami masing - masing yang bertanda tangan dibawah mi:
1. Daniel Thamrin Suen, S.Sos, M.Si
2. Ambari, S.I.P
3. Asep Trisman 4. Bambang S
5. Hironimus
6. Petrus, Amd 7. Yohanes Yan
8. Slamet
9. Eko Purwanto, ST. 10. Wawan Gunawan 11.Tatok Hermanto 12.Muhammad Hidayat
Camat Kapuas Sekcam Kapuas Danramil Kapolsek Kades Sungai Mawang Seklur Bunut
Kades Lape Penvakilan Masyarakat Koord. P2T PT PLN (Persero) UPK RING KAL I Anggota P2T PT PLN (Persero) UPK RING KAL 1 Anggota P2T PT PLN (Persero) UPK RING KAL I Anggota P2T PT PLN (Persero) UPK RING KAL 1
Bersama - sama telah melakukan Konsultasi Publik atau Sosialisasi pembangunan tapak tower SUIT 150 kV Tayan - Sanggau di Kantor Kecamatan Kapuas.
1. Sosialisasi dilakukan dengan berpedoman kepada
1. UU No.2 tahun 2012 tentang Pengadaan Tanah bagi Pelaksanaan Pembangunan untuk Kepentingan Umum.
2. Perpres No. 40 tahun 2014 tentang Perubahan atas Peraturan Presiden No. 71 tahun 2012 tentang Penyelenggaraan Pengadaan Tanah Bagi Pembangunan untuk Kepentingan Umum.
3. Peraturan Kepala Badan Pertanahan Nasional Republik Indonesia No. 05 tahun 2012 tentang Pengadaan Tanah bagi Pelaksanaan Pembangunan untuk Kepentingan Umum.
4. Keputusan Direksi PT PLN (Persero) No. 0289.KIDIRJ20I3 tentang Pengadaan Tanah untuk Kepentingan Penyediaan Tenaga Listrik, Biaya Oprasional Pengadaan Tanah dan Biaya Oprasional Kompensasi di Lingkup PT PLN (Persero).
5. Rekomendasi Gubernur Kepala Daerah Tingkat I Kalimantan Barat No. 671.1 / 1167 / DPE-C3 tanggal 29 April 2009 tentang Pembangunan Sarana Ketenagalistrikan di kalimantan Barat.
6. Keputusan Bupati Sanggau No. 250 Tahun 2014 tanggal 28 April 2014 Tentang
Penetapan Lokasi Tower Saluran Udara Tegangan Tinggi 150 kV di Wilayah Tayan Hilir, Balai, Tayan Hulu, Parindu, Kapuas dan Mukok.
7. Di capai kesepakatan lokasi Pembangunan tanah tapak tower sesuai hasil pendataan Inventarisasi di lapangan.
BERITA ACARA KONSULTASI PUBLIK ATAU SOSIALISASI PEMBANGUNAN
SUTT 150 kV SFKADAU - SINTANG KECAMATAN SEKADAU HILIR, KABUPATEN SEKADAU
(DESA BOKAK SEBUMBUN)
Pada hari mi Selasa Tanggal Sebelas Bulan April Tahun Dua Ribu Tujuh Belas (Ii —04 —2017) kami
masing - masing yang bertanda tangan dibawah mi:
1. Hermanto S.Sos, M.Si : Camat Sekadau Hilir
2. Minaryarti S.Sos : Sekcam Sekadau Hilir
3. Indra F. Chaniago : Danramil Sekadau
4. Zainudin
5. Budi
6. Martinus Pen, S. Sos
7. Ricko
8. Afditia Azhari
9. Gebyar Lintang Ndadari
10.Faisol Adi Fahlefi
11.Andi Eko Saputro
12. llham Riza
13. Aulia Rachman Maulana
14. Nur Cahyani
Wakapolsek Sekadau
Badan Intelejen Negara
Kepala Desa Bokak Sebumbun
Ketua Tim Pengadaan Tanah dan ROW PT PLN UPP KITRING KBB 2
Sekretaris Tim Pengadaan Tanah dan ROW PT PLN UPP KITRING KBB 2
Anggota Tim Pengadaan Tanah dan ROW FT PLN IJPP KITRING KBB 2
Anggota Tim Pengadaan Tanah dan ROW PT PLN UPP KITRING KBB 2
Anggota Tim Pengadaan Tanah dan ROW PT PLN UPP KITRING KBB 2
Anggota Tim Pengadaan Tanah dan ROW PT PLN UPP KITRING KBB 2
Anggota Tim Pengadaan Tanah dan ROW PT PLN UPP KITRING KBB 2
Anggota Tim Pengadaan Tanah dan ROW PT PLN UPP KITRING KBB 2
Bersama - sama telah melakukan konsultasi publik atau sosialisasi pembangunan tower SUIT 150 kV
Sekadau - Sintang di Kantor Desa Bokak Sebumbun.
I. Sosialisasi dilakukan dengan berpedoman kepada
1. UU No.2 tahun 2012 tentang Pengadaan Tanah bagi Pelaksanaan Pembangunan Untuk
Kepentingan Umum.
2. Perpres No. 40 tahun 2014 tentang Perubahan atas Peraturan Presiden No. 71 tahun 2012
tentang Penyelenggaraan Pengadaan Tanah Bagi Pembangunan untuk Kepentingan
Umum.
3. Peraturan Kepala Badan Pertanahan Nasional Republik Indonesia No. 05 tahun 2012
tentang Pengadaan Tanah bagi Pelaksanaan Pembangunan Untuk Kepentingan Umum.
Social Semi Annual Report January - June 2018
Appendix 18 Documentation of Leaflet Distribution for Affected Household
in Tayan – Sanggau - Sekadau Transmission Line
1 2 3 4 5 6 7 8 9
1 T.166 Simplisianus HH 42 M Farmer/Petani 4
1 T.194 Donata/Pak Agus P HH 55 M PNS 5
2 T.196 Kurbinus/Sabinus HH 45 M Perangkat Desa 5
1 T.149 Yulia Widiawati HH 32 F Ibu Rumah tangga 4
2 T.155 Lusia HH 38 F Farmer/Petani 4
1 Solisman HH 33 M Farmer/Petani 3
2 Alicius HH 72 M Farmer/Petani 5
3 Tonel HH 63 M Farmer/Petani 4
1 Daniel HH 45 M Karyawan BUMN 5
2 T.173 Ignasius HH 50 M Wiraswasta 5
2. Village Sebera
3. Village Suka Gerundi
4. Village Bunut
5. Village Pusat Damai
SANGGAU DISTRICT
1. Village Palemjaya
LEAFLET DISTRIBUTION FOR AFFECTED HOUSEHOLD IN 150 kV TAYAN - SANGGAU - SEKADAU TRANSMISSION LINE
NO Tower Name HH Status Age Sex OccupationNumber of HH
memberDOcumentation
Social Semi Annual Report January - June 2018
Appendix 19 Tayan – Sanggau - Sekadau Transmission Line’s Project Leaflet
Social Semi Annual Report January - June 2018
Appendix 20 Decree Letter of Bupati Sekadau about Location Assignment
Permissions for 150 kV Sanggau substations