ROW HOUSES – PHASE 15 BHK Villas on Dwarka Expressway
www.SiddhanthPromoters.com 4
Block A, C & DRow House in Phase 1 are Spread Across Block A (38 Units), Block C (48 Units) & Block C (7 Units).
92 Units are in Finishing Stage Including the External Infrastructure.
The External Infrastructure Work Like Boundary Wall, Entry Gates, Security Cabins, Landscaping etc, are also in Progress.
Row House at International City - Phase 1
www.SiddhanthPromoters.com 5
Row House at International City - Phase 1
Row House Progress Summary
No. of Units
Milestones Block A Block C Block D
Internal Plastering 37 37 7
Internal Flooring 37 48 7
External Plastering 37 48 7
Internal Painting 0 9 5
www.SiddhanthPromoters.com 9
VILLAS – PHASE 1Duplex Villas in Gurgaon
www.SiddhanthPromoters.com 10
ONGOING ACTIVITIES IN BLOCK B (B-001 TO B-031)
The Structure Work is Completed for 27 Units and in Progress for Other Units.
The Activities on External Plastering, External Painting, Flooring, Wall Cladding are in Progress.
Block B (Total Units: 31)
Milestones No. of Units
Block Work 27
Internal Plastering 23
Internal Flooring 10
External Flooring 10
Block B: Villa Construction Update
www.SiddhanthPromoters.com 12
Block B (Total Units: 31)
Milestones No. of Units
Block Work 31
Internal Plastering 20
Internal Flooring 2
External Flooring 1
Block B: Villas Construction Update ON GOING ACTIVITIES IN BLOCK B(B-041 TO B-072)
The Internal Plastering is in Progress in 11 Units and External Plastering is Going on for 12 Units.
The Flooring is in Progress for 8 Units.
www.SiddhanthPromoters.com 14
Block B (Total Units: 34)
Milestones No. of Units
Superstructure 31
Block Work 23
Internal Plastering 17
Block B: Villa Construction UpdateON GOING ACTIVITIES IN BLOCK B (B-073 TO B-106)
The Flooring and Water Proofing on Terrace is inProgress for 13 Units.
The Work on False Ceiling is in Progress for 8 Units.
www.SiddhanthPromoters.com 16
DUPLEX VILLAS – PHASE 2Presidential Villas in Gurgaon
www.SiddhanthPromoters.com 18
Block E (Total 600 Sq. Yd. DV Units: 61)
Milestones Achieved No. of Units
First Floor Roof Slab 46
Second Floor Roof Slab 45
Superstructure 43
Block E:Duplex Villa Construction Update
ON GOING ACTIVITIES IN BLOCK E (600 Sq. Yd. Duplex Villa)
The Super Structure is Completed for 43 Units and The Block Work is in Progress for 27 Units.
The Work on Development of Green Area in Block E is also in Progress.
www.SiddhanthPromoters.com 20
OTHER UPDATESSobha International City Gurgaon
www.SiddhanthPromoters.com 22
Connectivity to International City
Connectivity to International City Has Improved Over The Last Few Years and The Current Access Roads Are Shown Through Live Videos. The Links Are Mentioned Below:i. Via Bijwasan – https://www.youtube.com/watch?v=onl3y9Clrwii. Via Dwarka – http://www.youtube.com/watch?v=ljEbbA4e22o
A Factual Survey of Dwarka Expressway Was Done in March 2015 by Sobha. The Link is Mentioned Below:
i. Dwarka Expressway Survey Video – https://www.youtube.com/watch?v=olz1zaMGekY
International City Has Recently Been Featured in NDTV. The Link is Mentioned Below:
http://www.ndtv.com/video/player/the-property-show/property-it-s-hot-dwarka-expressway-special/372889
www.SiddhanthPromoters.com 23
Contact us for Booking
Siddhanth Promoters1110, Arunachal Building,
19 Barakhamba Road,New Delhi – 110001
Visit us:www.SiddhanthPromoters.com
Email us:[email protected]
Call us:011 – 43575152011 – 43755152
+91 – 9891121131+91 - 9891521131