1 Nur Widi Priambodo 23213305 UAS-OPDAL Genap 2014 1. Problem 1 Tabel 3. Measurements of active powers No Meter MW 1 M12 24.4 2 M14 40.3 3 M15 32.2 4 M21 -25.1 5 M24 -31.0 6 M25 16.9 7 M26 25.9 8 M23 1.9 9 M32 -1.9 10 M35 16.7 11 M36 46.7 12 M41 -41.0 13 M42 -31.2 14 M45 4.2 15 M54 -4.0 16 M51 -32.2 17 M53 -16.8 18 M56 0.3 19 M65 -0.3 20 M62 -25.9 21 M63 -47.0 Notes: 1. M km is MW-meter placed at the bus k end of the line connecting bus k and bus m. 2. The standard deviation of each meter is =5MW. 3. Base MVA = 100MW. Table 3 shows the measurements of MW flows in the lines of power system as shown in Fig. 4.13 (reference book) where the line data and bus data are shown in Fig. 4.20 (reference book). The system is represented as DC network, with bus 1 as slack bus. All meter are of identical accuracy with standard deviation =5MW. a. Find the estimated angles of each bus. b. Detect if there may be a bad meter by testing the residue J using suitable statistical methodology ( distribution). Use the threshold value α = 0.01 that J will exceed t j . c. The covariance matrix of the residues can be evaluated using the following formula: = ( 1 ) 1 Each diagonal element of K can be used as the variance ( 2 ) of the corresponding residue of each measurement. Identify the bad meter by looking at the normalized residue r i / . Use normalized residu of 3 as bad.
14

Soal UAS Opdal_2014genap

Nov 23, 2015

Download

Documents

Jawaban uas opdal semester genap 2014
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 1 Nur Widi Priambodo 23213305 UAS-OPDAL Genap 2014

    1. Problem 1

    Tabel 3. Measurements of active powers

    No Meter MW

    1 M12 24.4

    2 M14 40.3

    3 M15 32.2

    4 M21 -25.1

    5 M24 -31.0

    6 M25 16.9

    7 M26 25.9

    8 M23 1.9

    9 M32 -1.9

    10 M35 16.7

    11 M36 46.7

    12 M41 -41.0

    13 M42 -31.2

    14 M45 4.2

    15 M54 -4.0

    16 M51 -32.2

    17 M53 -16.8

    18 M56 0.3

    19 M65 -0.3

    20 M62 -25.9

    21 M63 -47.0

    Notes:

    1. Mkm is MW-meter placed at the bus k end of the line connecting bus k and bus m.

    2. The standard deviation of each meter is =5MW.

    3. Base MVA = 100MW.

    Table 3 shows the measurements of MW flows in the lines of power system as shown in Fig.

    4.13 (reference book) where the line data and bus data are shown in Fig. 4.20 (reference book).

    The system is represented as DC network, with bus 1 as slack bus. All meter are of identical

    accuracy with standard deviation =5MW.

    a. Find the estimated angles of each bus.

    b. Detect if there may be a bad meter by testing the residue J using suitable statistical

    methodology ( distribution). Use the threshold value = 0.01 that J will exceed tj.

    c. The covariance matrix of the residues can be evaluated using the following formula:

    = (1)1

    Each diagonal element of K can be used as the variance (2) of the corresponding

    residue of each measurement. Identify the bad meter by looking at the normalized

    residue ri/ . Use normalized residu of 3 as bad.

  • 2 Nur Widi Priambodo 23213305 UAS-OPDAL Genap 2014

    Jawab:

    1. A

    - Mengubah daya terukur dalam basis 100MW

    Meter MW Basis

    100MW

    M12 24.4 0.244 M14 40.3 0.403 M15 32.2 0.322 M21 -25.1 -0.251 M24 -31.0 -0.31 M25 16.9 0.169 M26 25.9 0.259 M23 1.9 0.019 M32 -1.9 -0.019 M35 16.7 0.167 M36 46.7 0.467 M41 -41.0 -0.41 M42 -31.2 -0.312 M45 4.2 0.042 M54 -4.0 -0.04 M51 -32.2 -0.322 M53 -16.8 -0.168 M56 0.3 0.003 M65 -0.3 -0.003 M62 -25.9 -0.259 M63 -47.0 -0.47

    - Membuat matriks H, R , dan Z

    Matriks H tersusun dari koefisiensi-koefisiensi dari persamaan berikut

    _ =1

    ( )

    Dimana,

    Mkm_est = estimasi besar daya yang terukur pada bus k ke bus m (saluran k-m).

    Xkm = reaktansi saluran k-m

    , = sudut estimasi pada bus k, bus m

    Dari persamaan di atas dapat disusun matriks sebagai berikut

    Misal:

    12_ =1

    12(1 2) , 1 = 0 karena slack bus

    12_ =1

    0.2(0 2) = 52 , dst...

    Maka,

    12_14_15_

    =

    5 0 00 0 1 14 0 0 0

    0 00 0

    1 15 0

    234

  • 3 Nur Widi Priambodo 23213305 UAS-OPDAL Genap 2014

    Sehingga matriks H dan M untuk problem 1 diperoleh sebagai berikut.

    Matriks R merupakan matriks diagonal dengan elemen diagonalnya berupa varians dari

    masing-masing alat ukur. = 5 = 0.05( 100) sehingga varians

    adalah 2 = 0.0025.

    H

    5

    0

    0

    5

    10

    3.33

    5

    4

    4

    0

    0

    0

    10

    0

    0

    0

    0

    0

    0

    5

    0

    0

    0

    0

    0

    0

    0

    0

    4

    4

    3.84

    10

    0

    0

    0

    0

    0

    3.84

    0

    0

    0

    10

    0

    5

    0

    0

    10

    0

    0

    0

    0

    0

    0

    5

    10

    2.5

    2.5

    0

    0

    0

    0

    0

    0

    0

    0

    3.33

    0

    0

    3.33

    0

    0

    0

    3.84

    0

    0

    0

    2.5

    2.5

    3.33

    3.84

    3.33

    3.33

    0

    0

    0

    0

    0

    0

    0

    0

    5

    0

    0

    0

    10

    0

    0

    0

    0

    0

    0

    3.33

    3.33

    5

    10

    M

    0.244

    0.403

    0.322

    0.251

    0.310

    0.169

    0.259

    0.019

    0.019

    0.167

    0.467

    0.41

    0.312

    0.042

    0.04

    0.322

    0.168

    0.003

    0.003

    0.259

    0.470

    R

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0.0025

  • 4 Nur Widi Priambodo 23213305 UAS-OPDAL Genap 2014

    - Memperkirakan sudut pada masing-masing bus

    1. B

    - Menghitung nilai residual, J(x) = J(2, 3, 4, 5, 6)

    Untuk menghitung residual dari n buah parameter yang tidak diketahui (contoh

    2... 6) dapat menggunakan formula berikut.

    (1 n) = Mi Mest _i(1 n)

    2

    i2

    m

    i=1

    Dimana,

    m = jumlah pengukuran

    2= varians masing-masing alat ukur

    Mest = nilai pengukuran estimasi dengan memasukkan nilai est pada persamaan Mkm_est

    Nilai Mest dan nilai J(x) adalah sebagai berikut

    Ketika terdapat bad measurement, nilai J(x) > tj, dimana tj merupakan nilai chi-square

    pada degree of freedom, K dan nilai threshold, .

    Xest HT

    R1H

    1

    HT

    R1M

    0.062

    0.063

    0.067

    0.103

    0.11

    M_est H

    0.308

    0.333

    0.342

    0.308

    0.05

    0.137

    0.242

    6.168 103

    6.168 103

    0.152

    0.469

    0.333

    0.05

    0.09

    0.09

    0.342

    0.152

    0.025

    0.025

    0.242

    0.469

    Jx

    0

    20

    i

    Mi

    M_esti

    2

    0.0025

    90.163

  • 5 Nur Widi Priambodo 23213305 UAS-OPDAL Genap 2014

    K = Nm Ns , dimana Nm = jumlah pengukuran, Ns = 2n-1 (n=jumlah bus).

    Dengan Nm=21, Ns=(2x6)-1=11 maka K=10.

    Pada tabel chi-square dengan K=10 dan =0.01 didapatkan nilai tj = 23.209

    Sehingga J(x) > tj (90.163 > 23.209) terdapat bad measurement

    1. C

    Kc R H HT

    R1H

    1

    HT

    0 1 2 3 4

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    -31.90410 -4-4.73710 -4-2.70110 -45.96410 -42.45410

    -4-4.73710 -31.88410 -4-2.40310 -44.73710 -4-2.8510

    -4-2.70110 -4-2.40310 -32.01610 -42.70110 -55.94510

    -45.96410 -44.73710 -42.70110 -31.90410 -4-2.45410

    -42.45410 -4-2.8510 -55.94510 -4-2.45410 -31.43910

    -41.27110 -57.51510 -4-3.03710 -4-1.27110 -4-1.0410

    -57.16410 -54.23410 -4-1.71110 -5-7.16410 -5-5.85910

    -56.10610 -53.60910 -4-1.45910 -5-6.10610 -5-4.99310

    -5-6.10610 -5-3.60910 -41.45910 -56.10610 -54.99310

    -58.810 -55.20110 -4-2.10210 -5-8.810 -5-7.19610

    -6-9.36810 -6-5.53710 -52.23810 -69.36810 -67.66110

    -44.73710 -46.16210 -42.40310 -4-4.73710 -42.8510

    -4-2.45410 -42.8510 -5-5.94510 -42.45410 -31.06110

    -53.4110 -41.27710 -4-2.42910 -5-3.4110 -41.87110

    -5-3.4110 -4-1.27710 -42.42910 -53.4110 -4-1.87110

    -42.70110 -42.40310 -44.83610 -4-2.70110 ...

    _sqr diag Kc( )

    1.904 103

    1.884 103

    2.016 103

    1.904 103

    1.439 103

    2.112 103

    1.852 103

    2.061 103

    2.061 103

    1.992 103

    1.426 103

    1.884 103

    1.439 103

    2.254 103

    2.254 103

    2.016 103

    1.992 103

    2.116 103

    2.116 103

    1.852 103

    1.426 103

    M_err M_est M

    0.064

    0.07

    0.02

    0.057

    0.36

    0.032

    0.017

    0.013

    0.013

    0.015

    2.483 103

    0.077

    0.262

    0.048

    0.05

    0.02

    0.016

    0.022

    0.022

    0.017

    5.169 104

  • 6 Nur Widi Priambodo 23213305 UAS-OPDAL Genap 2014

    Nilai varians (_sqr) didapat dari elemen-elemen diagonal dari matriks Kc. Ini

    merupakan varians dari setiap residual pengukuran (M_err). Bad measurement didapat

    ketika nilai absolute residual ternormalisasi ( |Ynorm| ) melebihi 3.

    Dari hasil membandingkan hasil |Ynorm| terhadap 3, hanya M36 dan M63 yang

    merupakan good measurement.

    tiga_sigma 3 _sqr

    0.131

    0.13

    0.135

    0.131

    0.114

    0.138

    0.129

    0.136

    0.136

    0.134

    0.113

    0.13

    0.114

    0.142

    0.142

    0.135

    0.134

    0.138

    0.138

    0.129

    0.113

    YnormM_err

    _sqr

    1.466

    1.614

    0.438

    1.305

    9.49

    0.706

    0.385

    0.283

    0.283

    0.346

    0.066

    1.775

    6.905

    1.012

    1.054

    0.438

    0.368

    0.476

    0.476

    0.385

    0.014

  • 7 Nur Widi Priambodo 23213305 UAS-OPDAL Genap 2014

    2. Problem 2

    Solve the problem 9.4 of the reference book : Power Generation Operational and Control

  • 8 Nur Widi Priambodo 23213305 UAS-OPDAL Genap 2014

    Jawab:

    a. Menghitung economic base point dan faktor partisipasi dari 2 unit yang mensuplai

    500MW.

    - Fungsi biaya bahan bakar untuk setiap unit

    1(1) = 1(1) 1 = (500 + 71 + 0.00212) 1

    = 500 + 71 + 0.00212

    2(2) = 2(2) 2 = (200 + 82 + 0.002522) 0.98

    = 196 + 7,842 + 0,0024522

    - Kondisi saat optimum dispatch adalah

    = 1 + 2 = 500 2 = 500 1

    11

    = 7 + 0,0041 = (1)

    22

    = 7,84 + 0,00492 = (2)

    Dengan mensubstitusikan P2 ke persamaan (2) maka diperoleh

    0,0041 + 0,00491 = 3.29

    Sehingga diperoleh 1 = 369,663 dan 2 = 130,337

    - Menghitung faktor partisipasi masing-masing unit:

    =

    =

    1"

    1"

    1 = 0,004 1

    0,004 1 + 0,0049 1= 0,550561

    2 = 0,0049 1

    0,004 1 + 0,0049 1= 0,4494

    b. Asumsi ada perubahan beban 10MW dan akan menghilangkan ACE menjadi 0, selama 5

    menit.

    - Menghitung batas baru

    =

    + ( ) =

    =

    ( )

    Sehingga,

    1 = 369,663 + 5 2 = 379,663

    1 = 369,663 5 2 = 359,663

    359,663 1 379,663

    2 = 130,337 + 5 2 = 140,337

    2 = 130,337 5 2 = 120,337

    120,337 2 140,337

  • 9 Nur Widi Priambodo 23213305 UAS-OPDAL Genap 2014

    - Menghitung output daya baru sesuai faktor partisipasi

    = +

    Sehingga,

    1 = 369,663 + 0,5505 10 = 375,168

    2 = 130,337 + 0,4494 10 = 134,786

    Base poin dan faktor partisipasi mungkin dialokasikan karena nilai output

    yang baru dari unit i masih dalam batas economic dispatch

    c. Perubahan beban 10 MW tetapi rate limit unit 1 menjadi 0.5 MW/min.

    - Menghitung batas baru

    1 = 369,663 + 5 0.5 = 372,163

    1 = 369,663 5 0.5 = 367,163

    367,163 1 372,163

    - Menghitung output daya baru sesuai faktor partisipasi

    1 = 369,663 + 0,5505 10 = 375,168

    Nilai P1 yang baru melebihi batas nilai P1.

    d. Asumsi T=5min dan total pertubed dispatch adalah 510MW

    - Menghitung pertubed economic dispatch

    = 1 + 2

    = 510 2 = 510 1

    11

    = 7 + 0,0041 = (1)

    22

    = 7,84 + 0,00492 = (2)

    Dengan mensubstitusikan P2 ke persamaan (2) maka diperoleh

    0,0041 + 0,00491

    = 3.29

    Sehingga diperoleh 1 = 375.28 dan 2

    = 134.72

    - Menghitung faktor partisipasi baru, perubahan daya total 10MW (soal c)

    =

    1 =375.28 369,663

    10= 0.56 2 =

    134.72 130,337

    10= 0.44

    - Batas baru dengan menggunakan unit 1 rate limit 0.5MW/min dan unit 2

    2MW/min. Maka diperoleh

    367,163 1 372,163

    120,337 2 140,337

  • 10 Nur Widi Priambodo 23213305 UAS-OPDAL Genap 2014

    - Menghitung output baru dengan faktor partisipasi baru

    1 = 369,663 + 0,56 10 = 375,263

    2 = 130,337 + 0,44 10 = 134,737

    Dengan faktor partisipasi baru hasil tidak jauh berbeda dengan menggunakan faktor

    partisipasi sebelumnya. Dan daya yang baru juga masih dalam economics dispatch.

  • 11 Nur Widi Priambodo 23213305 UAS-OPDAL Genap 2014

    3. Problem 3

    Solve the problem 11.4 of the reference book : Power Generation Operational and Control

  • 12 Nur Widi Priambodo 23213305 UAS-OPDAL Genap 2014

    Jawab

    LANGKAH 1

    Menganalisa bahwa daerah N1 dan N3 terdiri hanya saluran 2-4, untuk melihat apakah sesuai

    bonding criteria atau tidak, jika tidak maka perlu diperluas.

    - Menghitung dan

    Berikut hasil penghitungan dan

    untuk outage pada saluran 2-4.

    - Menghitung 2,24 dan 4,24 (bus 1 = reference bus)

    =

    0 0 00 0.09412 0.080510 0.08051 0.16590

    0 0 0

    0.06298 0.06435 0.081290.05897 0.09077 0.12895

    0 0.06298 0.058970 0.06435 0.090770 0.08129 0.12895

    0.10088 0.05422 0.059200.05422 0.12215 0.089270.05920 0.08927 0.16328

    --> diket hlm 426

    Dengan menggunakan formula , dan matriks X diatas maka diperoleh nilai 2,24

    dan 4,24 sebagai berikut

    2,24 = 22 24 24

    24 (22 + 44 224)=

    0.09412 0.06298 0.1

    0.1 (0.09412 + 0.10088 2 0.06298)= 0.1

    4,24 = 42 44 24

    24 (22 + 44 224)= 0.12242

    - Menghitung 2 4

    , =

    = ,

    saluran MW limit (pu) base 100MVA

    f0_pq (pu)

    fmax_pq xpq fmax_pqxpq

    1-2 0.3 0.253 0.047 0.2 0.0094

    1-4 0.5 0.416 0.084 0.2 0.0168

    1-5 0.4 0.331 0.069 0.3 0.0207

    2-3 0.2 0.018 0.182 0.25 0.0455

    2-4 0.4 0.325 - - -

    2-5 0.2 0.162 0.038 0.3 0.0114

    2-6 0.3 0.248 0.052 0.2 0.0104

    3-5 0.2 0.169 0.031 0.26 0.00806

    3-6 0.6 0.449 0.151 0.1 0.0151

    4-5 0.2 0.041 0.159 0.4 0.0636

    5-6 0.2 0.003 0.197 0.3 0.0591

  • 13 Nur Widi Priambodo 23213305 UAS-OPDAL Genap 2014

    Maka diperoleh nilai 2, 4, dan 2 4 sebagai berikut

    2 = 2,24 . 24 = 0.1 0.325 = 0.0325

    4 = 4,24 .24 = 0.12242 0.325 = 0.03979

    2 4 = 0.0325 + 0.03979 = 0.07229

    Berdasarkan teori, N2 akan terhindar dari overload jika memenuhi

    >

    Karena 2 4 = 0.07229 lebih besar = 0.00806 maka N2 akan

    mengalami overload, sehingga perlu memperluas N1 dan menghitung nilai

    yang baru.

    LANGKAH 2

    Memperbesar daerah N1 agar saluran pada daerah N2 tidak overload, dengan menghitung

    dari masing-masing saluran sehingga memenuhi kriteria ( >

    ).

    - Menghitung semua saluran

    Dengan cara yang sama dan menggunakan matriks X dan data reaktansi saluran maka

    diperoleh.

    1,24 = 0.2034 1 = 1,24 .24 = 0.2034 0.325 = 0.0661

    2,24 = 0.1 2 = 2,24 .24 = 0.0325

    3,24 = 0.0695 3 = 3,24 .24 = 0.0226

    4,24 = 0.1224 4 = 4,24 .24 = 0.0398

    5,24 = 0.0327 5 = 5,24 .24 = 0.0106

    6,24 = 0.0713 6 = 6,24 .24 = 0.0232

    1 2 = 0.0986 2 6 = 0.0093

    1 4 = 0.0263 3 5 = 0.012

    1 5 = 0.0767 3 6 = 0.0006

    2 3 = 0.0099 4 5 = 0.0504

    2 4 = 0.0723 5 6 = 0.0126

    2 5 = 0.0219

    Dari data diatas nilai 3 6 yang memenuhi kriteria <

    sehingga N1 diperluas agar mencakup bus 3 dan bus 6.

  • 14 Nur Widi Priambodo 23213305 UAS-OPDAL Genap 2014

    - Menghitung saluran yang overload ketika outage terjadi di saluran 2-4.

    Dengan menggunakan tabel d factor (disediakan)dapat ditentukan besar semua

    aliran daya pada saluran sehingga dapat disimpulkan saluran mana yang mengalami

    overload ketika outage pada saluran 2-4 terjadi.

    Saluran MW limit (pu)

    f0_pq (pu)

    d_factor fl

    f_pq_2-4 out Keterangan

    1-2 0.3 0.253 -0.5 -0.1265 0.1265

    1-4 0.5 0.416 0.61 0.25376 0.66976 Overload

    1-5 0.4 0.331 -0.11 0.03641 0.29459

    2-3 0.2 0.018 0.12 0.00216 0.02016

    2-4 0.4 0.325 - - - -

    2-5 0.2 0.162 0.23 0.03726 0.19926 Kritis

    2-6 0.3 0.248 0.15 0.0372 0.2852

    3-5 0.2 0.169 0.14 0.02366 0.19266 Kritis

    3-6 0.6 0.449 -0.02 0.00898 0.44002

    4-5 0.2 0.041 -0.39 0.01599 0.02501

    5-6 0.2 0.003 -0.13 0.00039 0.00261 Keterangan:

    fl = f0_pq x d_factor

    f_pq_2-4 = fl + f0_pq

    f_pq_2-4 adalah flow ketika outage terjadi di saluran 2-4

    Overload terjadi ketika flow pada suatu saluran melebihi flow batas saat terjadi outage.

    Dari tabel diatas terlihat bahwa overload terjadi di saluran 1-4 dan kritis pada saluran 2-

    5 dan 3-5. Kritis dapat dikategorikan overload karena nilai terlalu dekat dengan batas.

    Sehingga area N1+N3 harus mencakup bus 1,2,3,4, dan 5 agar saluran di N2 tidak ada

    yang overload.