TeslaMeeting04 JM SNS Cryomodule Production At Jefferson Lab J. Mammosser, Peter Kneisel
30

SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

Jun 27, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

TeslaMeeting04 JM

SNS Cryomodule Production At Jefferson LabJ. Mammosser, Peter Kneisel

Page 2: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

2TeslaMeeting04 JM

Outline

• JLab Production Requirements• Difficulties in Qualifying Cavities• Process Review and Findings

– Procedures and Process Facilities • New Process Sequence• Current Performance• Remaining Tasks For High Beta Cavities• Conclusion

Page 3: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

3TeslaMeeting04 JM

JLab Production Requirements

• Medium Beta Cryomodules– Produce 11 strings of 3 cavities each– Couplers

� 50 ohm� 50KW average power� Peak Power 550KW @ 1.3 ms 60Hz

– Cavities � Beta = 0.61, 805 MHz� Epk/Eacc = 2.71, Bp/Eacc = 5.72 mT/(MV/m)� R/Q = 279 ohms� VTA Qualifying Gradient - Eacc >10 MV/m @ Q- 5E9, 2.1K

Page 4: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

4TeslaMeeting04 JM

JLab Production Requirements

• High Beta Cryomodules• Produce 12 strings of 4 cavities each• Cavities

• Beta = 0.81, 805 MHz• Epk/Eacc = 2.19 Bp/Eacc = 4.72 mT/(MV/m)• R/Q = 483 ohms• VTA Qualifying Gradient - Eacc >16 MV/m @ Q- 5E9, 2.1K

Page 5: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

5TeslaMeeting04 JM

N – 51Mean – 20.94Std Dev – 10.46

N – 21Mean – 26.94Std Dev – 8.74

All Vertical Tests Qualified for String Assembly

FEpeak

15 20 25 30 35 40 45

−MB VTA Cavity Performance- Epk @ FE onset (MV/m)

FEpeak

5 10 15 20 25 30 35 40 45

Page 6: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

6TeslaMeeting04 JM

Definition of Field Emission Onset - JLab

10-1

100

101

102

103

104

Rad

atio

n at

top

plat

e (m

R/H

r)

1614121086Eacc (MV/m)

−MB30 11/15/03

Page 7: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

7TeslaMeeting04 JM

Field Emission Onset Chronologically

VTA Test Data All Cavities

5

10

15

20

25

30

35

40

45

50

date

Avg=22.8

LCL=13.8

UCL=31.7

EpkFE-onset

Page 8: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

8TeslaMeeting04 JM

Difficulties in Qualifying Cavities

B

MB VTA Success Rate Passed first testPassed second testPassed third testPassed sixth testPassed seventh test

60%16%

12%

8%4%

Page 9: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

9TeslaMeeting04 JM

Process Review and Findings

• JLab held an internal review September 15th 2003

• October 15th 2003 SNS held an external review of cryomoduleproduction at JLab– External review team consisted of the following:

� Helen Edwards, FNAL – Chair� Peter Kneisel, Jlab� Hassan Padamsee, Cornell University� Yanglai Cho, ANL� Carlo Pagani, DESY-TESLA/ INFN� Axel Matheisen, DESY� Lutz Lilje, DESY� Detlef Reschke, DESY

Page 10: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

10TeslaMeeting04 JM

Process Review and Findings

• Additionally:– Norbert Holtkamp and Carl Strawbridge, SNS– JLab Management and staff

• The focus of the review was to identify possible improvements toprocedures to increase cavity qualification rates

• Special attention to existing procedures, facilities and comparison to DESY TESLA procedures identified many areas of possible improvement.

• A general review of what was known about pushing out field emission was also very constructive.

Page 11: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

11TeslaMeeting04 JM

Production Sequence- Receiving Inspection

Receiving Inspection

1Cavities moved into testlab receiving area

2 Initial inspection of cavities3 Cavity is moved into QA lab4 Mechanical inspection

5Cavity is moved up to RF tuning area

6 RF Inspection

− Find more info on Accel’s process

− No internal inspection performed

Page 12: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

12TeslaMeeting04 JM

Production Sequence- Heat Treatment

Heattreatment

7Cavity is moved to chemroom

8 Cavity is Degreased in US

9Cavity is moved to RF tuning area

10 Insertion into the furnace11 Furnace run

− Rinse to Resistivity and etch before HT

− Drying after degreasing

− Should change to a liquid detergent vs powder

Has not been implemented because all MBcavities were already heattreated , will happen on the HB cavities. We are prepared for the change

Page 13: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

13TeslaMeeting04 JM

Production Sequence- Helium Vessel Welding

Helium Vessel Welding12 RF tuning

13Cavity is moved towelding area

14Component setup and alignment

15 Tack welding completed16 All Welds are completed17 Field flatness measurement

18Cavity is moved to cryomodule assembly area

19 Leak Test of vessel

− Remove plastic caps and use metal seals

− Determine frequency by passbandmodes, seal cavity when possible

Again all MB and some HB were already welded so this will be implemented on the HB

Page 14: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

14TeslaMeeting04 JM

Cleanroom Facility

Final Assembly

Final String Assembly

CleanroomChemistry

Pre-cleaning of Parts

Page 15: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

15TeslaMeeting04 JM

Production Sequence- Vertical Test Qualification

Vertical Test Qualification

20moved into chemroom on transfer cart

21Moved to passthru and cavity connected to lift straps

22Inserted into Ultrsonic tank using overhead hoist

23Ultrasonic 1 hour with DI and Alconox

24 Cavity removed from US tank25 Cavity rinsed with DI water

26Cavity placed back on transfer cart

27Cart pushed into cleanroom passthru

28

Lift cart moved to cavity and connected and removed from transfer cart

Two step rinsing, ultrasonic degreasing + flowthru

Overflow ultrasonic + filtering

Move to cleanroom sealed

Improvements to degreasing were made – DI degreasing open then repeated with second DI no soap and improved rinsing, followed by drying in cleanroom ---next step is to install resistivity monitoring and flow thru

Page 16: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

16TeslaMeeting04 JM

Production Sequence- Vertical Test Qualification

29

Cavity moved to open area and flange hardware installed

30Cavity inserted into cabinet and acid connections made

31 Water leak test performed

32Cavity Process Program Started

33Acid mixed and filtered 15-30 minutes, nitrogen leak test

34 Acid flows thru cavity (20um)35 Acid drains36 DI Water rinse for 3 minutes

37Three fill and dumps with DI water

38 Flange hardware removed39 DI water rinse of flanges

More chemistry 100um

Waste acid after 10g/L

100um added and acid wasted after 15g/L , all string chem new acidIncrease fill/dumps & follow with a flowthru rinse to pH, transfer to HPR wetNow 10 Fill & Dumps minimum (pH), flanges changes, flow thru to 5-6M ohm cm

Page 17: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

17TeslaMeeting04 JM

Production Sequence- Vertical Test Qualification

40 Cavity moved to HPR cabinet

41Cavity inserted into cabinet and aligned

42 HPR Program Started

43Pump starts and wand and table move

44Wand moves up and down and is repeated n loops

45 Cavity drains overnight

46Cavity flanges blanked all but top

47 Lift cart attached to cavity

48Cavity is removed from cabinet

49cavity is transfer to short mast cart

50Cavity is moved to Class 10 area

51 Cavity top flange assembled

52Cavity probe flange assembled

53Cavity HOM flange assembled

Total time 4 hrs, wand movement top to bottom, check effectively & durationCleanroom air top only, filtered nitrogen purgeOptimize nozzle size, positionTransfer to Class10 immediately after HPR & blankDry overnight

HPR time was increased X4Nozzle optimization underway – fan jet bestWet delivery to HPRImmediate removal blank and dry over night

Page 18: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

18TeslaMeeting04 JM

Production Sequence- Vertical Test Qualification

54 Cavity FPC flange assembled

55Cavity HOM flange assembled

56 All hardware is torqued

57Cavity is moved back to the main cleanroom

58Cavity is transferred to the tall mast cart

59Cavity inserted into HPR cabinet

60 Cavity HPR program started

61Pump starts and wand and table move

62Wand moves up and down and is repeated n loops

63 Cavity bottom flange blanked

64 Cavity removed from cabinet

65Cavity is transfer to short mast cart

66Cavity is moved into Class 10 area

67Pumpout flange is assembled to cavity

68 Bolts are torqued

Nitrogen cleaning of hardwareHorizontal drying2x HPR w/drain in betweenDrain by flipping then dry overnightEvacuate & isolate &move out of cleanroom, assembly to stand

Nitrogen cleaning of parts performedNo Horizontal drying attemptedNo flipping but dry overnightEvacuation and isolation in cleanroom

Page 19: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

19TeslaMeeting04 JM

Production Sequence- Vertical Test Qualification

69Cavity is moved into vertical attachment room

70Cavity vacuum connection is made

71 Vacuum pump is started

72

Cavity is isolated and cold trap removed from rough pump line

73Vacuum pump is started, pumps over night

74 Leak test of cavity and stand

75Cavity moved into VTA parkinglot

76Cavity vacuum is reestablished

77 Cavity HOM 's are tuned78 Cavity is moved into dewar

Clean teststandCavity isolated from teststand?Stop processing at sigh of FESurface resistance during pumpdownPassband Q vsENo HOM probesHigh Power Connectors

Cavity isolated, stop at FEonset, some surface resistance at pumpdownNo HOM probes, standard cables

Page 20: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

20TeslaMeeting04 JM

79 Dewar is qualifed

80Dewar is cooled down and filled

81Dewar is topped off and pumped

82 Cavity is RF tested83 Dewar is warmed up

84Cavity is moved back into cleanroom

85Cavity is letup to nitrogen and disassembled

Production Sequence- Vertical Test Qualification

Backfill with N2 in a clean way

Backfill no longer on stand and in a clean way

Page 21: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

21TeslaMeeting04 JM

Vertical Test Facilities

Page 22: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

22TeslaMeeting04 JM

External Review Summary

• Review identified process changes that could improve performance

� Additional rinsing after chemistry and for HP rinsing – JLab was HP rinsing a factor of two less for the surface area of

these cavities

� Keeping the cavity surface wet between chemistry and HPR steps– identified by DESY as important to reduce FE

� Allowing the cavity surface to dry between HPR steps– dry surfaces are less likely to adhere particulates from

subsequent procedures

Page 23: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

23TeslaMeeting04 JM

External Review Results

– Adjust HPR head to increase the number of nozzles and reduce the nozzle diameter to increase impact force� Jlab’s HPR works well on small diameter structures and was not optimized for

these cavities

– Isolate cavities from test stand during RF testing � This reduces the possibility of cross contamination from the test stand� Back fill cavity after testing not through test stand

– Flow thru rinsing added during degreasing steps� Provides a more controlled way to ensure it clean

– Use fresh acid for final processing <10g/L Nb

Page 24: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

24TeslaMeeting04 JM

Vertical qualification Sequence

– Degrease - move to dry in Class 10

−Chemistry 100um , followed by 10 fills and dumps, rinse to 5 M ohm cm, wet transfer to HPR−HPR 2 x 2 hours, 1200PSI drain in between, transfer to Class 10, dry overnight

−Assembly probes & flanges−HPR 2 x 2 hours, 1200 PSI, drain in between, transfer to Class 10, dry overnight

−Assembly of final flange, evacuate in Class 100, leaktest, isolate with valve

−Move out of cleanroom to vertical test area and insert into test stand

−Insert into dewar and cooldown, fill and pump to 2.1K

−RF test, warm up

Page 25: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

25TeslaMeeting04 JM

Performance Immediately Improved

10.00

20.00

30.00

40.00

50.00

60.00

All_

FEpk

3102

831

031

3110

531

107

3111

231

113

3112

231

205

3120

731

210

3121

531

217

4010

8

VTA date

Avg=33.3059

LCL=20.8832

UCL=45.7286

Individual Measurement of All_FEpk

Control Chart

Page 26: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

26TeslaMeeting04 JM

Current Vertical Data

10 20 30 40 50

MeanStd DevStd Err Meanupper 95% Meanlower 95% MeanN

33.3059 10.37726 2.87813439.57681527.034985

13

MomentsAll_FEpk

Distributions

−HPR Pump FAILURE

Page 27: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

27TeslaMeeting04 JM

Vertical Data – new procedures

109

1010

1011

0 5 10 15 20

MBspecHBspecMB03CMB21CMB26MB27MB28MB29MB30MB31AMB32MB33MB34MB35A

Eacc

Page 28: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

28TeslaMeeting04 JM

Vertical Test History

0

2

4

6

8

10

12

14

16

18

20

1-Nov-02

1-Dec-02

1-Jan-03

31-Jan-03

3-Mar-03

2-Apr-03

3-May-03

2-Jun-03

3-Jul-03 2-Aug-03

2-Sep-03

2-Oct-03

2-Nov-03

2-Dec-03

2-Jan-04

Eacc

EaccA. Spec.Min. S.Max. S.MB1MB2MB3MB4MB5MB6MB7MB8MB9MB10MB11Reject

Page 29: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

29TeslaMeeting04 JM

Remaining Tasks For High Beta

−Add additional rinsing steps before furnace treatment

−Improve HPR reliability and effectiveness

−Develop EP procedures and demonstrate performance

Page 30: SNS Cryomodule Production At Jefferson Lab · 2004-01-23 · TeslaMeeting04 JM 3 JLab Production Requirements • Medium Beta Cryomodules – Produce 11 strings of 3 cavities each

30TeslaMeeting04 JM

Conclusion:

• BEFORE THIS REVIEW: – Qualification rate was low due to early FE-onset– Epeak FE –onset – 21 MV/m, std dev 10.5– 50-60% success rate first test

• REVIEW IDENTIFIED AREAS OF IMPROVEMENT: – Process sequence modified dramatically

• CURRENT PERFORMANCE:– 12/14 passes first test– Epeak FE –onset – 33 MV/m, std dev 10.4– Two failures, both due to HPR pump failures

• More Improvements To Come