TANAHDAFTAR ANALISAHARGA SATUAN PEKERJAANNo.KoofisienSatuanUpah/
BahanHarga SatuanHarga UpahHarga BahanJumlah Harga
VI. PEKERJAAN TANAH
6.1.MENGGALI 1 M3 TANAH BIASA SEDALAM 1 METERUpah
:0.750OHPekerja0.025OHMandor
6.2.MENGGALI 1 M3 TANAH BIASA SEDALAM 2 METERUpah
:0.900OHPekerja0.045OHMandor
6.3.MENGGALI 1 M3 TANAH BIASA SEDALAM 3 METERUpah
:1.050OHPekerja0.067OHMandor
6.4.MENGGALI 1 M3 TANAH KERAS SEDALAM 1 METERUpah
:1.000OHPekerja0.032OHMandor
6.5.MENGGALI 1 M3 TANAH CADAS SEDALAM 1 METERUpah
:1.500OHPekerja0.060OHMandor
6.6.MENGGALI 1 M3 TANAH LUMPUR SEDALAM 1 METERUpah
:1.200OHPekerja0.045OHMandor
6.7.MENGERJAKAN 1 M2 STRIPPING TEBING SETINGGI 1 METERUpah
:0.050OHPekerja0.005OHMandor
6.8.MEMBUANG 1 M3 TANAH SEJAUH 30 METERUpah
:0.330OHPekerja0.010OHMandor
6.9.MENGURUG KEMBALI 1 M3 GALIANMengurug kembali 1 m3 galian
dihitung dari 1/3 kali dari indeks pekerjan galian
6.10.MEMADATKAN 1 M3 TANAH (PER 20 CM)Upah
:0.500OHPekerja0.050OHMandor
6.11.MENGURUG 1 M3 PASIR URUGUpah
:0.300OHPekerja0.010OHMandorBahan :1.200m3PU
6.12.MEMASANG 1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 3 PP : 7 TLUpah
:0.800OHPekerja0.400OHTukang Batu0.040OHKepala
Tukang0.080OHMandorBahan :0.135m3KP0.400m3PP0.948m3TL
6.13.MEMASANG 1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 5 TLUpah
:0.800OHPekerja0.400OHTukang Gali0.040OHKepala
Tukang0.080OHMandorBahan :0.248m3KP1.240m3TL
6.14.MEMASANG 1 M2 LAPISAN IJUK TEBAL 10 CMUpah
:0.150OHPekerja0.015OHMandorBahan :6.000kgIjuk
6.15.MENGURUG 1 M3 SIRTU PADAT UNTUK PENINGGIAN LANTAI
BANGUNANUpah :0.250OHPekerja0.025OHMandorBahan :1.200m3Sirtu
PONDASIDAFTAR ANALISAHARGA SATUAN
PEKERJAANNo.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
VIPEKERJAAN PONDASI
6.1.MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 3 PPUpah
:1.500OHPekerja0.600OHTukang batu0.060OHKepala
Tukang0.075OHMandorBahan :1.200m3Batu Belah 15 cm/20
cm202.000kgPC0.485m3PP
6.2.MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 4 PPUpah
:1.500OHPekerja0.600OHTukang batu0.060OHKepala
Tukang0.075OHMandorBahan :1.200m3Batu Belah 15 cm/20
cm163.000kgPC0.520m3PP
6.3.MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 5 PPUpah
:1.500OHPekerja0.600OHTukang batu0.060OHKepala
Tukang0.075OHMandorBahan :1.200m3Batu Belah 15 cm/20
cm136.000kgPC0.544m3PP
6.4.MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 6 PPUpah
:1.500OHPekerja0.600OHTukang batu0.060OHKepala
Tukang0.075OHMandorBahan :1.200m3Batu Belah 15 cm/20
cm117.000kgPC0.561m3PP
6.5.MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 8 PPUpah
:1.500OHPekerja0.600OHTukang batu0.060OHKepala
Tukang0.075OHMandorBahan :1.200m3Batu Belah 15 cm/20
cm91.000kgPC0.584m3PP
6.6.MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 KP : 1 SM : 2
PPUpah :1.500OHPekerja0.600OHTukang batu0.060OHKepala
Tukang0.075OHMandorBahan :1.200m3Batu Belah 15 cm/20
cm0.170m3KP0.170m3SM0.340m3PP
6.7.MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 3 KP : 10
PPUpah :1.500OHPekerja0.600OHTukang batu0.060OHKepala
Tukang0.075OHMandorBahan :1.200m3Batu Belah 15 cm/20
cm61.000kgPC0.147m3KP0.492m3PP
6.8.MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1/4 PC : 1 KP : 4
PPUpah :1.500OHPekerja0.600OHTukang batu0.060OHKepala
Tukang0.075OHMandorBahan :1.200m3Batu Belah 15 cm/20
cm41.000kgPC0.131m3KP0.523m3PP
6.9.MEMASANG 1 M3 BATU KOSONG (AANSTAMPING)Upah
:0.780OHPekerja0.390OHTukang batu0.039OHKepala
Tukang0.039OHMandorBahan :1.200m3Batu Belah 15 cm/20 cm0.432m3Pasir
Urug
6.10.MEMASANG 1 M3 PONDASI SIKLOP, 60% BETON CAMPURAN 1 PC : 2
PB : 3 KR DAN 40 % BATU BELAHUpah :3.000OHPekerja0.850OHTukang
batu0.085OHKepala Tukang0.150OHMandorBahan :0.480m3Batu Belah 15
cm/20 cm194.000kgPC0.312m3Pasir Beton0.468m3KR126.000kgBesi
Beton1.800kgKawat Beton
6.11.MEMASANG 1 M3 PONDASI SUMURAN, DIAMETER 100 CMUpah
:2.380OHPekerja0.300OHTukang batu0.030OHKepala
Tukang0.080OHMandorBahan :0.450m3Batu Belah 15 cm/20
cm194.000kgPC0.312m3PB0.468m3KR
BETONDAFTAR ANALISAHARGA SATUAN PEKERJAANNo.KoofisienSatuanUpah/
BahanHarga SatuanHarga UpahHarga BahanJumlah Harga
VIPEKERJAAN BETON
6.1.MEMBUAT 1 M3 BETON MUTU F'C = 7,4 MPa (K 100), SLUMP (12 2)
CM, W/C = 0,87Upah :1.650OHPekerja0.275OHTukang Batu0.028OHKepala
Tukang0.083OHMandorBahan :247.000kgPC869kgPB999kgKR (Maksimum 30
mm)215LiterAir
6.2.MEMBUAT 1 M3 BETON MUTU F'C = 9,8 MPa (K 125), SLUMP (12 2)
CM, W/C = 0,78Upah :1.650OHPekerja0.275OHTukang Batu0.028OHKepala
Tukang0.083OHMandorBahan :276.000kgPC828kgPB1012kgKR (Maksimum 30
mm)215LiterAir
6.3.MEMBUAT 1 M3 BETON MUTU F'C = 12,2 MPa (K 150), SLUMP (12 2)
CM, W/C = 0,72Upah :1.650OHPekerja0.275OHTukang Batu0.028OHKepala
Tukang0.083OHMandorBahan :299.000kgPC799kgPB1017kgKR (Maksimum 30
mm)215LiterAirCATT: Bobot isi pasir = 1.400 kg/m3, Bobot isi
kerikil = 1.350 kg/m3, bukling factor pasir = 20 %
6.4.MEMBUAT 1 M3 LANTAI KERJA BETON MUTU F'C = 7,4 MPa (K 100),
SLUMP (3-6) CM, W/C = 0,87Upah :1.200OHPekerja0.200OHTukang
Batu0.020OHKepala Tukang0.060OHMandorBahan
:230.000kgPC893kgPB1027kgKR (Maksimum 30 mm)200LiterAir
6.5.MEMBUAT 1 M3 BETON MUTU F'C = 14,5 MPa (K 175), SLUMP (12 2)
CM, W/C = 0,66Upah :1.650OHPekerja0.275OHTukang Batu0.028OHKepala
Tukang0.083OHMandorBahan :326.000kgPC760kgPB1029kgKR (Maksimum 30
mm)215LiterAir
6.6.MEMBUAT 1 M3 BETON MUTU F'C = 16,9 MPa (K 200), SLUMP (12 2)
CM, W/C = 0,61Upah :1.650OHPekerja0.275OHTukang Batu0.028OHKepala
Tukang0.083OHMandorBahan :352.000kgPC731kgPB1031kgKR (Maksimum 30
mm)215LiterAir
6.7.MEMBUAT 1 M3 BETON MUTU F'C = 19,3 MPa (K 225), SLUMP (12 2)
CM, W/C = 0,58Upah :1.650OHPekerja0.275OHTukang Batu0.028OHKepala
Tukang0.083OHMandorBahan :371.000kgPC698kgPB1047kgKR (Maksimum 30
mm)215LiterAir
6.8.MEMBUAT 1 M3 BETON MUTU F'C = 21,7 MPa (K 250), SLUMP (12 2)
CM, W/C = 0,56Upah :1.650OHPekerja0.275OHTukang Batu0.028OHKepala
Tukang0.083OHMandorBahan :384.000kgPC692kgPB1039kgKR (Maksimum 30
mm)215LiterAir
6.9.MEMBUAT 1 M3 BETON MUTU F'C = 24,0 MPa (K 275), SLUMP (12 2)
CM, W/C = 0,53Upah :1.650OHPekerja0.275OHTukang Batu0.028OHKepala
Tukang0.083OHMandorBahan :406.000kgPC684kgPB1026kgKR (Maksimum 30
mm)215LiterAir
6.10.MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (12
2) CM, W/C = 0,52Upah :1.650OHPekerja0.275OHTukang
Batu0.028OHKepala Tukang0.083OHMandorBahan
:413.000kgPC681m3PB1021m3KR (Maksimum 30 mm)215LiterAir
6.11.MEMBUAT 1 M3 BETON MUTU F'C = 28,8 MPa (K 325), SLUMP (12
2) CM, W/C = 0,49Upah :2.100OHPekerja0.350OHTukang
Batu0.035OHKepala Tukang0.105OHMandorBahan
:439.000kgPC670kgPB1006kgKR (Maksimum 30 mm)215LiterAir
6.12.MEMBUAT 1 M3 BETON MUTU F'C = 31,2 MPa (K 350), SLUMP (12
2) CM, W/C = 0,48Upah :2.100OHPekerja0.350OHTukang
Batu0.035OHKepala Tukang0.105OHMandorBahan
:448.000kgPC667kgPB1000kgKR (Maksimum 30 mm)215LiterAir
6.13.MEMBUAT 1 M3 BETON KEDAP AIR DENGAN STROROX - 100Upah
:2.100OHPekerja0.350OHTukang Batu0.035OHKepala
Tukang0.105OHMandorBahan :400.000kgPC0.480m3PB0.800m3KR (Kerikil 2
cm/3cm)1.200LiterStrorox - 100
6.14.MEMASANG 1 M PVC WATERSTOP LEBAR 150 MMUpah
:0.060OHPekerja0.030OHTukang Batu / Pipa0.003OHKepala
Tukang0.003OHMandorBahan :1.050mWaterstop Lebar 150 mm
6.15.MEMASANG 1 M PVC WATERSTOP LEBAR 200 MMUpah
:0.070OHPekerja0.035OHTukang Batu / Pipa0.004OHKepala
Tukang0.007OHMandorBahan :1.050mWaterstop Lebar 200 mm
6.16.MEMBUAT 1 M PVC WATERSTOP LEBAR 230 MM - 320 MMUpah
:0.080OHPekerja0.040OHTukang Batu / Pipa0.004OHKepala
Tukang0.004OHMandorBahan :1.050mWaterstop Lebar 230 mm - 320 mm
6.17.PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIRUpah
:0.070OHPekerja0.070OHTukang Besi0.007OHKepala
Tukang0.004OHMandorBahan :10.500kgBesi Beton
(Polos/Ulir)0.150kgKawat Beton
6.18.MEMASANG 10 KG KABEL PRESSTRESSED POLOS/STRANDSUpah
:0.050OHPekerja0.050OHTukang Besi0.005OHKepala
Tukang0.003OHMandorBahan :10.500kgBesi Beton
(Polos/Ulir)0.100kgKawat Beton
6.19.MEMASANG 10 KG JARING KAWAT BAJA/WIRE MESHUpah
:0.025OHPekerja0.025OHTukang Besi0.025OHKepala
Tukang0.001OHMandorBahan :10.200kgJaring Kawat Baja
Dilas0.050kgKawat Beton
6.20.MEMASANG 1 M2 BEKISTING UNTUK PONDASIUpah
:0.520OHPekerja0.260OHTukang Kayu0.026OHKepala
Tukang0.026OHMandorBahan :0.040m3Kayu Kelas III0.300kgPaku 5 cm -
10 cm0.100LiterMinyak Bekisting
6.21.MEMASANG 1 M2 BEKISTING UNTUK SLOOFUpah
:0.520OHPekerja0.260OHTukang Kayu0.026OHKepala
Tukang0.026OHMandorBahan :0.045m3Kayu Kelas III0.300kgPaku 5 cm -
10 cm0.100LiterMinyak Bekisting
6.22.MEMASANG 1 M2 BEKISTING UNTUK KOLOMUpah
:0.660OHPekerja0.330OHTukang Kayu0.033OHKepala
Tukang0.033OHMandorBahan :0.040m3Kayu Kelas III0.400kgPaku 5 cm -
12 cm0.200LiterMinyak Bekisting0.015m3Balok Kayu Kelas
II0.350LbrPlywood Tebal 9 mm2.000BatangDolken Kayu Galam, (8-10)
cm, panjang 4 m
6.23.MEMASANG 1 M2 BEKISTING UNTUK BALOKUpah
:0.660OHPekerja0.330OHTukang Kayu0.033OHKepala
Tukang0.033OHMandorBahan :0.040m3Kayu Kelas III0.400kgPaku 5 cm -
12 cm0.200LiterMinyak Bekisting0.018m3Balok Kayu Kelas
II0.350LbrPlywood Tebal 9 mm2.000BatangDolken Kayu Galam, (8-10)
cm, panjang 4 m
6.24.MEMASANG 1 M2 BEKISTING UNTUK LANTAIUpah
:0.660OHPekerja0.330OHTukang Kayu0.033OHKepala
Tukang0.033OHMandorBahan :0.040m3Kayu Kelas III0.400kgPaku 5 cm -
12 cm0.200LiterMinyak Bekisting0.015m3Balok Kayu Kelas
II0.350LbrPlywood Tebal 9 mm6.000BatangDolken Kayu Galam, (8-10)
cm, panjang 4 m
6.25.MEMASANG 1 M2 BEKISTING UNTUK DINDINGUpah
:0.660OHPekerja0.330OHTukang Kayu0.033OHKepala
Tukang0.033OHMandorBahan :0.030m3Kayu Kelas III0.400kgPaku 5 cm -
12 cm0.200LiterMinyak Bekisting0.020m3Balok Kayu Kelas
II0.350LbrPlywood Tebal 9 mm3.000BatangDolken Kayu Galam, (8-10)
cm, panjang 4 m4.000BuahFormite/penjaga Jarak Bekisting/Spacer
6.26.MEMASANG 1 M2 BEKISTING UNTUK TANGGAUpah
:0.660OHPekerja0.330OHTukang Kayu0.033OHKepala
Tukang0.033OHMandorBahan :0.030m3Kayu Kelas III0.400kgPaku 5 cm -
12 cm0.150LiterMinyak Bekisting0.015m3Balok Kayu Kelas
II0.350LbrPlywood Tebal 9 mm2.000BatangDolken Kayu Galam, (8-10)
cm, panjang 4 m
6.27.MEMASANG 1 M2 JEMBATAN UNTUK PENGECORAN BETONUpah
:0.150OHPekerja0.050OHTukang Kayu0.005OHKepala
Tukang0.008OHMandorBahan :0.0264m3Kayu Kelas III (Papan)0.600kgPaku
5 cm - 12 cm0.500BatangDolken Kayu Galam (Kaso), (8-10) cm, panjang
4 m
6.28.MEMBUAT 1 M3 PONDASI BETON BERTULANG (150 KG BESI +
BEKISTING)Upah :5.300OHPekerja0.275OHTukang Batu1.300OHTukang
Kayu1.050OHTukang Besi0.262OHKepala Tukang0.265OHMandorBahan
:0.020m3Kayu Kelas III 1.500kgPaku 5 cm - 12 cm0.400LiterMinyak
Bekisting157.500kgBesi Beton Polos2.250kgKawat
Beton336.000kgPC0.540m3PB0.810m3KR
6.29.MEMBUAT 1 M3 SLOOF BETON BERTULANG (200 KG BESI +
BEKISTING)Upah :5.650OHPekerja0.275OHTukang Batu1.560OHTukang
Kayu1.400OHTukang Besi0.323OHKepala Tukang0.283OHMandorBahan
:0.270m3Kayu Kelas III 2.000kgPaku 5 cm - 12 cm0.600LiterMinyak
Bekisting210.000kgBesi Beton Polos3.000kgKawat
Beton336.000kgPC0.540m3PB0.810m3KR
6.30.MEMBUAT 1 M3 KOLOM BETON BERTULANG (300 KG BESI +
BEKISTING)Upah :7.050OHPekerja0.275OHTukang Batu1.560OHTukang
Kayu2.100OHTukang Besi0.403OHKepala Tukang0.353OHMandorBahan
:0.400m3Kayu Kelas III 4.000kgPaku 5 cm - 12 cm2.000LiterMinyak
Bekisting315.000kgBesi Beton Polos4.500kgKawat
Beton336.000kgPC0.540m3PB0.810m3KR0.150m3Kayu Kelas II
Balok3.500LembarPlywood 9 mm20.000BatangDolken Kayu Galam, (8-10)
cm, panjang 4 m
6.31.MEMBUAT 1 M3 BALOK BETON BERTULANG (200 KG BESI +
BEKISTING)Upah :6.350OHPekerja0.275OHTukang Batu1.650OHTukang
Kayu1.400OHTukang Besi0.333OHKepala Tukang0.318OHMandorBahan
:0.320m3Kayu Kelas III 3.200kgPaku 5 cm - 12 cm1.600LiterMinyak
Bekisting210.000kgBesi Beton Polos3.000kgKawat
Beton336.000kgPC0.540m3PB0.810m3KR0.140m3Kayu Kelas II
Balok2.800LembarPlywood 9 mm16.000BatangDolken Kayu Galam, (8-10)
cm, panjang 4 m
6.32.MEMBUAT 1 M3 KOLOM BETON BERTULANG (150 KG BESI +
BEKISTING)Upah :5.300OHPekerja0.275OHTukang Batu1.300OHTukang
Kayu1.050OHTukang Besi0.265OHKepala Tukang0.265OHMandorBahan
:0.320m3Kayu Kelas III 3.200kgPaku 5 cm - 12 cm1.600LiterMinyak
Bekisting157.500kgBesi Beton Polos2.250kgKawat
Beton336.000kgPC0.540m3PB0.810m3KR0.120m3Kayu Kelas II
Balok2.800LembarPlywood 9 mm32.000BatangDolken Kayu Galam, (8-10)
cm, panjang 4 m
6.33.MEMBUAT 1 M3 DINDING BETON BERTULANG (150 KG BESI +
BEKISTING)Upah :5.300OHPekerja0.275OHTukang Batu1.300OHTukang
Kayu1.050OHTukang Besi0.262OHKepala Tukang0.265OHMandorBahan
:0.240m3Kayu Kelas III 3.200kgPaku 5 cm - 12 cm1.600LiterMinyak
Bekisting157.500kgBesi Beton Polos2.250kgKawat
Beton336.000kgPC0.540m3PB0.810m3KR0.160m3Kayu Kelas II
Balok2.800LembarPlywood 9 mm24.000BatangDolken Kayu Galam, (8-10)
cm, panjang 4 m
6.34.MEMBUAT 1 M3 DINDING BETON BERTULANG (200 KG BESI +
BEKISTING)Upah :5.650OHPekerja0.275OHTukang Batu1.560OHTukang
Kayu1.400OHTukang Besi0.323OHKepala Tukang0.283OHMandorBahan
:0.250m3Kayu Kelas III 3.000kgPaku 5 cm - 12 cm1.200LiterMinyak
Bekisting210.000kgBesi Beton Polos3.000kgKawat
Beton336.000kgPC0.540m3PB0.810m3KR0.105m3Kayu Kelas II
Balok2.500LembarPlywood 9 mm14.000BatangDolken Kayu Galam, (8-10)
cm, panjang 4 m
6.35.MEMBUAT 1 M' KOLOM PRAKTIS BETON BERTULANG (11 X 11) CMUpah
:0.180OHPekerja0.020OHTukang Batu0.020OHTukang Kayu0.020OHTukang
Besi0.006OHKepala Tukang0.009OHMandorBahan :0.002m3Kayu Kelas III
0.010kgPaku 5 cm - 12 cmLiterMinyak Bekisting3.000kgBesi Beton
Polos0.450kgKawat Beton4.000kgPC0.600m3PB0.009m3KR
6.36.MEMBUAT 1 M' RING BALOK BETON BERTULANG (10 X 15) CMUpah
:0.297OHPekerja0.033OHTukang Batu0.033OHTukang Kayu0.033OHTukang
Besi0.010OHKepala Tukang0.015OHMandorBahan :0.003m3Kayu Kelas III
0.020kgPaku 5 cm - 12 cmLiterMinyak Bekisting3.600kgBesi Beton
Polos0.050kgKawat Beton5.500kgPC0.009m3PB0.015m3KR
DINDING
DAFTAR ANALISAHARGA SATUAN PEKERJAAN
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
I.PEKERJAAN PERMULAAN1.1.PEMBERSIHAN LAPANGAN TIAP 10 M2Upah
:0.750orgPekerja0.025orgMandor
Untuk 1 m2 = 1/10 x Anal.
1.2.PASANGAN BOUWPLANK TIAP 10 M'Upah
:0.280orgPekerja0.800orgTukang Kayu0.080orgKepala Tukang
Kayu0.014orgMandorBahan :0.090m3Kayu Klas III13.500m'Kayu Tiang
Pancang0.100kgPaku Biasa
Untuk 1 m' = 1/10 x Anal.
II.PEKERJAAN GALIAN & TIMBUNAN2.1.PEMBUANGAN HUMUS TANAH
TIAP M3Upah0.750orgPekerja0.025orgMandorUpah = 1/2 x Anal.
2.2.ANALISA A.01 (1 M3 GALIAN TANAH BIASA)Upah
:0.750orgPekerja0.025orgMandor
2.3.ANALISA A.02 (1 M3 GALIAN TANAH KERAS)Upah
:1.000orgPekerja0.033orgMandor
2.4.ANALISA A.03 (1 M3 GALIAN TANAH BERBATU)Upah
:1.500orgPekerja0.050orgMandor
2.5.ANALISA A.04 (1 M3 GALIAN TANAH BERLUMPUR)Upah
:1.500orgPekerja0.050orgMandor
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
2.6.ANALISA A.06 (1 M3 TANAH DIANGKAT DENGAN JARAK 30 M')Upah
:0.330orgPekerjaERROR:#REF!ERROR:#REF!0.010orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
2.7.ANALISA A.07 (1 M3 TANAH DIANGKAT DENGAN JARAK LEBIH DARI 30
M')Upah :Untuk Menghitungnya Dipakai Rumus :
Keterangan :K =Biaya Yang Dicari Per m3a =Upah Pekerja SetempatL
=Jarak Pengangkutan Dalam Meter
2.8.ANALISA A.16 (1 M3 URUGAN TANAH)Upah
:0.250orgPekerjaERROR:#REF!ERROR:#REF!0.010orgMandorERROR:#REF!ERROR:#REF!Bahan
:1.200m3Tanah
TimbunanERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
2.9.ANALISA A.16a (1 M3 URUGAN TANAH BEKAS GALIAN)Upah
:0.250orgPekerjaERROR:#REF!ERROR:#REF!0.010orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
2.10.ANALISA A.18 (1 M3 URUGAN PASIR)Upah
:0.300orgPekerjaERROR:#REF!ERROR:#REF!0.010orgMandorERROR:#REF!ERROR:#REF!Bahan
:1.200m3Pasir
UrugERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
2.11.ANALISA A.18a (1 M3 STABILISASI TANAH DENGAN KERIKIL
TIMBUN)Upah
:0.300orgPekerjaERROR:#REF!ERROR:#REF!0.010orgMandorERROR:#REF!ERROR:#REF!Bahan
:1.200m3Kerikil
TimbunERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
2.12.TIMBUNAN TANAH DENGAN SIRTU TIAP 1 M3Upah
:0.300orgPekerjaERROR:#REF!ERROR:#REF!0.010orgMandorERROR:#REF!ERROR:#REF!Bahan
:1.200m3SirtuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
III.PEKERJAAN PASANGAN BATU KALI3.1.ANALISA G.02 (1 M3 MEMASANG
AANSTAMPANG BATU KALI)Upah
:1.500orgPekerjaERROR:#REF!ERROR:#REF!0.075orgMandorERROR:#REF!ERROR:#REF!Bahan
:1.100m3Batu KaliERROR:#REF!ERROR:#REF!0.500m3Pasir
UrugERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
3.2.ANALISA G.13 (1 M3 SPESI ADUKAN 1:1)Bahan :17.500zakSemen
(50 kg)ERROR:#REF!ERROR:#REF!0.700m3Pasir
PasangERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
3.3.ANALISA G.14 (1 M3 SPESI ADUKAN 1:2)Bahan :11.750zakSemen
(50 kg)ERROR:#REF!ERROR:#REF!0.950m3Pasir
PasangERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
3.4.ANALISA G.16 (1 M3 SPESI ADUKAN 1:3)Bahan :9.000zakSemen (50
kg)ERROR:#REF!ERROR:#REF!1.080m3Pasir
PasangERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
3.5.ANALISA G.19 (1 M3 SPESI ADUKAN 1:4)Bahan :7.249zakSemen (50
kg)ERROR:#REF!ERROR:#REF!1.160m3Pasir
PasangERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
3.6.ANALISA G.03 (1 M2 MEMASANG BATU KOSONG DISIAR SPESI 1:2 T =
25 CM)Upah :0.615orgPekerjaERROR:#REF!ERROR:#REF!0.080orgTukang
BatuERROR:#REF!ERROR:#REF!0.008orgKepala Tukang
BatuERROR:#REF!ERROR:#REF!0.031orgMandorERROR:#REF!ERROR:#REF!Bahan
:0.275m3Batu KaliERROR:#REF!ERROR:#REF!0.008m3Pasir
PasangERROR:#REF!ERROR:#REF!0.095zakSemen (50
kg)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
3.7.ANALISA G.04 (1 M2 MEMASANG BATU TURAP T = 23 CM)Upah
:0.800orgPekerjaERROR:#REF!ERROR:#REF!0.040orgMandorERROR:#REF!ERROR:#REF!Bahan
:0.250m3Batu KaliERROR:#REF!ERROR:#REF!0.200m3Batu Pecah
5/10ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
3.8.ANALISA G.05b (3 M3 MEMASANG BATU BRONJONG DENGAN KAWAT
DIGALVANO DIA 4 MM)Upah :1.800orgPekerja
AnyamERROR:#REF!ERROR:#REF!4.500orgPekerja
PengisiERROR:#REF!ERROR:#REF!2.200orgTukang
AnyamERROR:#REF!ERROR:#REF!0.080orgMandorERROR:#REF!ERROR:#REF!Bahan
:3.000m3Batu KaliERROR:#REF!ERROR:#REF!45.000kgKawat
DigalvanoERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Untuk
I m3 = 1/3 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
3.9.ANALISA G.26 (1 M3 UPAH PASANGAN BATU KALI)Upah
:3.600orgPekerjaERROR:#REF!ERROR:#REF!1.200orgTukang
BatuERROR:#REF!ERROR:#REF!0.120orgKepala Tukang
BatuERROR:#REF!ERROR:#REF!0.160orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
3.10.ANALISA G.32m (1 M3 PASANGAN BATU KALI 1:3)Upah :Upah =
Anal. G.26 (No. 3.9.) ERROR:#REF!ERROR:#REF!Bahan :1.200m3Batu
KaliERROR:#REF!ERROR:#REF!4.049zakSemen ( 50 kg
)ERROR:#REF!ERROR:#REF!0.486m3Pasir
PasangERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
3.11.ANALISA G.32h (1 M3 PASANGAN BATU KALI 1:4)Upah :Upah =
Anal. G.26 (No. 3.9.) ERROR:#REF!ERROR:#REF!Bahan :1.200m3Batu
KaliERROR:#REF!ERROR:#REF!3.257zakSemen ( 50 kg
)ERROR:#REF!ERROR:#REF!0.522m3Pasir
PasangERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
3.12.ANALISA G.32g (1 M3 PASANGAN BATU KALI 1:5)Upah :Upah =
Anal. G.26 (No. 3.9.) ERROR:#REF!ERROR:#REF!Bahan :1.200m3Batu
KaliERROR:#REF!ERROR:#REF!2.516zakSemen ( 50 kg
)ERROR:#REF!ERROR:#REF!0.504m3Pasir
PasangERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
IV.PEKERJAAN BETON4.1.ANALISA G.41 (1 M3 STAMP BETON 1:2:3)Upah
:6.000orgPekerjaERROR:#REF!ERROR:#REF!1.000orgTukang
BatuERROR:#REF!ERROR:#REF!0.100orgKepala Tukang
BatuERROR:#REF!ERROR:#REF!0.300orgMandorERROR:#REF!ERROR:#REF!
Bahan :0.820m3Kerikil BetonERROR:#REF!ERROR:#REF!0.540m3Pasir
BetonERROR:#REF!ERROR:#REF!6.800zakSemen (50
kg)ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!ERROR:#REF!
4.2.ANALISA G.41a (1 M3 STAMP BETON 1:1.5 :2.5)Upah :Upah = Upah
Anal. G.41 (No. 4.1.) ERROR:#REF!ERROR:#REF!Bahan :0.853m3Kerikil
BetonERROR:#REF!ERROR:#REF!0.512m3Pasir
BetonERROR:#REF!ERROR:#REF!8.540zakSemen (50
kg)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
4.3.ANALISA G.43a (1 M3 STAMP BETON 1:3:5 WORK FLOOR)Upah
:6.000orgPekerjaERROR:#REF!ERROR:#REF!0.500orgTukang
BatuERROR:#REF!ERROR:#REF!0.050orgKepala Tukang
BatuERROR:#REF!ERROR:#REF!0.300orgMandorERROR:#REF!ERROR:#REF!Bahan
:0.950m3Kerikil BetonERROR:#REF!ERROR:#REF!0.570m3Pasir
BetonERROR:#REF!ERROR:#REF!4.752zakSemen (50
kg)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
4.4.ANALISA G.44 (1 M3 STAMP BETON 1:3:6)Upah :Upah = Upah Anal.
G.43a (No. 4.3.) ERROR:#REF!ERROR:#REF!Bahan :0.950m3Kerikil
BetonERROR:#REF!ERROR:#REF!0.570m3Pasir
BetonERROR:#REF!ERROR:#REF!4.240zakSemen (50
kg)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
4.5.ANALISA F.08 (10 M2 CETAKAN BETON)Upah
:2.000orgPekerjaERROR:#REF!ERROR:#REF!5.000orgTukang
KayuERROR:#REF!ERROR:#REF!0.500orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.100orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 2/3 x Anal. ERROR:#REF!Bahan :0.200m3Kayu Kelas IV (Papan
Bekisting)ERROR:#REF!ERROR:#REF!4.000kgPakuERROR:#REF!ERROR:#REF!
Bongkar+Siram
:4.000orgPekerjaERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Untuk
1 m2 = 1/10 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!
4.6.ANALISA I.02 (100 KG PEMBESIAN/RANGKA BETON)Upah
:9.000orgPekerjaERROR:#REF!ERROR:#REF!9.000orgTukang
BesiERROR:#REF!ERROR:#REF!3.000orgKepala Tukang
BesiERROR:#REF!ERROR:#REF!ERROR:#REF!Upah = 3/4 x Anal.
ERROR:#REF!Bahan :110.000kgBesi
BetonERROR:#REF!ERROR:#REF!2.000kgKawat
BetonERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Untuk 1
kg = 1/100 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!
4.7.SUPL. V (1 M3 BETON BERTULANG 1:2:3)Upah+Bahan :1.000m3Stamp
Beton 1:2:3; Anal. G.41 (No.
4.1.)ERROR:#REF!ERROR:#REF!100.000kgRangka Besi Beton; Anal. I.02
(No. 4.6.)ERROR:#REF!ERROR:#REF!10.000m2Cetakan Beton; Anal. F.08
(No. 4.5.) ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
4.8.SUPL. V/A (1 M3 BETON BERTULANG 1:2:3 PLAT
PONDASI)Upah+Bahan :1.000m3Stamp Beton 1:2:3; Anal. G.41 (No.
4.1.)ERROR:#REF!ERROR:#REF!150.000kgRangka Besi Beton; Anal. I.02
(No. 4.6.)ERROR:#REF!ERROR:#REF!6.000m2Cetakan Beton; Anal. F.08
(No. 4.5.) ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
4.9.SUPL. V/B (1 M3 BETON BERTULANG 1:2:3; SLOOF, KOLOM, BALOK
PRAKTIS)Upah+Bahan :1.000m3Stamp Beton 1:2:3; Anal. G.41 (No.
4.1.)ERROR:#REF!ERROR:#REF!130.000kgRangka Besi Beton; Anal. I.02
(No. 4.6.)ERROR:#REF!ERROR:#REF!10.000m2Cetakan Beton; Anal. F.08
(No. 4.5.) ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
4.10.SUPL. V/C (1 M3 BETON BERTULANG 1:2:3; SLOOF)Upah+Bahan
:1.000m3Stamp Beton 1:2:3; Anal. G.41 (No.
4.1.)ERROR:#REF!ERROR:#REF!130.000kgRangka Besi Beton; Anal. I.02
(No. 4.6.)ERROR:#REF!ERROR:#REF!10.000m2Cetakan Beton; Anal. F.08
(No. 4.5.) ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
4.11.SUPL. V/D (1 M3 BETON BERTULANG 1:2:3;
KOLOM/TIANG)Upah+Bahan :1.000m3Stamp Beton 1:2:3; Anal. G.41 (No.
4.1.)ERROR:#REF!ERROR:#REF!160.000kgRangka Besi Beton; Anal. I.02
(No. 4.6.)ERROR:#REF!ERROR:#REF!10.000m2Cetakan Beton; Anal. F.08
(No. 4.5.) ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
4.12.SUPL. V/E (1 M3 BETON BERTULANG 1:2:3; BALOK)Upah+Bahan
:1.000m3Stamp Beton 1:2:3; Anal. G.41 (No.
4.1.)ERROR:#REF!ERROR:#REF!160.000kgRangka Besi Beton; Anal. I.02
(No. 4.6.)ERROR:#REF!ERROR:#REF!10.000m2Cetakan Beton; Anal. F.08
(No. 4.5.) ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
4.13.SUPL. V/F (1 M3 BETON BERTULANG 1:2:3 PLAT LANTAI)Stamp
& Besi Beton :1.000m3Stamp Beton 1:2:3; Anal. G.41 (No.
4.1.)ERROR:#REF!ERROR:#REF!120.000kgRangka Besi Beton; Anal. I.02
(No. 4.6.)ERROR:#REF!ERROR:#REF!Cetakan Beton : Upah :Upah = Upah
Anal. F.08 (No. 4.5.) ERROR:#REF!ERROR:#REF! Bahan :0.200m3Kayu
Bekisting-Kelas IV (Balok)ERROR:#REF!ERROR:#REF!4.000hlTriplek 5
mmERROR:#REF!ERROR:#REF!4.000kgPakuERROR:#REF!ERROR:#REF!
Bongkar+Siram
:4.000orgPekerjaERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
4.14.SUPL. V/G (1 M3 BETON BERTULANG 1:1.5:2.5 PLAT/BALOK
LEVEL)Upah+Bahan :1.000m3Stamp Beton 1:1.5:2.5; Anal. G.41a(No.
4.2.) ERROR:#REF!ERROR:#REF!150.000kgRangka Besi Beton; Anal. I.02
(No. 4.6.)ERROR:#REF!ERROR:#REF!10.000m2Cetakan Beton; Anal. F.08
(No. 4.5.) ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
4.15.SUPL. V (1 M3 BETON TAK BERTULANG 1:2:3)Upah+Bahan
:1.000m3Stamp Beton 1:2:3; Anal. G.41 (No.
4.1.)ERROR:#REF!ERROR:#REF!6.000m2Cetakan Beton; Anal. F.08 (No.
4.5.) ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
4.16.ANALISA Stamp Beton K-175 / M3Upah
:0.723orgPekerjaERROR:#REF!ERROR:#REF!0.241orgTukang
BatuERROR:#REF!ERROR:#REF!0.060orgMandorERROR:#REF!ERROR:#REF!Bahan
:0.710m3Kerikil BetonERROR:#REF!ERROR:#REF!0.510m3Pasir
BetonERROR:#REF!ERROR:#REF!6.420zakSemen (50
kg)ERROR:#REF!ERROR:#REF!Peralatan :340.000.4418JamConcrete
MixerRp46,570Rp20,5750.0602JamWater
TankerRp124,384Rp7,4880.4418JamConcrete
VibratorRp25,272Rp11,1651.0000LsAlat
BantuRp1,200Rp1,200ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
4.17.ANALISA Stamp Beton K-225 / M3Upah
:0.723orgPekerjaERROR:#REF!ERROR:#REF!0.241orgTukang
BatuERROR:#REF!ERROR:#REF!0.060orgMandorERROR:#REF!ERROR:#REF!Bahan
:0.780m3Kerikil BetonERROR:#REF!ERROR:#REF!0.49330.500m3Pasir
BetonERROR:#REF!ERROR:#REF!0.626.800zakSemen (50
kg)ERROR:#REF!ERROR:#REF!6.5455Peralatan :0.4418JamConcrete
MixerRp46,570Rp20,5750.0446JamWater
TankerRp124,384Rp5,5480.4418JamConcrete
VibratorRp25,272Rp11,1651.0000LsAlat
BantuRp1,200Rp1,200ERROR:#REF!ERROR:#REF!ERROR:#REF!4.18.ANALISA
Stamp Beton K-250 / M3Upah
:0.723orgPekerjaERROR:#REF!ERROR:#REF!0.241orgTukang
BatuERROR:#REF!ERROR:#REF!0.060orgMandorERROR:#REF!ERROR:#REF!Bahan
:0.760m3Kerikil BetonERROR:#REF!ERROR:#REF!0.500m3Pasir
BetonERROR:#REF!ERROR:#REF!0.647.280zakSemen (50
kg)ERROR:#REF!ERROR:#REF!345.2kg6.90Peralatan :0.442JamConcrete
MixerRp46,570Rp20,5750.045JamWater
TankerRp124,384Rp5,5480.442JamConcrete
VibratorRp25,272Rp11,1651.000LsAlat
BantuRp1,200Rp1,200ERROR:#REF!ERROR:#REF!ERROR:#REF!4.19.ANALISA
F.08 a ( 10 M2 CETAKAN BETON) BETON COMPOSITE Upah :Upah = Upah
Anal. F.08 (No. 4.5.) ERROR:#REF!ERROR:#REF! Bahan :0.200m3Kayu
Bekisting-Kelas IV (Balok)ERROR:#REF!ERROR:#REF!4.000hlMultipleks
10 mmERROR:#REF!ERROR:#REF!4.000kgPakuERROR:#REF!ERROR:#REF!
Bongkar+Siram
:4.000orgPekerjaERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Untuk 1
m2 = 1/10 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
4.20.ANALISA STUT WERK (SW) / M3Upah :10.500orgTukang
KayuERROR:#REF!ERROR:#REF!1.050orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!3.500orgPekerjaERROR:#REF!ERROR:#REF!0.175orgMandorERROR:#REF!ERROR:#REF!Bahan
:0.700m3Balok Kayu Kelas
IIERROR:#REF!ERROR:#REF!4.000KgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!V.PEKERJAAN
PONDASI SUMURAN
Perhitungan Luas Cetakan Sumuran : - Dia. Sumuran 1.00 m = 3.14
x (1.00 m + 1.20 m ) x 1.00 m = 6.91 m2 - Dia. Sumuran 1.20 m =
3.14 x (1.20 m + 1.44 m ) x 1.00 m = 8.29 m2
5.1.ANALISA G.41/X (MEMBUAT 1 BH CINCIN SUMURAN DIA. 1.0
M)Cincin Sumur :0.3500m3Stamp Beton 1:2:3; Anal. G.41 (No.
4.1.)ERROR:#REF!ERROR:#REF!Cetakan Sumur Beton :1.7275m2Cetakan
Beton; Anal. F.08 (No. 4.5.)
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!5.2.ANALISA G.41/XX
(MEMBUAT 1 BH CINCIN SUMURAN DIA 1.0 - 1.2 M)Cincin Sumur
:0.5000m3Stamp Beton 1:2:3; Anal. G.41 (No.
4.1.)ERROR:#REF!ERROR:#REF!Cetakan Beton Sumur :2.0725m2Cetakan
Beton; Anal. F.08 (No. 4.5.)
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!5.3.ANALISA A.X/1
(MENURUNKAN CINCIN SUMURAN 1.0 M PERTAMA)Galian Tanah
:0.750orgPekerjaERROR:#REF!ERROR:#REF!0.025orgMandorERROR:#REF!ERROR:#REF!Menurunkan
Cincin :0.500orgPekerjaERROR:#REF!ERROR:#REF!0.050orgKepala Tukang
BatuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
5.4.ANALISA A.X/2 (MENURUNKAN CINCIN SUMURAN 1.0 M KEDUA)Galian
Tanah & Menurunkan Cincin :Upah = 1.5 x Anal. A.X/1; (No.
5.3.)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
5.5.ANALISA A.X/3 (MENURUNKAN CINCIN SUMURAN 1.0 M KETIGA)Galian
Tanah & Menurunkan Cincin :Upah = 2 x Anal. A.X/1; (No.
5.3.)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!KESIMPULAN : Untuk
Menurunkan 3 bh Sumuran Pada 1 Tempat Adalah :- Sumuran Pertama;
Anal. A.X/1 (No. 5.3.)ERROR:#REF!- Sumuran Kedua; Anal. A.X/2 (No.
5.4)ERROR:#REF!- Sumuran Ketiga; Anal. A.X/3 (No.
5.5.)ERROR:#REF!ERROR:#REF!ERROR:#REF!
5.6.ANALISA G.32/X (1 M3 CAMPURAN BATU KALI DENGAN STAMP BETON
1:3:5)Upah+Bahan :1.200m3Batu
KaliERROR:#REF!ERROR:#REF!0.450m3Stamp Beton 1:3:5; Anal.
G.43/A(No. 4.3.) ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
5.7.ANALISA G.32/X + G.43/A (1 M3 CYCLOPEN 1:3:5 + 40 % CAMPURAN
BATU KALI)Upah+Bahan :0.600m3Stamp Beton 1:3:5; Anal. G.43/A(No.
4.3.) ERROR:#REF!ERROR:#REF!0.400m3Campuran Anal. G.32/X (No.
5.6.)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
5.8.BETON CAMPURAN 1:2:3 SPIRAL TIAP 1 M3Upah+Bahan
:1.000m3Stamp Beton 1:2:3; Anal. G.41 (No.
4.1.)ERROR:#REF!ERROR:#REF!40.000kgRangka Besi Beton; Anal. I.02
(No. 4.6.)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
5.9.ANALISA Z.1 (1 TITIK PONDASI SUMURAN DIA. 1.0 M DALAM 1.0 M'
DIISI CYCLOPEN)Cincin Sumuran :1.000bhCincin Sumuran; Anal. G.41/X
(No. 5.1.)ERROR:#REF!ERROR:#REF!Menurunkan Cincin Sumuran
:1.000m'Cincin I; Anal. A.X/1 (No. 5.3.)
ERROR:#REF!ERROR:#REF!Cyclopen Beton :0.785m3Cyclopen Beton
1:3:5;Anal. G.32/X + G.43/A (No. 5.7.)
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
5.10.ANALISA Z.2 (1 TITIK PONDASI SUMURAN DIA. 1.0 M DALAM 2.0
M' DIISI CYCLOPEN)Cincin Sumuran :2.000bhCincin Sumuran; Anal.
G.41/X (No. 5.1.)ERROR:#REF!ERROR:#REF!Menurunkan Cincin Sumuran
:1.000m'Cincin I; Anal. A.X/1 (No. 5.3.)
ERROR:#REF!ERROR:#REF!1.000m'Cincin II; Anal. A.X/2 (No. 5.4.)
ERROR:#REF!ERROR:#REF!Cyclopen Beton :1.570m3Cyclopen Beton
1:3:5;Anal. G.32/X + G.43/A (No. 5.7.)
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
5.11.ANALISA Z.3 (1 TITIK PONDASI SUMURAN DIA. 1.0 M DALAM 3.0
M' DIISI CYCLOPEN)Cincin Sumuran :3.000bhCincin Sumuran; Anal.
G.41/X (No. 5.1.)ERROR:#REF!ERROR:#REF!Menurunkan Cincin Sumuran
:1.000m'Cincin I; Anal. A.X/1 (No. 5.3.)
ERROR:#REF!ERROR:#REF!1.000m'Cincin II; Anal. A.X/2 (No. 5.4.)
ERROR:#REF!ERROR:#REF!1.000m'Cincin III; Anal. A.X/3 (No. 5.5.)
ERROR:#REF!ERROR:#REF!Cyclopen Beton :2.355m3Cyclopen Beton
1:3:5;Anal. G.32/X + G.43/A (No. 5.7.)
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
5.12.ANALISA Y.1 (1 TITIK PONDASI SUMURAN DIA. 1.2 M DALAM 1.0
M' DIISI CYCLOPEN)Cincin Sumuran :1.000bhCincin Sumuran; Anal.
G.41/XX (No. 5.2.)ERROR:#REF!ERROR:#REF!Menurunkan Cincin Sumuran
:1.000m'Cincin I; Anal. A.X/1 (No. 5.3.) ERROR:#REF!ERROR:#REF!Upah
= 1.5 x Anal. ERROR:#REF!Cyclopen Beton :1.130m3Cyclopen Beton
1:3:5;Anal. G.32/X + G.43/A (No. 5.7.)
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
5.13.ANALISA Y.2 (1 TITIK PONDASI SUMURAN DIA. 1.2 M DALAM 2.0
M' DIISI CYCLOPEN)Cincin Sumuran :2.000bhCincin Sumuran; Anal.
G.41/XX (No. 5.2.)ERROR:#REF!ERROR:#REF!Menurunkan Cincin Sumuran
:1.000m'Cincin I; Anal. A.X/1 (No. 5.3.)
ERROR:#REF!ERROR:#REF!1.000m'Cincin II; Anal. A.X/2 (No. 5.4.)
ERROR:#REF!ERROR:#REF!ERROR:#REF!Upah = 1.5 x Anal.
ERROR:#REF!Cyclopen Beton :2.260m3Cyclopen Beton 1:3:5;Anal. G.32/X
+ G.43/A (No. 5.7.)
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!5.14.ANALISA
Y.3 (1 TITIK PONDASI SUMURAN DIA. 1.2 M DALAM 3.0 M' DIISI
CYCLOPEN)Cincin Sumuran :3.000bhCincin Sumuran; Anal. G.41/XX (No.
5.2.)ERROR:#REF!ERROR:#REF!Menurunkan Cincin Sumuran :1.000m'Cincin
I; Anal. A.X/1 (No. 5.3.) ERROR:#REF!ERROR:#REF!1.000m'Cincin II;
Anal. A.X/2 (No. 5.4.) ERROR:#REF!ERROR:#REF!1.000m'Cincin III;
Anal. A.X/3 (No. 5.5.) ERROR:#REF!ERROR:#REF!ERROR:#REF!Upah = 1.5
x Anal. ERROR:#REF!Cyclopen Beton :3.390m3Cyclopen Beton
1:3:5;Anal. G.32/X + G.43/A (No. 5.7.)
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
6.1.ANALISA G.27 (1 M3 UPAH PASANGAN BATU BATA)Upah
:4.500orgPekerjaERROR:#REF!ERROR:#REF!1.500orgTukang
BatuERROR:#REF!ERROR:#REF!0.150orgKepala Tukang
BatuERROR:#REF!ERROR:#REF!0.225orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!VIPEKERJAAN
DINDING SNI DT-91-0009-2007
6.1.MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM
TEBAL 1 BATA, CAMPURAN SPESI 1 PC : 2 PP Upah
:0.600OHPekerja0.200OHTukang batu0.020OHKepala
Tukang0.030OHMandorBahan :140.000bhBata
MerahERROR:#REF!ERROR:#REF!43.500kgPCERROR:#REF!ERROR:#REF!0.080m3PPERROR:#REF!ERROR:#REF!0.0ERROR:#REF!ERROR:#REF!
6.2.MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM
TEBAL 1 BATA, CAMPURAN SPESI 1 PC : 3 PP Upah
:0.600OHPekerjaERROR:#REF!ERROR:#REF!0.200OHTukang
Batu0.020OHKepala Tukang0.030OHMandorBahan :140.000bhBata
MerahERROR:#REF!ERROR:#REF!32.950kgPCERROR:#REF!ERROR:#REF!0.091m3PPERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
6.3.MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM
TEBAL 1 BATA, CAMPURAN SPESI 1 PC : 4 PP Upah
:0.600OHPekerja0.200OHTukang batu0.020OHKepala
Tukang0.030OHMandorERROR:#REF!ERROR:#REF!Bahan :140.000bhBata
MerahERROR:#REF!ERROR:#REF!26.550kgPCERROR:#REF!ERROR:#REF!0.093m3PPERROR:#REF!ERROR:#REF!
6.4.MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM
TEBAL 1 BATA, CAMPURAN SPESI 1 PC : 5 PP Upah
:0.600OHPekerja0.200OHTukang batu0.020OHKepala
Tukang0.030OHMandorBahan :140.000bhBata
Merah22.200kgPC0.102m3PP
6.5.MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM
TEBAL 1 BATA, CAMPURAN SPESI 1 PC : 6 PP Upah
:0.600OHPekerja0.200OHTukang batu0.020OHKepala
Tukang0.030OHMandor
Bahan :140.000bhBata Merah18.500kgPC0.122m3PP
6.6.MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM
TEBAL 1 BATA, CAMPURAN SPESI 1 PC : 3 KP : 10 PP Upah
:0.600OHPekerja0.200OHTukang batu0.020OHKepala
Tukang0.030OHMandorBahan :140.000bhBata
Merah10.080kgPC0.0925m3PP0.0275m3KP
6.7.MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM
TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 2 PP Upah
:0.300OHPekerja0.100OHTukang batu0.010OHKepala
Tukang0.015OHMandorBahan :70.000bhBata Merah18.950kgPC0.038m3PP
6.8.MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM
TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 3 PP Upah
:0.300OHPekerja0.100OHTukang batu0.010OHKepala
Tukang0.015OHMandorBahan :70.000bhBata Merah14.370kgPC0.040m3PP
6.9.MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM
TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 4 PP Upah
:0.300OHPekerja0.100OHTukang batu0.010OHKepala
Tukang0.015OHMandorBahan :70.000bhBata Merah11.500kgPC0.043m3PP
6.10.MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM
TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 5 PP Upah
:0.300OHPekerja0.100OHTukang batu0.010OHKepala
Tukang0.015OHMandorBahan :70.000bhBata Merah9.680kgPC0.045m3PP
6.11.MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM
TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 6 PP Upah
:0.300OHPekerja0.100OHTukang batu0.010OHKepala
Tukang0.015OHMandorBahan :70.000bhBata Merah8.320kgPC0.049m3PP
6.12.MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM
TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 8 PP Upah
:0.300OHPekerja0.100OHTukang batu0.010OHKepala
Tukang0.015OHMandorBahan :70.000bhBata Merah6.500kgPC0.050m3PP
6.13.MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM
TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 3 KP : 10 PP Upah
:0.300OHPekerja0.100OHTukang batu0.010OHKepala
Tukang0.015OHMandorBahan :70.000bhBata
Merah4.500kgPC0.050m3PP0.015m3KP
6.14.MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM
TEBAL 1/2 BATA, CAMPURAN SPESI 1 KP : 1 SM : 1 PP Upah
:0.300OHPekerja0.100OHTukang batu0.010OHKepala
Tukang0.015OHMandorBahan :70.000bhBata
Merah0.018m3SM0.018m3PP0.018m3KP
6.15.MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM
TEBAL 1/2 BATA, CAMPURAN SPESI 1 KP : 1 SM : 2 PP Upah
:0.300OHPekerja0.100OHTukang batu0.010OHKepala
Tukang0.015OHMandorBahan :70.000bhBata
Merah0.014m3SM0.028m3PP0.014m3KP
6.16.MEMASANG 1 M2 DINDING HB 20, CAMPURAN SPESI 1 PC : 3 PP
Upah :0.300OHPekerja0.150OHTukang batu0.015OHKepala
Tukang0.015OHMandorBahan :12.500bhHB
2030.320kgPC0.728m3PP0.280kgBesi Angkur = 8 mm
6.17.MEMASANG 1 M2 DINDING HB 20, CAMPURAN SPESI 1 PC : 4 PP
Upah :0.300OHPekerja0.150OHTukang batu0.015OHKepala
Tukang0.015OHMandorBahan :12.500bhHB
2024.260kgPC0.772m3PP0.280kgBesi Angkur = 8 mm
6.18.MEMASANG 1 M2 DINDING HB 15, CAMPURAN SPESI 1 PC : 3 PP
Upah :0.360OHPekerja0.120OHTukang batu0.012OHKepala
Tukang0.018OHMandorBahan :12.500bhHB
1522.740kgPC0.550m3PP0.280kgBesi Angkur = 8 mm
6.19.MEMASANG 1 M2 DINDING HB 15, CAMPURAN SPESI 1 PC : 4 PP
Upah :0.360OHPekerja0.120OHTukang batu0.012OHKepala
Tukang0.018OHMandorBahan :12.500bhHB
1518.200kgPC0.582m3PP0.280kgBesi Angkur = 8 mm
6.20.MEMASANG 1 M2 DINDING HB 10, CAMPURAN SPESI 1 PC : 3 PP
Upah :0.300OHPekerja0.100OHTukang batu0.010OHKepala
Tukang0.015OHMandorBahan :12.500bhHB
1015.160kgPC0.364m3PP0.280kgBesi Angkur = 8 mm
6.21.MEMASANG 1 M2 DINDING HB 10, CAMPURAN SPESI 1 PC : 4 PP
Upah :0.300OHPekerja0.100OHTukang batu0.010OHKepala
Tukang0.015OHMandorBahan :12.500bhHB
1012.130kgPC0.388m3PP0.280kgBesi Angkur = 8 mm
6.22.MEMASANG 1 M2 DINDING TERAWANG (ROSTER) UKURAN (12 X 11 X
24) CM, CAMPURAN SPESI 1 PC : 3 PP Upah
:0.300OHPekerja0.100OHTukang batu0.010OHKepala
Tukang0.015OHMandorBahan :30.000bhTerawang
(Roster)14.000kgPC0.032m3PP
6.23.MEMASANG 1 M2 DINDING TERAWANG (ROSTER) UKURAN (12 X 11 X
24) CM, CAMPURAN SPESI 1 PC : 4 PP Upah
:0.300OHPekerja0.100OHTukang batu0.010OHKepala
Tukang0.015OHMandorBahan :30.000bhTerawang
(Roster)11.000kgPC0.035m3PP
6.24.MEMASANG 1 M2 DINDING BATA BERONGGA EKSPOSE UKURAN (5 X 11
X 24) CM, CAMPURAN SPESI 1 PC : 3 PP Upah
:0.300OHPekerja0.150OHTukang batu0.015OHKepala
Tukang0.015OHMandorBahan :70.000bhBatang Berongga
Ekspose14.000kgPC0.032m3PP
Upah :0.600OHPekerjaOHTukang batu0.020OHKepala
Tukang0.200OHMandor
0.030Bahan :140.000bhBata Merah18.500kgPC0.122m3PP
6.5.
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
6.5.ANALISA G.33f (1 M3 PASANGAN BATU BATA 1:5)Upah :Upah =
Anal. G.27 (No. 6.1.) ERROR:#REF!ERROR:#REF!Bahan :500.000bhBatu
BataERROR:#REF!ERROR:#REF!1.989zakSemen (50
Kg)ERROR:#REF!ERROR:#REF!0.396m3Pasir
PasangERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
6.6.ANALISA I.st (1 M3 PASANGAN HOLLOWBRICK 10.20.40 CM)Upah
:Upah = Anal. G.27 (No. 6.1.) ERROR:#REF!ERROR:#REF!Bahan
:120.000bhBatu HollowbrickERROR:#REF!ERROR:#REF!2.214zakSemen (50
Kg)ERROR:#REF!ERROR:#REF!0.267m3Pasir
PasangERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
6.7.ANALISA 2.st (1 M3 PASANGAN BATU KERAWANG 10.20.40 CM)Upah
:Upah = Anal. G.27 (No. 6.1.) ERROR:#REF!ERROR:#REF!Bahan
:120.000bhBatu KerawangERROR:#REF!ERROR:#REF!2.214zakSemen (50
Kg)ERROR:#REF!ERROR:#REF!0.267m3Pasir
PasangERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!6.8.PASANGAN
DINDING KERAMIK TIAP 1 M2Upah+Bahan :Upah = 2 x Upah Supl. III (No.
10.5.)ERROR:#REF!ERROR:#REF!0.010m3Spesi 1:2 Anal. G.14; (No. 3.3.)
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Upah+Spesi = 1.25 x
Anal. ERROR:#REF!ERROR:#REF!0.100kgSemen
PutihERROR:#REF!ERROR:#REF!1.000m2Keramik
DindingERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
6.9.ANALISA F.37 (1 M2 DINDING PAPAN SUSUN SIRIH T= 2 CM)Upah
:0.280orgPekerjaERROR:#REF!ERROR:#REF!0.800orgTukang
KayuERROR:#REF!ERROR:#REF!0.080orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.014orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 2/3 x 1/2 x Anal. ERROR:#REF!ERROR:#REF!Bahan :0.024m3Kayu Kelas
II
(Papan)ERROR:#REF!ERROR:#REF!0.200kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
6.10.ANALISA F.37a (1 M2 DINDING PAPAN T = 2 CM)Upah :Upah = 1.3
x Upah Anal. F.37 (No. 6.8.)ERROR:#REF!ERROR:#REF!Bahan
:0.024m3Kayu Kelas II
(Papan)ERROR:#REF!ERROR:#REF!0.200kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
6.11.ANALISA F.37b (1 M2 DINDING PAPAN SUSUN SIRIH T = 3 CM)Upah
:Upah = Upah Anal. F.37 (No. 6.8.) ERROR:#REF!ERROR:#REF!Bahan
:0.033m3Kayu Kelas II
(Papan)ERROR:#REF!ERROR:#REF!0.300kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
6.12.ANALISA F.37c (1 M2 DINDING PAPAN T = 3 CM)Upah :Upah = 1.3
x Upah Anal. F.37 (No. 6.8.)ERROR:#REF!ERROR:#REF!Bahan
:0.033m3Kayu Kelas II
(Papan)ERROR:#REF!ERROR:#REF!0.300kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
6.13.ANALISA G.48 (1 M2 UPAH PLESTERAN T = 10 MM)Upah
:0.400orgPekerjaERROR:#REF!ERROR:#REF!0.150orgTukang
BatuERROR:#REF!ERROR:#REF!0.015orgKepala Tukang
BatuERROR:#REF!ERROR:#REF!0.020orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
6.14.ANALISA G.47 (1 M2 UPAH PLESTERAN T = 15 MM)Upah
:0.400orgPekerjaERROR:#REF!ERROR:#REF!0.200orgTukang
BatuERROR:#REF!ERROR:#REF!0.020orgKepala Tukang
BatuERROR:#REF!ERROR:#REF!0.020orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
6.15.ANALISA G.50h (1 M2 PLESTERAN 1:2 T = 10 MM)Upah :Upah =
Anal. G.48 (No. 6.12.) ERROR:#REF!ERROR:#REF!Bahan :0.1430zakSemen
(50 kg)ERROR:#REF!ERROR:#REF!0.0114m3Pasir
PasangERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
6.16.ANALISA G.50i (1 M2 PLESTERAN 1:3 T = 15 MM)Upah :Upah =
Anal. G.47 (No. 6.13.) ERROR:#REF!ERROR:#REF!Bahan :0.1632zakSemen
(50 kg)ERROR:#REF!ERROR:#REF!0.0194m3Pasir
PasangERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
6.17.ANALISA G.50k (1 M2 PLESTERAN 1:3 T = 10 MM)Upah :Upah =
Anal. G.48 (No. 6.12.) ERROR:#REF!ERROR:#REF!Bahan :0.108zakSemen
(50 kg)ERROR:#REF!ERROR:#REF!0.013m3Pasir
PasangERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
6.18.ANALISA G.50q (1 M2 PLESTERAN 1:4 T = 15 MM)Upah :Upah =
Anal. G.47 (No. 6.13.) ERROR:#REF!ERROR:#REF!Bahan :0.1302zakSemen
(50 kg)ERROR:#REF!ERROR:#REF!0.0209m3Pasir
PasangERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
6.19.ANALISA G.50qa (1 M2 PLESTERAN 1:4 T = 10 MM)Upah :Upah =
Anal. G.48 (No. 6.12.) ERROR:#REF!ERROR:#REF!Bahan :Bahan = 2/3 x
Bahan Anal. G.50q(No. 6.17.)
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
6.20.ANALISA G.52 (1 M2 PLESTERAN LAMA DIKEROK DAN DIPLESTER
KEMBALI 1:4)Upah
:0.700orgPekerjaERROR:#REF!ERROR:#REF!0.250orgTukang
KayuERROR:#REF!ERROR:#REF!0.025orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.035orgMandorERROR:#REF!ERROR:#REF!Bahan
:0.020m3Spesi Adukan 1:4; Anal. G.19 (No.
3.5.)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
6.21.ANALISA G.Ist (1 M2 AFWERKING BETON 1:1)Upah :Upah = 1.5 x
Anal. G.48 (No. 6.12.) ERROR:#REF!ERROR:#REF!Bahan :Bahan = 1/2 x
Bahan Anal. G.50h(No. 6.14.)
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
VII.PEKERJAAN KUSEN, PINTU DAN JENDELA7.1.ANALISA F.26 (1 M3
MENGERJAKAN KUSEN SEDERHANA)Upah
:10.000orgPekerjaERROR:#REF!ERROR:#REF!30.000orgTukang
KayuERROR:#REF!ERROR:#REF!3.000orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.500orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 3/4 x Anal. ERROR:#REF!ERROR:#REF!Bahan :1.100m3Kayu Kelas II
(Balok)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
7.2.ANALISA F.27 (1 M3 MENGERJAKAN KAYU KUSEN)Upah
:12.000orgPekerjaERROR:#REF!ERROR:#REF!36.000orgTukang
KayuERROR:#REF!ERROR:#REF!3.600orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.600orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 2/3 x Anal. ERROR:#REF!ERROR:#REF!Bahan :1.100m3Kayu Kelas II
(Balok)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
7.3.ANALISA F.33 (1 M2 MEMASANG PINTU/JENDELA PANEL)Upah
:2.500orgPekerjaERROR:#REF!ERROR:#REF!7.500orgTukang
KayuERROR:#REF!ERROR:#REF!0.750orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.125orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 3/4 x Anal. ERROR:#REF!ERROR:#REF!Bahan :0.044m3Kayu Kelas II
(Papan)ERROR:#REF!ERROR:#REF!0.050kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
7.4.ANALISA F.33a (1 M2 MEMASANG PINTU TEAKWOOD DOUBLE)Upah
:Upah = 2/3 x Upah Anal. F.33 (No. 7.3.)ERROR:#REF!ERROR:#REF!Bahan
:0.028m3Kayu Kelas II
(Papan)ERROR:#REF!ERROR:#REF!0.834hlTeakwoodERROR:#REF!ERROR:#REF!0.020kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
7.5.ANALISA F.33b (1 M2 MEMASANG PINTU TRIPLEKS BIASA
DOUBLE)Upah :Upah = 2/3 x Upah Anal. F.33 (No.
7.3.)ERROR:#REF!ERROR:#REF!Bahan :0.028m3Kayu Kelas II
(Papan)ERROR:#REF!ERROR:#REF!0.834hlTripleks t = 4
mmERROR:#REF!ERROR:#REF!0.020kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
7.6.MEMASANG PINTU WC SENG DAN TRIPLEKS TIAP 1 M2Upah :Upah =
2/3 x Upah Anal. F.33 (No. 7.3.)ERROR:#REF!ERROR:#REF!Bahan
:0.028m3Kayu Kelas II (Papan)ERROR:#REF!ERROR:#REF!0.417hlTripleks
t = 4 mmERROR:#REF!ERROR:#REF!0.417hlSeng Plat BJLS 30
KERROR:#REF!ERROR:#REF!0.020kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
7.7.MEMASANG PINTU WC DOUBLE TRIPLEK DILAPISI SENG TIAP 1 M2Upah
:Upah = 2/3 x Upah Anal. F.33 (No. 7.3.)ERROR:#REF!ERROR:#REF!Bahan
:0.028m3Kayu Kelas II (Papan)ERROR:#REF!ERROR:#REF!0.834hlTripleks
t = 4 mmERROR:#REF!ERROR:#REF!0.834hlSeng Plat BJLS 30
KERROR:#REF!ERROR:#REF!0.020kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
7.8.ANALISA F.30 (1 M2 MEMASANG PINTU/JENDELA KLAM)Upah
:1.300orgPekerjaERROR:#REF!ERROR:#REF!4.000orgTukang
KayuERROR:#REF!ERROR:#REF!0.400orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.065orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 2/3 x Anal. ERROR:#REF!ERROR:#REF!Bahan :0.036m3Kayu Kelas II
(Papan)ERROR:#REF!ERROR:#REF!0.200kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
7.9.ANALISA F.34 (1 M2 MEMASANG PINTU/JENDELA JALUSI)Upah
:3.000orgPekerjaERROR:#REF!ERROR:#REF!9.000orgTukang
KayuERROR:#REF!ERROR:#REF!0.900orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.150orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 2/3 x Anal. ERROR:#REF!ERROR:#REF!Bahan :0.036m3Kayu Kelas II
(Papan)ERROR:#REF!ERROR:#REF!0.200kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
7.10.ANALISA F.36 (1 M2 MEMASANG PINTU/JENDELA KACA T = 3
MM)Upah :2.000orgPekerjaERROR:#REF!ERROR:#REF!6.000orgTukang
KayuERROR:#REF!ERROR:#REF!0.600orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.100orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 1/2 x Anal. ERROR:#REF!ERROR:#REF!Bahan :0.035m3Kayu Kelas II
(Papan)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
7.11.ANALISA F.36a (1 M2 MEMASANG KACA TETAP T = 3 MM)Upah :Upah
= 1/5 x Upah Anal. F.36 (No. 7.10.)ERROR:#REF!ERROR:#REF!Bahan
:1.100m2Kaca t = 3
mmERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
7.12.ANALISA F.36b (1 M2 MEMASANG KACA TETAP T = 5 MM)Upah :Upah
= 1/5 x Upah Anal. F.36 (No. 7.10.)ERROR:#REF!ERROR:#REF!Bahan
:1.100m2Kaca t = 5 mmERROR:#REF!ERROR:#REF!4.000m'Papan Les
KacaERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
7.13.ANALISA F.34a (1 M2 MEMASANG VENTILASI KAYU)Upah :Upah =
1/2 x Upah Anal. F.34 (No. 7.9.)ERROR:#REF!ERROR:#REF!Bahan
:0.054M3Kayu Kelas II
(Papan)ERROR:#REF!ERROR:#REF!0.020KGPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!7.14.ANALISA
(1 M2 MEMASANG VENTILASI SINGOK)0.0300Anal. F.27
(Rangka)ERROR:#REF!ERROR:#REF!1.0000Anal F.34a (Ventilasi
KayuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
VIII.PEKERJAAN KAP/ATAP8.1.ANALISA F.22 (1 M3 MENGERJAKAN
KUDA-KUDA BENTANG MAKS 7 M')Upah
:8.000orgPekerjaERROR:#REF!ERROR:#REF!24.000orgTukang
KayuERROR:#REF!ERROR:#REF!2.400orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.400orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 3/4 x Anal. ERROR:#REF!ERROR:#REF!Bahan :1.100m3Kayu Balok Kelas
II
(Balok)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!8.2.ANALISA
F.23 (1 M3 MENGERJAKAN KUDA-KUDA BENTANG LEBIH 7 M')Upah
:12.000orgPekerjaERROR:#REF!ERROR:#REF!36.000orgTukang
KayuERROR:#REF!ERROR:#REF!3.600orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.600orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 3/4 x Anal. ERROR:#REF!ERROR:#REF!Bahan :1.100m3Kayu Balok Kelas
II
(Balok)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
8.3.ANALISA F.24 (1 M3 MENGERJAKAN KUDA-KUDA DAK WERK)Upah
:14.000orgPekerjaERROR:#REF!ERROR:#REF!42.000orgTukang
KayuERROR:#REF!ERROR:#REF!4.200orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.700orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 3/4 x Anal. ERROR:#REF!ERROR:#REF!Bahan :1.100m3Kayu Balok Kelas
II
(Balok)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!8.4.ANALISA
F.16 (1 M2 MEMASANG RANGKA ATAP GENTENG/SIRAP)Upah
:0.100orgPekerjaERROR:#REF!ERROR:#REF!0.100orgTukang
KayuERROR:#REF!ERROR:#REF!0.010orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.005orgMandorERROR:#REF!ERROR:#REF!Bahan
:0.0167m3Kayu Kelas II
(Balok)ERROR:#REF!ERROR:#REF!0.2500kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
8.5.ANALISA F.19 (1 M2 MEMASANG RANGKA ATAP SENG)Upah
:0.0150orgPekerjaERROR:#REF!ERROR:#REF!0.1000orgTukang
KayuERROR:#REF!ERROR:#REF!0.0100orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.0075orgMandorERROR:#REF!ERROR:#REF!Bahan
:0.018m3Kayu Kelas II
(Balok)ERROR:#REF!ERROR:#REF!0.100kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
8.6.ANALISA F.21 (1 M2 MEMASANG LESPLANK PAPAN)Upah
:0.280orgPekerjaERROR:#REF!ERROR:#REF!0.800orgTukang
KayuERROR:#REF!ERROR:#REF!0.080orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.0140orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 2/3 x Anal. ERROR:#REF!ERROR:#REF!Bahan :0.022m3Kayu Kelas II
(Papan)ERROR:#REF!ERROR:#REF!0.100kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
8.7.MEMASANG LESPLANK SUPERDEKS TIAP 1 M2Upah :Upah = Upah Anal.
H.08 (No. 8.8.) ERROR:#REF!ERROR:#REF!Bahan
:0.833hlSuperdeksERROR:#REF!ERROR:#REF!0.011m3Kayu Kelas II
(Balok)ERROR:#REF!ERROR:#REF!0.010kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
8.8.ANALISA H.08 (1 M2 MEMASANG ATAP SENG BJLS 20.K)Upah
:0.100orgPekerjaERROR:#REF!ERROR:#REF!0.200orgTukang
KayuERROR:#REF!ERROR:#REF!0.020orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.005orgMandorERROR:#REF!ERROR:#REF!Bahan
:0.833hlSeng BJLS 20.KERROR:#REF!ERROR:#REF!0.020kgPaku
SengERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
8.9.ANALISA H.08a (1 M2 MEMASANG SENG METAL WARNA)Upah
:0.100orgPekerjaERROR:#REF!ERROR:#REF!0.200orgTukang
KayuERROR:#REF!ERROR:#REF!0.020orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.005orgMandorERROR:#REF!ERROR:#REF!Bahan
:2.200hlSeng Metal WarnaERROR:#REF!ERROR:#REF!0.020kgPaku Seng
MetalERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
8.10.ANALISA H.10 (10 M' MEMASANG PERABUNG SENG BJLS 20.K)Upah
:0.250orgPekerjaERROR:#REF!ERROR:#REF!0.250orgTukang
KayuERROR:#REF!ERROR:#REF!0.025orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!Bahan :2.000hlSeng Plat BJLS
20.KERROR:#REF!ERROR:#REF!0.040kgPaku
SengERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Untuk 1
m' = 1/10 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!
8.11.ANALISA H.08a (1 M2 MEMASANG ATAP SENG BJLS 30.K)Upah :Upah
= Upah Anal. H.08 (No. 8.8.) ERROR:#REF!ERROR:#REF!Bahan
:0.833hlSeng BJLS 30.KERROR:#REF!ERROR:#REF!0.020kgPaku
SengERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
8.12.ANALISA H.10a (10 M' MEMASANG PERABUNG SENG BJLS 30.K)Upah
:Upah = Upah Anal. H.10 (No. 8.10.) ERROR:#REF!ERROR:#REF!Bahan
:2.000hlSeng Plat BJLS 30.KERROR:#REF!ERROR:#REF!0.040kgPaku
SengERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Untuk 1
m' = 1/10 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!
8.13.ANALISA H.14 (10 M' MEMASANG KIELGOT SENG BJLS 30.K)Upah
:5.000orgPekerjaERROR:#REF!ERROR:#REF!8.000orgTukang
KayuERROR:#REF!ERROR:#REF!0.800orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.250orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 1/4 x Anal. ERROR:#REF!ERROR:#REF!Bahan :5.250hlSeng Plat BJLS
30.KERROR:#REF!ERROR:#REF!0.900kgPaku
KelingERROR:#REF!ERROR:#REF!0.100m3Kayu Kelas II
(Papan)ERROR:#REF!ERROR:#REF!0.050kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Untuk
1 m2 = 1/10 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
8.14.ANALISA H.18 (10 M' MEMASANG AFVOERPYPEN SENG BJLS
30.K)Upah :2.250orgPekerjaERROR:#REF!ERROR:#REF!3.750orgTukang
KayuERROR:#REF!ERROR:#REF!0.375orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.110orgMandorERROR:#REF!ERROR:#REF!Bahan
:2.500hlSeng Plat BJLS
30.KERROR:#REF!ERROR:#REF!32.000bhSekrupERROR:#REF!ERROR:#REF!8.000bhBesi
BegolERROR:#REF!ERROR:#REF!Biaya
MematriERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Untuk
1 m2 = 1/10 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!
8.15.ANALISA H.17 (10 M' MEMASANG DAHGOOT SENG BJLS 30.K)Upah
:3.000orgPekerjaERROR:#REF!ERROR:#REF!5.000orgTukang
KayuERROR:#REF!ERROR:#REF!0.500orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.150orgMandorERROR:#REF!ERROR:#REF!Bahan
:3.000hlSeng Plat BJLS 30.KERROR:#REF!ERROR:#REF!12.000bhBesi
GotERROR:#REF!ERROR:#REF!48.000bhSekrupERROR:#REF!ERROR:#REF!Biaya
MematriERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Untuk
1 m2 = 1/10 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!8.16.ANALISA
H.18a (10 M' MEMASANG AFVOERPYPEN DARI PIPA PVC DIA. 3")Upah
:Upah=1/2 x Upah Anal. H.18 (No. 8.14.)ERROR:#REF!ERROR:#REF!Bahan
:10.000m'Pipa PVC O 3"ERROR:#REF!ERROR:#REF!8.000btgBesi
BegolERROR:#REF!ERROR:#REF!3.000bhKenie PVC O
3"ERROR:#REF!ERROR:#REF!1.000bhLem
PlastikERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Untuk
1 m2 = 1/10 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!
IX.PEKERJAAN PLAFOND9.1.ANALISA F.01 (1 M3 PEKERJAAN BALOK
PLAFOND)Upah :5.000orgPekerjaERROR:#REF!ERROR:#REF!15.000orgTukang
KayuERROR:#REF!ERROR:#REF!1.500orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.250orgMandorERROR:#REF!ERROR:#REF!Bahan
:1.100m3Kayu Kelas II
(Balok)ERROR:#REF!ERROR:#REF!3.6019.000kgPakuERROR:#REF!ERROR:#REF!1.00ERROR:#REF!ERROR:#REF!ERROR:#REF!9.2.ANALISA
H.11 (1 M2 PASANGAN PLAFOND ETERNIT)Upah :Upah = Upah Anal. H.08
(No. 8.8.) ERROR:#REF!ERROR:#REF!Bahan
:1.000hlEternitERROR:#REF!ERROR:#REF!0.010kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
9.3.ANALISA F.21a (1 M2 MEMASANG LES ETERNIT)Upah :Upah = 2 x
Upah Anal. F.21 (No. 8.6.)ERROR:#REF!ERROR:#REF!Bahan :0.012m3Kayu
Kelas II
(Papan)ERROR:#REF!ERROR:#REF!0.100kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!9.4.ANALISA
H.11a (1 M2 MEMASANG PLAFOND TRIPLEKS T = 4 MM)Upah :Upah = 2 x
Upah Anal. H.08 (No. 8.8)ERROR:#REF!ERROR:#REF!Bahan
:0.417hlTripleks t = 4
mmERROR:#REF!ERROR:#REF!0.010kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
9.5.ANALISA F.21b (1 M2 MEMASANG PLAFOND KISI-KISI DARI PAPAN
LES)Upah :Upah = 2 x Upah Anal. F.21 (No.
8.6.)ERROR:#REF!ERROR:#REF!100.00Bahan :12.500.833m2Papan
LesERROR:#REF!ERROR:#REF!8.000.010kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!3.133.449.6.ANALISA
H.11a (1 M2 PEKERJAAN LOTENG LAMBRISERING)Upah
:0.100orgPekerjaERROR:#REF!ERROR:#REF!0.200orgTukang
KayuERROR:#REF!ERROR:#REF!0.020orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.005orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 2 x Upah Anal. ERROR:#REF!ERROR:#REF!Bahan
:12,000.003.440btgLambriseringERROR:#REF!ERROR:#REF!0.010kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
9.7.ANALISA F.20 (1 M' MEMASANG LES PINGGIR PLAFOND)Upah
:0.200orgTukang KayuERROR:#REF!ERROR:#REF!0.030orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!ERROR:#REF!Upah = 2/3 x Anal.
ERROR:#REF!ERROR:#REF!Bahan :1.100m'Les
ProfilERROR:#REF!ERROR:#REF!0.005kgPakuERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
9.8.ANALISA (1 M2 PEKERJAAN LOTENG GIPSUM T = 9 MM)Upah :Upah =
2 x Upah Anal. H.08 (No. 8.8)ERROR:#REF!ERROR:#REF!Bahan
:0.417hlGibsumERROR:#REF!ERROR:#REF!25.000bhPaku
GipsumERROR:#REF!ERROR:#REF!0.020kgDempul
GipsumERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
9.9.ANALISA F.20 st (1 M' MEMASANG LES PINGGIR GIPSUM 5 CM)Upah
:0.200orgTukang KayuERROR:#REF!ERROR:#REF!0.030orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!ERROR:#REF!Upah = 2/3 x Anal.
ERROR:#REF!ERROR:#REF!Bahan :1.100m'Les Profil
GipsumERROR:#REF!ERROR:#REF!0.010kgLem Profil
GipsumERROR:#REF!ERROR:#REF!6.000bhPaku
GipsumRp1,000Rp6,000ERROR:#REF!ERROR:#REF!ERROR:#REF!
X.PEKERJAAN LANTAI10.1.ANALISA G.67 (1 M2 UPAH LANTAI BETON T =
7 CM)Upah :0.7200orgPekerjaERROR:#REF!ERROR:#REF!0.1350orgTukang
BatuERROR:#REF!ERROR:#REF!0.0135orgKepala Tukang
BatuERROR:#REF!ERROR:#REF!0.0360orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
10.2.ANALISA G.67/A (1 M2 LANTAI BETON 1:3:5 T = 7 CM)Upah :Upah
= Anal. G.67 (No. 10.1.) ERROR:#REF!ERROR:#REF!Bahan :0.077m3Bahan
Stamp. Beton 1:3:5; Anal. G.43/A(No. 4.3.)
ERROR:#REF!ERROR:#REF!0.008m3Spesi Adukan 1:3; Anal. G.16 (No.
3.4.)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
10.3.ANALISA G.67/B (1 M2 LANTAI BETON 1:3:5 T = 10 CM)Upah
:Upah = 1.5 x Anal. G.67 (No. 10.1.) ERROR:#REF!ERROR:#REF!Bahan
:0.110m3Bahan Stamp. Beton 1:3:5; Anal. G.43/A(No. 4.3.)
ERROR:#REF!ERROR:#REF!0.008m3Spesi Adukan 1:3; Anal. G.16 (No.
3.4.)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
10.4.ANALISA G.67/C (1 M2 LANTAI BETON 1:3:6 T = 7 CM)Upah :Upah
= Anal. G.67 (No. 10.1.) ERROR:#REF!ERROR:#REF!Bahan :0.364zakSemen
(50 kg)ERROR:#REF!ERROR:#REF!0.044m3Pasir
BetonERROR:#REF!ERROR:#REF!0.070m3Kerikil
BetonERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
10.5.SUPPLEMEN. III (1 M2 LANTAI UBIN PC BIASA)Upah
:0.500orgPekerjaERROR:#REF!ERROR:#REF!0.250orgTukang
BatuERROR:#REF!ERROR:#REF!0.025orgKepala Tukang
BatuERROR:#REF!ERROR:#REF!0.025orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 1.25 x Anal. ERROR:#REF!ERROR:#REF!Bahan :0.044m3Spesi Adukan
1:4; Anal. G.19 (No. 3.5)ERROR:#REF!ERROR:#REF!1.000m2Ubin PC
BiasaERROR:#REF!ERROR:#REF!0.020zakSemen (50
kg)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
10.6.PEMASANGAN LANTAI KERAMIK + LANTAI BETON T = 7 CM TIAP 1
M2Upah+Bahan :Upah=2 x Upah Supl. III
(No.10.5.)ERROR:#REF!ERROR:#REF!0.010m3Spesi Adukan 1:2; Anal. G.14
(No. 3.3.)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Upah+Spesi =
1.25 x Anal. ERROR:#REF!ERROR:#REF!0.100kgSemen
PutihERROR:#REF!ERROR:#REF!1.000m2Keramik
LantaiERROR:#REF!ERROR:#REF!1.000m2Lantai Beton 1:3:5 T = 7
cmERROR:#REF!Anal. G.67/A (No. 10.2.)
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
10.7.PEMASANGAN LANTAI KERAMIK TIAP 1 M2Upah+Bahan :Upah=2 x
Upah Supl. III (No.10.5.)ERROR:#REF!ERROR:#REF!0.010m3Spesi Adukan
1:2; Anal. G.14 (No.
3.3.)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Upah+Spesi = 1.25
x Anal. ERROR:#REF!ERROR:#REF!0.100kgSemen
PutihERROR:#REF!ERROR:#REF!1.000m2Keramik
LantaiERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!10.8.SUPPLEMEN
III/B (1 M2 LANTAI UBIN TERASO)Upah+Bahan :Upah = Upah Supl. III
(No. 10.5.) ERROR:#REF!ERROR:#REF!0.044m3Spesi Adukan 1:4; Anal.
G.19 (No.
3.5.)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Upah+Spesi = 1.25
x Anal. ERROR:#REF!ERROR:#REF!0.020kgSemen
PutihERROR:#REF!ERROR:#REF!1.000m2Ubin
TerasoERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!10.9.PEMASANGAN
PAVING BLOCK TIAP M2Upah
:0.4403orgPekerjaERROR:#REF!ERROR:#REF!0.1394orgMandorERROR:#REF!ERROR:#REF!Bahan
:35.000bhPaving BlokERROR:#REF!ERROR:#REF!0.050bhPasir
AlasERROR:#REF!ERROR:#REF!0.040zakPasir
UrugERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
XI.PEKERJAAN CAT/KAPURAN11.1.ANALISA K.23 (100 M2 UPAH MENCAT 1
x JALAN)Upah :5.000orgPekerjaERROR:#REF!ERROR:#REF!7.500orgTukang
CatERROR:#REF!ERROR:#REF!0.750orgKepala Tukang
CatERROR:#REF!ERROR:#REF!0.250orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
1 m2 = 1/100 x Anal. ERROR:#REF!ERROR:#REF!11.2.ANALISA K.18+K.23
(10 M2 MEMENIE 1 x JALAN)Upah :Upah = 0.10 x Anal. K.23 (No. 11.1.)
ERROR:#REF!ERROR:#REF!Bahan
:1.200kgMenieERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Untuk
1 m2 = 1/10 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!11.3.ANALISA
K.18 + K.23 (10 M2 MEMENIE ATAP SENG 2 x JALAN)Upah+Bahan
:Upah+Bahan = 2 x (Anal. K.18 + K.23)(No. 11.2.)
ERROR:#REF!ERROR:#REF!Untuk 1 m2 = 1/10 x Anal.
ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
11.4.ANALISA K.06+K.23 (10 M2 CAT MINYAK 2 x JALAN PADA BIDANG
YANG PERNAH DICAT)Upah :Upah = 0.2 x Anal. K.23 (No. 11.1.)
ERROR:#REF!ERROR:#REF!Bahan :2.600kgCat
WarnaERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Upah 1
m2 = 1/10 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!11.5.ANALISA
K.30 (10 M2 MENDOMPOL/PLAMUR)Upah :1.400orgTukang
CatERROR:#REF!ERROR:#REF!0.140orgKepala Tukang
CatERROR:#REF!ERROR:#REF!Bahan :1.260kgDompol
JadiERROR:#REF!ERROR:#REF!2.000hlAmplasERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
1 m2 = 1/10 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!11.6.ANALISA
K.09+K.23+K.30 (10 M2 1 x CAT DASAR, 2 x CAT MINYAK +
MENDOMPOL/PLAMUR)Upah :Upah = 0.3 x Anal. K.23 (No. 11.1.)
ERROR:#REF!ERROR:#REF!Bahan :1.430kgCat
DasarERROR:#REF!ERROR:#REF!2.840kgCat
WarnaERROR:#REF!ERROR:#REF!1.000m2Mendompol; Anal. K.30 (No. 11.5.)
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Upah 1 m2 =
1/10 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!11.7.ANALISA G.53
(100 M2 MENGAPUR DENGAN KAPUR SIRIH)Upah
:6.600orgPekerjaERROR:#REF!ERROR:#REF!1.100orgTukang
CatERROR:#REF!ERROR:#REF!0.110orgKepala Tukang
CatERROR:#REF!ERROR:#REF!Bahan :0.110m3Kapur
SirihERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Upah 1
m2 = 1/100 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!
11.8.ANALISA K.18 + K.23 (10 M2 MENCAT 2 x JALAN DENGAN
VERNIS)Upah :Upah = 0.1 x Anal. K.23 (No. 11.1.)
ERROR:#REF!ERROR:#REF!Bahan :1.200kgCat
VernisERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Upah 1
m2 = 1/10 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!
11.9.ANALISA G.53/B (10 M2 MENCAT DENGAN CAT TEMBOK)Membersihkan
(Anal. K.33)
:0.500orgPekerjaERROR:#REF!ERROR:#REF!0.025orgMandorERROR:#REF!ERROR:#REF!Mendompol/Plamur
(Anal. K.30) :Upah+Bahan=Anal. K.30 (No.
11.5.)ERROR:#REF!ERROR:#REF!Mencat Dengan Cat Tembok (3 x Jalan)
:Upah=0.3 x Upah Anal. G.53 (No.
11.7.)ERROR:#REF!ERROR:#REF!3.200kgCat
TembokERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Upah 1
m2 = 1/10 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!11.10.ANALISA
G.53/C (10 M2 CAT TEMBOK PADA BIDANG YANG PERNAH DICAT/ CAT LOTENG
TRIPLEK)Membersihkan (Anal. K.33)
:0.500orgPekerjaERROR:#REF!ERROR:#REF!0.025orgMandorERROR:#REF!ERROR:#REF!Mencat
Dengan Cat Tembok (2 x Jalan) :Upah=0.2 x Upah Anal. G.53 (No.
11.7.)ERROR:#REF!ERROR:#REF!2.200kgCat
TembokERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Upah 1
m2 = 1/10 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
11.11.ANALISA K.53/D (10 M2 MENCAT TEKSTURE)Upah
:3.000orgPekerjaERROR:#REF!ERROR:#REF!5.300orgTukang
CatERROR:#REF!ERROR:#REF!0.530orgKepala Tukang
CatERROR:#REF!ERROR:#REF!0.150orgMandorERROR:#REF!ERROR:#REF!Bahan
:5.240kgCat TembokERROR:#REF!ERROR:#REF!1.750kgSerbuk
TekstureERROR:#REF!ERROR:#REF!3.500kgPlamurERROR:#REF!ERROR:#REF!27.000m1Kain
StariminERROR:#REF!ERROR:#REF!0.100kgLemERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
1 m2 = 1/10 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!
11.12.ANALISA K.53/D (1 M2 MENCAT DENGAN MELAMIN)Upah
:0.120orgPekerjaERROR:#REF!ERROR:#REF!0.220orgTukang
CatERROR:#REF!ERROR:#REF!0.020orgKepala Tukang
CatERROR:#REF!ERROR:#REF!0.020orgMandorERROR:#REF!ERROR:#REF!Bahan
:2.000hlAmplasERROR:#REF!ERROR:#REF!0.200kgMelaminERROR:#REF!ERROR:#REF!0.500kgThinerERROR:#REF!ERROR:#REF!0.050bhKuas
Bambu 3"ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
11.13.ANALISA K.01 (10 M2 RESIDU KAYU)Upah :Upah=0.1 x Upah
Anal. K.23 (No. 11.1.)ERROR:#REF!ERROR:#REF!Bahan
:1.200kgResiduERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Untuk
1 m2 = 1/10 x Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!
XII.PEKERJAAN SEPTICTANK & PAGAR12.1.SEPTICTANK KAPASITAS 15
ORANG KOMPLEKSBahan+Upah :21.000m3Galian Tanah; Anal. A.01 (No.
2.2.) 0.00.0Urugan Kembali 1/4 Galian0.00.03.600m3Pas. Bata 1:2;
Anal. G.33.m (No. 6.2.)ERROR:#REF!ERROR:#REF!0.080m3Coran Beton
Tumbuk 1:2:3; Anal. G.41(No. 4.1.)
ERROR:#REF!ERROR:#REF!29.000m2Plesteran 1:2; Anal. G.50/h (No.
6.14.)ERROR:#REF!ERROR:#REF!0.200m3Beton Bertulang Plat LantaiSupl.
V/F (No. 4.13.) ERROR:#REF!ERROR:#REF!1.500m3Kerikil
SaringanERROR:#REF!ERROR:#REF!2.000m3Pasir
SaringanERROR:#REF!ERROR:#REF!5.000m'Pipa PVC Dia.
4"ERROR:#REF!ERROR:#REF!2.500m'Pipa Besi Dia.
2"ERROR:#REF!ERROR:#REF!20.000kgIjuk
SaringanERROR:#REF!ERROR:#REF!ERROR:#REF!Biaya Lain-Lain = 10 % x
Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
12.2.SEPTICTANK KAPASITAS 25 ORANG KOMPLEKSBahan+Upah
:22.000m3Galian Tanah; Anal. A.01 (No. 2.2.) 0.00.0Urugan Kembali
1/4 Galian0.00.03.900m3Pas. Bata 1:2; Anal. G.33.m (No.
6.2.)ERROR:#REF!ERROR:#REF!0.800m3Coran Beton Tumbuk 1:2:3; Anal.
G.41(No. 4.1.) ERROR:#REF!ERROR:#REF!35.000m2Plesteran 1:2; Anal.
G.50/h (No. 6.14.)ERROR:#REF!ERROR:#REF!0.300m3Beton Bertulang Plat
LantaiSupl. V/F (No. 4.13.) ERROR:#REF!ERROR:#REF!1.500m3Kerikil
SaringanERROR:#REF!ERROR:#REF!2.000m3Pasir
SaringanERROR:#REF!ERROR:#REF!5.000m'Pipa PVC Dia.
4"ERROR:#REF!ERROR:#REF!2.500m'Pipa Besi Dia.
2"ERROR:#REF!ERROR:#REF!20.000kgIjuk
SaringanERROR:#REF!ERROR:#REF!ERROR:#REF!Biaya Lain-Lain = 10 % x
Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!12.3.SEPTICTANK KAPASITAS 50
ORANG KOMPLEKSBahan+Upah :24.000m3Galian Tanah; Anal. A.01 (No.
2.2.) 0.00.0Urugan Kembali 1/4 Galian0.00.04.500m3Pas. Bata 1:2;
Anal. G.33.m (No. 6.2.)ERROR:#REF!ERROR:#REF!0.150m3Coran Beton
Tumbuk 1:2:3; Anal. G.41(No. 4.1.)
ERROR:#REF!ERROR:#REF!42.500m2Plesteran 1:2; Anal. G.50/h (No.
6.14.)ERROR:#REF!ERROR:#REF!0.350m3Beton Bertulang Plat LantaiSupl.
V/F (No. 4.13.) ERROR:#REF!ERROR:#REF!1.500m3Kerikil
SaringanERROR:#REF!ERROR:#REF!2.000m3Pasir
SaringanERROR:#REF!ERROR:#REF!5.000m'Pipa PVC Dia.
4"ERROR:#REF!ERROR:#REF!2.500m'Pipa Besi Dia.
2"ERROR:#REF!ERROR:#REF!20.000kgIjuk
SaringanERROR:#REF!ERROR:#REF!ERROR:#REF!Biaya Lain-Lain = 10 % x
Anal. ERROR:#REF!ERROR:#REF!ERROR:#REF!12.4.PASANGAN BARU PAGAR BRC
TINGGI 0.90 M TIAP 10 M'Pekerjaan Pondasi :5.000m2Pembersihan
Lapangan (No. 1.1.) 0.00.02.000m'Pas. Bouwplank (No. 1.2.)
0.00.02.500m3Galian Tanah (Anal. A.1)0.00.0Urugan Kembali 1/4
Galian0.00.00.250m3Urugan Pasir Di Bawah PondasiAnal. A.18 (No.
2.10.) ERROR:#REF!ERROR:#REF!1.880m3Pas. Pondasi Batu Kali 1:4;
Anal G.32h(No. 3.11.) ERROR:#REF!ERROR:#REF!ERROR:#REF!Untuk 1 m' =
1/10 x Anal. ERROR:#REF!ERROR:#REF!Pekerjaan Sloof/Pagar
:0.300m3Coran Sloof 1:2:3; Supl. V/B (No.
4.9.)ERROR:#REF!ERROR:#REF!0.550m3Pas. Tiang Pagar Batu Bata 1:425
x 50 x 1.10 Anal. G.33h (No. 6.4.)0.00.08.000m'Pas. Bagar BRC
T=0.90 mERROR:#REF!ERROR:#REF!14.900m2Plesteran 1:4 T =10 mm; Anal.
G.50.qa(No. 6.18.) ERROR:#REF!ERROR:#REF!14.900m2Cat Tembok 3 x
Jalan; Anal. G.53/B(No. 11.9.)
ERROR:#REF!ERROR:#REF!ERROR:#REF!Untuk 1 m' = 1/10 x Anal.
ERROR:#REF!ERROR:#REF!CATATAN :- Pasangan Pondasi Batu Kali Pada
Analisa Pagar BRC Tersebut Di AtasUntuk Daerah Normal/Datar- Untuk
Daerah Yang Tidak Normal/Datar Pondasinya Disesuaikan Dengan
Kondisi Daerah Setempat (Volume Pondasi Dihitung Kembali)
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
XIII.PEKERJAAN BONGKARAN13.1.ANALISA L.04 (10 M2 MEMBONGKAR
DINDING TEMBOK)Upah
:2.000orgPekerjaERROR:#REF!ERROR:#REF!0.100orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 1.3 x Anal. ERROR:#REF!Untuk 1 m2 = 1/10 x Anal.
ERROR:#REF!ERROR:#REF!
13.2.ANALISA L.05 (10 M2 MEMBONGKAR LANTAI BETON/BATA)Upah
:2.000orgPekerjaERROR:#REF!ERROR:#REF!0.100orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 1.3 x Anal. ERROR:#REF!Untuk 1 m2 = 1/10 x Anal.
ERROR:#REF!ERROR:#REF!
13.3.ANALISA L.07 (10 M2 MENURUNKAN ATAP GENTENG)Upah
:2.000orgPekerjaERROR:#REF!ERROR:#REF!0.100orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 1.3 x Anal. ERROR:#REF!Untuk 1 m2 = 1/10 x Anal.
ERROR:#REF!ERROR:#REF!
13.4.ANALISA L.08 (10 M2 MENURUNKAN ATAP SENG)Upah
:1.000orgPekerjaERROR:#REF!ERROR:#REF!0.500orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 1.3 x Anal. ERROR:#REF!Untuk 1 m2 = 1/10 x Anal.
ERROR:#REF!ERROR:#REF!
13.5.ANALISA L.09 (10 M2 MENURUNKAN RANGKA ATAP)Upah
:1.000orgPekerjaERROR:#REF!ERROR:#REF!0.250orgTukang
KayuERROR:#REF!ERROR:#REF!0.025orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.050orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 1.3 x Anal. ERROR:#REF!Untuk 1 m2 = 1/10 x Anal.
ERROR:#REF!ERROR:#REF!
13.6.ANALISA L.11 (10 M2 MEMBONGKAR PLAFOND PAPAN)Upah
:2.000orgPekerjaERROR:#REF!ERROR:#REF!0.600orgTukang
KayuERROR:#REF!ERROR:#REF!0.060orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.100orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 1.3 x Anal. ERROR:#REF!Untuk 1 m2 = 1/10 x Anal.
ERROR:#REF!ERROR:#REF!
13.7.ANALISA L.12 (1 M3 MEMBONGKAR BALOK PLAFOND/KUDA KUDA;
BAHAN DIPAKAI LAGI)Upah
:4.000orgPekerjaERROR:#REF!ERROR:#REF!6.000orgTukang
KayuERROR:#REF!ERROR:#REF!0.060orgKepala Tukang
KayuERROR:#REF!ERROR:#REF!0.200orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 1.3 x Anal. ERROR:#REF!ERROR:#REF!
No.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
13.8.MEMBONGKAR BALOK PLAFOND/KUDA KUDA; BAHAN TIDAK DIPAKAI
LAGI TIAP 1 M3)Upah
:4.000orgPekerjaERROR:#REF!ERROR:#REF!0.200orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Upah
= 1.3 x Anal. ERROR:#REF!ERROR:#REF!
PEKERJAAN JALAN1.PEMBERSIHAN BAHU DAN SALURAN JALAN TIAP 10
M2Upah :2.000orgPekerja
ERROR:#REF!ERROR:#REF!0.100orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Alat
:Alat Bantu 10% x UpahERROR:#REF!ERROR:#REF!Untuk 1 m2 = 1/10 x
AnalisaERROR:#REF!ERROR:#REF!
2.TIMBUNAN KLAS C (SIRTU) TIAP 1 M3Upah
:0.375orgPekerjaERROR:#REF!ERROR:#REF!0.199orgMandorERROR:#REF!ERROR:#REF!ERROR:#REF!Bahan
:1.200m3SirtuERROR:#REF!ERROR:#REF!Alat
:0.0009hrMengggilasRp200,000180ERROR:#REF!ERROR:#REF!ERROR:#REF!
3.ANALISA C.6a (4 M2 JALAN KERIKIL LEBAR 4 M, T= 15 CM)Upah
:2.400orgPekerjaERROR:#REF!ERROR:#REF!0.120orgMandorERROR:#REF!ERROR:#REF!Bahan
:0.500m3Batu KaliERROR:#REF!ERROR:#REF!0.200m3Kerikil
BetonERROR:#REF!ERROR:#REF!0.200m3Pasir
UrugERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Untuk 1
m2 = 1/4 x AnalisaERROR:#REF!ERROR:#REF!ERROR:#REF!
4.WATERBOUND MACADAM TIAP 1 M3Upah
:1.250orgPekerjaERROR:#REF!ERROR:#REF!0.125orgMandorERROR:#REF!ERROR:#REF!Bahan
:1.000m3Batu Pecah 5/7ERROR:#REF!ERROR:#REF!0.300m3Batu Pecah
3/4ERROR:#REF!ERROR:#REF!0.300m3Pasir
UrugERROR:#REF!ERROR:#REF!Alat
:0.001hrMenggilasRp200,000Rp200ERROR:#REF!ERROR:#REF!ERROR:#REF!No.KoofisienSatuanUpah/
BahanHarga SatuanHarga UpahHarga BahanJumlah Harga
5.LAPISAN ASPAL KULIT TEBAL 4 CM TIAP 100 M2Upah
:4.000orgPekerja TerlatihERROR:#REF!ERROR:#REF!1.000orgTukang Masak
AspalERROR:#REF!ERROR:#REF!1.000orgTukang Lebur
AspalERROR:#REF!ERROR:#REF!1.000orgMandorERROR:#REF!ERROR:#REF!Bahan
:300.000kgAspalERROR:#REF!ERROR:#REF!0.250m3Kayu
ApiERROR:#REF!ERROR:#REF!1.200m3Spilt 0.5 -
1.0ERROR:#REF!ERROR:#REF!Alat
:0.0009hrMenggilasRp200,000Rp180ERROR:#REF!ERROR:#REF!ERROR:#REF!Untuk
1 m2 = 1/100 x AnalisaERROR:#REF!ERROR:#REF!ERROR:#REF!
6.PENETRASI ASPAL TEBAL 4 CM TIAP 100 M2Upah :2.000orgPekerja
Pembersih ( Terlatih )ERROR:#REF!ERROR:#REF!8.000orgPekerja
MenghamparERROR:#REF!ERROR:#REF!2.000orgTukang Masak
AspalERROR:#REF!ERROR:#REF!1.000orgMandorERROR:#REF!ERROR:#REF!Bahan
:3.300m3Batu Pecah 2/3ERROR:#REF!ERROR:#REF!2.200m3Split 0.5 -
1.0ERROR:#REF!ERROR:#REF!1.200m3Abu Batu/Pasir
SaringERROR:#REF!ERROR:#REF!500.000kgAspalERROR:#REF!ERROR:#REF!0.500m3Kayu
ApiERROR:#REF!ERROR:#REF!Alat
:0.001hrMenggilasRp200,000Rp180ERROR:#REF!ERROR:#REF!ERROR:#REF!Untuk
1 m2 = 1/100 x AnalisaERROR:#REF!ERROR:#REF!ERROR:#REF!
&"Swis721 BdCnOul BT,Bold Outline Italic"&9ANALISA :
&P ( 25 )
&"Swis721 BdCnOul BT,Bold Outline Italic"&9ANALISA :
&P ( 25 )
&"Dutch801 XBd BT,Extra Bold"Bid. Bina Prog. & Teknis
DPU
&"CommercialScript BT,Regular"&11"By Defriyanto"
&"CommercialScript BT,Regular"&11"By Defriyanto"
&"Dutch801 XBd BT,Extra Bold Italic"Analisa SNI CK-IV/2008 -
&P
PLESTERANDAFTAR ANALISAHARGA SATUAN
PEKERJAANNo.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
VIPEKERJAAN PLESTERAN
6.1.MEMASANG 1 M2 PLESTERAN 1 PC : 1 PP, TEBAL 15 MMUpah
:0.200OHPekerja0.150OHTukang batu0.015OHKepala
Tukang0.010OHMandorBahan :15.504kgPC0.016m3PP
6.2.MEMASANG 1 M2 PLESTERAN 1 PC : 2 PP, TEBAL 15 MMUpah
:0.200OHPekerja0.150OHTukang batu0.015OHKepala
Tukang0.010OHMandorBahan :10.224kgPC0.020m3PP
6.3.MEMASANG 1 M2 PLESTERAN 1 PC : 3 PP, TEBAL 15 MMUpah
:0.200OHPekerja0.150OHTukang batu0.015OHKepala
Tukang0.010OHMandorBahan :7.776kgPC0.023m3PP
6.4.MEMASANG 1 M2 PLESTERAN 1 PC : 4 PP, TEBAL 15 MMUpah
:0.200OHPekerja0.150OHTukang batu0.015OHKepala
Tukang0.010OHMandorBahan :6.240kgPC0.024m3PP
6.5.MEMASANG 1 M2 PLESTERAN 1 PC : 5 PP, TEBAL 15 MMUpah
:0.200OHPekerja0.150OHTukang batu0.015OHKepala
Tukang0.010OHMandorBahan :5.184kgPC0.026m3PP
6.6.MEMASANG 1 M2 PLESTERAN 1 PC : 6 PP, TEBAL 15 MMUpah
:0.200OHPekerja0.150OHTukang batu0.015OHKepala
Tukang0.010OHMandorBahan :4.416kgPC0.027m3PP
6.7.MEMASANG 1 M2 PLESTERAN 1 PC : 7 PP, TEBAL 15 MMUpah
:0.200OHPekerja0.150OHTukang batu0.015OHKepala
Tukang0.010OHMandorBahan :3.936kgPC0.028m3PP
6.8.MEMASANG 1 M2 PLESTERAN 1 PC : 8 PP, TEBAL 15 MMUpah
:0.200OHPekerja0.150OHTukang batu0.015OHKepala
Tukang0.010OHMandorBahan :3.456kgPC0.029m3PP
6.9.MEMASANG 1 M2 PLESTERAN 1 PC : 1/2 KP : 3 PP, TEBAL 15
MMUpah :0.220OHPekerja0.120OHTukang batu0.012OHKepala
Tukang0.011OHMandorBahan :5.760kgPC0.003m3KP0.013m3PP
6.10.MEMASANG 1 M2 PLESTERAN 1 PC : 2 KP : 8 PP, TEBAL 15 MMUpah
:0.220OHPekerja0.120OHTukang batu0.012OHKepala
Tukang0.011OHMandorBahan :3.000kgPC0.005m3KP0.020m3PP
6.11.MEMASANG 1 M2 PLESTERAN 1 SM : 1 KP : 1 PP, TEBAL 15 MMUpah
:0.220OHPekerja0.120OHTukang batu0.012OHKepala
Tukang0.011OHMandorBahan :0.009m3SM0.009m3KP0.009m3PP
6.12.MEMASANG 1 M2 PLESTERAN 1 SM : 1 KP : 2 PP, TEBAL 15 MMUpah
:0.220OHPekerja0.120OHTukang batu0.012OHKepala
Tukang0.011OHMandorBahan :0.007m3SM0.007m3KP0.015m3PP
6.13.MEMASANG 1 M2 PLESTERAN 1 PC : 2 PP, TEBAL 20 MMUpah
:0.260OHPekerja0.200OHTukang batu0.020OHKepala
Tukang0.013OHMandorBahan :13.632kgPC0.027m3PP
6.14.MEMASANG 1 M2 PLESTERAN 1 PC : 3 PP, TEBAL 20 MMUpah
:0.260OHPekerja0.200OHTukang batu0.020OHKepala
Tukang0.013OHMandorBahan :10.368kgPC0.031m3PP
6.15.MEMASANG 1 M2 PLESTERAN 1 PC : 4 PP, TEBAL 20 MMUpah
:0.260OHPekerja0.200OHTukang batu0.020OHKepala
Tukang0.013OHMandorBahan :8.320kgPC0.032m3PP
6.16.MEMASANG 1 M2 PLESTERAN 1 PC : 5 PP, TEBAL 20 MMUpah
:0.260OHPekerja0.200OHTukang batu0.020OHKepala
Tukang0.013OHMandorBahan :6.912kgPC0.035m3PP
6.17.MEMASANG 1 M2 PLESTERAN 1 PC : 6 PP, TEBAL 20 MMUpah
:0.260OHPekerja0.200OHTukang batu0.020OHKepala
Tukang0.013OHMandorBahan :5.888kgPC0.036m3PP
6.18.MEMASANG 1 M2 PLESTERAN 1 SM : 1 KP : 2 PP, TEBAL 20 MMUpah
:0.286OHPekerja0.220OHTukang batu0.022OHKepala
Tukang0.014OHMandorBahan :0.009m3SM0.009m3KP0.018m3PP
6.19.MEMASANG 1 M2 BERAPEN 1 PC : 5 PP, TEBAL 15 MMUpah
:0.150OHPekerja0.070OHTukang batu0.007OHKepala
Tukang0.008OHMandorBahan :5.184kgPC0.026m3PP
6.20.MEMASANG 1 M2 PLESTERAN SKONING 1 PC : 2 PP, LEBAR 10
MMUpah :0.057OHPekerja0.380OHTukang batu0.038OHKepala
Tukang0.003OHMandorBahan :0.500kgPC0.013m3PP
6.21.MEMASANG 1 M2 PLESTERAN GRANIT, 1 PC : 2 GRANIT, TEBAL 10
MMUpah :0.450OHPekerja0.200OHTukang batu0.020OHKepala
Tukang0.025OHMandorBahan :10.000kgPC15.000kgBatu Granit
6.22.MEMASANG 1 M' PLESTERAN TERASO, 1 PC : 2 BATU TERASO, TEBAL
10 MMUpah :0.450OHPekerja0.200OHTukang batu0.020OHKepala
Tukang0.025OHMandorBahan :10.000kgPC15.000kgBatu Teraso
6.23.MEMASANG 1 M2 PLESTERAN CIPRAT, 1 PC : 2 PPUpah
:0.250OHPekerja0.100OHTukang batu0.010OHKepala
Tukang0.013OHMandorBahan :4.320kgPC0.006m3PP
6.24.MEMASANG 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH
(=20 M')Upah :0.150OHPekerja0.070OHTukang batu0.007OHKepala
Tukang0.008OHMandorBahan :3.108kgPC
6.25.MEMASANG 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK
EKSPOSE (= 8 M')Upah :0.075OHPekerja0.035OHTukang batu0.004OHKepala
Tukang0.004OHMandorBahan :1.600kgPC
6.26.MEMASANG 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1 PC
: 2 PPUpah :0.300OHPekerja0.140OHTukang batu0.014OHKepala
Tukang0.015OHMandorBahan :6.340kgPC0.012m3PP
6.26.MEMASANG 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1 PC
: 2 PPUpah :0.300OHPekerja0.140OHTukang batu0.014OHKepala
Tukang0.015OHMandorBahan :6.340kgPC0.012m3PP
6.27.MEMASANG 1 M2 ACIANUpah :0.150OHPekerja0.100OHTukang
batu0.010OHKepala Tukang0.008OHMandorBahan :3.250kgPC
KAYUDAFTAR ANALISAHARGA SATUAN PEKERJAANNo.KoofisienSatuanUpah/
BahanHarga SatuanHarga UpahHarga BahanJumlah Harga
VI. PEKERJAAN KAYU
6.1.MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN KUSEN JENDELA,
KAYU KELAS IUpah :6.000OHPekerja20.000OHTukang Kayu2.000OHKepala
Tukang0.300OHMandorBahan :1.100m3Balok Kayu1.250kgPaku 10
cm1.000kgLem kayu
6.2.MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN KUSEN JENDELA,
KAYU KELAS II ATAU IIIUpah :6.000OHPekerja18.000OHTukang
Kayu2.000OHKepala Tukang0.300OHMandorBahan :1.200m3Balok
Kayu1.250kgPaku 10 cm1.000kgLem kayu
6.3.MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR, KAYU KELAS II
Upah :0.350OHPekerja1.050OHTukang Kayu0.105OHKepala
Tukang0.018OHMandorBahan :0.040m3Papan kayu0.050kgPaku 5 cm - 7
cm
6.4.MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA, KAYU KELAS
III Upah :0.350OHPekerja1.050OHTukang Kayu0.105OHKepala
Tukang0.018OHMandorBahan :0.040m3Papan kayu0.050kgPaku 5 cm - 7
cm
6.5.MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL, KAYU KELAS I
ATAU II Upah :1.000OHPekerja2.500OHTukang Kayu0.250OHKepala
Tukang0.050OHMandorBahan :0.040m3Papan kayu0.500kgLem kayu
6.6.MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS
I ATAU II Upah :0.800OHPekerja2.000OHTukang Kayu0.200OHKepala
Tukang0.040OHMandorBahan :0.024m3Papan kayu0.300kgLem kayu
6.7.MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI KAYU
KELAS I ATAU II Upah :1.000OHPekerja3.000OHTukang Kayu0.300OHKepala
Tukang0.050OHMandorBahan :0.064m3Papan kayu0.500kgLem kayu
6.8.MEMBUAT 1 M2 DAUN PINTU KAYU LAPIS (PLYWOOD) RANGKAP, RANGKA
TERTUTUP KAYU KELAS II (LEBAR SAMPAI 90 CM)Upah
:0.600OHPekerja2.000OHTukang Kayu0.200OHKepala
Tukang0.030OHMandorBahan :0.025m3Papan kayu0.030kgPaku 1 cm - 2,5
cm0.500kgLem kayu1.000LembarPlywood Tebal 4 mm ukuran (90 x 220)
cm
6.9.MEMBUAT 1 M2 PINTU PLYWOOD RANGKAP, RANGKA EXPOSE KAYU KELAS
I ATAU II Upah :0.800OHPekerja2.000OHTukang Kayu0.200OHKepala
Tukang0.040OHMandorBahan :0.0256m3Papan kayu0.030kgPaku 1 cm - 2,5
cm0.500kgLem kayu1.000LembarPlywood Tebal 4 mm ukuran (90 x 220)
cm
6.10.MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I ATAU II Upah
:0.500OHPekerja2.000OHTukang Kayu0.200OHKepala
Tukang0.025OHMandorBahan :0.060m3Papan kayu0.150kgPaku 1 cm - 2,5
cm
6.11.MEMASANG 1 M2 TEAKWOOD RANGKAP, RANGKA EXPOSE KAYU KELAS I
Upah :0.800OHPekerja2.000OHTukang Kayu0.200OHKepala
Tukang0.040OHMandorBahan :0.025m3Papan kayu0.030kgPaku 1 cm - 2,5
cm0.300kgLem kayu1.000lembarTeakwood Tebal 4 mm Ukuran (90 x 220)
cm
6.12.MEMASANG 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA, RANGKA EXPOSE
KAYU KELAS II Upah :0.800OHPekerja2.500OHTukang Kayu0.250OHKepala
Tukang0.040OHMandorBahan :0.025m3Papan kayu0.030kgPaku 1 cm - 2,5
cm0.800kgLem kayu1.000lembarTeakwood Tebal 4 mm Ukuran (90 x 220)
cm0.500lembarFormika
6.13.MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS
I, II DAN III BENTANG 6 METER Upah :4.000OHPekerja12.000OHTukang
Kayu1.200OHKepala Tukang0.200OHMandorBahan :1.100m3Balok
Kayu15.000kgBesi strip tebal 5 mm5.600kgPaku 12 cm
6.14.MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS IUpah
:6.000OHPekerja20.000OHTukang Kayu2.000OHKepala
Tukang0.300OHMandorBahan :1.200m3Balok Kayu15.000kgBesi strip tebal
5 mm5.600kgPaku 12 cm
6.15.MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS IIUpah
:2.400OHPekerja7.200OHTukang Kayu0.720OHKepala
Tukang0.120OHMandorBahan :1.100m3Balok Kayu15.000kgBesi strip tebal
5 mm3.000kgPaku 12 cm
6.16.MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS
IIUpah :0.100OHPekerja0.100OHTukang Kayu0.010OHKepala
Tukang0.005OHMandorBahan :0.014m3Kaso-kaso (5 x 7) cm0.036m3Reng (2
x 3) cm0.250kgPaku 5 cm dan 10 cm
6.17.MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS IIUpah
:0.100OHPekerja0.100OHTukang Kayu0.010OHKepala
Tukang0.005OHMandorBahan :0.014m3Kaso-kaso (5 x 7) cm0.057m3Reng (3
x 4) cm0.250kgPaku 5 cm dan 10 cm
6.18.MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS IIUpah
:0.120OHPekerja0.120OHTukang Kayu0.012OHKepala
Tukang0.006OHMandorBahan :0.165m3Kayu kelas II0.200kgPaku 5 cm
Sampai 10 cm
6.19.MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100) CM, KAYU
KELAS II ATAU IIIUpah :0.150OHPekerja0.250OHTukang
Kayu0.025OHKepala Tukang0.075OHMandorBahan :0.0154m3Kaso-kaso (5 x
7) cm0.200kgPaku 7 cm - 10 cm
6.20.MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS
II ATAU IIIUpah :0.200OHPekerja0.300OHTukang Kayu0.030OHKepala
Tukang0.010OHMandorBahan :0.0163m3Kaso-kaso (5 x 7) cm0.250kgPaku 7
cm - 10 cm
6.21.MEMASANG 1 M1 LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I
ATAU KELAS IIUpah :0.100OHPekerja0.200OHTukang Kayu0.025OHKepala
Tukang0.005OHMandorBahan : 0.0108m3Papan Kayu0.100kgPaku 5 cm dan 7
cm
6.22.MEMASANG 1 M1 LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I
ATAU KELAS IIUpah :0.100OHPekerja0.200OHTukang Kayu0.020OHKepala
Tukang0.005OHMandorBahan : 0.011m3Papan Kayu0.050kgPaku 5 cm dan 7
cm
6.23.MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM , KAYU
KELAS II ATAU IIIUpah :0.150OHPekerja0.450OHTukang
Kayu0.045OHKepala Tukang0.008OHMandorBahan : 0.028m3Balok
Kayu0.150kgPaku 5 cm dan 7 cm
6.24.MEMASANG 1 M2 DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU
KELAS II Upah :0.150OHPekerja0.450OHTukang Kayu0.045OHKepala
Tukang0.008OHMandorBahan : 0.028m3Balok Kayu, Ukuran (6 x 12)
cm0.150kgPaku 5 cm dan 10 cm 0.860LembarTeakwood Tebal 4 mm, ukuran
120 cm x 240 cm
6.25.MEMASANG 1 M2 DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU
KELAS II Upah :0.200OHPekerja0.600OHTukang Kayu0.060OHKepala
Tukang0.010OHMandorBahan : 0.028m3Balok Kayu, Ukuran (6 x 12)
cm0.150kgPaku 5 cm dan 10 cm 0.860LembarPlywood Tebal 4 mm, ukuran
120 cm x 240 cm
6.26.MEMASANG 1 M2 DINDING LAMBRIZIRING DARI PAPAN KAYU KELAS I
Upah :0.600OHPekerja1.800OHTukang Kayu0.180OHKepala
Tukang0.030OHMandorBahan : 0.007m3Papan Kayu0.100kgPaku 5 cm dan 10
cm 0.150kgPaku Skrup 10 cm
6.27.MEMASANG 1 M2 DINDING LAMBRIZIRING DARI PLYWOOD UKURAN (120
X 240) CMUpah :0.025OHPekerja0.075OHTukang Kayu0.0075OHKepala
Tukang0.0013OHMandorBahan : 0.400lembarPlywood Tebal 4
mm0.050kgPaku 1 cm dan 2,5 cm
6.28.MEMASANG 1 M2 DINDING BILIK, RANGKA KAYU KELAS III ATAU
IVUpah :0.100OHPekerja0.050OHTukang Kayu0.005OHKepala
Tukang0.005OHMandorBahan : 1.500m2Bilik Bambu0.014m3Kaso-kaso (5 x
7) cm0.012kgPaku0.003m3List Kayu 2/4
PENUTUP LANTAI N DINDINGDAFTAR ANALISAHARGA SATUAN
PEKERJAANNo.KoofisienSatuanUpah/ BahanHarga SatuanHarga UpahHarga
BahanJumlah Harga
VIPenutup Lantai dan Dinding
6.1.MEMASANG 1 M2 LANTAI UBIN PC ABU-ABU UKURAN (40 X 40) CM
Upah :0.250OHPekerja0.120OHTukang batu0.012OHKepala
Tukang0.013OHMandorBahan :6.630bhUbin Abu-abu9.800kgPC0.045m3PP
6.2.MEMASANG 1 M2 LANTAI UBIN PC ABU-ABU UKURAN (30 X 30) CM
Upah :0.260OHPekerja0.125OHTukang batu0.013OHKepala
Tukang0.013OHMandorBahan :11.870bhUbin
Abu-abu10.000kgPC0.045m3PP
6.3.MEMASANG 1 M2 LANTAI UBIN PC ABU-ABU UKURAN (20 X 20) CM
Upah :0.270OHPekerja0.130OHTukang batu0.013OHKepala
Tukang0.014OHMandorBahan :26.500bhUbin
Abu-abu10.400kgPC0.045m3PP
6.4.MEMASANG 1 M2 LANTAI UBIN WARNA UKURAN (40 X 40) CM Upah
:0.250OHPekerja0.120OHTukang batu0.012OHKepala
Tukang0.013OHMandorBahan :6.630bhUbin
Warna9.800kgPC0.045m3PP1.300kgSemen Warna
6.5.MEMASANG 1 M2 LANTAI UBIN WARNA UKURAN (30 X 30) CM Upah
:0.260OHPekerja0.125OHTukang batu0.013OHKepala
Tukang0.013OHMandorBahan :11.870bhUbin
Warna10.000kgPC0.045m3PP1.500kgSemen Warna
6.6.MEMASANG 1 M2 LANTAI UBIN WARNA UKURAN (20 X 20) CM Upah
:0.270OHPekerja0.130OHTukang batu0.013OHKepala
Tukang0.014OHMandorBahan :26.500bhUbin
Warna10.400kgPC0.045m3PP1.620kgSemen Warna
6.7.MEMASANG 1 M2 LANTAI UBIN TERASO UKURAN (40 X 40) CM Upah
:0.250OHPekerja0.120OHTukang batu0.012OHKepala
Tukang0.013OHMandorBahan :6.630bhUbin
Teraso9.800kgPC0.045m3PP1.300kgSemen Warna
6.8.MEMASANG 1 M2 LANTAI UBIN TERASO UKURAN (30 X 30) CM Upah
:0.260OHPekerja0.125OHTukang batu0.013OHKepala
Tukang0.013OHMandorBahan :11.870bhUbin
Teraso10.000kgPC0.045m3PP1.500kgSemen Warna
6.9.MEMASANG 1 M2 LANTAI UBIN GRANIT UKURAN (40 X 40) CM Upah
:0.250OHPekerja0.120OHTukang batu0.012OHKepala
Tukang0.013OHMandorBahan :6.630bhUbin
Granit9.800kgPC0.045m3PP1.300kgSemen Warna
6.10.MEMASANG 1 M2 LANTAI UBIN GRANIT UKURAN (30 X 30) CM Upah
:0.260OHPekerja0.125OHTukang batu0.013OHKepala
Tukang0.013OHMandorBahan :11.870bhUbin
Granit10.000kgPC0.045m3PP1.500kgSemen Warna
6.11.MEMASANG 1 M2 LANTAI UBIN TERALUX UKURAN (40 X 40) CM Upah
:0.250OHPekerja0.120OHTukang batu0.013OHKepala
Tukang0.013OHMandorBahan :6.630bhUbin Teralux
Kerang9.800kgPC0.045m3PP1.300kgSemen Warna
6.12.MEMASANG 1 M2 LANTAI UBIN TERALUX UKURAN (30 X 30) CM Upah
:0.260OHPekerja0.125OHTukang batu0.013OHKepala
Tukang0.013OHMandorBahan :11.870bhUbin Teralux
Kerang10.000kgPC0.045m3PP1.500kgSemen Warna
6.13.MEMASANG 1 M2 LANTAI UBIN TERALUX MARMER UKURAN (60 X 60)
CM Upah :0.250OHPekerja0.120OHTukang batu0.012OHKepala
Tukang0.013OHMandorBahan :3.100bhUbin Teralux
Marmer9.600kgPC0.045m3PP1.500kgSemen Warna
6.14.MEMASANG 1 M2 LANTAI UBIN TERALUX MARMER UKURAN (40 X 40)
CM Upah :0.250OHPekerja0.120OHTukang batu0.012OHKepala
Tukang0.013OHMandorBahan :6.630bhUbin Teralux
Marmer9.800kgPC0.045m3PP1.300kgSemen Warna
6.15.MEMASANG 1 M2 LANTAI UBIN TERALUX MARMER UKURAN (30 X 30)
CM Upah :0.260OHPekerja0.125OHTukang batu0.013OHKepala
Tukang0.013OHMandorBahan :11.870bhUbin Teralux
Marmer10.000kgPC0.045m3PP1.500kgSemen Warna
6.16.MEMASANG 1 M PLINT UBIN PC ABU-ABU UKURAN (15 X 20) CM Upah
:0.090OHPekerja0.090OHTukang batu0.009OHKepala
Tukang0.005OHMandorBahan :5.300bhPlint ubin1.650kgPC0.004m3PP
6.17.MEMASANG 1 M PLINT UBIN PC ABU-ABU UKURAN (10 X 30) CM Upah
:0.090OHPekerja0.090OHTukang batu0.009OHKepala
Tukang0.005OHMandorBahan :3.530bhPlint ubin1.240kgPC0.003m3PP
6.18.MEMASANG 1 M PLINT UBIN PC ABU-ABU UKURAN (10 X 40) CM Upah
:0.090OHPekerja0.090OHTukang batu0.009OHKepala
Tukang0.005OHMandorBahan :2.650bhPlint ubin1.240kgPC0.003m3PP
6.19.MEMASANG 1 M PLINT UBIN PC WARNA UKURAN (10 X 20) CM Upah
:0.090OHPekerja0.090OHTukang batu0.009OHKepala
Tukang0.005OHMandorBahan :5.300bhPlint ubin PC
Warna1.140kgPC0.003m3PP0.100kgSemen Warna
6.20.MEMASANG 1 M PLINT UBIN PC WARNA UKURAN (10 X 30) CM Upah
:0.090OHPekerja0.090OHTukang batu0.009OHKepala
Tukang0.005OHMandorBahan :3.530bhPlint ubin PC
Warna1.140kgPC0.003m3PP0.100kgSemen Warna
6.21.MEMASANG 1 M PLINT UBIN PC WARNA UKURAN (10 X 40) CM Upah
:0.090OHPekerja0.090OHTukang batu0.009OHKepala
Tukang0.005OHMandorBahan :2.650bhPlint ubin PC
Warna1.140kgPC0.003m3PP0.100kgSemen Warna
6.22.MEMASANG 1 M PLINT UBIN TERASO UKURAN (10 X 30) CM Upah
:0.090OHPekerja0.090OHTukang batu0.009OHKepala
Tukang0.005OHMandorBahan :3.530bhPlint ubin
Teraso1.140kgPC0.003m3PP0.100kgSemen Warna
6.23.MEMASANG 1 M PLINT UBIN TERASO UKURAN (10 X 40) CM Upah
:0.090OHPekerja0.090OHTukang batu0.009OHKepala
Tukang0.005OHMandorBahan :2.650bhPlint ubin
Teraso1.140kgPC0.003m3PP0.100kgSemen Warna
6.24.MEMASANG 1 M PLINT UBIN GRANIT UKURAN (10 X 40) CM Upah
:0.090OHPekerja0.090OHTukang batu0.009OHKepala
Tukang0.005OHMandorBahan :2.650bhPlint ubin
Teraso1.140kgPC0.003m3PP0.100kgSemen Warna
6.25.MEMASANG 1 M PLINT UBIN GRANIT UKURAN (10 X 30) CM Upah
:0.090OHPekerja0.090OHTukang batu0.009OHKepala
Tukang0.005OHMandorBahan :3.530bhPlint ubin