S.N. BHOBE & ASSOCIATES Pvt. Ltd. · S. N. BHOBE & ASSOCIATES Pvt. Ltd. has been nominated for ... Rajasthan State Road ... Year of realization –Jan.2015 Client - Maharashtra State
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Maharashtra State Road Development Corporation Ltd.
Karnataka Road Development. Corp. Ltd.
Thane Municipal Corporation
Municipal Corporation of Greater Mumbai
Navi Mumbai Municipal Corporation
Pimpri Chinchwad Municipal Corporation
Pune Municipal Corporation
Kalyan Dombivli Municipal Corporation
Surat Municipal Corporation
Bruhat Bangalore Mahanagar Palika
Tuljapur Development Authority
City Corporation of Belgaum
Amravati Municipal Corporation
Bangalore Development Authority
Municipal Corporation of New Delhi
Nagpur Municipal Corporation
Indore Municipal Corporation
Konkan Railway Corporation Ltd.
NABARD & Rural Roads
Goa State Infrastructure Development Corporation
City & Industrial Development Corporation of
Maharashtra Limited
Rail Vikas Nigam Limited
Indian Railway
IRCON International Ltd.
Bihar Rajya Pul Nirman Nigam Ltd.
Dedicated Freight Corridor Corporation of India Ltd
Rajasthan State Road Development & Construction
Corporation Ltd.
Goa State Road Development Corp. Ltd
Bangalore Metro Rail Corp. Ltd
Bihar State Road Development Corp. Ltd
Tamilnadu Highway Department
Indian Bank, Kolkata
Airport Authority of India
Hindustan Aeronautics Limited
Mumbai International Airport Pvt. Ltd
Mahanagar Telephone Nigam Ltd.
Maharashtra Maritime Board
Hyderabad Urban Development Authority
Public Works Department, Uttarakhand
Ashoka Buildcon Ltd.
PROJECTS HANDLED
S. N. BHOBE & ASSOCIATES Pvt. Ltd. has completed a number of projects in different areas of infrastructure works as
consultants. Some of our recent achievements are featured below:
BRIDGES (€1=INR 80)
Consultancy services for Rehabilitation of Mahatma Gandhi Setu on NH 19 in Patna in the State of Bihar on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis.
Concept - High Level River Bridge
Total length of bridge - 5.5 km
Project Cost - ₨. 10,000 M (€ 125 Million)
Year of realization - 2011
Client - National Highway Authority of India
Scope - Consultancy services for Rehabilitation of Distressed Bridge
Widening and improvement of Sion – Panvel Special State Highway (SSH) from Kalamboli Junction (Ch. 115/800) to B.A.R.C. Junction (Ch. 140/690) under BOT (5 + 5 CC lane - 25 km Highway) on NH-4
Length of Highway 25 Km 1. Taloja Creek Bridge (Length 134.120m) 2. Jui Creek Bridge (Length 89.2 m) 3. CMLR flyover (Length 739.360 m) 4. Kamothe flyover (Length 704.050 m) 5. Sanapada flyover (Length 706.047 m) 6. Taloja flyover (Length 581.390 m) 7. Uran flyover (Length 964.028 m) 8. Turbhe R.O.B (Length 1578 m) 9. Mankhurd R.O.B (Length 43.6 m) 10. 8 Nos. Minor Bridges 11. 11 Nos. FOBs 12. CD Work
Project Cost - ₨.17000 M (€ 212.50 Million)
Year of realization - 2014
Client – Sion Panvel Tollways Private Limited
Scope - Design Consultancy
Cable stay bridge across Mapusa river, Goa
Concept - Cable Stay River Bridge
Cable stay portion Length - 185 m
Project Cost - ₨.207 million (€ 2.59 Million)
Year of realization - 2005
Client - Goa State Infrastructure Development Corporation Ltd.
Consultancy services for pre-tender and post-tender activities including design for the work of construction of flyover at Swargate and Market Yard Junction in Pune City.
Total length of bridge – 1.8 Km
Project Cost - ₨.1400 M (€ 17.50 Million)
Year of realization – Jan.2015
Client - Maharashtra State Road Development Corp. Ltd. (MSRDC)
Scope - Pre-tender activities including Detailed Project Report and post-tender activities including design, Project Management Consultancy
Consultancy service for preparation of Detailed Project Report and Bid Process Management for selection of agency for Work of connectivity from Sewri to Worli (East - West Corridor) for Mumbai Trans Harbour Link (MTHL) Dispersal.
Concept – Elevated Corridor
Total length of bridge – 4.5 km
Project Cost - ₨.4907 M (€ 61.34 Million)
Year of realization – Dec.2013
Client - Mumbai Metropolitan Development Authority (MMRDA)
Scope - Detailed Project Report and Bid Process Management
Grade separator, Kengri Junction, Bangalore
Total length - 1114 m, No. of lanes - 2
Project Cost - ₨.229.90 M (€ 2.87 Million)
Year of realization - 2009
Client - Karnataka Road Development Corporation Ltd.
Construction of Rail Over Bridge near Seawood – Darave Railway Station at Belapur end
Length of ROB Bridge 745.10 m, 6 Lane, 22 No. spans of 20 m and 2 spans of 25 m, 4 No. of spans of 38 m, Approach road 103.05 M. All spans are Prestressed concrete I girder
Project Cost - ₨.350 M (€ 4.38 Million)
Year of realization - 2011
Client - City and Industrial Development Corp. of Maharashtra Ltd. (CIDCO)
Scope - Design Consultancy
Construction of Khanda ROB on Diva Panvel Railway Line (Ch.66/12) Khanda Colony in New Panvel
Length of ROB Bridge 775.50 m, 4 Lane
Project Cost - ₨.433.6 M (€ 5.42 Million)
Year of realization - 2012
Client - City and Industrial Development Corp. of Maharashtra Ltd. (CIDCO)
Scope - Design Consultancy
Project Management Consultancy for works of Construction of: New Bridge over River Roopnarayan at Kolghat, (LHS) (Ch km 73/500 of NH-6) in Midnapur District, West Bengal (Length 1019.11 m, width 15 m) and Construction of an incomplete Bridge over River Roopnayaran at Koghat, (RHS) (Ch. km 73/500 of NH-6) in Midnapur District, West Bengal (Length 323.10 m, width 15 m) including both bridges approaches (retaining structures), Widening & Rehabilitation of ROB at Km 18.094 (LHS) & km 23.831 (LHS), for project Six lanning of Dhankuni - Kharagpur section of NH-6 from Km 17/600 to Km 129/000 in the state of West Bengal
Project cost - ₨. 1159.1 M (€ 14.49 Million)
Year of realization - 2013
Client - Ashoka Buildcon Ltd.
Scope - Project Management Consultancy
Flyover at Kapodra fire station junction on Varachha road, Surat
Total Length - 549.00 m, No. of lanes - 4
Project cost - ₨.107.34 M (€ 1.34 million)
Year of realization - 2010
Client - Surat Municipal Corporation
Scope - Design, Project Management Consultant
Construction of Flyover Bridge at Gujarat Gas Circle, Adajan Road in Surat
Construction of Flyover near Times of India Building at Malad on western express highway-appointment of project management consultancy.
Project cost - ₨.180 M (€ 2.25 Million)
Year of realization - 2012
Client - Maharashtra State Road Development Corporation. Ltd
Scope - Project Management Consultancy
Under pass at Ramamurthy Nagar on Outer Ring Road at Bangalore
No. of lanes - 6
Project Cost - ₨.171.76 M (€ 2.15 Million)
Year of realization - 2007
Client - Bangalore Development Authority
Scope - Consultancy Services for Project Management and Quality Assurance
HIGHWAYS & ROADS Feasibility Study and pretender activities for the proposed four laning of existing two lane / New construction of Nagpur-Aurangabad-Sinner-Ghoti-Mumbai Road basis (BOT) Phase I" a) Singhkhedraja to Jalna 26.30 km b) Aurangabad -Lasur - Vaijapur - Puntamba Phata 85.55 km
Total Length - 121.228 km, 4 Lane No. of Major Bridges : 4 Nos (Width 26.5m ) No. of Minor Bridges : 52 Nos No. of ROBs: 1 (Length 320 m)
Project Cost - ₨.6200 M (€ 77.50 Million)
Year of realization – 31st July, 2012
Client - Maharashtra State Road Development Corp. Ltd. (MSRDC)
Scope - Feasibility Study& Pre Tender Activities including Detailed Project Report, Traffic Survey & Traffic Studies
Consultancy Service for "Feasibility Study and pretender activities for the proposed four laning of existing two lane / New construction of Nagpur-Aurangabad-Sinner-Ghoti-Mumbai Road basis (BOT) Phase II c) Puntamba Phata-Sinner-Ghoti (including Sinner Bypass) 107.80 Km
Total Length - 107.80 km, 4 Lane No. of Major Bridges : 4 Nos (Length more than 90 m each) No. of Minor Bridges : 49 Nos No. of ROBs: 1 (Length approx.. 250 m)
Project Cost - ₨.5290 M (€ 66.13 Million)
Year of realization - 31st July, 2012
Client - Maharashtra State Road Development Corp. Ltd. (MSRDC)
Scope - Feasibility Study& Pre Tender Activities including Detailed Project Report, Traffic Survey & Traffic Studies
Consultancy for Pre and Post Tender activities for Construction / Improvement to Aundh – Ravet Road, Pimpri – Chinchwad, Pune, Maharashtra on B.O.T. Basis
Total Length - 14.5 Km, 4+4 Lane 45 m for 7.50 m 30 m for 7.00 m
Project Cost - ₨.2436 M (€ 30.48 Million)
Year of realization - Dec.2014
Client - Pimpri Chinchwad Municipal Corporation (PCMC)
Scope - Feasibility Study & Pre Tender Activities including Detailed Project Report, Traffic Survey & Traffic Studies , Project Management Consultancy
Consultancy services for conducting Topographical survey, Identification Properties, Investigations, Transportation & Planning & Surveying, preparation of Engineering Design cost Estimates with Techno commercial study, Detailed Project Report& Bidding documents for widening & construction of 13 nos. High / Medium density corridor roads as per JNNURM Norms (35 Kms) in Bangalore City of dual C.W. of 2 & 3 lanes (24 m & 30 m width)
Preparation of JNNURM complaint Detailed Project Report for High Quality up graded road network in new zones of BBMP area Package-II, Zone-II, Mahadevpura Zone
Scope - Detailed Project Report including Topographical survey, Soil Investigations, Planning, Traffic studies, Design, Preparation of Estimates, Tender documents& assisting clients in finalization of contracts
Consultancy services for conducting, Topographical survey, identification properties, Investigations, Transportation, Planning & Surveying, Preparation of Engineering Design Cost Estimates with Techno – commercial study. Detailed Project Report& Bidding Documents for Widening & construction of 35 Nos. of High / Medium density corridor roads as per JNNURM Norms in Bangalore City.
Total Length - 42 Km 24 m R.O.W. (4 Lane) for 30.00 km 30 m R.O.W. (6 Lane) for 12.00 km
Scope - Detailed Project Report including Topographical Survey, Soil Investigations, Planning, Design, Traffic survey, Preparation of Estimates, Tender Documents& assisting client in finalization of contracts
Preparation of JNNURM complaint Detailed Project Report for high quality up graded road network in New Zones of BBMP area Package-I, Zone I, Baytaranypura Zone
Total Length - 40 Km 18 m road for 10.00 km (2 Lane) 24 m road for 24.00 km ( 4 Lane) 30 m road for 6.00 km (4 Lane)
Four laning and improvement, Toll collection and operation and maintenance of Bhiwandi Kalyan Shilphata Highway. (B.O.T) Value of the works – INR 1210.16 million
Realization Date – 2013
Client – Maharashtra State Road Development Corporation Site – Kalyan, Indian
Scope of Work – Project Management Consultancy
Four laning of Aurangabad - Jalna Road including Beed and Zalta bypass, Aurangabad
Value of the works – INR 1990 million
Realization Date – 2009
Client – Maharashtra State Road Development Corporation Ltd.
Site – Aurangabad, India
Scope of Work – Independent Consultants
Cement concrete pavement and improvement of existing Roads, Indore
Value of the works INR 443.26 million (EUR 7.38 million)
Realization Date 2010
Client Indore Municipal Corporation
Site Indore, India
Scope of Work Project Management Consultancy
Cement concrete pavement on Udhna – Magdalla and Adajan Roads, Surat
Value of the works - INR 354.35 million (EUR 7.38 million)
Realization Date – 2010
Client - Surat Municipal Corporation, Surat
Site - Surat, India
Scope of Work - Project Management Consultancy
Development of Roads from Chopdem to Mandrem, Goa Value of the works INR 50.88 million ( EUR 0.78 million ) Realization Date 2005 Client Goa State Infrastructure Development Corporation Ltd. (GSIDCL) Site Goa, India Scope of Work Preliminary Design, Techno feasibility Study, Preparation of estimates
Asphalting works of 16 nos. of Roads, Bangalore
Value of the works INR 150 million (EUR 2.30 million) Realization Date 2009 Client Bruhath Bangalore Mahanagara Palike Site Bangalore, India Scope of Work Project Management Quality Assurance
Mastic asphalt wearing course from Sion to Mulund on Eastern Express Highway, Mumbai Value of the works INR 330.24 million (EUR 5.08 million) Realization Date 2011 Client Mumbai Metropolitan Region Development Authority (MMRDA) Site Mumbai, India Scope of Work Supervision, Quality Control Recording of Measurements, billing and certification.
Construction of Footpath and Cycle Tracks on Feeder Roads of BRTS System, Pune Value of the works INR 1170 million (EUR 19.50 million) Realization Date Ongoing Client Pune Municipal Corporation, Pune Site Pune, India Scope of Work Concept and design
Project Management Consultancy
SKYWALKS
Skywalk way at Bandra station (West), Mumbai - SATIS Value of the works INR 280 million (EUR 4.30 million) Realization Date 2010 Client Mumbai Metropolitan Region Development Authority (MMRDA) Site Mumbai, India Scope of Work Detailed Project Report Proof Checking Project Management Consultancy
Skywalk way from Bandra station (E) to Kalanagar, Mumbai - SATIS
Value of the works INR 130 million (EUR 2.00 million) Realization Date 2008 Client Mumbai Metropolitan Region Development Authority (MMRDA) Site Mumbai, India Scope of Work Preliminary Design Pre and Post Tender Activities Techno feasibility study Project Management Consultancy
Skywalk way at Virar Station (E), Mumbai - SATIS Value of the works INR 111.37 million (EUR 1.71 million) Realization Date 2010 Client Mumbai Metropolitan Region Development Authority (MMRDA) Site Mumbai, India Scope of Work Architectural and Structural Design Project Management Consultancy
Skywalk way at Kandivali Station (E), Mumbai - SATIS Value of the works INR 307 million (EUR 5.2 million) Realization Date 2010 Client Maharashtra State Road Development Corporation Ltd. (MSRDC) Site Mumbai, India Scope of Work Design and detailed engineering Supervision of Work Project Management Consultancy
Skywalk at Grant Road (Nana Chowk) Mumbai Value of the works INR 504.6 million (EUR 7.76 million) Realization Date 2010 Client Maharashtra State Road Development Corporation Ltd. (MSRDC) Site Mumbai, India Scope of Work Detail Engineering Project Management Consultancy
RAILWAYS
Dedicated Freight Corridor from JNPT (CR) –(KM – 92) to Sachin (WR) – (KM – 252) Value of the works INR 61.03 million (EUR 0.93 million) Realization Date 2009 Client Dedicated Freight Corridor Corporation Of India Ltd. Site Central - Western, India Scope of Work Staking out alignment, Detail engineering construction survey Preparation of Land Plan Geotechnical investigation Preparation of schedule of quantities Preparation of Tender document
Supply and installation of tracks, signaling and Electrical works with the doubling of railway line from Panvel to Jasai, JNPT, Navi Mumbai (Kms 16.10) Value of the works INR 63 million (EUR 0.96 million) Realization Date 2007 Client Rail Vikas Nigam Limited. Site Navi Mumbai, Maharashtra Scope of Work Project Management Consultancy
Implementation of supply and installation of road bed, facilities, bridges, tracks, signaling and electrification with doubling of Mohol – Solapur - B.G. Line (Kms 33.16) Value of the works INR 3.5 million (EUR 0.05 million) Realization Date 2007 Client Rail Vikas Nigam Limited. Site Solapur, Maharashtra Scope of Work Project Management Consultancy
Construction of road bed, major and minor bridges, new line between Dankuni - Furfura Sharif (20 Km) on Howrah division of ER, West Bengal.
VALUE OF THE WORKS INR 14.10 million (EUR 0.22 million) Realization Date Ongoing Client Rail Vikas Nigam Limited. Site West Bengal, India Scope of Work Project Management Consultancy
Construction of road bed, major and minor bridges, signaling works with doubling of Hotgi – Gulbarga section (98 Km) part of Daund – Gulbarga doubling in Solapur division of CR, India.
Value of the works INR 54.65 million ( EUR 0.87 million) Realization Date Ongoing Client Rail Vikas Nigam Limited Site Solapur, India Scope of Work Project Management Consultancy
AIRPORTS
Construction of extension of additional taxi track and apron, Ojhar Airport, Nashik Value of the works INR 97.80 million (EUR 1.55 million) Realization Date 2010 Client Hindustan Aeronautics Limited Site Nasik, India Scope of Work Structural Design Project Management Consultancy
Construction of airport terminal building, Ojhar Airport, Nashik Value of the works INR 100 million (EUR 1.53 million) Client Hindustan Aeronautics Limited Site Nasik, India Scope of Work Concept, Design and PMC
UTILITIES
Project Implementation of 80 MLD Sewage Treatment Plant, Airoli, Navi Mumbai Value of the works INR 597.85 million (EUR 9.12 million) Realization Date 2009 Client Navi Mumbai Municipal Corporation Ltd. (NMMC) Site Navi Mumbai, India Scope of Work Concept and Design Project Management Consultancy
Project implementation of 100 MLD Sewage Treatment Plant, Nerul, Navi Mumbai Value of the works INR 699.90 million (EUR 9.18 million) Realization Date 2009 Client Navi Mumbai Municipal Corporation Ltd. Site Navi Mumbai, India Scope of Work Concept and Design Project Management Consultancy
Project Implementation of 100 MLD Sewage Treatment Plant, Vashi, Navi Mumbai Value of the works INR 699.33 million (EUR 10.72 million) Realization Date 2009 Client Navi Mumbai Municipal Corporation Ltd. Site Navi Mumbai, India Scope of Work Concept and Design Project Management Consultancy
ARCHITECTURE AND PLANNING
Construction of Engineering College for VIT, Wadala Value of the works INR 120 million (EUR 1.84 million) Realization Date 2005 Client Vidyalankar Dnyanpeeth Trust Site Mumbai, India Scope of Work Pretender Activity Structural Design Project Management Consultancy
Construction of Rajasthan Bhavan, Navi Mumbai
Value of the works INR 250 million (EUR 3.84 million) Realization Date Ongoing Project Client Rajasthan State Road Development & Construction Corporation Ltd. Site Navi Mumbai, India Scope of Work Detailed Project Report Project Management Consultancy
Construction of Building for Tuljapur development authority, Osmanabad Value of the works INR 148.20 million (EUR 2.28 million) Realization Date Ongoing Project Client Tuljapur Development Authority Site Tuljapur, Osmanabad, India Scope of Work Project Management Consultancy
Construction of Agro-Commercial mall, Mapusa sub-yard, Goa Value of the works INR 670 million (EUR 10.30 million) Client Goa State Agricultural Marketing Board Site Panaji, India Scope of Work Concept and Design Structural Design Project Management Consultancy
Construction of Pavana riverfront development for river Pavana, Pune Value of the works INR 60 million (EUR 0.95 million) Realization Date On going Project Client Pimpri Chinchwad Municipal Corporation, Pune Site Pune, Maharashtra, India Scope of Work Concept and Design Project Management Consultancy
Construction of riverfront development of Mandovi River, Goa Value of the works INR 60 million (EUR 0.95 million) Realization Date 2006 Client Goa State Infrastructure Development Corporation Ltd. Site Goa, India Scope of Work Design Project Management Consultancy
City beautification work, Pune Value of the works INR 50 million (EUR 0.76 million) Realization Date 2009 Client Pune Municipal Corporation, Pune Site Pune, Maharashtra, India Scope of Work Architectural Planning Designing Project Management Consultancy
S.N. BHOBE & ASSOCIATES Pvt. Ltd.
Our Presence Countrywide
CORPORATE OFFICE: MUMBAI
S. N. BHOBE & ASSOCIATES Pvt. Ltd.
4th Floor, Pudhari Bhavan,
Plot No. 29 to 30,36 & 37, Sector – 30 A, Near Sanpada Railway Station, Vashi , Navi Mumbai - 400 705
Tel . No. +91 22 41270037
Regional Offices Pune
#5, Chaitraban Complex, 1st Floor, Above Hotel Samrat,
Wakdewadi, Shivajinagar, Pune – 411 003 Tel No. +91 20 25540041 Fax No. +91 20 25540041 Emai l : pune@snbapl .com