Top Banner
发现SMR计划如何帮助房奴 现有还款 MORTGAGEONE 慧斩224个月(75.17%) 及MYR80,618.79利息(77.64%) SMRPLAN.COM 1 6 活动:网络研讨会 语言:中文 日期:6 th Mar 2014 星期:四 时间:12PM-1PM 地点:在线 费用:免费 赠品:免费SMR计划分析
41

SMR PLAN Case Study 6 (Mandarin)

Jul 14, 2015

Download

Economy & Finance

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SMR PLAN Case Study 6 (Mandarin)

发现SMR计划如何帮助房奴现有还款

MORTGAGEONE慧斩224个月(75.17%)

及MYR80,618.79利息(77.64%)

S M R P L A N . C O M 1

6

• 活动:网络研讨会• 语言:中文• 日期:6th Mar 2014• 星期:四

• 时间:12PM-1PM• 地点:在线• 费用:免费• 赠品:免费SMR计划分析

Page 2: SMR PLAN Case Study 6 (Mandarin)

纲要

S M R P L A N . C O M 2

1. 引言

2. SMR 计划过程

3. 问与答

4. 免费礼物

5. 总结

6

Page 3: SMR PLAN Case Study 6 (Mandarin)

引言

S M R P L A N . C O M 3

您是否知道“如果您没有一个跳出债圈计划,那您必定被他人的跳入债圈计划影响”?

完成此网络研讨会后 〉〉〉

Page 4: SMR PLAN Case Study 6 (Mandarin)

跳入债圈计划

S M R P L A N . C O M 4

您会发现下图显示一个跳入债圈计划的问题。

另外〉〉〉

项目 事项 原本 当前 问题

1 剩余时间

2 总还款

3 总利息

298个月 298个月 0个月

RM242,366.38 RM242,366.38 RM0.00

RM103,839.40 RM103,839.40 RM0.00

Page 5: SMR PLAN Case Study 6 (Mandarin)

跳出债圈计划

S M R P L A N . C O M 5

您也会发现下图显示一个跳出债圈计划的方案。

好消息〉〉〉

项目

事项 月总

还款 利息 本金

1 银行

2 SMR75

3 节省

298 RM242,366.38 RM103,839.40 RM138,526.98

74 RM161,747.59 RM23,220.61 RM138,526.98

224 RM80,618.79

75.17% 77.64%

Page 6: SMR PLAN Case Study 6 (Mandarin)

SMR计划

S M R P L A N . C O M 6

是一个跳出债圈计划 解决一个跳入债圈计划

并帮助世界房奴跳出债圈

的方案 的问题

免费礼物〉〉〉

Page 7: SMR PLAN Case Study 6 (Mandarin)

免费礼物

S M R P L A N . C O M 7

提问〉〉〉

好消息!为了感谢您注册此网络研讨会,您将得到高达三份免费SMR计划分析的免费礼物,请索取如下:

请检阅您的电子邮件有关索取免费礼物的步骤。

1 •社交网络

2 •注册免费会员

3 •准备和扫描贷款文件

4 •上传贷款文件

5 •免费SMR计划分析

Page 8: SMR PLAN Case Study 6 (Mandarin)

提问〉〉〉

S M R P L A N . C O M 8

• 如果您有任何问题,请点 击 “ Ask aQuestion”提问并在网络研讨会进行时随时开 始 聊 天 "StartChat",我们会在此网络研讨会结束前回答每一个问题。

• 如果我们不能此网络研讨会在回答你的问题,我们将会通过电子邮件回答。 〈〈〈纲要

Page 9: SMR PLAN Case Study 6 (Mandarin)

在此个案中,我们将告诉您SMR计划过程如何帮助房奴慧斩马来西亚渣打銀行现有还款MortgageOne224个月(75.17%)及MYR80,618.79利息(77.64%).

S M R P L A N . C O M 9

SMR计划过程

分析 申请 合约

付款文件与资料SMR计划

执行附加

SMR计划

让我们逐步的与您分享。

Page 10: SMR PLAN Case Study 6 (Mandarin)

分析文件带来

1. 银行协议书:14 August 2008, 15 August 2008, 16 August 2008, 9 October 2008

2. 银行首期信日期: 30th November 2008

3. 银行最新结单:31st December 2013

S M R P L A N . C O M 10

SMR分析〉〉〉

Page 11: SMR PLAN Case Study 6 (Mandarin)

SMR分析

S M R P L A N . C O M 11SMR拟定》》》

项目 事项 总

A原本

贷款金额

B 期间

C 已付期数

D 剩余期数(B – C)

E 贷款余额

F 当前基贷率 (BLR)

G 利率

H 每月还款

I 目前贷款期限

J 期数调整(I - D)

K 总还款(H x I)

L 总利息(K – E)

RM159,032.95

360 个月

62个月

298个月

RM138,526.98

6.60%

BLR – 2.05% 4.55%

RM813.31

298个月

延长 0个月

RM242,366.38

RM103,839.40

Page 12: SMR PLAN Case Study 6 (Mandarin)

SMR 拟定

S M R P L A N . C O M 12〈〈〈SMR计划过程

配套 节省 时间 利息 费用 收费 租金、现金回报

SMR25 25%

SMR50 50%

SMR75 75%

76个月

150个月

224个月

RM25,959.85

RM51,919.70

RM77,879.55

1%

1.5%

2%

RM1,385.2

7

RM2,077.9

0

RM2,770.5

4

RM813.31

RM60,998.25

RM121,996.50

RM182,181.44

申请人选择SMR75配套慧斩75%时间及75%利息。

Page 13: SMR PLAN Case Study 6 (Mandarin)

申请

注册SMRPlan.com

免费会员

提交申请

SMR计划确认收到申请

4th December 2013

14th December 201320th December 2013

S M R P L A N . C O M 13〈〈〈SMR计划过程

Page 14: SMR PLAN Case Study 6 (Mandarin)

合约

批准 执行

21st December 2013 26th December 2013

S M R P L A N . C O M 14〈〈〈SMR计划过程

Page 15: SMR PLAN Case Study 6 (Mandarin)

付款

26th December 2013

SMR 计划费用

服务税

S M R P L A N . C O M 15〈〈〈SMR计划过程

Page 16: SMR PLAN Case Study 6 (Mandarin)

文件与资料

准备

查询收到

30th December 2013

31st December 2013

11th February 2014

S M R P L A N . C O M 16〈〈〈SMR计划过程

Page 17: SMR PLAN Case Study 6 (Mandarin)

SMR计划12th February 2014

S M R P L A N . C O M 17

SMR

分析

SMR

拟定

SMR

摊还表

SMR

执行

Page 18: SMR PLAN Case Study 6 (Mandarin)

SMR分析

1. 物业资料

2. 贷方资料

3. 原本贷款资料

4. 当前贷款资料

5. 您有什么问题吗?

6. 您的问题根本原因是什么?

S M R P L A N . C O M 18

Page 19: SMR PLAN Case Study 6 (Mandarin)

1. 物业资料

1. 买卖合约日期: 14-Feb-2001

2. 物业: 双层排屋

3. 房屋计划:在施工单位

4. 购买价格: RM208,000.00

5. 首期: RM56,000.00

S M R P L A N . C O M 19

Page 20: SMR PLAN Case Study 6 (Mandarin)

2. 贷方资料

1. 银行金融机构:商业银行

2. 贷方: Standard Chartered Bank Malaysia Berhad

S M R P L A N . C O M 20

Page 21: SMR PLAN Case Study 6 (Mandarin)

3. 原本贷款资料

1. 贷款状况: 现有还款

2. 贷款类型: MortgageOne

3. 银行协议书日期:15 August 2008

4. 贷款合约日期: 13-Nov-2008

5. 自动转帐帐户: 有

S M R P L A N . C O M 21深入分析〉〉〉

Page 22: SMR PLAN Case Study 6 (Mandarin)

S M R P L A N . C O M 22S M R P L A N . C O M

3. 原本贷款资料

A. Loan Principal

Amount: RM156,000.00

MRTA: RM3,032.95

Legal Fee: RM0.00

Valuation Fee: RM0.00

Others: RM0.00

Total: RM159,032.95

C. Mortgage Type: Adjustable Rates Mortgage

Re

pa

yme

nt

B. Period: 360 Months

D. Basis Year: 365 Days

G. Exact Day: Yes

E. Compounded Interest: Daily

F. Payment Frequency:

Monthly

H. Base Lending Rate: 6.75%

I. Number of Tier: 4

J. Interest Rate:

Tier 1: 12 Months BLR - 1.75% = 5.00%

Tier 2: 12 Months BLR - 1.75% = 5.00%

Tier 3: 36 Months BLR - 1.70% = 5.05%

Tier 4: 300 Months BLR - 2.05% = 4.70%

K. Repayment :

Tier Months Monthly

1 12 RM853.72

2 12 RM853.69

3 36 RM858.32

4 300 RM828.72

L. Loan Disbursement:

First Release: 31 October 2008

Final Release: 05 January 2009

M. 1st Repayment Date: 30 November 2008

N. Total

Repayment:

RM299,764.44

Total Interest

RM140,731.49

Total Principal

RM159,032.95

当前贷款资料分析如何?〉〉〉

Year 1: the date of the first

disbursement until

30/11/2009. Year 2:

1/12/2009 until

30/11/2009. Year 3 to

Year 5: 1/12/2010 until

30/11/2013.

Subsequent years:

1/12/2013 and

thereafter.

Interest on the facility (ies)

(other than the overdraft

facility) shall be calculated on

a daily basis and capitalized

monthly. Until commencement

of the instalment repayment,

interest shall be paid monthly

in arrears commencing from

the corresponding date falling

one month after the first

drawndown date.

Page 23: SMR PLAN Case Study 6 (Mandarin)

4. 当前贷款资料

S M R P L A N . C O M 23S M R P L A N . C O M您有什么问题吗?〉〉〉

B. No. of

Installments

Paid:

62 Months

C. Number of Installments Remaining: 298 Months

D. Outstanding Balance: RM138,526.98

E. Current BLR: 6.60%

J. No. of

Installments

Extended

Re

pa

yme

nt

B. Period: 360 Months 0 Months

A. As at: 31 December 2013

F. Number of Tier Remaining: 1

G. Interest Rate: BLR – 2.05% = 4.55%

H. Repayment:

RM813.31

I. Current Loan Tenure:

298 Months

K. Total

Repayment:

RM242,366.38 Total Interest

RM103,839.40

Total Principal

RM138,526.98

Total Repayment Paid:

RM52,805.88

Total Principal Paid:

RM20,505.97

Total Interest Paid:

RM32,299.91

Page 24: SMR PLAN Case Study 6 (Mandarin)

5. 您有什么问题吗?

S M R P L A N . C O M 24您的问题根本原因是什么?

项目 事项 原本 当前 问题

1 剩余时间

2 总还款

3 总利息

298个月 298个月 0个月

RM242,366.38 RM242,366.38 RM0.00

RM103,839.40 RM103,839.40 RM0.00

Page 25: SMR PLAN Case Study 6 (Mandarin)

6. 您的问题根本原因是什么?

S M R P L A N . C O M 25

Current Loan

Tenure

298 Months

&

Total Interest

RM103,839.40

问题

根本原因

基贷率变动

MortgageOne

没有附加SMR

摊还表

统一结单Consolidated

Statement

Page 26: SMR PLAN Case Study 6 (Mandarin)

基贷率变动

S M R P L A N . C O M 26

6.75%

6.50%

5.95%

5.55%

5.80%

6.05%

6.30%

6.60%

5.50%

5.70%

5.90%

6.10%

6.30%

6.50%

6.70%

2007 2008 2009 2010 2011

Page 27: SMR PLAN Case Study 6 (Mandarin)

统一结单Consolidated Statement

S M R P L A N . C O M 27

Loan Account

31 Dec 2013

Outstanding Loan Amount

RM138,526.98

Current Account

15 Jan 2014

Available Credit For Withdrawal

Cash

RM40,855.71

Consolidated Statement

15 Jan 2014

Loan Account Number: xxx-x-xxxxxxx-x

RM Balance

97,641.27

Interest Saved

RM6,478.06

Monthly Installment @

Next Due Date

RM813.03

31 Jan 2014

Interest Rate %

4.5500%

−Total Loan Limit

Available

(redemption

reference) at last

due date:

RM145,005.04

Page 28: SMR PLAN Case Study 6 (Mandarin)

SMR拟定

1. SMR目标

2. SMR方法

S M R P L A N . C O M 28

Page 29: SMR PLAN Case Study 6 (Mandarin)

1. SMR目标

S M R P L A N . C O M 29

B. No. of

Installments

Paid:

62 Months

Number of Installments Remaining: 298 Months

J. No. of

Installments

Extended

Re

pa

yme

nt

B. Period: 360 Months 0 Months

Current Loan Tenure: 298 Months

Total Interest

RM103,839.40

Total Principal

RM138,526.98

配套 节省 个月 利息

SMR75 75% 224 RM77,879.55

如何实现?〉〉〉

Page 30: SMR PLAN Case Study 6 (Mandarin)

2. SMR方法

S M R P L A N . C O M 30

B. No. of

Installments

Paid:

62 Months

J. No. of

Installments

Extended

Re

pa

yme

nt

B. Period: 360 Months 0 Months

Total Interest

RM103,839.40

Total Principal

RM138,526.98

配套 节省 个月 利息

SMR75 75% 224 RM77,879.55

Total

Interest

RM25,959.85

Total

Principal

RM138,526.98Save

75% Time

&

75% Interest

With

SMR Schedule

>>>

Number of Installments Remaining: 298 Months

Current Loan Tenure: 298 Months

Page 31: SMR PLAN Case Study 6 (Mandarin)

SMR摊还表

S M R P L A N . C O M 31

Page 32: SMR PLAN Case Study 6 (Mandarin)

SMR摊还表

一份SMR摊还表由2014年1月31日起生效实施。

申请人须在“备注”栏跟进,审查和反馈来控制SMR摊还表。

S M R P L A N . C O M 32

银行和SMR摊还表的差异。

递增还款计划〉〉〉

项目

事项 月总

还款 利息 本金

1 银行

2 SMR75

3 节省

298 RM242,366.38 RM103,839.40 RM138,526.98

74 RM161,747.59 RM23,220.61 RM138,526.98

224 RM80,618.79

75.17% 77.64%

Page 33: SMR PLAN Case Study 6 (Mandarin)

SMR摊还表

在此SMR摊还表,还款将每月递增慧斩马来西亚渣打銀行现有还款MortgageOne224个月(75.17%)及MYR80,618.79利息(77.64%).

S M R P L A N . C O M 33如何执行?〉〉〉

-

500.00

1,000.00

1,500.00

2,000.00

2,500.00

3,000.00

3,500.00

1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 73

Page 34: SMR PLAN Case Study 6 (Mandarin)

SMR执行

S M R P L A N . C O M 34

31st January 2014

起生效实施

Page 35: SMR PLAN Case Study 6 (Mandarin)

执行

申请者必须严格按照本公司SMR计划提供的还款到期日或还款到期日的三个工作天内及时支付准确还款金额。

申请者必须严格遵守还款到期日以现金或支票支付还款至贷款帐号。

S M R P L A N . C O M 35更多〉〉〉

Page 36: SMR PLAN Case Study 6 (Mandarin)

执行

未偿还贷方之贷款余额不得包括杂项的费用如保险费,罚款,滞纳金,行政收费和律师费。

S M R P L A N . C O M 36

更多〉〉〉

Page 37: SMR PLAN Case Study 6 (Mandarin)

执行

SMR计划将自动被终止及无效,如果你自己通过以下其中的一项行动提前终止SMR计划。

1. 关闭处置该物业,或2. 转移物业给任何第三方,或3. 再融资现有贷款融资,或4. 向贷方早赎回贷款融资,或5. 拖欠贷款融资的还款,或6. 从事某种情况或行为而导致贷方收回或终止贷款融资

S M R P L A N . C O M 37如何监管? 〉〉〉

Page 38: SMR PLAN Case Study 6 (Mandarin)

附加SMR计划

S M R P L A N . C O M 38

问与答〉〉〉

Applicant

Lender

Central Bank

基贷率Base Lending Rate

调利率Adjusted

Interest

Rate

低利率Lower

Interest

Rate

利率变动 Variation of Interest Rate (

在利率变动(VIR)的情况,由于改变

• 中 央 银 行 基 贷 率(BLR)或

• 贷方调利率(AIR)或

• 您 申 请 低 利 率(LIR),

申请者可以申请附加SMR计划。

Page 39: SMR PLAN Case Study 6 (Mandarin)

问与答

S M R P L A N . C O M 39

好,现在是问与答。

• 如果您有任何问题,请点 击 “ Ask aQuestion”提问并现在 开 始 聊 天 “StartChat”,我们现在会回答每一个问题。

• 如果我们不能此网络研讨会在回答你的问题,我们将会通过电子邮件回答。

〈〈〈纲要

Page 40: SMR PLAN Case Study 6 (Mandarin)

免费礼物

S M R P L A N . C O M 40

好消息!为了感谢您注册此网络研讨会,您将得到高达三份免费SMR计划分析的免费礼物,请索取如下:

请检阅您的电子邮件有关索取免费礼物的步骤。

1 •社交网络

2 •注册免费会员

3 •准备和扫描贷款文件

4 •上传贷款文件

5 •免费SMR计划分析

Page 41: SMR PLAN Case Study 6 (Mandarin)

总结

S M R P L A N . C O M 41

1. 首先,感谢您加入此SMR计划个案网络研讨会。

2. 其次,请尽快或在两周内上传您的免费SMR计划分析贷款文件,否则......

3. 第三,我会通过电子邮件跟进您。4. 第四,这个免费礼物也开放给那

些注册并收看重播网络研讨会的产业主及借款人。

5. 最后,希望你喜欢这网络研讨会,我们今天的网络研讨会就此结束!